REHABILITATION AND UPGRADATION OF QADIRABAD BARRAGE

Factors Used (PKR)


Section Ref. Estimated Cost 348,158,388
Bid Sec 2 % (PKR) 8,703,960

T=1 for Construction


AACT (2*V/T) 2 period less than 12 696,316,776
3.2 months
3.1 Cash Flow (3*V/T) 3 T= 8 months 130,559,395.50
2.4.1 Exp-1. (5 Years) * 70% 80% 278,526,710
Completion Time 240 Days
Limit / Category -
3.1- Audited statements Last 03 years