Professional Documents
Culture Documents
Paper 0087
Paper 0087
Not all projects within the register comply with the The register includes a brief summary of the technology
definition of active networks previously given, though they concerned or the activity undertaken in each project.
have been identified as possessing the potential to play a Where possible, this is as close to the official project
supportive role in the operation of active networks, descriptor, but may be adapted by the authors for the
although they may not possess ‘active’ characteristics. purpose of the register.
The register consists of 121 entries in a tabular format, an For projects and programmes which have progressed
example of an entry is shown in Table 1. The project title, beyond the research and development phases, and solutions
organizations involved, and funding sources (when have been demonstrated on the network, the Deployment
available) are provided, giving the reader the essential Summary column summarises the magnitude, timescale
background information on each entry. The Activity Type and location of deployment. The Impact of Activity
column allows the maturity of entries in the register to be column concerns competed projects, and when available,
differentiated by different phases of the development provides short statements measuring the success of the
process: project and its effect on the surrounding network.
• Research Currently, due to the infancy of active network
• Development technologies, it is too early to measure the impact of
• Trial deployment for many projects, although it is expected that
• Pilot in future editions of the register the significance of this
• Full Deployment section may grow. As with the Summary of
Technology/Activity column, the statements within this
Details of the project timeframes, including the status of section are kept as close as possible to official statements
the project (Ongoing or Completed) are provided, along on the impact of the project.
with the country where the work has taken place. Due to
the large range of projects concerned with active networks, For further information on the projects within the register,
projects within the register cover a wide range of technical a point of contact or relevant website is provided, and
areas. 11 key technical areas have been identified, which when applicable, a link to either a report or website
are assigned to each project. The larger research providing more information is given.
programmes found in the register may encompass more
than one area of technical focus. The areas of technical Projects and programmes within the register were
focus are: identified through guidance and discussion with key
• Active Management Planning individuals involved in the field of active network
• Communications and Control research. For each entry, the main information resources
were technical papers, project reports and contact with
• Demand Side Management
individuals involved.
• Fault Level Management
• Future Technologies The Classification of Technical Focus and Activity Type
• Modelling and Analysis sections are key elements in the register, as the information
• Power Flow Management collected through these sections provides the basis for
• Power Quality useful analysis considering the maturity and spread of
• Protection Systems active network projects and technologies.
• Storage
• Voltage Control
Classification
Activity Type
Organisation
Organisation
Technology/
Technology/
Summary of
Deployment
Project Title
Report Link
of technical
Project ID
Summary
Impact of
Start and
Funding
Country
Contact
Activity
Activity
Activity
Partner
Source
details
Status
(URL)
focus
Lead
To date an
http://www.ensg.org.uk/assets/k
online
David.MacLeman@scottish-
Research & Development
closed-
Power Flow Management
Paper 0087
Paper 0087
CONCLUSION
IMPACT OF ACTIVE NETWORK
The findings from the register confirm that there are still
TECHNOLOGIES ON FUTURE NETWORKS: few ANM technologies deployed in the UK to date. Of
FURTHER WORK current projects, the majority are at the R&D phase,
Current research at the University of Strathclyde is projects which hold promise for facilitating the connection
investigating the changes occurring to the operational of DG should be identified and fast-tracked toward
characteristics of distribution networks which underpin deployment.
current design standards in the UK. The deployment of
ANM systems will change these operational Due to the fast-moving characteristics of active network
characteristics, in turn affect network planning and design. technologies, the register will continue to be updated
The magnitude of this change is greatly dependant on the biennially in order to keep its contents accurate and
extent to which network parameters are actively controlled informative.
and the scale of deployment.
REFERENCES
If the deployment of ANM solutions continues the current
trend, as bespoke solutions designed to overcome a barrier
to DG connection on a distinct section of network, the [1] S.N. Liew, A. Beddoes, G. Strbac, “Ancillary
impact is likely to be less. Services Market Opportunities in Active Distribution
Large-scale deployment of ANM systems in the UK, Networks”, Proceedings Second International
monitoring and controlling distribution networks, would Symposium on Distributed Generation: Power
increase the accessibility of distribution networks for new System and Market Aspects, Session 9: Active
generator connections, giving network planners greater Networks, 2002
control over issues such as situating sites for DG
connections, and the need to incorporate and connect [2] D. Popovic et al, “A Technical Review and
control systems to network expansion Assessment of Active Network Management
Infrastructures and Practises”, 2006, contractor: EA
Assuming the growth and successful demonstration of Technology, Report Number DG/CG/00068, DTI
ANM solutions, it will be necessary to include the impact Programme: New and Renewable Energy
of such solutions into account when performing long-term
planning of network expansion and reinforcement. ANM [3] R. MacDonald, G. W Ault, R. Currie, “Active
technologies have the potential to defer network Network Deployment Register Project Report”, 2008,
reinforcement, and may be applicable to such situations, available at: www.instee.strath.ac.uk
though this will also include the need to incorporate
control systems to the planning process. [4] European Commission, “Strategic Research Agenda
for Europe’s Electricity Networks of the Future”,
These are the fundamental changes that will take place, but European Technology Platform SmartGrids, 2007
the work aims to further identify detailed aspects of current
design standards which may prove disadvantageous to the
deployment and operation of active distribution networks.