1. Data Kurva Baku Metode Theis
DATA KURVA BAKU METODE THEIS
u W(u) u W(u) u W(u) u W(u)
1 6.33 1 4.04 1 1.823 1 0.219
2 5.64 2 3.35 2 1.223 2 0.049
3 5.23 3 2.96 3 0.906 3 0.013
4 4.95 4 2.68 4 0.702 4 0.004
5 4.73 5 2.47 5 0.560 5 0.001
6 4.54 6 2.30 6 0.454
7 4.39 7 2.15 7 0.274
8 4.26 8 2.03 8 0.311
9 4.14 9 1.92 9 0.260
2. Data Drawdown Pumping Test Data
DATA DRAWDOWN HASIL PUMPING TEST (METODE THEIS DAN JACOB)
t Well A Well B Well C Data jarak r
0.50 0.01 0.25 0.32
1.00 0.01 0.35 0.48
1.50 0.05 0.45 0.61
2.00 0.14 0.55 0.70
2.50 0.23 0.63 0.77
3.00 0.29 0.68 0.86
3.50 0.36 0.74 0.91
4.00 0.42 0.78 0.94
4.50 0.46 0.82 0.97
5.00 0.50 0.86 1.01
5.50 0.53 0.90 1.03
6.00 0.56 0.92 1.05
6.50 0.59 0.95 1.06 Jarak r sumur A dari sumur uji = 32.1 m
7.00 0.64 0.96 1.10 Jarak r sumur B dari sumur uji = 30.8 m
7.50 0.65 0.99 1.12 Jarak r sumur C dari sumur uji = 11.7 m
8.00 0.66 1.01 1.14
8.50 0.68 1.02 1.15
9.00 0.70 1.04 1.16
9.50 0.71 1.06 1.18
10.00 0.73 1.07 1.19
15.00 0.82 1.15 1.27
20.00 0.87 1.22 1.32
25.00 0.90 1.25 1.34
30.00 0.94 1.28 1.36
35.00 0.95 1.30 1.38
40.00 0.96 1.32 1.39
45.00 0.97 1.33 1.40
50.00 0.98 1.34 1.41
55.00 0.98 1.35 1.41
60.00 0.98 1.35 1.41
3. Data R2/t Pumping Test Data
2,25 ( 36.4)( .4 ∗ 6 )
𝑆=
(32. )
(3 6.9)(84)
𝑆=
(32. )
25779.6
𝑆=
3 .4
𝑆 = 25. 877
Well B
t0 = 0.36 menit
s2 = 10 menit
s1 = 3 menit
Δs = 7 menit
Q = 2000 m3/hari
. 𝑄
𝑇 = 4.𝜋.𝛥𝑠
2.3 (2 )
𝑇=
(4 3. 4)7
46
𝑇=
87.92
𝑇 = 52.32 𝑚 /𝑗𝑎𝑚
2,25 (52.32)( .36 ∗ 6 )
𝑆=
(3 .8)
( 7.72)(2 .6)
𝑆=
(3 .8)
2542.752
𝑆=
948.64
𝑆 = 2.68 4
Well C
t0 = 0.375 menit
s2 = 10 menit
s1 = 2 menit
Δs = 8 menit
Q = 2000 m3/hari
. 𝑄
𝑇 = 4.𝜋.𝛥𝑠
2.3 (2 )
𝑇=
(4 3. 4)8
46
𝑇=
.8
𝑇 = 45.63 𝑚 /𝑗𝑎𝑚
2,25 ( 7 3.4)55
𝑆=
(32 )
2 795.75
𝑆=
(32 )
𝑆 = 2.5855
5. Perhitungan Graphical Solution – Theis Method – Unsteady State Flow
Condition
Well A
2
𝑇= .4
4 3. 4 .23
2
𝑇= .4
2.88
8
𝑇=
2.88
𝑇= . 2 𝑚 /ℎ𝑎𝑟𝑖
4. 𝜋. 𝑢
𝑆=
𝑟 /𝑡
4 3. 4 . 9
𝑆=
4 2. 6
. 3 4
𝑆=
4 2. 6
𝑆= . 27
Well B
2
𝑇= . 2.96
4 3. 4 .78
2
𝑇= . 2.96
9.7968
592
𝑇=
9.7968
𝑇 = 6 4.27 𝑚 /ℎ𝑎𝑟𝑖
4. 𝜋. 𝑢
𝑆=
𝑟 /𝑡
4 3. 4 . 3
𝑆=
237. 6
.3768
𝑆=
237. 6
𝑆= . 58
Well C
2
𝑇= . 2.68
4 3. 4 .77
2
𝑇= . 2.68
9.67 2
536
𝑇=
9.67 2
𝑇 = 554.22 𝑚 /ℎ𝑎𝑟𝑖
4. 𝜋. 𝑢
𝑆=
𝑟 /𝑡
4 3. 4 . 4
𝑆=
54.76
.5 24
𝑆=
54.76
𝑆= . 9 7