1. This item shall consist of clearing, with the material so disturbed to manner approved by the Engineer.

grubbing, removing and disposing avoid _____. True or False?


all vegetation and debris as
designated in the Contract, except 15. Each layer shall be _____ to fill 29. Unless otherwise directed, the
those objects that are designated all voids. substructures of existing
to remain in place or are to be structures shall be removed down
removed in consonance with other 16. The top layer of material buried to the natural stream bottom and
provisions of this Specification. shall be covered with _____ of those parts outside of the stream
The work shall also include the earth or other approved material shall be removed down to at least
preservation from injury or and shall be graded, shaped and _____below natural ground
defacement of all objects compacted to present a pleasing surface.
designated to remain. appearance.
30. Steel bridges and wood bridges
2. The _____ will establish the limits 17. The disposal areas shall be when specified to be salvaged
of work and designate all trees, __a)___,__b)___ and ___c)__ at shall be _____.
shrubs, plants and other things to the Contractor’s expense.
remain. 31. Steel members shall be _____
18. Woody material may be disposed unless such match marking is
3. The _____ shall preserve all off by _____. waived by the Engineer.
objects designated to remain.
19. The _____ may be used for 32. All concrete pavement, base
4. Paint required for cut or scarred mulch, slope erosion control or course, sidewalks, curbs, gutters,
surface of trees or shrubs selected may be uniformly spread over etc., designated for removal, shall
for retention shall be an _____ selected areas as directed by the be (1)______.
prepared especially for tree Engineer.
surgery. 33. All concrete pavement, base
20. Wood chips used as mulch for course, sidewalks, curbs, gutters,
5. Clearing shall extend __a)___ or slope erosion control shall have a
etc., designated for removal, shall
__b)___ as the case maybe for the maximum thickness of
entire length of the project unless ___a)__and faces not exceeding be _____ in any dimension and
otherwise shown on the plans or __b)___on any individual surface stockpiled at designated locations
as directed by the Engineer and area. on the project for use by the
provided it is within the right of Government.
way limits of the project, with the 21. Wood chips not designated for
exception of trees under the use under other sections shall be 34. There will be no separate payment
jurisdiction of the __c)___ spread over the designated areas for excavating for removal of
in layers not to exceed _____loose structures and obstructions or for
6. Removal of undisturbed stumps thickness. backfilling and compacting the
and roots and nonperishable solid remaining cavity. True or false?
objects with a minimum depth of 22. Diseased trees shall be _____ as
_____ below subgrade or slope of directed by the Engineer. 35. When the Contract stipulates that
embankment will not be required. payment will be made for removal
23. All merchantable timber in the of obstructions on lump-sum
7. In areas outside of the grading clearing area which has not been basis, the pay item will include all
limits of cut and embankment removed from the right of way structures and obstructions
areas, stumps and nonperishable prior to the beginning of encountered within the roadway.
solid objects shall be cut off not construction shall _____, unless True or false?
more than _____ above the otherwise provided.
ground line or low water level. 36. Where the contract stipulates that
24. Branches of trees extending over payment will be made for the
8. In areas to be rounded at the top the roadbed shall be trimmed to removal of specific items on a unit
of cut slopes, stumps shall be give a clear height of _____above basis, measurement will be made
_____ with or below the surface the roadbed surface. by the unit stipulated in the
of the final slope line. Contract. True or false?
25. The diameter of trees will be
9. Grubbing of pits, channel measured at a height of __a)___ 37. This Item shall consist of
changes and ditches will be above the ground. Trees less than roadway and drainage and borrow
required only to the _____. ___b)__in diameter will not be excavation and the disposal of
measured for payment. material in accordance with this
10. In areas covered by Specification and in conformity
cogon/talahib, wild grass and 26. This Item shall consist of the with the lines, grades and
other vegetations, top soil shall be removal wholly or in part, and dimensions shown on the Plans or
cut to a maximum depth of _____ satisfactory disposal of all established by the Engineer.
or as designated by the Engineer, buildings, fences, structures, old
and disposed outside the clearing pavements, abandoned pipe lines, 38. _____ shall consist of the
and grubbing limits as indicated in and any other obstructions which excavation and disposal of all
the typical roadway section. are not designated or permitted to materials regardless of its nature,
remain, except for the obstructions not classified and included in the
11. Except in areas to be excavated, to be removed and disposed off Bill of Quantities under other pay
stump holes and other holes from under other items in the Contract. items.
which obstructions are removed It shall also include the salvaging
shall be backfilled with _____. of designated materials and 39. _____ shall consist of igneous,
backfilling the resulting trenches, sedimentary and metamorphic
12. If __a)___ is burned, it shall be holes, and pits. rock which cannot be excavated
burned under the constant care of without blasting or the use of
___b)__ at such times and in such 27. All existing bridges, culverts and rippers, and all boulders or other
a manner that the surrounding other drainage structures in use by detached stones each having a
vegetation, other adjacent traffic shall not be removed until volume of 1 cubic meter or more
property, or anything designated satisfactory arrangements have as determined by physical
to remain on the right of way will been made to accommodate measurements or visually by the
not be __c)___. traffic. True or False? Engineer.
13 . If permitted, burning shall be 28. All sections of structures removed 40. _____ shall consist of all
done in accordance with __a)___, which are not designated for excavation not included in the Bill
__b)___, and __c)___. stockpiling or re-laying shall of Quantities under “rock
become the property of the excavation” or other pay items.
14. If disposal is by burying, the Government and be removed from
debris shall be placed in layers the project or disposed off in a
41. _____ shall consist of the removal 56. Unless otherwise provided in the not otherwise provided for in the
and disposal of deposits of Contract, rock excavation which Specifications. Except as
saturated or unsaturated mixtures requires drilling and shooting otherwise provided for pipe
of soils and organic matter not shall be _____. culverts, the backfilling of
suitable for foundation material completed structures and the
regardless of moisture content. 57. Presplitting to obtain faces in the disposal of all excavated surplus
rock and shale formations shall be materials, shall be in accordance
42. _____ will consist of material performed by: with these Specifications and in
obtained from sources designated reasonably close conformity with
on the Plans or in the Special 58. Controlled blasting shall begin the Plans or as established by the
Provisions. with a _____ approved by the Engineer.
Engineer.
43. _____ will consist of material - This Item shall include necessary
obtained from sources provided 59. The Engineer may order _____ diverting of live streams, bailing,
by the Contractor. when he determines that the pumping, draining, sheeting,
materials encountered have bracing, and the necessary
44. When there is __a)___ and that become unsuitable for being construction of cribs and
shown on the Plans, a __b)___ presplit. cofferdams, and furnishing the
referred to the datum plane used materials therefore, and the
in the approved Plan shall be 60. The holes shall be charged with subsequent removal of cribs and
undertaken by the Contractor explosives of the size, kind, cofferdams and the placing of all
under the control of the Engineer strength, and at the spacing necessary backfill.
to serve as basis for the suitable for the formations being
computation of the actual volume presplit, and with stemming - This Item shall also include the
of the excavated materials. material which passes a furnishing and placing of
_____standard sieve and which approved foundation fill material
45. All excavations shall be finished has the qualities for proper to replace unsuitable material
to _____. confinement of the explosives. encountered below the foundation
elevation of structures.
46. No materials shall be wasted 61. The finished presplit slope shall
without authority of the Engineer. be reasonably _____. Variance 69. When the footing is to rest on
True or False? from the true plane of the material other than rock, _____
excavated back slope shall not shall not be made until just before
47. _____ shall be conducted so that exceed _____; however, localized the footing is to be placed.
material outside of the limits of irregularities or surface variations
slopes will not be disturbed. that do not constitute a safety 70. When the foundation material is
hazard or an impairment to soft or mucky or otherwise
48. Where provided for on the Plans drainage courses or facilities will unsuitable, as determined by the
or in the Special Provisions, be permitted. Engineer, the Contractor shall
suitable topsoil encountered in remove the unsuitable material
excavation and on areas where 62. A maximum offset of _____will and backfill with approved
embankment is to be placed shall be permitted for a construction granular material. This foundation
be removed to such extent and to working bench at the bottom of fill shall be placed and compacted
such depth as the Engineer may each lift for use in drilling the next in _____layers up to the
direct. True or False? lower presplitting pattern. foundation elevation.

49. All suitable material removed 63. _____ shall be formed by plowing 71. When foundation piles are used,
from the excavation shall be used a continuous furrow along the line the excavation of each pit shall be
in the formation of the staked by the Engineer. _____ and any placing of
embankment, subgrade, shoulders, foundation fill shall be done after
slopes, bedding, and backfill for 64. The ditches shall be cleaned out the piles are driven.
structures, and for other purposes by hand shovel work, by ditcher,
shown on the Plans or as directed. or by some other suitable method, 72. Where rock, hardpan, or other
True or False? throwing all loose materials on the unyielding material is
downhill side so that the bottom encountered, it shall be removed
50. The Engineer will designate as of the finished ditch shall be below the foundation grade for a
_____ those soils that cannot be approximately _____below the depth of at least __a)___ of fill
properly compacted in crest of the loose material piled on over the top of pipe, whichever is
embankments. the downhill side. greater, but not to exceed __b)___
of the pipe.
51. Only _____ shall be used in the 65. Rock shall be excavated to a depth
construction of embankments and of _____below subgrade within 73. The width of the excavation shall
backfills. the limits of the roadbed, and the be at least _____greater than the
excavation backfilled with horizontal outside diameter of the
52. _____ shall not be placed until material designated on the Plans pipe.
after the readily accessible or approved by the Engineer and
roadway excavation has been compacted to the required density. 74. The excavation below grade shall
placed in the fill, unless otherwise be backfilled with selected fine
permitted or directed by the 66. Material below subgrade, other compressible material, such as
Engineer. than solid rock shall be silty clay or loam, and lightly
thoroughly scarified to a depth of compacted in layers not over
53. If the Contractor places more _____and the moisture content _____in uncompacted depth to
borrow than is required and increased or reduced, as form a uniform but yielding
thereby causes a waste of necessary, to bring the material foundation
excavation, the amount of such throughout this 150 mm layer to
waste will be deducted from the the moisture content suitable for 75. Where a firm foundation is not
_____. maximum compaction. encountered at the grade
established, due to soft, spongy, or
54. Excavation areas and borrow pits 67. The material used for backfilling other unstable soil, such unstable
may be _____ before excavating up to the ground line or water soil under the pipe and for a width
the material. level, whichever is higher, shall be of at least _____ on each side of
_____ selected from the roadway the pipe shall be removed to the
55. The Contractor shall provide excavation, if available. depth directed by the Engineer
drilling equipment capable of and replaced with approved
suitably checking the moisture 68. This Item shall consist of the granular foundation fill material
penetration to the full depth of the necessary excavation for properly compacted to provide
excavation. True or False? foundation of bridges, culverts, adequate support for the pipe,
underdrains, and other structures unless other special construction
methods are called for on the elevation on both sides of an -Soils with very low natural
Plans. abutment, pier, or wall. density, __f)___.

76. The foundation surface shall 87. If conditions require placing -Soils that cannot be properly
provide a firm foundation of backfill or embankment compacted as determined by the
uniform density throughout the appreciably higher on one side Engineer.
length of the culvert and, if than on the opposite side, the
directed by the Engineer, shall be additional material on the higher
cambered in the direction parallel side shall not be placed until the 98. _____ shall consist of
to the pipe centerline. True or masonry has been in place for constructing roadway
False? _____, or until tests made by the embankments, including
laboratory under the supervision preparation of the areas upon
77. _____ shall be used wherever of the Engineer establishes that which they are to be placed; the
water-bearing strata are the masonry has attained construction of dikes within or
encountered above the elevation sufficient strength to withstand adjacent to the roadway; the
of the bottom of the excavation. any pressure created by the placing and compacting of
methods used and materials approved material within roadway
78. When conditions are encountered placed without damage or strain areas where unsuitable material
which, as determined by the beyond a safe factor. has been removed; and the placing
Engineer, render it impracticable and compacting of embankment
to dewater the foundation before 88. _____ shall not be placed behind material in holes, pits, and other
placing the footing, the Engineer the walls of concrete culverts or depressions within the roadway
may require the _____ of such abutments or rigid frame area.
dimensions as he may consider structures until the top slab is
necessary, and of such thickness placed and cured. 99. Where shown on the Plans or
as to resist any possible uplift. directed by the Engineer, the
The concrete for such seal shall be 89. Backfill and embankment behind surface of the existing ground
placed as shown on the Plans or abutments held at the top by the shall be compacted to a depth of
directed by the Engineer. superstructure, and behind the _____and to the specified
sidewalls of culverts, shall be requirements of this Item.
79. When weighted cribs are _____.
employed and the mass is utilized 100. Where provided on the Plans and
to overcome partially the 90. The placing of embankment and Bill of Quantities the top portions
hydrostatic pressure acting against the benching of slopes shall of the roadbed in both cuts and
the bottom of the foundation seal, continue in such a manner that at embankments, as indicated, shall
special anchorage such as _____ all times there will be horizontal consist of _____ from
shall be provided to transfer the berm of thoroughly compacted excavations.
entire mass of the crib to the material for a distance at least
foundation seal. equal to the height of the
abutment or wall to the backfilled
80. When a foundation seal is placed against except insofar as
under water, the cofferdams shall undisturbed material obtrudes
be _____ as directed. upon the area. True or False?

81. _____ shall be constructed so as 91. _____ shall be provided for a


to protect green concrete against drainage filter at weepholes as
damage from sudden rising of the shown on the Plans.
stream and to prevent damage to
the foundation by erosion. 92. This Item shall consist of the
construction of embankment in
82. No _____ shall be left in accordance with this Specification
cofferdams or cribs in such a way and in conformity with the lines,
as to extend into substructure grades and dimensions shown on
masonry, without written the Plans or established by the
permission from the Engineer. Engineer.

83. Any __a)___ that may be 93. Material which is acceptable in


permitted from the interior of any accordance with the Contract and
foundation enclosure shall be which can be compacted in the
done in such a manner as to manner specified in this Item. It
preclude the possibility of any can be common material or rock.
portion of the concrete material
being carried away. Any pumping 94. What is the required particle size
required during the placing of for selected borrow for topping
concrete, or for a period of at least under Item 104 (embankment)?
__b)__ thereafter, shall be done
from a suitable sump located 95. P.I. requirement for Item 104
outside the concrete forms. (selected common borrow) is
what?
84. _____ shall not commence until
the seal has set sufficiently to 96. LL requirements for Item 104
withstand the hydrostatic pressure. (selected common borrow) are
what?
85. Excavated areas around structures
shall be backfilled with __a)___ 97. - __a)___Materials containing
approved by the Engineer and detrimental quantities of organic
placed in horizontal layers not materials, such as grass, roots and
over __b)___in thickness, to the sewerage.
level of the original ground
surface. Each layer shall be - ___b)__ such as peat and muck
moistened or dried as required and
thoroughly compacted with -Soils with liquid limit __c)___
__c)___. and/or plasticity index __d)___.

86. In placing backfills or -Soils with a natural water content


embankment, the material shall be __e)___.
placed _____ in so far as possible
to approximately the same