It is defined as the process of translating the arrow diagram into time table of calendar
days.
a. Planning c. Controlling
b. Scheduling d. Monitoring
55. This shows the relationships between the operations and the leeway limitations.
a. Days c. Months
b. Weeks d. Years
59. ______________ through the use of PERT/CPM gives the management a reliable
system identifying job problems within days instead of months.
a. Planning c. Controlling
b. Job Control d. Monitoring
60. The PERT/CPM schedule shows the relationships between the operations and the
____________.
a. Critical c. Scheduled
b. Non critical d. None of the above
62. In scheduling, calendar days permit the inclusion of __________, holidays, weather
and other time lost.
a. Everyday c. Weekdays
b. Rainy day d. Weekends
63. The ____________ is supplied with time status reports showing the overall status of
the project in general and in particular.
a. Architect c. Engineer
b. Contractor d. Owner
64. The contractor is provided with revised ________ which reflect the actual work
conditions and the project status.