49. All suitable material removed 63. _____ shall be formed by plowing 71. When foundation piles are used,
from the excavation shall be used a continuous furrow along the line the excavation of each pit shall be
in the formation of the staked by the Engineer. _____ and any placing of
embankment, subgrade, shoulders, foundation fill shall be done after
slopes, bedding, and backfill for 64. The ditches shall be cleaned out the piles are driven.
structures, and for other purposes by hand shovel work, by ditcher,
shown on the Plans or as directed. or by some other suitable method, 72. Where rock, hardpan, or other
True or False? throwing all loose materials on the unyielding material is
downhill side so that the bottom encountered, it shall be removed
50. The Engineer will designate as of the finished ditch shall be below the foundation grade for a
_____ those soils that cannot be approximately _____below the depth of at least __a)___ of fill
properly compacted in crest of the loose material piled on over the top of pipe, whichever is
embankments. the downhill side. greater, but not to exceed __b)___
of the pipe.
51. Only _____ shall be used in the 65. Rock shall be excavated to a depth
construction of embankments and of _____below subgrade within 73. The width of the excavation shall
backfills. the limits of the roadbed, and the be at least _____greater than the
excavation backfilled with horizontal outside diameter of the
52. _____ shall not be placed until material designated on the Plans pipe.
after the readily accessible or approved by the Engineer and
roadway excavation has been compacted to the required density. 74. The excavation below grade shall
placed in the fill, unless otherwise be backfilled with selected fine
permitted or directed by the 66. Material below subgrade, other compressible material, such as
Engineer. than solid rock shall be silty clay or loam, and lightly
thoroughly scarified to a depth of compacted in layers not over
53. If the Contractor places more _____and the moisture content _____in uncompacted depth to
borrow than is required and increased or reduced, as form a uniform but yielding
thereby causes a waste of necessary, to bring the material foundation
excavation, the amount of such throughout this 150 mm layer to
waste will be deducted from the the moisture content suitable for 75. Where a firm foundation is not
_____. maximum compaction. encountered at the grade
established, due to soft, spongy, or
54. Excavation areas and borrow pits 67. The material used for backfilling other unstable soil, such unstable
may be _____ before excavating up to the ground line or water soil under the pipe and for a width
the material. level, whichever is higher, shall be of at least _____ on each side of
_____ selected from the roadway the pipe shall be removed to the
55. The Contractor shall provide excavation, if available. depth directed by the Engineer
drilling equipment capable of and replaced with approved
suitably checking the moisture 68. This Item shall consist of the granular foundation fill material
penetration to the full depth of the necessary excavation for properly compacted to provide
excavation. True or False? foundation of bridges, culverts, adequate support for the pipe,
underdrains, and other structures unless other special construction
methods are called for on the elevation on both sides of an -Soils with very low natural
Plans. abutment, pier, or wall. density, __f)___.
76. The foundation surface shall 87. If conditions require placing -Soils that cannot be properly
provide a firm foundation of backfill or embankment compacted as determined by the
uniform density throughout the appreciably higher on one side Engineer.
length of the culvert and, if than on the opposite side, the
directed by the Engineer, shall be additional material on the higher
cambered in the direction parallel side shall not be placed until the 98. _____ shall consist of
to the pipe centerline. True or masonry has been in place for constructing roadway
False? _____, or until tests made by the embankments, including
laboratory under the supervision preparation of the areas upon
77. _____ shall be used wherever of the Engineer establishes that which they are to be placed; the
water-bearing strata are the masonry has attained construction of dikes within or
encountered above the elevation sufficient strength to withstand adjacent to the roadway; the
of the bottom of the excavation. any pressure created by the placing and compacting of
methods used and materials approved material within roadway
78. When conditions are encountered placed without damage or strain areas where unsuitable material
which, as determined by the beyond a safe factor. has been removed; and the placing
Engineer, render it impracticable and compacting of embankment
to dewater the foundation before 88. _____ shall not be placed behind material in holes, pits, and other
placing the footing, the Engineer the walls of concrete culverts or depressions within the roadway
may require the _____ of such abutments or rigid frame area.
dimensions as he may consider structures until the top slab is
necessary, and of such thickness placed and cured. 99. Where shown on the Plans or
as to resist any possible uplift. directed by the Engineer, the
The concrete for such seal shall be 89. Backfill and embankment behind surface of the existing ground
placed as shown on the Plans or abutments held at the top by the shall be compacted to a depth of
directed by the Engineer. superstructure, and behind the _____and to the specified
sidewalls of culverts, shall be requirements of this Item.
79. When weighted cribs are _____.
employed and the mass is utilized 100. Where provided on the Plans and
to overcome partially the 90. The placing of embankment and Bill of Quantities the top portions
hydrostatic pressure acting against the benching of slopes shall of the roadbed in both cuts and
the bottom of the foundation seal, continue in such a manner that at embankments, as indicated, shall
special anchorage such as _____ all times there will be horizontal consist of _____ from
shall be provided to transfer the berm of thoroughly compacted excavations.
entire mass of the crib to the material for a distance at least
foundation seal. equal to the height of the
abutment or wall to the backfilled
80. When a foundation seal is placed against except insofar as
under water, the cofferdams shall undisturbed material obtrudes
be _____ as directed. upon the area. True or False?