You are on page 1of 3

201.

The completed cement treated designed level and transverse bituminous surface course in
base shall be cured with a _____ slopes shown on the Plans. The accordance with the Plans and
applied as soon as possible after allowable tolerances shall be Specifications.
the completion of final rolling. what?
The surface shall be kept moist 226. Cover Aggregate for _____ shall
until the seal is applied. 214. This Item shall consist of consist of sand and fine
preparing and treating an screenings, reasonably free from
202. The rate of application of aggregate base course with dirt or other organic matter.
bituminous curing seal shall be material in accordance with the
between _____ of surface. Plans and Specifications, 227. Aggregate for _____ shall be
preparatory to the construction of crushed stone, crushed slag or
203. Curing seal will be applied in a bituminous surface course. crushed gravel.
sufficient quantity to provide a
continuous film over the base. The 215. The liquid bituminous material of 228. Only _____ shall be used in a
film shall be maintained at least item 301 shall be sprayed by project unless alternative types are
_____ unless the treated base is means of a pressure distributor of approved.
protected by a subsequent course. not less than ___a)___, mounted
on pneumatic tires of such width 229. The aggregate of item 303 shall
204. This Item shall consist of and number that the load produced have a mass percent of wear
furnishing and placing aggregate on the road surface will not _____ when tested by AASHTO T
in stockpiles at locations shown exceed ___b)___ width of tire. 96.
on the Plans or as directed and
approved by the Engineer. 216. The tank shall have a heating 230. When crushed slag is used in item
device able to heat a complete 303, it shall be of uniform density
205. The stockpile area, as staked by charge of bituminous liquid to and quality and shall have a
the Engineer, shall be graded, _____. density of not less than
shaped and compacted to a ___a)___as determined by
uniform cross-section that will 217. Consequently, the flames must not ___b)___.
drain satisfactorily. The entire area directly touch the casing of the
shall be compacted with a tank containing the bituminous 231. No _____ shall be continued at
minimum of _____ of the liquid. The liquid shall be night unless provided with
approved equipment. insulated in such a way that the sufficient lighting.
drop in temperature when the tank
206. This item shall consist of a is filled with bituminous liquid at 232. Seal coating operations shall not
wearing or top course composed 180ᵒC and not heated will be less be started until the bituminous
of gravel or crushed aggregate and than _____. surface is thoroughly compacted
binder material, whichever is by traffic and rolling. In no event
called for in the Bill of Quantities, 218. The distributor shall be able to shall seal coat be placed on newly
constructed on a prepared base in vary the spray width of the constructed or reconditioned
accordance with this Specification bituminous liquid in maximum surfaces in less than _____ after
and in conformity with the lines, steps of _____. such surface is laid and opened to
grades and typical cross-sections traffic, unless ordered in writing
shown on the Plans. 219. The distributor shall be furnished by the Engineer.
with a ___a)___, indicating its
207. The coarse aggregate material forward speed, which shall be 233. Bituminous material shall be
retained on the 2.00 mm (No.10) visible from the driver’s seat. The applied by means of a pressure
sieve of item 300 shall have a distributor shall be designed so distributor at the rate of
mass percent of wear by the Los that the deviation from the approximately ___a)___ and
Angeles Test (AASHTO T 96) of prescribed rate of application does ___b)___, per square metre of
_____. not exceed ___b)___ and shall be surface, in a uniform, unbroken
equipped with a device for hand spread over the section to be
208. When crushed aggregate of item spraying of the bituminous liquid. treated.
300 is called for in the Bill of
Quantities, not less than _____ of 220. The bituminous Prime Coat 234. Immediately after the application
the particles retained on the 4.75 materials should be applied by a of asphalt, the cover aggregate
mm (No. 4) sieve shall have at pressure distributor at specified shall be evenly spread over the
least one (1) fractured face. temperature and at an application surface at the rate of
rate ranging from_____. approximately _____.
209. The fraction passing the 0.075
mm (No.200) sieve of item 300 221. The prime coat shall be left 235. The use of ___a)___ attached to
shall _____ of the fraction passing undisturbed for a period of at least tail gates of trucks shall ___b)___.
the 0.425 mm (No.40) sieve. ___a)___ and shall not be
___b)___ to traffic until it has 236. As soon as the cover aggregate
210. The fraction passing the 0.425 penetrated and cured sufficiently has been spread, the surface shall
mm (No. 40) sieve of item 300 so that it will not be picked up by be broomed lightly with approved
shall have a liquid limit ___a)___ the wheels of passing vehicles. push or drag broom to insure an
and a plasticity index range of even distribution, and shall then
___b)___, when tested by 222. Bituminous Prime Coat shall be be rolled with an approved power
AASHTO T 89 and T 90, measured by the _____. roller weighing _____ to a
respectively. uniform surface.
223. This Item shall consist of
211. Materials for gravel surface preparing and treating an existing 237. This Item shall consist of either a
course of item 300 shall have a bituminous or cement concrete single application of bituminous
soaked CBR Value of _____ as surface with bituminous material material followed by a single
determined by AASHTO T 193. in accordance with the Plans and spreading of aggregate (single
The CBR Value shall be obtained Specifications, preparatory to the surface treatment) or two
at the maximum dry density and construction of a bituminous applications of bituminous
determined by AASHTO T 180, surface course. material each followed by a
Method D. spreading of aggregate (double
224. The rate of application for surface treatment) in accordance
212. Materials for crushed aggregate Bituminous Tack coat (of either with the Plans and Specifications.
surface course of item 300 shall the Rapid Curing Cut-back or the
have a soaked CBR Value of Emulsified Asphalt) shall be 238. The aggregate of item 304 shall
_____ respectively as determined within the range of _____, the have a mass percent of wear
by AASHTO T 193. The CBR exact rate as determined by the _____ when tested by AASHTO T
Value shall be obtained at the Engineer. 96.
maximum dry density and
determined by AASHTO T 180, 225. This Item shall consist of an 239. When crushed gravel is used in
Method D. application of bituminous material item 304, not less than _____ of
213. The aggregate surface course of with or without an application of the particles retained on the 4.75
item 300 shall be laid to the aggregate on an existing
mm (No. 4) sieve shall have at 253. Application of bituminous ___c)___of compaction width.
least one fractured face. material shall be made only when (item 306)
the aggregate is dry and the
240. When crushed slag is used in item atmospheric temperature in the 263. _____ may be specified for
304, it must be of uniform density shade is _____ and when the pneumatic-tire rollers.
and quality and shall have a weather is not foggy or rainy.
density not less than _____as 264. At least _____ shall be allowed
determined by AASHTO T 19. 254. The aggregate shall be dry-rolled for measuring, sampling and
until it is compacted and keyed. testing for approval of quantity
241. The Contractor shall furnish the Rolling shall progress gradually and gradation before the
Engineer a _____ in duplicate from the sides to the center, windrowed material is spread for
immediately upon delivery of parallel with the center line of the application of bituminous
asphaltic material to the Site. road and overlapping uniformly material.
each preceding rear wheel track by
242. The weighing equipment shall one-half the width of such track 265. Should the mixture show an
have an approved multiple beam and shall continue until the excess, deficiency or uneven
type scale with indicator and other aggregate does not creep or distribution of bituminous
necessary dials for accurately displace ahead of the rollers. material (item 306), the condition
weighing the aggregate. The scale shall be corrected by the _____.
shall be protected by a weather- 255. Along curbs, headers and walls,
proof house with a floor area not and at all places not accessible to 266. After the material is spread, the
less than _____. the roller, the aggregate shall be surface shall be rolled. Rolling
tamped thoroughly with shall be _____, except that on
243. The required asphaltic material mechanical tampers or with hand superelevated curves, rolling shall
shall be applied to the surface at tampers. Each hand tamper shall progress from the lower to the
least _____ after it has been prime have a mass of ___a)___ and a upper edge.
coated. face area of ___b)___.
267. Each pass shall terminate at least
244. Asphaltic material shall be applied 256. Prior to application of the ______in advance or to the rear of
on a ___a)___ whenever cut-back bituminous material of item 305, the end of the preceding pass.
or asphalt cement is used; the surface of the aggregate layer
___b)___ when emulsified asphalt will be tested by the Engineer
is used. using a ___a)___ at selected 268. Surface requirements shall be as
locations. The variation of the specified in Subsection 307.3.11
245. Spraying shall not be done unless surface from the testing edge of except that the permissible surface
the road temperature has been the straight-edge between any two variance will be _____.
above ___a)___for at least contacts with the surface shall at
___b)___ prior to the no point exceed ___b)___. 269. This item includes general
commencement of spraying requirements that are applicable to
operations, and the temperature 257. This Item shall consist of all types of bituminous plant mix
shall not be less than 20ᵒC during constructing a bituminous road- surface courses irrespective of
the spraying. mix surface course on a prepared gradation of aggregate or kind and
base in accordance with these amount of bituminous material.
246. The application temperature for Specification and in conformity Derivations from these general
asphalt cement shall be within the with the lines, grades and typical requirements will be indicated in
range that produces a viscosity of cross-sections shown on the Plans, the specific requirements for each
_____. or as established by the Engineer. type.
247. No portion of the sprayed surface 258. Any particles of salvaged - This work shall consist of
shall remain uncovered for a aggregate appearing in the surface constructing one or more
period in excess of ___a)___. at the time of lay-down and bituminous bound layers on a
Immediately after spreading the finishing that will not pass 37.5 prepared foundation in accordance
aggregate, the treated surface shall mm (1-1/2 inch) sieve of item 306 with the Specifications and the
be rolled with an approved shall be _____ by the Contractor specific requirements of the type
___b)___. as directed by the Engineer. under contract, and in reasonably
close conformity with the lines,
248. Traffic shall be prohibited from 259. The proportion of bituminous grades, thickness, and typical
traveling at speeds in excess of material on the basis of total dry cross-sections shown on the Plans
_____ until the asphaltic material aggregate of item 306 shall be within the tolerances specified or
has set. from ___a)___ when cut-back established by the Engineer.
asphalt is used and from ___b)___
249. This Item shall consist of when emulsified asphalt is used. 270. The _____ shall be composed of
furnishing and placing one or aggregate, mineral filler, hydrated
more courses of graded aggregate 260. During the mixing operation (item lime, and bituminous material.
and one or more application of 306), _____ of hydrated lime, dry
bituminous material, followed by aggregate basis, shall be added to 271. At least ___a)___, the Contractor
a seal coat with cover aggregate the mixture. The lower percentage shall submit in writing a ___b)___
constructed on a prepared base in limit is applicable to aggregates for each mixture supported by
accordance with this which are predominantly laboratory test data along with
Specifications and in conformity calcareous. samples and sources of the
with the lines, grades and typical components and viscosity-
crosssections shown on the Plans. 261. The distributor (item 306) shall be temperature relationships
so designed, equipped, maintained information to the Engineer for
250. The aggregate of item 305 shall and operated that bituminous testing and approval.
have a mass percent of wear material at even heat may be
_____ when tested by AASHTO T applied uniformly on variable 272. After the job-mix is established,
96. widths of surface up to ___a)___ all mixture furnished for the
at readily determined and project shall conform thereto
251. When the crushed gravel is controlled rates from ___b)___, within the following ranges of
subjected to five cycles of the with uniform pressure, and with tolerances of what?
sodium sulfate soundness test an allowable variation from any
(AASHTO T 104), the weighted specified rate not to exceed 273. The mixture (item 307) shall have
loss shall _____. ___c)___. a minimum compressive strength
of _____.
252. When crushed slag is used in item 262. Rollers shall be self-propelled
305, it must be of uniform density steel-wheel tandem or 3-wheel 274. The mixture (item 307) shall have
and quality and shall have a rollers weighing ___a)___ each a mass percent air voids with the
density not less than _____as and pneumatic tire rollers having a range of _____.
determined by AASHTO T 19. total compacting width of
___b)___ and the gross mass
adjustable within the range of
275. The mixture (item 307) shall also opening of the weigh box gate and
have an index of retained strength the start of introduction of
of _____ when tested by bituminous material.
AASHTO T 165.
291. The _____ is the interval of time
276. For aggregates having maximum between the start of introduction
sizes ___a)___, ___b)___ will be of bituminous material and the
modified to use opening of the mixer gate.
___c)___cylindrical specimens.
The ___d)___ (6 inches cylinders 292. The control of the timing shall be
will be compacted by the flexible and capable of being set at
procedures outlined in ___e)___ intervals of _____.
modified to employ ___f)___ of a
molding load of ___g)___, with 293. A _____ shall be installed as a
no appreciable holding time after part of the timing device and shall
each application of the full load. be so designed as to register only
(item 307) completely mixed batches.

277. The proportion of bituminous 294. The plant shall be equipped to


material (item 307), on the basis conveniently handle individual
of total dry aggregate, shall be test samples weighing not less
from _____. than _____.

278. Hydrated lime shall be added to 295. Each truck shall have a _____ or
the mixture during the mixing other suitable material of such size
operation in the amount of _____, as to protect the mixture from the
dry aggregate basis. weather.

279. ___a)___ shall be accurate to 296. Ski-type device of not less than
___b)___ of the maximum load _____in length or as directed by
that may be required. the Engineer.

280 . ___a)___ shall be inspected and 297. _____ set to grade.


sealed as often as the Engineer
may deem necessary to assure 298. Short ski or shoe
their continued accuracy. The
Contractor shall have on hand not 299. Immediately before placing the
less than ___b)___ weights for bituminous mixture, the existing
testing the scales. surface shall be cleaned of loose
or deleterious material by _____
281. _____ shall be provided for or other approved means.
checking the quantity or rate of
flow of bituminous material into 300. Contract surface or curb, gutters,
the mixer. manholes and other structures
shall be painted with a _____ prior
282. An _____ of adequate range in to the bituminous mixture being
temperature reading shall be fixed placed against them.
in the bituminous feed line at a
suitable location near the charging
valve at the mixer unit.

283. The equipment used to measure


the bituminous material shall be
accurate to _____.

284. The bituminous material bucket


shall be a _____.

285. The length of the discharge


opening or spray bar shall be
_____ and it shall discharge
directly into the mixer.

286. The capacity of the bituminous


material bucket shall be at least
_____ in excess of the weight of
bituminous material required in
any batch.

287. The indicator dial shall have a


capacity of at least _____ in
excess of the quantity of
bituminous material used in a
batch.

288. All of the bituminous material


required for one batch shall be
discharged in not more than _____
after the flow has started.

289. The clearance of blades from all


fixed and moving parts shall not
exceed ___a)___unless the
maximum diameter of the
aggregate in the mix exceed
___b)___, in which case the
clearance shall not exceed
___c)___.

290. The _____ is defined as the


interval of time between the

You might also like