You are on page 1of 37

FLEXI MULTIRADIO

Installation, Commissioning and Integration


Acceptance Manual

Project Name : LTE & 2G Modernization


Phase : LTE 2017_Phase 2
Region : East Java
2G
Site Configuration : 3G
2G + 3G
Site Name : XL - MODUNG SAMPANG
Site ID : 131043
BSC Name :
RNC Name : Madura 1
SITE ACCEPTANCE CERTIFICATE

PO Number 2015 NEFPA/PO/21112018-0580-a

Site ID 131043

Site Name XL - MODUNG SAMPANG

Work type New site / Collocated / Swap

BTS Equipment Type Flexi Multiradio 2G Flexi Multiradio 3G


Stack type Pole Mounted
BTS Installation Type
Rack Wall Mounted
Site Solution Feederless Feederline
Green Field Indoor
Rooftop
Site Type Green Field Outdoor
3rd Party Building/Tower
Inbuilding Coverage
BTS Configuration 2G ___ / ___ / ___ @ ___ Watt 3G 1 / 1 / 1 @ 40 Watt

Site Address Jl.Beler Atas RT.05 , RW.03 Rong Tengah Sampang - Madura

Installer Name: Salman


Installation Date 06-04-2019
Phone Number: 089613564111
Commissioning Engineer : Edi R.
Commissioning Date 06-04-2019
Phone Number: 089677977542
Self Assesment Date :

Integration Date 06-04-2019

Nokia Siemens Networks hereby states that the whole of supplies detailed above have been
inspected, implemented, tested and unless otherwise stated conform to the specified requirements
in the contract or order identified above.
NOKIA Ms Huawei H3I
BMG MS Huawei
Representative Cluster Representative

Signature :

Approved by :

Date :

Table of Contents
Revision number: 00 2 Document title: Flexi Multiradio Acceptance
Date of issue: August 6, 2012 of Document number: 4090
References: 37 Release status: Release
1. Antenna and Feeder System............................................................................................ 4
1.1 Antenna Configuration............................................................................................... 4
1.2 Feeder Configuration.................................................................................................. 5
1.3 Voltages Measurement............................................................................................... 6
1.4 Antenna Line Sweep Test Tool.................................................................................... 6
1.5 Antenna Line Sweep Test Result................................................................................7
1.6 Antenna Line Quality Checklist..................................................................................9
2. Equipment Installation & Commissioning Record...........................................................10
2.1 BTS Instalation Record............................................................................................. 10
2.1.1 BTS Information.............................................................................................. 10
2.1.2 BOQ Modules.................................................................................................. 13
2.2 Commissioning Record............................................................................................. 15
2.2.1 BTS & Transmission Information.....................................................................15
2.2.2 Node B and RNC Information..........................................................................15
2.2.3 Remote Access Test........................................................................................ 16
2.2.4 TRX Configuration........................................................................................... 17
2.3 Test Call.................................................................................................................... 17
2.3.1 2G Test Call..................................................................................................... 17
2.3.2 3G Test Call..................................................................................................... 19
3. ATTACHMENTS................................................................................................................ 22

Revision number: 00 3 Document title: Flexi Multiradio Acceptance


Date of issue: August 6, 2012 of Document number: 4090
References: 37 Release status: Release
1. ANTENNA AND FEEDER SYSTEM

1.1 Antenna Configuration

A. 2G Antennas

SECTOR 1 SECTOR 2 SECTOR 3 SECTOR 4 SECTOR 5 SECTOR 6

Antenna Type

Serial No

Direction

Mechanical Tilt

Electrical Tilt

Antenna Height

B. 3G Antennas

SECTOR 1 SECTOR 2 SECTOR 3 SECTOR 4 SECTOR 5 SECTOR 6


TDJH- TDJH- TDJH-
Antenna Type 182020DE- 182020DE- 182020DE-
65Fv01 65Fv01 65Fv01

Serial No RT185000005 RT185000043 RT185000026

Direction 60 180 310

Mechanical Tilt 4 4 4

Electrical Tilt 2 2 2

Antenna Height 35m 35m 35m


Note: Please fill in “2G” if using 2G and 3G dualband antenna type.

Revision number: 00 4 Document title: Flexi Multiradio Acceptance


Date of issue: August 6, 2012 of Document number: 4090
References: 37 Release status: Release
1.2 Feeder Configuration

A. 2G Feeder System

Actual Feeder Installed


Sector 1 Sector 2 Sector 3 Sector 4 Sector 5 Sector 6
FEEDER
Feeder Cable
Type
Installed Feeder
m m m m m m
Length
Top Jumper
m m m m m m
Length
Buttom Jumper
m m m m m m
Length
FEEDERLESS
RFM/ RFM/ RFM/ RFM/ RFM/ RFM/
Top Jumper
RRH RRH RRH RRH RRH RRH
Length
1 2 3 4 5 6
Optical Cable
Type
Optical Cable
m m m m m m
Length
DC Cable Type

DC Cable Length m m m m m m

B. 3G Feeder System

Actual Feeder Installed


Sector 1 Sector 2 Sector 3 Sector 4 Sector 5 Sector 6
FEEDER
Feeder Cable
Type
Installed Feeder
m m m m m m
Length
Top Jumper
m m m m m m
Length
Buttom Jumper
m m m m m m
Length
FEEDERLESS
RFM/ RFM/ RFM/ RFM/ RFM/ RFM/
Top Jumper
RRH RRH RRH RRH RRH RRH
Length
5m 5m 5m 4 5 6
Optical Cable
Type
Optical Cable
m m m m m m
Length
DC Cable Type

DC Cable Length m m m m m m

Revision number: 00 5 Document title: Flexi Multiradio Acceptance


Date of issue: August 6, 2012 of Document number: 4090
References: 37 Release status: Release
1.3 Voltages Measurement

A. Rectifier System

Items Specification Measurement Result

AC Input of
220±10% VAC 221 VAC
Rectifier System
DC Output of
-40.5 VDC – -57 VDC 53 VDC
Rectifier System

B. 2G

Items Specification Measurement Result


AC Input of
220±10% VAC
Rectifier System
DC Output of
-40.5 VDC – -57 VDC
Rectifier System
DC Input of
-40.5 VDC – -57 VDC
System Module
FEEDERLESS
RFM/ RFM/ RFM/ RFM/ RFM/ RFM/
RRH RRH RRH RRH RRH RRH
1 2 3 4 5 6
DC Input of RF
-36 VDC – -57 VDC
Module or RRH

C. 3G

Items Specification Measurement Result

AC Input of
220±10% VAC 221 VAC
Rectifier System
DC Output of
-40.5 VDC – -57 VDC 53 VDC
Rectifier System
DC Input of
-40.5 VDC – -57 VDC 53 VDC
System Module
FEEDERLESS
RFM/ RFM/ RFM/ RFM/ RFM/ RFM/
RRH RRH RRH RRH RRH RRH
1 2 3 4 5 6
DC Input of RF
-36 VDC – -57 VDC
Module or RRH

1.4 Antenna Line Sweep Test Tool

DATE OF LAST
MANUFACTURER MODEL SERIAL NUMBER
CALIBRATION

Anritsu S331D 1110046 15-01-2019

Revision number: 00 6 Document title: Flexi Multiradio Acceptance


Date of issue: August 6, 2012 of Document number: 4090
References: 37 Release status: Release
1.5 Antenna Line Sweep Test Result

A. VSWR Measurement

Measure the VSWR value of feederline, including the RF bottom jumper, feederline,
and antenna. Maximum VSWR value allowed is 1.3.

2G 3G

SECTOR 1 Tx1/Rx1 RxDiv1 Tx2/Rx2 RxDiv2

VSWR Value

Return Loss (max)

SECTOR 2 Tx1/Rx1 RxDiv1 Tx2/Rx2 RxDiv2

VSWR Value

Return Loss (max)

SECTOR 3 Tx1/Rx1 RxDiv1 Tx2/Rx2 RxDiv2

VSWR Value

Return Loss (max)

SECTOR 4 Tx1/Rx1 RxDiv1 Tx2/Rx2 RxDiv2

VSWR Value

Return Loss (max)

Sector 5 Tx1/Rx1 RxDiv1 Tx2/Rx2 RxDiv2

VSWR Value

Return Loss (max)

Sector 6 Tx1/Rx1 RxDiv1 Tx2/Rx2 RxDiv2

VSWR Value

Return Loss (max)

Revision number: 00 7 Document title: Flexi Multiradio Acceptance


Date of issue: August 6, 2012 of Document number: 4090
References: 37 Release status: Release
B. DTF – SWR Measurement
Bottom Feeder Cable Top Antenna
Jumper Jumper

M1 M2 M5 M3 M4

Distance to Fault Criteria:


M1 Connection point between RF/RRH Module to the bottom Distance 0 m, SWR  1.05
jumper
M2 Connection point between bottom jumper to the feeder Distance 3-6 m, SWR  1.05
M3 Connection point between feeder to top jumper Distance as per feeder length,
SWR  1.05
M4 Connection point between top jumper to the antenna Distance 3-6 m, SWR  1.05
M5 Maximum VSWR value on feeder line Distance between M2 & M3,
SWR  1.01

2G Feeder Lines

M1 M2 M3 M4 M5 Not
Feeder OK N/A Remark
S D S D S D S D S D OK

Sector 1 A
Sector 1 B
Sector 2 A
Sector 2 B
Sector 3 A
Sector 3 B
Sector 4 A
Sector 4 B
Sector 5 A
Sector 5 B
Sector 6 A
Sector 6 B

3G Feederlines

M1 M2 M3 M4 M5 Not
Feeder OK N/A Remark
S D S D S D S D S D OK

Sector 1 A

Revision number: 00 8 Document title: Flexi Multiradio Acceptance


Date of issue: August 6, 2012 of Document number: 4090
References: 37 Release status: Release
Sector 1 B
Sector 2 A
Sector 2 B
Sector 3 A
Sector 3 B
Sector 4 A
Sector 4 B
Sector 5 A
Sector 5 B
Sector 6 A
Sector 6 B

1.6 Antenna Line Quality Checklist

Item Description OK NOK N/A

1 EQUIPMENT PREPARATION
1.1 Delivery checked, shortcomings recorded √
1.2 Transport damages recorded √
2 SITE PREPARATION
2.1 Equipment layout checked, differences to the drawings recorded √
2.2 Cabling routes checked, cable trays & ladders installed √
2.3 Antenna tower/pole grounding checked √
3 ANTENNA INSTALLATION
3.1 Antenna mounted according to Site Specific Documents √
3.2 Mounting height checked according to Final Site Configuration √
3.3 Lobe direction checked according to Final Site Configuration √
Mechanical tilting angle checked according to Final Site
3.4 √
Configuration
3.5 Electrical tilting angle checked according to Final Site Configuration √
3.6 Antenna mounting clamps checked, all screws tightened √
4 FEEDER INSTALLATION

4.1 Feeder cables installed according to Site Specific Documents √


4.2 Feeder cables grounded at top of support structure √
4.3 Feeder cables grounded at bottom of tower/mast √
Feeder cables grounded at additional points (d > 40m)where
4.4 √
applicable
4.5 Feeder cables grounded at the gland plate √
4.6 Feeder/ jumper cables secured in position √
4.7 Feeder cables labelled correctly √

Revision number: 00 9 Document title: Flexi Multiradio Acceptance


Date of issue: August 6, 2012 of Document number: 4090
References: 37 Release status: Release
Item Description OK NOK N/A

Antenna feeder and jumper connectors checked and tightened at


4.8 √
both ends
4.9 All external connectors checked for correct sealing √
4.10 BTS jumper cable connectors checked and tightened at both ends √
5 OPTICAL INSTALLATION
5.1 Optic cables installed according to Site Specific Documents √
5.2 Optic cables use conduit and secured in position with cable ties √
5.3 Optic cables labelled correctly √
5.4 Optic cables port plug in properly √
5.5 IP seal for Optic cables port plug in properly √
5.6 Optic cables spare rolled with diameter minimum 140mm √
5.7 Optic cables spare placed in a secure position √
5.8 Optic cables installed separated with power cable √

2. EQUIPMENT INSTALLATION & COMMISSIONING RECORD

2.1 BTS Instalation Record

2.1.1 BTS Information

ITEM DESCRIPTION OK NOK N/A


1 PREPARATION
1.1 Delivery checked, shortcomings recorded √
1.2 Transport damages recorded √
2 SITE PREPARATION
2.1 Equipment layout checked, differences to the drawings recorded √
2.2 Cabling routes checked, cable trays installed √
2.3 Installation of main grounding busbar (connection to building earth)

checked
3 CABINET INSTALLATION
3.1 BTS installed according to the Site Specific Documents √
3.2 Cabinets fixed to wall or floor, secured and feet adjusted √
4 CABINET EXTERNAL CABLING
4.1 Each BTS cabinet connected to main grounding busbar √
4.2 Power cables to BTS cabinets connected and marked √
4.3 Antenna Cables connected to BTS and tightened. √
4.4 Cables secured and tidy on cable tray √
5 ALARM TERMINAL BLOCK INSTALLATION AND CABLING
5.1 Alarm Terminal Block installed according to Site Specific Documents √
5.2 Alarm Terminal Panel labelled √
5.3 Alarm Terminal Panel connected to main grounding busbar √
5.4 Alarm cable to BTS connected and marked √
Revision number: 00 10 Document title: Flexi Multiradio Acceptance
Date of issue: August 6, 2012 of Document number: 4090
References: 37 Release status: Release
ITEM DESCRIPTION OK NOK N/A
5.5 Cables from equipment room alarm units (door etc.) connected and

marked
5.6 Jumpers connected on Alarm Terminal Block
6 DDF INSTALLATION AND CABLING
6.1 DDF installed according to Site Specific Documents √
6.2 DDF connected to equipment room grounding busbar √
6.3 DDF crossconnected cables fitted √
6.4 2MB Abis cables connected and marked at BTS √
6.5 2MB Abis cables connected and marked at BTS DDF √
6.6 2MB cables connected and marked between Telecom DDF and BTS

DDF
7 BTS PLUG-IN UNIT INSTALLATION
7.1 Switches and jumper settings of units and motherboards set

according to instructions in Section 7.2
7.2 Plug-in Module interconnection cables connected √
7.3 Plug-in Module retaining screws tightened √
7.4 Connectors tightened correctly (N-Type, SMA, Data, Power) √
8 CABINET INTERNAL CABLING
8.1 All cables and connectors in BTS cabinets connected (including
unused cables) as for the BTS configuration specified in Section 1
8.2 All the TRX RF cable connections to the combiners are checked in
the table at previous paragraph 7.3.
8.3 Cables in BTS cabinets cable formed and cable tied
8.4 Earth Strap to cabinet door(s) connected
8 CABINET INTERNAL CABLING
All cables and connectors in BTS cabinets connected (including

8.1 unused cables) as for the BTS configuration specified in Section 1
8.2 All the TRX RF cable connections to the combiners are checked in

the table at previous paragraph 7.3.
8.3 Cables in BTS cabinets cable formed and cable tied √
8.4 Earth Strap to cabinet door(s) connected √
9 FINISHING
9.1 ‘Hardware kit’ box of BTS checked and left in the site √
9.2 BTS Cabinet door key left on site √
9.3 BTS cabinet top cover and rear door fitted and secured √
9.4 Packing materials removed from the site √
9.5 Rubbish removed and room cleaned and tidy √
10 DOCUMENTATION
10.1 BTS Factory Test Reports placed in Section 10 of the Site Folder √
10.2 BTS inventory lists placed in Section 9, Serial numbers of units and
cabinets must be checked, - actual differences from the packing lists √
recorded in Section 9.5 /.

Revision number: 00 11 Document title: Flexi Multiradio Acceptance


Date of issue: August 6, 2012 of Document number: 4090
References: 37 Release status: Release
2.1.2 BOQ Modules

A. Flexi Multiradio BTS 2G

Item
Item Description Quantity Part Number Serial Number
Code
ESMB FLEXI EDGE 18
472109A
TRX SYSTEM MODULE
ESMC FLEXI EDGE 36
472059A
TRX SYSTEM MODULE
FIQB Abis over IP
472234A
Ethernet and E1 T1 sym
Flexi Optical Telecom SFP
471880A
GbE 1310nm
FXEB FLEXI RF MODULE
472501A
1800 TRIPLE 90W
FXEA FLEXI RF MODULE
472084A
1800 TRIPLE 70W
FMFA FLEXI MOUNTING
470149A
KIT FLOOR/WALL/POLE
EMHA FLEXI EDGE
470316A
MECHANICAL 3U UNIT
FMAA FLEXI MOUNTING
471657A
AUXILIARY BRACKET
FTCB OD CABLE RJ48C
470309A
120ohm 15M
FSFB Flexi System Fibre
471395A
B 50 m
FPIA Flexi Pole Installation
471767A
Kit
FSEC Flexi System
471397A
External OVP
FSES Flexi Ext. Semi-
472285A
integrated OVP
FSEB Flexi System
471424A
External Alarm
FSAA Flexi System Alarm
471628A
Cable 15m
ESFA SYNC CABLE FOR
471371A
FLEXI 12M

Revision number: 00 12 Document title: Flexi Multiradio Acceptance


Date of issue: August 6, 2012 of Document number: 4090
References: 37 Release status: Release
B. Flexi Multiradio BTS 3G

Item
Item Description Quantity Part Number Serial Number
Code

471469A FSME SYSTEM MODULE

471402A FSMD SYSTEM MODULE

FTIB Transport PDH/


471720A
Ethernet/ ToP
FTLB Transport Eth/PDH
471984A
high-performance
FRGP Flexi RF Module
472100B
2100MHz Triple 70W
FSEC Flexi System
471397A
External OVP
FSES Flexi Ext. Semi-
472285A
integrated OVP
FMFA FLEXI MOUNTING
470149A
KIT FLOOR/WALL/POLE
FMCA FLEXI 3U
470239A MOUNTING COVERS
FRONT/BACK
FSAA Flexi System Alarm
471628A
Cable 15m
FSEB Flexi System
471424A
External Alarm
FTCR OD Cable RJ45
471408A
CAT5E 15m
FTCH OD CABLE LC SM
470311A
1310 15M
Flexi Optical Telecom SFP
471880A
GbE 1310nm
Flexi Optical Telecom SFP
471881A
GbE 850nm MM
FSFB Flexi System Fibre
471395A
B 50 m
FPIA Flexi Pole Installation
471767A
Kit
FSKA FLEXI SYSTEM
471226A
EXTENSION KIT
ESFA SYNC CABLE FOR
471371A
FLEXI 12M

Revision number: 00 13 Document title: Flexi Multiradio Acceptance


Date of issue: August 6, 2012 of Document number: 4090
References: 37 Release status: Release
2.1.2.1 BoQ Upgrade / Licenses

Existing
No Object Final Quantity
Quantity
2.2 1 Channel Element Co
m 2 TRx mi
ss io
3 HSDPA Code
ni ng
Record

2.2.1 BTS & Transmission Information

TRS Information VALUE BTS Information VALUE


Authentication Server
TRS Public IP 10.158.140.181
Name
TRS Destination IP Authentication Server IP
131043_ XL -
TRS Gateway IP 10.251.104.233 BTS/NodeB Name MODUNG
SAMPANG_3G
TRS LMP Public IP BTS ID / SALUNAME*
TRS LMT IP BTS/NodeB IP Address 10.158.140.181
TRS LMP Broadcast IP SW Load*
Neighbour Node
Combining*
Discovery
NTP IP 10.1.136.59 COBA* Switch Setting
System Name COSA*
User Label BSC/RNC Name
Location BSC/RNC ID
Q1 Baud rate BSC/RNC IP
Other Destination IP Real Tilt 1 IP

* For BTS 24x

2.2.2 Node B and RNC Information

Parameter RNC NODE B

Node Name
PLMN ID
Routing Area Code
Location Area Code
Service Area Code
O&M Link (IP Address)
ET-Board Port
VPI / VCI
Transmission Capacity

PARAMETER SECTOR 1 SECTOR 2 SECTOR 3 REMARK


Revision number: 00 14 Document title: Flexi Multiradio Acceptance
Date of issue: August 6, 2012 of Document number: 4090
References: 37 Release status: Release
SAC
CELL ID
Primary
Scrambling
Code (PSC)
Adjacent Cell
PSC

2.2.3 Remote Access Test

TEST DATE COMMENTS ü

Abis Test 13-02-2019 OK

External Alarm Tests* 13-02-2019 OK

BTS Restart 13-02-2019 OK

Launch & connection BTS Manager from NEMU 13-02-2019 OK

Revision number: 00 15 Document title: Flexi Multiradio Acceptance


Date of issue: August 6, 2012 of Document number: 4090
References: 37 Release status: Release
2.2.4 TRX Configuration

TRX Configuration Installed GSM900/DCS1800 TRX Configuration:


TRX ARFN TRX ARFN TRX TRX ARFN
ARFN
No No No No
1 7 13 18
2 8 14 20
3 9 15 21
4 10 16 22
5 11 17 23
6 12 18 24

2.3 Test Call

2.3.1 2G Test Call

a. Timeslot Test Call

Mobile Originated Call / Mobile Terminated Call


Sector 1 Sector 2 Sector 3 Sector 4 Sector 5 Sector 6
TRX / SEC TRX / SEC TRX / SEC TRX / SEC TRX / SEC TRX / SEC
T
1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6
S
0
1
2
3
4
5
6
7

b. Voice Test Call

Test Call Result


Item Test MO Number MT Number REMARK
Ok NOk N/A
Mobile
Originating
Mobile
Terminating

c. SMS Test

Test Call Result


Item Test MO Number MT Number REMARK
Ok NOk N/A
Mobile
Originating
Mobile
Terminating

Revision number: 00 16 Document title: Flexi Multiradio Acceptance


Date of issue: August 6, 2012 of Document number: 4090
References: 37 Release status: Release
d. MMS Test

Test Call Result


Item Test MO Number MT Number REMARK
Ok NOk N/A
Mobile
Originating
Mobile
Terminating

e. Handover Test

Originating Destination Test Call Result


Item Test REMARK
Cell Id Cell Id Ok NOk N/A
SECTOR 1
Incoming
Handover
Outgoing
Handover
SECTOR 2
Incoming
Handover
Outgoing
Handover
SECTOR 3
Incoming
Handover
Outgoing
Handover
SECTOR 4
Incoming
Handover
Outgoing
Handover
SECTOR 5
Incoming
Handover
Outgoing
Handover
SECTOR 6
Incoming
Handover
Outgoing
Handover

Revision number: 00 17 Document title: Flexi Multiradio Acceptance


Date of issue: August 6, 2012 of Document number: 4090
References: 37 Release status: Release
f. Emergency Test Call

Test Call Result


Item Test MO Number MT Number REMARK
Ok NOk N/A
112
118

2.3.2 3G Test Call

a. Voice Test Call

Test Call Result


Item Test MO Number MT Number REMARK
Ok NOk N/A
Mobile
089629593327 089613564111
Originating
Mobile
089613564111 089629593327
Terminating

b. Video Test Call

Test Call Result


Item Test MO Number MT Number REMARK
Ok NOk N/A
Mobile
089629593327 089613564111
Originating
Mobile
089613564111 089629593327
Terminating

c. Packet Switch Test Call

MO Host Throughput Test Call Result REMARK


Item Test
Number Address / Delay Ok NOk N/A
PING 089629593327 google.co.id 32ms
WAP 089629593327 tri.co.id 23ms
HTTP 089629593327 google.co.id 34ms
FTP
089629593327 speedtest.net 36ms
Downlink
FTP Uplink 089629593327 speedtest.net 34ms
Video
089629593327 youtube.co.id 33ms
Streaming

Revision number: 00 18 Document title: Flexi Multiradio Acceptance


Date of issue: August 6, 2012 of Document number: 4090
References: 37 Release status: Release
d. SMS Test

Test Call Result


Item Test MO Number MT Number REMARK
Ok NOk N/A
Mobile
Originating
Mobile
Terminating

e. MMS Test

Test Call Result


Item Test MO Number MT Number REMARK
Ok NOk N/A
Mobile
Originating
Mobile
Terminating

f. Handover Test

Originating Destination Test Call Result


Item Test REMARK
Cell Id Cell Id Ok NOk N/A
SECTOR 1
Incoming
Handover
Outgoing
Handover
SECTOR 2
Incoming
Handover
Outgoing
Handover
SECTOR 3
Incoming
Handover
Outgoing
Handover
SECTOR 4
Incoming
Handover
Outgoing
Handover
SECTOR 5
Incoming
Handover
Outgoing
Handover
SECTOR 6

Revision number: 00 19 Document title: Flexi Multiradio Acceptance


Date of issue: August 6, 2012 of Document number: 4090
References: 37 Release status: Release
Incoming
Handover
Outgoing
Handover

g. Emergency Test Call

Test Call Result


Item Test MO Number MT Number REMARK
Ok NOk N/A
112
118

Revision number: 00 20 Document title: Flexi Multiradio Acceptance


Date of issue: August 6, 2012 of Document number: 4090
References: 37 Release status: Release
3. ATTACHMENTS

1. Screenshoots
a. 2G Modules Configuration
b. 3G Modules Configuration
c. 2G TRX Availability
d. 3G CE Availability
e. 2G Transmission Module Configuration
f. 3G Transmission Module Configuration
2. Antenna Sweep Test Result
a. 2G Sector 1 VSWR and DTF
b. 2G Sector 2 VSWR and DTF
c. 2G Sector 3 VSWR and DTF
d. 2G Sector 4 VSWR and DTF
e. 2G Sector 5 VSWR and DTF
f. 2G Sector 6 VSWR and DTF
g. 3G Sector 1 VSWR and DTF
h. 3G Sector 2 VSWR and DTF
i. 3G Sector 3 VSWR and DTF
j. 3G Sector 4 VSWR and DTF
k. 3G Sector 5 VSWR and DTF
l. 3G Sector 6 VSWR and DTF
3. Installation Pictures
 2G
a. System Module Installation (open and closed front cover)
b. RFM/RRH installation (open and closed front cover)
c. FSEC installation (feederless only) on SM and RFM/RRH
d. DC power cable termination to MCB in Rectifier System
e. DDF Installation
f. Feeder Installation
g. Antenna Installation
 3G
a. System Module Installation (open and closed front cover)
b. RFM/RRH installation (open and closed front cover)
c. FSEC installation (feederless only) on SM and RFM/RRH
d. DC power cable termination to MCB in Rectifier System
e. DDF Installation
f. Feeder Installation
g. Antenna Installation
4. Commissioning Files
 2G
a. TRSconfig.txt
b. BTScomm_report.txt
c. BTSalarm.txt
 3G
a. TRSconfig.txt
b. BTScomm_report.txt
c. BTSalarm.txt
d. HSDPA upload/download screenshoots (www.speedtest.net)
5. Redline drawing

Revision number: 00 21 Document title: Flexi Multiradio Acceptance


Date of issue: August 6, 2012 of Document number: 4090
References: 37 Release status: Release
CAPTURE
SITE ID/SITE NAME: 131043_ XL - MODUNG SAMPANG

Revision number: 00 22 Document title: Flexi Multiradio Acceptance


Date of issue: August 6, 2012 of Document number: 4090
References: 37 Release status: Release
Revision number: 00 23 Document title: Flexi Multiradio Acceptance
Date of issue: August 6, 2012 of Document number: 4090
References: 37 Release status: Release
Revision number: 00 24 Document title: Flexi Multiradio Acceptance
Date of issue: August 6, 2012 of Document number: 4090
References: 37 Release status: Release
Revision number: 00 25 Document title: Flexi Multiradio Acceptance
Date of issue: August 6, 2012 of Document number: 4090
References: 37 Release status: Release
Revision number: 00 26 Document title: Flexi Multiradio Acceptance
Date of issue: August 6, 2012 of Document number: 4090
References: 37 Release status: Release
IMPLEMENTATION PHOTO BEFORE
SITE ID/SITE NAME: 131043_ XL - MODUNG SAMPANG

NEW SITE NEW SITE

View To Site View BTS Position

NEW SITE NEW SITE

View BTS Open View Rack Rectifier

NEW SITE NEW SITE

View Battery Before


View Display Rectifier Before

Revision number: 00 27 Document title: Flexi Multiradio Acceptance


Date of issue: August 6, 2012 of Document number: 4090
References: 37 Release status: Release
IMPLEMENTATION PHOTO AFTER
SITE ID/SITE NAME : 131043_ XL - MODUNG SAMPANG

View Tower View To Site

View Access To site 1 View to BTS Position

View BTS Closed View To BTS Open

Revision number: 00 28 Document title: Flexi Multiradio Acceptance


Date of issue: August 6, 2012 of Document number: 4090
References: 37 Release status: Release
View Installation RF Module View installation Cable Interface
&Labelling

View labeling power to System module View Labeling alarm to System Module

View Jumper Installation View Label Jumper

Revision number: 00 29 Document title: Flexi Multiradio Acceptance


Date of issue: August 6, 2012 of Document number: 4090
References: 37 Release status: Release
View Installation Cable Grounding to View Installation grounding to main Bar
system Module

View Installation Cable Grounding to RF View Installation grounding to main Bar


Module

View Rack Rectifier View Display Rectifier

Revision number: 00 30 Document title: Flexi Multiradio Acceptance


Date of issue: August 6, 2012 of Document number: 4090
References: 37 Release status: Release
View Battery View Module ACDC

View Installation Cable Power & MCB View To Labeling MCB

View labeling cable Power Photo Installation DDF Alarm / E1

Revision number: 00 31 Document title: Flexi Multiradio Acceptance


Date of issue: August 6, 2012 of Document number: 4090
References: 37 Release status: Release
View labeling DDF Alarm / E1 View Tray Vertical
Y

View Tray Horizontal View Photo ACPDB

View KWH Display Load Current After

Revision number: 00 32 Document title: Flexi Multiradio Acceptance


Date of issue: August 6, 2012 of Document number: 4090
References: 37 Release status: Release
SPEED TEST
SITE ID/SITE NAME: 131043_ XL - MODUNG SAMPANG

4. PUNCH LIST

Site ID : 131043
Integration date: 06-04-2019

Note – Comments – Fault


Number Problems Cleared

1 Chapter : Name :

Description : Date :

2 Chapter : Name :

Description: Date :

3 Chapter : Name :

Description Date :

4 Chapter : Name :

Description : Date :

Approved by :
NOKIA Representative BMG Huawei MS

Nama : Nama : Nama :


Date : Date : Date :

Huawei MS Cluster H3I

Revision number: 00 33 Document title: Flexi Multiradio Acceptance


Date of issue: August 6, 2012 of Document number: 4090
References: 37 Release status: Release
Nama : Nama:
Date : Date :

SPEED TEST

Revision number: 00 34 Document title: Flexi Multiradio Acceptance


Date of issue: August 6, 2012 of Document number: 4090
References: 37 Release status: Release
Revision number: 00 35 Document title: Flexi Multiradio Acceptance
Date of issue: August 6, 2012 of Document number: 4090
References: 37 Release status: Release
TEST CALL

Revision number: 00 36 Document title: Flexi Multiradio Acceptance


Date of issue: August 6, 2012 of Document number: 4090
References: 37 Release status: Release
Revision number: 00 37 Document title: Flexi Multiradio Acceptance
Date of issue: August 6, 2012 of Document number: 4090
References: 37 Release status: Release

You might also like