The document provides a table of contents for an engineering and integrity workshop hosted by NationalGrid from July 10-14, 2017. The workshop covers four modules: distribution pipeline design, transmission pipeline design, regulator station design, and integrity management. Module 1 covers topics related to distribution pipeline design such as materials, valves, horizontal directional drilling, and loading conditions. Module 2 discusses transmission pipeline design topics like valve sets, road/railroad crossings, and non-destructive testing. Module 3 focuses on regulator station design including regulation equipment, control valves, overpressure protection, and station layout. Module 4 addresses integrity management including an overview, in-line inspection, and pressure testing.
Original Description:
Natural Gas - Engineering & Integrity Workshop GTI Table of Contents
The document provides a table of contents for an engineering and integrity workshop hosted by NationalGrid from July 10-14, 2017. The workshop covers four modules: distribution pipeline design, transmission pipeline design, regulator station design, and integrity management. Module 1 covers topics related to distribution pipeline design such as materials, valves, horizontal directional drilling, and loading conditions. Module 2 discusses transmission pipeline design topics like valve sets, road/railroad crossings, and non-destructive testing. Module 3 focuses on regulator station design including regulation equipment, control valves, overpressure protection, and station layout. Module 4 addresses integrity management including an overview, in-line inspection, and pressure testing.
The document provides a table of contents for an engineering and integrity workshop hosted by NationalGrid from July 10-14, 2017. The workshop covers four modules: distribution pipeline design, transmission pipeline design, regulator station design, and integrity management. Module 1 covers topics related to distribution pipeline design such as materials, valves, horizontal directional drilling, and loading conditions. Module 2 discusses transmission pipeline design topics like valve sets, road/railroad crossings, and non-destructive testing. Module 3 focuses on regulator station design including regulation equipment, control valves, overpressure protection, and station layout. Module 4 addresses integrity management including an overview, in-line inspection, and pressure testing.
1.1 Pipeline Definitions 1.2 Basic Industry Materials 1.3 Distribution Valves 1.4 Miscellaneous Code Requirements 1.5 Horizontal Directional Drilling Process 1.6 Cathodic Protection Design 1.7 Loading Service Conditions 1.8 Exposed Crossing Design Problem Equations & Nomenclature
Module 2 Transmission Pipeline Design
2.1 Valve Set Design 2.2 Launchers and Receivers 2.3 Road and Railroad Crossings 2.4 Stream and River Crossings 2.5 Non-Destructive Testing
Module 3 Regulator Station Design
3.1 Self-Contained Regulation Equipment & Data Specs 3.2 Pilot-Operated Regulators EZR Equipment Data & Specification 3.3 Control Valves 3.4 Regulator Setting Design 3.5 Aerodynamic Noise 3.6 Overpressure Protection & Relief Valve Sizing 3.7 Gas Conditioning Equipment 3.8 Station Layout and Design
Module 4 Integrity Management
4.1 Pipeline Integrity Overview 4.2 In-line Inspection (ILI) or Smart Pigs 4.3 Pressure Testing 1 G A S T E C H N O L O G Y I N S T I T U T E 2 G A S T E C H N O L O G Y I N S T I T U T E