Name of the work: AM to Marical - Raikode road from Km. 0/0 to 22/400 for the year
2011-12
Sl. Measurements
Description Nos Breadt Quantity Rate per Amount
No Length Depth
h
a) Marical - Raikode road from Km. 0/0 to 22/400 150.00 208.60 1 31290.00
Sqm Sqm
2 Providing BT patch work for pot holes of depth ranging from
25 to 35mm ,using 20-25mm HBG metal with required
quantity of 10-12 mm size HBG key chips and 80/100 grade
bitumen at 45 kgs/1Cum of work for filling the pot holes and
sealing the filled up pot hole with a 15 mm thick layer using
10-12 mm HBG key chips and 80/100 grade bitumen trimming
the edges to provide vertical faces , cleaning applying tack
coat , filling the pot holes compacting with power Road Roller
of 8 to 10 Tonnes finishing and blinding the surface using
stone dust/ sand , including cot of all materials T&P , and
labour charges for all operations etc. at site of complete
a) Marical - Raikode road from Km. 0/0 to 22/400 100.00 148.40 1 14840.00
Sqm Sqm
3 Stripping the excess soil from the shoulder shurface to achieve
the approved level for sectioning the berms, shoulders as per
MORT&H specification No.3003 (As per E-in-C Circular Memo
NO.Maintenance/ E.E(TEC) TA15/AE4/2005, dt.25/04/2005)
444755974.xls Page 1
Sl. Measurements
Description Nos Breadt Quantity Rate per Amount
No Length Depth
h
10 Provision for Painting of KM, HM, 5th KM and village name boards, 35000.00
Traffic census survey, Culvert repairs
11 Provision for unforeseen items and rounding off 479.00
Total 259500.00
444755974.xls Page 2
DATA
Name of the work: AM to Marical - Raikode road from Km. 0/0 to 22/400 for the year 2011-12
Sl.
Description Qty Rate per Amount
No.
1 Providing BT patch work for pot holes of depth ranging from 50 to 70mm ,using 40mm HBG metal with
required quantity of 10-12 mm size HBG key chips and 80/100 grade bitumen at 45 kgs/1Cum of work for
filling the pot holes and sealing the filled up pot hole with a 15 mm thick layer using 10-12 mm HBG key
chips and 80/100 grade bitumen trimming the edges to provide vertical faces , cleaning applying tack
coat , filling the pot holes compacting with power Road Roller of 8 to 10 Tonnes finishing and blinding the
surface using stone dust/ sand , including cot of all materials T&P , and labour charges for all operations
etc. at site of complete
Unit - 1Sqm
Materials
Pot hole filling:
40 mm HBG metal 1.00X1.00X0.045X1.10 0.0495 Cum 950.66 1 cum 47.06
10-12 mm size key chiX1.00X0.045X(13/100) 0.0059 Cum 1025.66 1 cum 6.00
80/100 Grade bitumen.00X0.055X45Kgs/Cum 1.890 Kgs 31598.50 1 MT 59.72
( Including tack coat )
Sealing the pot hole:
10-12mm size HBG chi1.00X1.00X0.015X1.33 0.020 Cum 1025.66 1 cum 20.46
Stone dust / Sand 1.00X1.00X0.003 0.003 Cum 234.20 1 cum 0.70
80/100 Grade bitumen0X0.015X80 Kgs/1Cum 1.080 Kgs 31598.50 1 MT 34.13
Labour charges
Pot hole filling with 1.00X1.00X0.045 0.045 Cum 588.00 1 Cum 26.46
40 mm HBG metal
Sealing the filled up 1.00X1.00X0.015 0.015 Cum 588.00 1 Cum 8.82
pot hole using 10-12
mm HBG metal. Add 15% on labour charges 35.28 5.29
208.64
Add TP 0.00% 0.00
TOTAL Rs. 208.64
Or say Rs 208.60
Per Sqm
2 Providing BT patch work for pot holes of depth ranging from 25 to 35mm ,using 20-25mm HBG metal with
required quantity of 10-12 mm size HBG key chips and 80/100 grade bitumen at 45 kgs/1Cum of work for
filling the pot holes and sealing the filled up pot hole with a 15 mm thick layer using 10-12 mm HBG key
chips and 80/100 grade bitumen trimming the edges to provide vertical faces , cleaning applying tack
coat , filling the pot holes compacting with power Road Roller of 8 to 10 Tonnes finishing and blinding the
surface using stone dust/ sand , including cot of all materials T&P , and labour charges for all operations
etc. at site of complete
Unit - 1Sqm
Materials
Pot hole filling:
20-25mm HBG metal 1.00X1.00X0.030X1.15 0.033 Cum 1363.16 1 cum 44.98
10-12 mm size key chi0X1.00X0.03X(13/100) 0.0039 Cum 1025.66 1 cum 4.00
Stone dust / Sand 1.00X1.00X0.003 0.003 Cum 234.20 1 cum 0.70
80/100 Grade bitumen.00X0.055X80Kgs/Cum 2.160 Kgs 31598.50 1 MT 68.25
( Including tack coat )
Labour charges
Pot hole filling with 1.00X1.00X0.030 0.03 Cum 588.00 1 Cum 17.64
20-25mm HBG metal
Sealing the filled up 1.00X1.00X0.015 0.015 Cum 588.00 1 Cum 8.82
pot hole using 10-12
mm HBG metal.
Add 15% on labour charges 26.46 3.97
148.37
444755974.xls Page 3
Sl.
Description Qty Rate per Amount
No.
4 Stripping the excess soil from the shoulder shurface to achieve the approved level for sectioning the
berms, shoulders as per MORT&H specification No.3003 (As per E-in-C Circular Memo NO.Maintenance/
E.E(TEC) TA15/AE4/2005, dt.25/04/2005)
Unit = 1 Sqm
Taking out put of 100 Sqm and assuming average depth of stripping as 75mm, quantity of
earth cutting involved = 7.50 Cum
LABOUR
0.10 Nos of Mate 237.00 Each 23.70
2.50 Nos of Mazdoor 196.00 Each 490.00
Sundries for caution boards, tools for ramming etc., LS 0.40
TOTAL 514.10
4% Statutory taxes
TOTAL 514.10
Note :- The earth stripped from earthen Rate for 1 Sqm 5.14
shoulders to be dumped on the side slopes Or say 5.10
locally for disposal
1 Sqm
5 Making up loss of material/ irregularities on the shoulder to the design level by adding fress approved soil
and compacting with appropriate equipment as per MORT&H specification No.3003 (As per E-in-C Circular
Memo NO.Maintenance/ E.E(TEC) TA15/AE4/2005,
Unit = 1 Sqm
Taking out put of 100 Sqm and assuming average thickness of filling to be 100mm, quantity
of tresh material / earth involved = 15 Cum
Labour
0.18 Nos of Mate 237.00 Each 42.66
4.50 Nos of Mazdoor 196.00 Each 882.00
Machinery
0.25 Hours Excavator 1.0 Cum Bucket capacity @ 1950.00 Hour
60 Cum / 1 Hour
Tipper (L.S. towards having other amenities 24.00 t.Km 4.5/t.KM 108.00
complete & rounding off is average lead in
Km. For borrow earth) = 24 x L = (1 Km lead
is considred, Hence L=1)
1.00 Cum rate as per SSR item 243 43.00 Cum 43.00
1.00 ADD seignorage charges 22.00 Cum 22.00
1.00 ADD 1 Km lead charges 21.50 Cum 21.50
TOTAL 86.50
Say Rs. 86.50
Cum
444755974.xls Page 4
Sl.
Description Qty Rate per Amount
No.
8 Clearing Juliflora (Prosafis) jungle including up-rooting and removing of Juliflora stumps including all labour
charges etc., complete for finished item of work.
1.00 Sqm rate as per SSR item 198 3.30 Sqm 3.30
TOTAL 3.30
Say Rs. 3.30
Sqm
9 Clearing of light / heavy / Scrub Jungle including all labour charges etc., complete for finished item of work.
10 Collection and supply of good gravel and spreading irrespective of thickness including watering ,etc
including cost, seigniorage charges and conveyance of all materials to site including all leads and lifts and
labour charges and as directed by the Engineer-in-charge.
14 White washing to culverts in two coats with white cement and approved branch mixing with fevicol and
blue including cost and conveyance of all materials and all labour charges etc., complete for finished item
of work.
444755974.xls Page 5
ROAD METAL RATES
NAME OF WORK ::- Name of the work: AM to Marical - Raikode road from Km. 0/0 to 22/400 for the year 2011-12
Deduct
Initial cost Machine
Lead in Blasting Seigniorage stacking Toal Cost
Sl.No Description of Metal Source of Supply
Kms
Conveyance less
charges
crushing
charges charges for per Cum
stacking charges
conveyance
4 SS Revetment work 300mm do 4 48.80 84.45 67.00 0.00 50.00 -10.55 239.70
5 SS Revetment work 225mm do 4 48.80 87.45 67.00 0.00 50.00 -10.55 242.70
1 40 mm SS-5 HBG M/C metal 25 229.40 489.45 70.00 122.36 50.00 -10.55 950.66
2 25 mm SS-5 HBG M/C metal do 25 229.40 817.45 70.00 204.36 50.00 -10.55 1360.66
3 20 mm SS-5 HBG M/C metal do 25 229.40 833.45 70.00 208.36 50.00 -10.55 1380.66
4 12 mm SS-5 HBG M/C metal do 25 229.40 677.45 70.00 169.36 50.00 -10.55 1185.66
5 10 mm SS-5 HBG M/C metal do 25 229.40 549.45 70.00 137.36 50.00 -10.55 1025.66
6 6 mm SS-5 HBG M/C metal do 25 229.40 417.45 70.00 104.36 50.00 -10.55 860.66
Quarry @ 5/4 on AAA road
7 Sand for Mortar 14 134.80 214.70 0.00 0.00 40.00 -5.30 384.20
8 Sand for Filling do 14 134.80 64.70 0.00 0.00 40.00 -5.30 234.20
9 HYSD Steel 0.00 0.00 0.00 0.00
Name of the work: AM to Marical - Raikode road from Km. 0/0 to 22/400 for the year
2011-12
Dt. 16.4.11
COST OF BITUMEN / MT Packed Packed Emulsion
(60/70) (80/100)
Initial cost (Ex. Chennai) 30859.07
Deduct loading -- --
to site
TOTAL
Or say
SSR 2010-11 SSR 2010-11
LEAD CHARGES Cost of Materials, Labour
Earth/Gravel/ Metal
Sand
loading 10.60 21.10 Material Rates
unloading 5.30 10.55 Roughstone 300mm (HBG)for revetment
stacking 5.30 10.55 Roughstone 225mm (HBG)for revetment
SS Revetment work 225mm
SS Revetment work 300mm
1 21.50 19.10 SS Revetment work 450mm
2 30.20 26.70 Laterite for Revetment 225mm
3 40.20 40.20 Laterite for Revetment 300mm
4 48.80 48.80 Jeddy stone above 450mm to 600mm
Quarry spall(Field picked metal)
5 57.40 57.40 Av. Of rate 25mm & 40mm
6 66.00 66.00 8.60 HBG Stone chips 2.36mm and below
7 74.60 74.60 2.36 to 5 mm IRC & MoRTH HBG M/C metal
8 83.20 83.20 5 to 7 mm IRC & MORTH HBG M/C metal
9 91.80 91.80 9.5 to 11.20 mm IRC & MoRTH HBG M/C metal
10 100.40 100.40 12 to 14 mm IRC & MoRTH HBG M/C metal
11 109.00 109.00 19 to 22 mm IRC & MoRTH HBG M/C metal
12 117.60 117.60 25 to 27 mm IRC & MoRTH HBG M/C metal
13 126.20 126.20 40 to 45 mm IRC & MoRTH HBG metal
14 134.80 134.80 50 to 55 mm IRC & MoRTH HBG metal
15 143.40 143.40 60 to 63 mm IRC & MoRTH HBG metal
16 152.00 152.00 65 mm IRC & MoRTH HBG metal
17 160.60 160.60 75 mm IRC & MoRTH HBG metal
18 169.20 169.20 RR masonry
19 177.80 177.80 CRS masonry
20 186.40 186.40 150 mm soling stone HBG metal
21 195.00 195.00 Gravel
22 203.60 203.60 6 mm SS-5 m/c HBG metal
23 212.20 212.20 10 mm SS-5 m/c HBG metal
24 220.80 220.80 12 mm SS-5 m/c HBG metal
25 229.40 229.40 20 mm SS-5 m/c HBG metal
26 238.00 238.00 25 mm SS-5 m/c HBG metal
27 246.60 246.60 40 mm SS-5 m/c HBG metal
28 255.20 255.20 50 mm SS-5 m/c HBG metal
29 263.80 263.80 60 mm SS-5 m/c HBG metal
30 272.40 272.40 7.20 65 mm SS-5 m/c HBG metal
31 279.60 279.60 75 mm SS-5 m/c HBG metal
32 286.80 286.80 75-100 mm SS-5 m/c HBG metal
33 294.00 294.00
34 301.20 301.20 Sand for Mortar
35 308.40 308.40 Sand for Filling
36 315.60 315.60 HYSD Steel
37 322.80 322.80 Mild Steel
38 330.00 330.00 Cement
39 337.20 337.20 Mild Steel 6mm
40 344.40 344.40 Blasting charges
41 351.60 351.60 Blasting charges
42 358.80 358.80 Blasting charges for rough stone
43 366.00 366.00 Seigniorage charges
44 373.20 373.20 Metal
45 380.40 380.40 Gravel/earth
46 387.60 387.60 Sand
47 394.80 394.80 Labour Rates
48 402.00 402.00 Mate
49 409.20 409.20 Mazdoor skilled, Mason
50 416.40 416.40 Mazdoor unskilled
51 423.60 423.60 Machinery Rates
52 430.80 430.80 1 Dozer( D 80 )
53 438.00 438.00
54 445.20 445.20
55 452.40 452.40 2 Mortor Grader
56 459.60 459.60
57 466.80 466.80
58 474.00 474.00
3 Hydraulic Excavator
59 481.20 481.20
60 488.40 488.40
61 495.60 495.60
4 Front end loader
62 502.80 502.80
63 510.00 510.00
5 Tipper- 5.5 Cum
64 517.20 517.20
65 524.40 524.40
66 531.60 531.60
6 Vibratory roller 8 tonne
67 538.80 538.80
68 546.00 546.00
7 Smooth wheeled roller 8 tonne
69 553.20 553.20
8 Water tanker 6 Kilolitre
70 560.40 560.40
71 567.60 567.60 9 Tractor
72 574.80 574.80 10 Tractor with rotavator
11 Tractor with ripper attachment
73 582.00 582.00
74 589.20 589.20
12 Air Compressor
75 596.40 596.40
76 603.60 603.60 13 Wet mix plant 60 TPH
14 Mechanical broom Hydraulic
77 610.80 610.80
15 Bitumen Pressure Distributor
78 618.00 618.00
79 625.20 625.20
16 Emulsion Pressure Distributor
80 632.40 632.40
17 Hot mix Plant – 120 TPH capacity
81 639.60 639.60
82 646.80 646.80
18 Hot mix Plant – 100 TPH capacity
83 654.00 654.00
84 661.20 661.20
19 Hot mix Plant – 60 TPH capacity
85 668.40 668.40
86 675.60 675.60
20 Hot mix Plant – 40 to 60 TPH capacity
87 682.80 682.80
88 690.00 690.00
21 Paver Finisher Hydrostatic with sensor
control 100 TPH
89 697.20 697.20
90 704.40 704.40
22 Paver finisher Mechanical 100
91 711.60 711.60
23 Hydraulic Chip Spreader
92 718.80 718.80
24 Tandem Road roller
93 726.00 726.00
25 Pneumatic Road roller
94 733.20 733.20
26 Pot-Hole repair machine
95 740.40 740.40
27 Bitumen boiler oil fired
96 747.60 747.60
97 754.80 754.80 28 GSB Plant 50 Cum
29 Mastic Cooker
98 762.00 762.00
30 Batching and Mixing Plant (a) 30 Cum
99 769.20 769.20 capacity
(b) 15 - 20 Cum capacity
100 776.40 776.40
31 Transit mixer
136.00
117.00
71.00
95.00
114.00
98.00
114.00
156.00
236.00
260.00
430.00
560.00
690.00
950.00
830.00
500.00
390.00
360.00
325.00
260.00
155.00
218.00
82.00
50.50
428.00
560.00
688.00
844.00
828.00
500.00
390.00
360.00
325.00
260.00
210.00
220.00
70.00
70.00
67.00
50.00
22.00
40.00
237.00
243.30 258
196.00
Soil Marshy
Soil unsuitable 1808.5
Soil loading Per Hour
WMM 1704.6
Soil compaction Per Hour
,BM compaction
746.5
Water transport Per Hour
345
Pulling Per Hour 345
Scarifying Per Hour 345
Scarifying Per Hour
345
General Per Hour
purpose 370
Wet mix Per Hour 1320
Surface Per Hour
cleaning 290
Applying Per Hour
bitumen tack
coat
940
Applying Per Hour
emulsion tack
coat 690
DBM/BM/SDC Per Hour
/Premix 23000
DBM/BM/SDC Per Hour
/Premix 19550
DBM/BM/SDC Per Hour
/Premix 17250
DBM/BM/SDC Per Hour
/Premix 15525
DBM/BM/SDC Per Hour
/Premix 2530
Paving of WMM, Per Hour
paving of DLC
1090
Surface Per Hour
dressing 2070
Rolling of Per Hour
Asphaltic
surface 1320
Rolling of Per Hour
Asphaltic
surface 1035
Repair of pot- Per Hour
holes 750
Bitumen Per Hour
Spraying 170
Producing GSB Per Hour 920
Mastic wearing Per Hour
coat 52
Concrete mixing Per Hour
2130
Concrete mixing Per Hour
1670
Transportation Per Hour
of concrete mix
1336.8
Pumping of Per Hour
Concrete 630
345
Concrete mixing Per Hour
520
0.75 m dia to Per Hour
1.20 m dia
boring
attachment 4485
Paving of Per Hour
concrete
surface 2360
Crushing of Per Hour
spalls 100 TPH 7070
Stressing of
Crushing of Per Hour
steel wires/
spalls 200 TPH 14880
stands Per Hour
110