I NationalHighwayAuthority
I
I
I
I Feifxo'Yri$rr.,r'Ars
I
I
for
I
I ConsultancySen ices
for
I Reviewof Preliminary €-i$n alongwithAlignment
Optimizatiou(if required),Traffic Studies,
t CommercialFeasibilityStudy and Bid Evaluation/
Bid ComparafiveAnalysisfor Hyderabad- Sukkur
I M ot orw ay-'P$Ct on B uil t- Opera t e-T ra nsfer (BOT)
I Basisu:nderPublic PrivatePartnership(PPP)
Arrangement
t
t TenderNo.6(481)
t Pages(1 to 99)
I October,2018
I
I
t Tableof Contents
I
Table of Contents
I
t
PAGE NO.
I DESCRIPTION
LETTER OF TNVTTATTON(LOI)
I ATTACHMENTS
',t,,
.,
19
TECHNICAL PROPOSALFORMS
,,.,,tt
'
'
:'t:
]-:
t)
24
'".'::;:'::'
t FINANCIAL PROPOSALFORMS,,,,,.,...,,.
::'
37
I APPENDIX A
TERMS OF REFERENCE
t,. .a.,
.
".:.::...
46
46
.::,,:. ..
I APPENDIXB ,.,,,.,.,:='l 59
59
MAN-MONTH A}.IE TY SCHEDULE
I APPENDIX C
'.:':.
60
CLTENTIS.REqURTMENTSFROM THE CONSULTANTS 60
T APPENDIX D 62
I PERSONNEL,EQUIPMENT,FACILITIESAND OTHERSSERVICESTO BE
PROVIDEDBY THE CLIENT 62
t APPENDIX E
COPYOF MODEL AGREEMENT
63
63
I ':
. ,:;..i..r
'.
.:i: r i.,
I \lt..l 'i
\,: 'i
: ,.,:i:
I '. ,.1
1';'; ,i,i
I ,.:l' . ,ll
I Letterof Invitation
I GOVERNMENT OF PAKISTAN
NATIONAL HIGHWAY AUTHORITY
I 27-MauveArea,G-911,
PostBox No. 1205,
ISLAMABAD
I Datedthe
Ref No.
I (LOI)
LETTER OF TNVTTATTON
I To,
A11prospectiveconsultants
I Gentlemen!
I agreement
other servicesand the content
of the same.b.y=NHA.'during
subjectto approval/revisions
be
contributing..to,"sefuices'shall
the negotiations.Similarly, all
deemedpart of the contract
agreementunlessit is specifiedfor any parti-'ulari.temup-front in your technicalproposalwhich
t to meritconsideration bv NHA.
I GeneralManager(P&CA)
I Telephone:+92-5| -9032727,
Fax:+92-5I-9260419
E-mail:gmpca.nha@gmail.com,
I Website:www.nha. gov.pk
I
I
t
I Servicesfor Hyderabad- SukkurMotorwayProjecton BOT BasisunderPPPArangement
Consultancy Page1 of99
l Attachments
t ATTACHMENTS
I Instructionsto Consultants(AnnexA)
I Data Sheet(AnnexB)
I Checklistfor Completeness
SummaryEvaluationSheet
of Proposal
I PersonnelEvaluationSheet
T TechnicalProposalForms
FinancialProposalForms
I AppendixB (Person-Months
andActivity Schedule)
AppendixC (Client'sRequirements
from the Cons'ult s) "::::':'
"
':t:t':'
I
I :::::
,
T =
:
I :
!
I
I
I
I - SukkurMotorwayProjecton BOT BasisunderPPPArrangement
Servicesfor Hyderabad
Consultancy Page2 of 99
I Instructionsto Consultants
T INSTRUCTIONSTO CONSULTANTS
AnnexA
I
I 1. INTRODUCTION
1.1 You are hereby invited to submit a technical and a financial proposal for consulting services
t required for the assignmentnamed in the rttached Data Sheet (referred to as "Data Sheet"
hereafter) annexed with this letter. Your proposal could form the basis for future
I negotiations and ultimately a Contract between your firm and the Client named in the Data
Sheet. .. ,;...
:
l 1.2 A brief description of the assignmentand its objectives are given in the Data Sheet.Details
are provided in the attachedRFP for design servicesprovided in the Documents, and will
'
' ''--
becomepart of agreementsubsequently.
I 1.3 The assignmentshallbe implementedin accordance specifiedin the Data
wifh the p-hasing
,,: a.,.',
.a:. ::.:.:.aa:-
t Sheet.
_,t
t tt
"''
I arrangements. You.,must fully inform yourself of local conditionsand take them into
accountin preparingy$ proposal.
T r.6 The Client shall.provide the inputs specifiedin the Data Sheet,assistthe Consultantsin
obtaining,licensesandpermitsneededto canyout the services,andmakeavailablerelevant
I 1 '7.
pr.qf -d4taandreports.
,' .t,
r " t r t . .' '
F.lbaSe
notethat:
,,
.'..,..''
:\,i \ Jk
"^rtu,
;"','i
l;i.ii'
t'l"i
I
''
'l
t 2.
2.1
DOCUMENTS
2.3 At any time beforethe sub,fnission of:proposals,the Client may, for any reason,whetherat
I its own initiative or in responseto a clarificationrequestedby an invited consultingfirm,
modify the Documentsby amendment. The amendmentshallbe sentin writing or by cable,
I 3.
tl*t1,1*ist
OF PROPOSAL
PREPARAT.ION
of twoparts- Technical
andFinancial
t 3.1 Technical:Proposal
I 3.1.1 The Technical Proposalshould be submittedusing the format specified and shall include
:, duly signedandstampedformsappended with the RFP.This is a mandatoryrequirementfor
evaluationof proposalsandneedsto be filled up carefully.
I responsibilitiesandassignments
c. Subcontracting
to be lookedafterby eachpartner.
I SpecialistSub-Consultantsmaybe included.
"'t-
I 3.1.5 The technical proposal shall not include any financial inforrmation.The Consultant's
comments,if any, on the data, servicesand facilities to be provided by the Client and
3,2 FinancialProposal ,
I 3.2.I The financial proposalshouldbe submittedusing the format specifiedand enclosedwith
this RFP.This is a mandatoryrequirernent for evaluationof proposalsandneedsto be filled
I ecifiedin the Form A-17 andaccordinglyalsoin Form
up carefully.The total costis to b.e,,,,,,
A-11.
I fn-==Ani
-_.11.
proposalshall also take into accountthe professionalliabilrty as provided
e relevantPECBye-Lawsandcostof insurances
u-nd-er,, specifiedin the DataSheet.
I
'.: t
::
:.t ,:
I 3 . 2 . 5 The evaluation committee will correct arly computational effors. When correcting
computational errors, in caseof discrepancybetween a partial amount and the total amount,
or between word and figures the formers will prevail. In addition to the above corrections,
I activities and items described in the Technical Proposals but not priced, in the Financial
Proposalsshall be assumedto be included in the prices of other activities or items, In case
I an activity or item is quantified in the Financial Proposal differently from the Technical
I 4. SUBMISSIONOF PROPOSALS
t 4.2 In the event of any discrepancybetweenthe copies of the proaosaf the original shall
govern. The original and each copy of the technical and financial proposalsshall be
I preparedin indelibleink and shall be signedby the author.i
-eoasultant's
representative.
The representative'satrthorizationshall be confirmed by a written power of attomey
I personorpersonssigningtheproposal. "
:
-.
4.4 The completedtechnical.andfinancialproposalsshall be deliveredon or beforethe time,
I date,andthe locationspecif@ in ihe DataSheet.
I 4.5 The proposalsshall,bevalid for the numberof daysstatedin the DataSheetfrom the dateof
its submission-:,D.ut!4gs period,you shall keepavailablethe professionalstaff proposed
for the assignment.The Client shall make its best effort to completenegotiationsat the
I locationstatedin theDataSheetwithin thisperiod.
.:..
.::
T 5.
5.1
PROPOSAL EVALUATION
' '.: '
-
t.
A Singlb-Stage-Two-Envelope
'
I 5.2 TechnicalProposal
5 . 2 . 1 The evaluationcommitteeappointedby the Client shall carry out its evaluationfor all the
I projectsas listedin Para1.1,applyingthe evaluationcriteriaandpoint systemspecifiedin
the Data Sheet.Each responsiveproposalshall be given a technicalscore: St. The
I 5.3 FinancialProposal
I S/:(1000xFm)/F ,.
(F: amountof specificfinancialPf{osa.l) ,=
,:
.:"'.'::
T 5.3.3 Proposals,in the Quality Cum Cost BasedSelection(QCBS) shall finaliy be ranked
accordingto their combinedtechnical(St) andfinaneial(S1)scoresusingthe weights(T- the
weight givento the technicalproposal,P = the weigtrtgiven to the financialproposal,and
I T+P:l) statedin theDataSheett ..",""'- .''..'.,.'
:::=':.
:::tj: it: ,l
: '.
I xPYo
t,=.,,,.. T'o/o+sY
I 6,
6.I
NEGOTIATION =,,'-."
Priorto the expirationof proposalvalidity,the Clientshallnotify the successful
Consultant
I
: .1.
6,2 Negotiationsngrr-nallytake from two to five days.The aim is to reachagreementon all
pointsa initiut a draft contractby the conclusionof negotiations.
t 6.3
. . . . . . .,m6
.
N-gatiatio'nsshall commencewith a discussionof your technicalproposal.The proposed
bdology,work plan, staffingand any suggestions you may havemadeto improvethe
I =,,
'1.:':
,TOR. Agreementshall then be reachedon the final TOR, the staffing,and the bar charts,
"'which shall indicateactivities,staff, and periodsin the field and in the home office, staff
months,logisticsandreporting.
T 6.4 Changesagreedupon shall then be reflected in the financial proposal, using proposedunit
6.s Having selectedConsultantson the basis of, among other things, an evaluation of proposed
r! I l'i i,i.;,r' key professional staff, the Client expects to negotiate a contract on the basis of the staff
'*
',i
I 6.6 The negotiationsshall be concludedwith a review of the draft form of the contract.The
Client and the Consultantsshall finalize the contract to conclude negotiations.If
t "t1
I
I 7.2 The selectedConsultantis expectedto
locationspecifiedin the DataSheet.
on the date and at the
t 8. CONFIRMATION OF'RECEIPT
(i)
l : :
Thatyou receivedthelettero:finvitation;
I (ii)
(iii)
a proposal;and
Whetheryou witrl'su.brn!1
If you plan to submitaproposal,whenandhow you will transmitit.
T
I -
'-=:.'-
'-:,.::
T
t =
t
t
I
t Servicesfor Hyderabad- SukkurMotorwayProjecton BOT BasisunderPPPArrangement
Consultancy Page9 of 99
I Data Sheet
t DATA SHEET
Annex-B
I LOI
Clause DESCRIPTIONOF CLAUSE
I No.
1.1 Servicesfor ooReview
The nameof Assignmentis:- Consultancy of Preliminary
I
t:
I 1.5 Conference
Pre-Proposal : Yes
-.:-
{No
-:
of the'O-ffuids) is (are):
Thename(s)andaddress(es)
l 28,MauveArea,G-g/I
Islamabad :
I
I :
I L.7 Followingsub-clauses
areadded:
.wiF?,""
I the existingload of work with a firm shallbe consideredas oneof the factors
for the considerationin the awardof the work.
Councilwith relevant
(a) Valid RegistrationCertificateof PakistanEr.r,,glneering
I providevalid RegistrationCertificate'(license)
caseof JV) by the PECwrll eqtitlethe
:
Clientto
of the firm (eachmemberin
rejectthe proposal.
t
1:':t::
T contraclual,.Obligations
consult@'' "-
(By all memberfirms in case of JV andlor sub-
..:
I (d) Cli-ent's satisfaction certificates (Perforrnance Reports) for the last three
relevant assignments from the respective clients. Moreover any adverse
repbrt regarding performance of Consultant on NHA projects received from
I NHA's any relevant quarter may become basis for its disqualification from
the servicesabovenamedin clause1.1.
(e) Signing and certification of the Checklist for Completenessof the Proposal
I as per attachmentat the end of Data Sheet.
t (ITC).
(b) Instructionsto Consultants
(c) DataSheet.
t (d) TechnicalProposalForms.
(e) FinancialProposalForms
GeneralManager(P&CA)
I NationalHighwayAuthority
28,MauveArea,G-911,
Islamabad
:
E-mail: gmpca.nha
! Add following:
@gmul.com
I The proposalsshould be.,-bodnd in the hard book binding form to deny the
possibilityof removalor additionof page(s).All the pagesof proposalmustbe
signedand stampedin original by authoized representative of the firmiJv. All
I the pagesmust be n beredstartingfrom first
161adhe-ri@ theserequirements
page
will be rei ected.
to last. Any proposalfound
I
I Data Sheet
I Projectsl;
He/shemust also haveperformedas TeamLeaderfor
at leastthree(03)majorHighwayDesignProjects.
I Structural Engineer Minimum B.Sc. (Civil Engineering)with minimum
twenty (20) years' relevantexperience(provenfifteen
I (15)years'designexperience
NationalHighwaysProjects);
asStructureEngineeron
-oR-
I M.Sc. (Structural Engineering) with minimum
eighteen (18) years relevant experience[proven
I thirteen (13) years' design experie €'aS''=Stfucture
Engineeron NationalHighwaysProjeCtsl.
I Traffic Engineer
t -oR-
I Projectsl.
I -oR-
PhD (Civil)/ PhD (Finance)/CFA with minimum
T :,ii.1,1,;.i
Seven(07)yearsexperience;
I
I DataSheet
I -oR-
MBA (Finance)/ICMA/ LLB with minimum fifteen
I (15)yearsexperience;
For all above,provenFive (05) years experienceas
I PPPExpert on megainfrastructureprojectspreferably
HighwayProjects.
I experience[proventhirteen(13) years'experienCe
as
Financial Expert on mega infrastructure projects
preferablyHighwayProjectsl;
I -oR-
Certificateof CharteredAccountancy'with minimum
I ten (10) years'relevantexperience[provenfive (05)
years' experienceas Chartered'Accountanton mega
I infrastructureprojectsp@aUty UighwayProjectsl.
-oR
t -oR-
Mastersof Law (LLM) CorporateLaw, with minimum
ten (10) years' relevantexperiencefproveneight (08)
I years' experienceas CorporateLaw Expert on mega
projectspreferablyHighwayProjects].
infrastructure
I -oR-
Mastersof Law (CorporateLaw) alongwith Bar at
I Law having minimum seven (07) years' relevant
experiencefproven five (05) years' experienceas
I ',',,'
' '':/
.i !:j.'ri?. r,,
: -i '
\'' :"
rr;. - i:i:
I
I DataSheet
Yes { No
I If Yes, details of training are given in TOR tl,. .r
W .j",I
I :\i-' . .". i
l..iii.-,,
Page15 of99
t
I DataSheet
I :'bf complete
Financial Proposal: One Original with CD (soft-:ftll
I FinancialProposalin PDF as
Forms)in sealedenvelope.
well asMS Word/Excel
':.,.:;. :::.:"
.,..='-:".-,-
::;..';'- -"
I National HighwayAuthority ..::::=:::
28, MauveArea G-9/1Islamabad.,i'
Telephone:+92-5I-9032727 '.',,,
''-'',;i
',"',,,
'"tj'::=-",,:'
I Facsimile: +92'51-9260419
..:=::::-::.
4.4
I Date: ',,,31't
october,2018
Time: 1130hours
I : NHA Main Auditorium
Locationof SubmisSi'on
', :-'...'=
NationalHighwayAuthority
27,MauveAteaG-9ll Islamabad.
I 4.5
,: =:i.
I GeneralManager(P&CA)
NationalHighwayAuthority
28, MauveAreaG-9lI Islamabad
I Telephone:+92-51-90327
Facsimile:+92-5|
27
-9260419
I
il
I ::.l.'
r.i.';1,.
. lt
::r.l:, '..';
t '':i:
Page16of99
I
I DataSheet
I 1.
Description/ Items
Experienceof the Firm
Points
100
1-a) GeneralExperiencein road Transport
I 1-b)
Sector
SpecificExperiencerelatedto particular
Q5)
Assisnment a5)
I 2. Approach& Methodology 250
2-a Appreciationof the Project g0)
I (r.
(it).
Evidenceof Site Visitwith Photographs
Clar ity of appreciation
(30),,
QAI=.
(iir. Comprehensiveness of appreci ation
I 2-b Problem StatemenVUnderstandingof
Objectives
at,'
,..(20't-
:::._:
I ut). Components
2-c Methodology
of ProposedServices .,r (20)
GA
t (i) ProposedSolutionsfor this Project,--,'",,,.
(ir. Qualityof Methodologt
(iii). Conciseness, essof
clarity and co-m-p.l'eq
(30)
Q0)
(30)
I 2-d
proposal
Suggestedchanges.,.for
TOR G0)
I 2-e
2-t
Work Program
StaffingSchedule
==-..
Qe)
(29)
3. Key Staff 450
I 4.
.,=
PerformaneeC
_-.'
cationfrom clients 100
J. Present.Commitments(current engagement 50
I 6.
gnd.avd.i. strength- justification)
Transfer of Knowledge* (Methodology/ 50
I PIans)
_:i:::.:::..
I afei-
I ''
, :..
''.",'
! !
i.
ii.
iii.
AcademicandGeneralQualifications
Professionalexperience relatedtothe Project
Statuswith the firm (Permanent & durationwith
30
60
10
per 3.1.4 (d))
11 Firm as LOI Clause
TotalPoints: 100
I
l DataSheet
I LATER).
I
t
t
t
I .: :: :. .: '
:.:,
I ::'
.:.1::::.:
t
I
I
I Servicesfor Hyderabad- SukkurMotorwayProjecton BOT BasisunderPPPArrangement
Consultancy Page18of99
I
I Checklist
I of Proposal
Checklistfor Completeness
I s.
No.
Description
Must attachDocuments
I member
representative
firm(S)/
of LeadFirm
sub-
consultant(s)to .the au,thorized
t
2. Power of Attorney to sign the Proposal a. By the owner/owners of Firm to a. By the owner/olvnersof each
(Original,scannedcopyis not acceptable) authorizedrepresentative. Firm to authorized
b. In caseof morethan one owner, rersr.esentative.-
legal authorityof issuingPower b. ln caseof morethanoneowner,
of Attorneyof Executantitself. Iegalauthorityof issuingPower
I of Attorneyof Executants
c. Powerof Attorneyby the duly
itself.
, altthorizedrepresentative(s)of
' member firm(s)/ sub-
I 7.
Ensineers)Bve-Laws.1986-
Affidavit on,s.tamppaporduly attestedby the
OathCommissioner to'theeffectthat the firm
Must be provided by all member
firm(s) including the Lead firm
hasnei,thrbeen blacklistednor any contract Mustprovide (and sub-consultant(s) if
I
ScheduleandTOR
affidavit will be signed by the
individualhimself
1 0 . Performance Cerliftcatel Assignment Must be provided for completed
$l Co
:..
- SukkurMotorwayProjecton BOT BasisunderPPPArrangement
Servicesfor Hyderabad Page19of99
R7
\?.f,n,rr.i..t.ag
+
Checklist
Must attachDocuments
s. Description
No.
ln caseof SingleEntity In caseof JV/ Sub-Consultants
REFERENCE
Note: Any project mentioned completed
underForm TEC-28 will not be considered
for evaluation unless Performance
Certificatei Assignment Completion
Certificatewith satisfactoryremarksby the
client's representativeis not attached.The
Client NIIA reservesthe right to verify the
Performance/ Assignment Completion
Cerlificates.
l1 Integrity Pact Documentduly filled in the
blank spaceswith requisiteinformationand Must provide Mustp,:l:-:de.,
sisned/stamped
t2. FINANCIAL PROPOSALFORMSFIN-1 to
FIN-7 duly completedas per Instructionsto
Consuitants/ Data Sheetand requirements of Must provide ,,,, ;]
TOR (To be attached with Financial
Pronosal)
IJ Audit Reportsof the {irm for pastthreeyears ':Muit.be :providedfor each firm
duly cetified by CharteredAccountant(To Must provide ,,who' proposesPersonnelfor the
'i{ssi.snment
be attachedwith FinancialProposal)
t4. Sequential page numbering of Proposal. :',:.,,
I Signingandstampingofproposal(Technical
andFinancial)whereverindicatedas well as
initial/ signatureand seal on all other pages
of proposals.The Proposalis bound as hard
I:::.:.
Must fulfill the reguirement Mustfulfill therequirement
Certification:-
I : .:.:::
:::
I, the undersigned, certify to the best of my knowledge and belief that alI above
mentioned documents(as applicab..le),Sr. No,l to 13 have been attachedto our proposal (technical
t and financial) and signed and stampedas per requirementmentionedat Sr. No.14, In the event of
any sort of falsification of this certifidon, the Client NHA may at its sole discretion disqualify our
firm from bidding for the AssignmenfnamedunderData SheetSub-Clause1.1.
I
I of thefirm(s)
Signatureof authorized.iepresentative Date:
Dav/Month/Year
_-t ttt-tt':t:
l '-
I (Seal)
T
I - SukkurMotorwayProjecton BOT BasisunderPPPArangement
Servicesfor Hyderabad
Consultancy Page20 of 99
I
I I I I I I I I r r I I I r I r I IIT
Evaluation Sheets
I
PERSONNELEVALUATION SHEET
Rating:- Excellent-1007o Verygood-90-997o AboveAverage- 80-89% Aveldge- 70-79o/o Below Average -149o/o Non-complying - 07o
Score:Maximum Weight X rating / 100.
a. Senior Highway Q: Minimum B.Sc. (Civil Engineering) With M.Sc. (Transportation Engineering) with
Engineer/ Team minimum twenty (20) years' relevant eXperienCF minimumeighteen(18) yearsrelevantexperience
Leader [proven fifteen (15) years' desigl experience'bs [proventhirteen(13) years' designexperienceas
Highway/ GeometricDesign Engineeron National Highway/ Geometric Design Engineer on
HighwaysProiectsl.(Marks: 70olo) NationalHishwavsProiectsl.(Marks: 307o)
b. Structural Q: Minimum B.Sc. (Civil Engineering) with M.Sc. (StructuralEngineering)with minimum
Engineers minimum twenty (20) years' relevant experience eighteen(18) yean relevantexperience[proven
(proven fifteen (15) years' design experienceas thirteen (13) years' desigrr experience as
Strucfl[e Hngrneer O,! Nallonal Hlghways ProJects) Structure Engineer on National Highways
Marks: 707o) : ,., :' ' Proiectsl.Marks: 307o)
c. Traffrc Engineers Q: Minimum tsiSc. (Civil Engineering) with M.Sc. (Traffic Engg./Transportation Engg.)with
minimum twenty (20).'years' relevant experience minimum eighteen (18) years' relevant
[proven fifteen (15) years' design experienceas experience[proven thirteen (13) years' design
Traffic Engineer on major Highways Projectsl experience as Traffrc Engineer on major
fMarks:707o) HighwaysProiectsl.(Marks: 307o)
Consultancy Servicesfor Hyderabad- Sukkur Motorway Project on BOT Basis under PPP Arrangement Pa4e22of99
I I I I I I r I I I I I I I I I r rrr r
Evaluation Sheets
PavementDesign Q: Minimum B.Sc. (Civil Engineering) with M.Sc. (Traffrc Engg.l Transportation Engg.l
Ensineer minimum twenty (20) years' relevant experience Highway Engg.) with minimum eighteen(18)
[proven fifteen (15) years' design experienceas years' relevantexperience[proventhirteen(13)
PavementEngineer on major Highway Projects]. years' designexperienceas PavementEngineel
e. PPPExpert Q: B.Sc. (Civil)/ BBA/ LLB with minimum Fifteen M.Sc.(Civil)IMBN ICMAi LLM with minimum vil)/ PhD (Finance/ MBA (Finance)/
(15)yearsexperience. (Marks: 70%) (Marks: l07o)
Ten(10)yearsexperience. CFA with minimum Seven ICMA/ LLB with
(07) years experience. minimum fifteen
(Marks: 10%) (15) years
experience.
Financial ExperU Q: Minimum M.Sc. Economics/ MBA (Finance)/ Certified Financial Analyst
CA ICMA/ ACCA with minimum fifteen (15) years' with minimum seven (07)
relevant experience [proven thirteen (13) years' years' relevant experience
experience as Financial Expert on mega [proven three (03) years'
infrastructure projects preferably Highway Projectsl. experience as Certified
(Marks: 707o) Financial Analyst on mega
infrastructure projects
preferably Highway
(Marks: l5%o
iects.l.
g. Corporate Law Q; Minimum Bachelors of Law (LLB) with Masters of Law (LLM) Corporate Law, with Masters of Law (Corporate
Expert minimum fifteen (15) years' relevant experience minimum ten (10) years' relevant experience Law) alongwith Bar at Law
[proventhirteen(13) years' experienceas Corporate [proveneight (08) years'experience
as Corporate havingminimum seven(07)
Law Expert on mega infrastructure projects Law Expert on mega infrastructure projects years' relevant experience
preferablyHighwayProjectsl.(Marks: 70%) prefetablyHighwayProjectsl.(Marks: 15%) [proven five (05) years'
experience as Corporate
Law Expert on mega
infrastructure projects
preferably Highway
iectsl. (Marks: l57o
h. Contract M.Sc. (Contracts/ Procurementor Contracts
Specialist Management)with minimum thirteen(13) years
relevant experience(proven eight (08) years'
experienceof Bidding/ Contract Documents.
He/shemust haveadequateknowledgeof FIDIC
contractualscheme.(Marks: 307o
/-9
;5/
AI
7l
*\
I vls
- SukkurMotor"way
Servicesfor Hyderabad
Consultancy Projecton BOT BasisunderPPPArrangement Page24of99
t TechnicalProposalForms
l Form 4.-L
Fonvr
TncrrxrcAr,PRoposALSuBMrssroN
I
I {Location,Date}
I DearSirs:
..'..'.
.]
T envelope.
a separate
.. :- ,.,;.,11,:::::
T OR
:::: ::a:::.
I We herebydeclarethat: . "-'o'.,.
(a)
:::::-a:. '::.
t misinterpretatiot'or
disqualifi,cation,'and/or
.
contained in this Proposal may lead to our
misrepresentation
by the Client.
maybe sanctioned
T (b) Our ProFoialshall be valid and remainbindingupon us for the periodof time specifiedin
theDataSheet,Clause4.5.
I (C)
(d)
with ITC Clause1.9.
We haveno conflict of interestin accordance
asstatedin DataSheetClause1.8.
We meetthe eligibility requirements
t (e) or any of the proposedexpertsprepared
Neitherwe, nor our JV Partner(s)/sub-consultant(s)
the TOR for this consultingassignment.
I (0 Within the time limit statedin the Data Sheet,Clause4.5, we undertaketo negotiatea
Contracton the basisof the proposedKey Experts.We acceptthat the substitutionof Key
T Expertsfor reasonsotherthan thosestatedin Instructionsto Consultants,Clause6.5 may
leadto the terminationof Contractnegotiations.
l (g) Our Proposalis binding upon us and subject to any modificationsresulting from the
I (h).
Contractnegotiations.
Our firm/ each member of our JV is not participatingin any other proposal for this
I Assignment.
I relatedto the Assignmentnot laterthan the datementionedin DataSheet4.5 (or the dateextended
with the written consentof Consultantin caseof delayin procurementprocess)
t We understandthat the Client is not boundto acceptany or all Proposal(s)that the Client
receives.
t We remain,
Yourssincerely,
I AuthorizedSignature{In full andinitials}:
Address:
t
I
t
r---\"\,
lis/]kt\
(+' ).fli
'\ /'.:ii!
kir.Eg{I/
t
t
I
T
I - SukkurMotorwayProjecton BOT BasisunderPPPArrangement
Servicesfor Hyderabad
Consultancy Page26of99
I
[r TechnicalProposalForms
T Form A-2
t ClrcNrosRnrnnnNcn
"=."
l Locationwithin Country:
.. .::
PrsfessionalStaff Provided by
Y.o.ur,_.irm:'.
t Name of Client:
1,::::.
No of Staff:
t No of StaffMonths:
Address:
I
I StartDate(Month/Year): 6pr"t#
(Month/Year):
Date Approx. Value of Services (in
CurrentUS$iRs.)
I Name of Associated
Firm (s), if any:,'
No. of Months of Professional
Staff Provided by Associated
I :i::::,':
Firm(s)
Name of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions
I performed:
I
-. :
. =:a:'' al
I Consultants'Name:
I
t
I - SukkurMotorwayProjecton BOT BasisunderPPPArrangement
ConsultancyServicesfor Hyderabad P a g e 2 7o f 9 9
t
TechnicalProposalForms
Form A-3
.:t"
...
=..-
,>l
<3o
:: :-::'
:::':::::::::
Form A-4
Or CoxSULTANT
CovrwrnNTs/SuccrsrroNs
Form A-5
l. Proposed
Position:
2. Nameof Firm:
3. Name of Staff:
4. Profession:
5. Dateof Birth:
6. Yearswith Firm:
1 Nationality:
8. N.I.CNumber:
9. CellNumber:
in Professional
1 0 . Membership Societies:
(Membershipof PEC is Mandatory)
11. DetailedTasksAssignedonthelro.l.ct:
-'-
o Key Qualificutigll;,.,
.,,
[Give an outline oistag'*l-Uer's experienceandtrainingmost pertinentto taskson assignment.
Describedegreeof res nsibility held by staff memberon relevantpreviousassignmentsand give
datesandt",,, Useup to one page].
:,
I Education , ..
.,,4a, t''
.=,.t.:.r:,'
"
a Record
Employment
\t.
l()
t::
(:1.
- SukkurMotorwayProjecton BOT BasisunderPPPArrangement
for Hyderabad Page30 of99
I I rrr
TechnicalProposalForms
Form A-6
Cotwr-nuoN ANDSunvrrssroNOF Rnponrs As PBnTon
ill
Reports
1.
2.
5.
4.
5.
6.
7.
8.
9.
t,l '
.:
Form A-7
1. TechnicaVManagerial Staff
il
Form A-8
/AcrrurY ScHEDULE
Wom Pr,^q.N
Items of Work/Activities Monthly Programfrom dateof assignm."itio the form of a Bar Chart)
I 2 3 4 3 6 7 8 9 10 1l 12 13 t4 15
'
Form A-9
Full Time:
PartTime: ActivitiesDufation
Yours faithfully,
Signature
(Authorized Representative)
Full Name
Designation
Address
Form A-10
Or Tnn Fmu
Cunnrnr CovrprrrvrENTs
Expected date of
Name of project Single or JV Task Assignment Start date of the project
comnletion
,,C',;#%*
;,'*<,/ \ --\
{:'i € )a
I
t
I
I
I
I
I
I
I
I
I
I
I
I
':
:':''=l::'
I
I
T
I
I - SukkurMotorwayProjecton BOT BasisunderPPPArrangement
Servicesfor Hyderabad
Consultancy Page37of99
I
ll
FinancialProposalForms
IT Form A-11
I FrNaNclrL PRoposALSuBMrssroN
Fonvr
ll
ll To: [Nameandaddressof Client]
{Location, Date}
lr DearSirs: t tt"',...
ll
.'
a .-,:.::.
ll Proposal.
Our attachedFinancial Proposal is for the amount of {Insert atnount in words and figures},
Ir including all Federal, Provincial & Local taxesapplicable as per law':$th€land. {Pleasenote that
all amountsshall be the sameas in FinancialProposalForm A-17): .
'r.;
,'.,.''ii.
'.,.,:.,;:.=
It
lt
Our FinancialProposalshallbe bindinguponus sut;' to the modificationsresultingfrom
Contractnegotiations,
indicated
up to expirationof the validity periodof the Proposal,i.e. beforethe date
in Clause4.5of theDataSheet.
I We remain
t Yourssincerely,
ne:{trnfull andinitials}:
AuthorizedSignature
Name and Titie of Signatory:
I In the capacitSrof:
Address:
I
. l
tr-malt:
',:,:
:.
{For a jbint venture, either all members shall sign or only the representative
T member/consultant,
shallbe attached.)
in which casethe power of attorneyto sign on behalf of all members
I
I
t
I Servicesfor Hyderabad- SukkurMotorwayProjecton BOT BasisunderPPPArrangement
Consultancy Page38 of 99
I
FinancialProposalForms
Form A-12
OF R.a,rnsFon CoNsuLTANcvCoNrnq.cr
Bnr,q.KDowN
Consultant:
Name Position Basic Social Overhead Sub- Fee Rateper Field Rateper
Salary Charges (%ageof Total (%age Month Allow. Month
perCal, (%oageof l+2) (1+2+3) of4) for (%ageof for Field
Month 1) project r) Work
I
I Notes:
t Item No. 3 Overhead shall include general''.,administrationcost, rent, clerical and junior
professionalstaff and business getting expenses,etc. Breakdown of proposed
percentagechargesfordVerheadshouldbe submittedandsupported(seeFormA-14).
I Item No. 5 Fee shall includecomp,anyprofit and shareof salaryof partnersand directors(if not
billed individuallyfor the project)or specifiedin overheadcostsof the Company.
J Full Name:
Signature:_
Title:
I
I
I - SukkurMotorwayProjecton BOT BasisunderPPPArrangement
Servicesfor Hyderabad
Consultancy Page39 of 99
FinancialProposalForms
Form A-13
BnBaxnowNOFSocrar,Cnancrs
Form A-14
OF OvsRHnaDCosrs
Bnn.q,KDowN
As a Toageof BasicSalaryand
Sr.No. DetailedDescription
SocialCharges
Form A-15
PageI of2
Total
Staff- Monthly Billing
Sr. No. Position Name Estimated
Months Rate
Amount (Rs.)
I. Professional/ Kev Staff
Sub-Total:
I Form A-15
Page2of 2
T EsnvrarED Lo cAr,CunnnNcy SALARyCosrs/RrvruxnRATroN
I
I Sr. No. Position Staff-Months
Monthly Billing
Rate
Total Estimated
Amount (Rs.)
I It is alsoto be notedthat the Client is not boundto agreeto the reasonsgiven in FormA-4.
,: :
'-a:,.,
l
I
I
I
I
I
t - SukkurMotorwayProjecton BOT BasisunderPPPArrangement
Servicesfor Hyderabad
Consultancy Page43 of99
I
I FinancialProposalForms
I Form 4.-16
I Drnrcr (NoN-SaLARY)
Cosrs
I Sr.
Nomenclature Unit Unit Price Total Amount
No. Qty.
I I. Rentfor OfficeAccommodation L.S
(Rs.) (Rs.)
I 2.
a
J.
Office Utilities Costs
Cost/ rentalof Furniture/ Furnishines
L.S
L.S
I A
a. Rentalcostsof Offrce/Other
Equipment
L.S
i. Computers andaccessories
I ii.
iii.
Photocopymachines
Communication equipment =_
iv. Drafting/ Engineering
I v.
equipment
Surveyinginstruments
vi. TransportVehicles
I vii. SitevisitsandMeetingsin
Islamabadduringcurrencyof , '
Projectandcoordinationduring
I 5.
supervision
Communication exoenses Per 5.0
Month
I 6. Drafting/ReproductiondRe s L.S
7 L.S
I 8. TopographicSurvey L.S
t 9.
10.
SatelliteImegery
IEE
L.S
L.S
I 11
11
LL'
:
HydrologyiHydraulicStudy L.S
L.S 500 ,'i:
t
.,.',t -,,::,
TotaI
I * Any additionalitem/ costquotedagainstthis line item mustbe supportedby solid/ tenablejustification(s)
o'Comments on TOR" without indicatingfinancial
detailedin TechnicalProposalSubmissionForm A-4
I valuetherein.The negotiationcommitteeof the Client may this coston the basisof justification
negotiate
providedin the form A-4 with the prospectivesuccessfulbidderin the light of ClauseITC 6.6 of RFP.
Moreover,if no justificationis given or Client doesnot agreeto thejustifications,the Client in both the
I casesshall not include this cost in the total cost offered by the Consultantsfor this assignment,
particularlyin caseanyamountagainstthis line item is deemedto havebeencoveredin otherpay items.
Form A-17
Or Cosr
Suvrnna,nv
I SalarvCost/Remuneration
2. Direct(Non-Salary)
Cost
J. SubTotal(1+2):
I 4.
SalesTax @ 16% on item S.No.3 above
which shall be kept as ProvisionalSum*,ro-
I 5.
the ContractAsreement
,1.:1::::
Grand Toinl:
'1:
I Note: 1- Consultantshall frll in the Cost compoo.n,, and if anythingis left blank it shall be
deemedto be includedin the cosh 1.,,1
I 2- Theduesand salariesof staff arepayableby the consultantin time andnot laterthan
10ft of the following month poiitively. In case of failure to do so Client shall
I OR
T
t - SukkurMotorwayProjecton BOT BasisunderPPPArrangement
Servicesfor Hyderabad
Consultancy Page45 of 99
I
Termsof Reference
APPENDIX-A
',..'..;,,,,,,;,,.,r'.:.:..:
::l=:::. ::::::::::.
(roR)
t A. PREAMBLE
t Motorway ((.PKM"), which starts from Karachi and connects major cities:
Hyderabad,Sukkur, Multan, Khanewal,Faisalabad,Islamabadand Nowshera,and
terminatesat Peshawar. ..,.
t The Projectshall be a 6-lanelimited accessfacility to be built on a new alignment.
,
., ,,,.
The Projectis the last anda vital link of PKM. It will facilitateEastern.Alignmentof
I the China PakistanEconomicCorridor (ooCPEC")to the ports
Southemterminus,M-6 Motorway will connectwith M-9 ($,qaclai- Hyderabad
araChi. At its
t B. PROJECTLOCATION :.
... .
t C.
Annexure-II.
tt
t andfinalizedduringnegotiationstage):
discussed
Part.I (Technical):
T : a,
I
",:..'. ,R
:
w of PreliminaryDesignalongwith Alignmentoptimization
''4 TrafficStudies
t
.
. .
:a:a::..:'
''
:i
,,'::::,,C1 Revised/ UpdatedPC-I (asrequired)
Part-II (Commercial):
I a. Commercial Feasibility Study
b. Agreement
Preparationof Requestfor Proposal(RFP)andModel Concession
I (CA)
c. Analysisof TechnicalBid
Bid Evaluation/ Bid Comparative
I
I Servicesfor Hyderabad- SukkurMotorwayProjecton BOT BasisunderPPPArrangement
Consultancy Page47 of99
I
Termsof Reference
D. PART.I
1. Background
.,
Summaryof Scopeof Work
1.
The broadsurnmaryof Part-Iof TOR is presented asfollowingwfticnwill be
readin conjunctionwith detailedTaskspresented in laterp#s'of the TOR.
t a.
b. Traffic Studies.
Sctihg
Reviewof PreliminaryDesignalongwith Alignmentoptimization.
t 3. D etaifed S.1
..
Work
.o.lp9,of
I
Termsof Reference
t Thd'.,eonsultants
'before
should inform the local police and administration
conductingall typesof field surveys.Beforeplanningthe field
reconnaissance, the Consultantsshould coordinatemeetingswith the
t local city development/ Highway Departmentto know any future
plansfor city expansionandprovincialroadsetc.
I
t - SukkurMotorwayProjecton BOT BasisunderPPPArrangement
Servicesfor Hyderabad
Consultancy Page49 of 99
I
I
Terms of Reference
t by the Consultants.
I required.
I
I Servicesfor Hyderabad- SukkurMotorwayProjecton BOT BasisunderPPPArrangement
Consultancy Page50 of 99
I
Termsof Reference
..,.Re..p..=o,,{
I ,
:
precedingactivities,the Consultantswill preparelupdate
i .::,:,,.
t
t
I - SukkurMotorwayProjecton BOT BasisunderPPPArrangement
Servicesfor Hyderabad
Consultancy Page51 of 99
I
I
Termsof Reference
t PART.II
I The following principal activities are identified that needto be caried out, but it
should not be construedas the total set of activities required for the successful
completionof tasksspecifiedin thepresentTOR:
t
I .:::::.:l:::: -
::
I ,,_="t
=-t= _ -
:: .
I =,-,_,.-.:-,:
I
I
I
I
I However,title of the landshallremainwith NHA;
encumbrances.
I
X (OperationExpenditures)
Analysis;
I ".
>jtnottine Forecasting;
andPeriodicMaintenance
I
I
I
I
I - SukkurMotorwayProjecton BOT BasisunderPPPArrangement
ConsultancyServicesfor Hyderabad Page52 of 99
I
I
Termsof Reference
I Identifyingothersourcesof Revenues
or CrossSubsidization;
::a:,.'':
'
': 'l'
t=
r,-.
I Viability GapAnalysis;
I FinancialAnalysisandBankability;
:
Evaluationof the variations (different project,,gtryct:uring.
options such as:
SensitivityAnalysis;
I & Recommendation;
Conclusion
t Defineprocurem€nt'strategy;
AdvisingandOudining'WayForward;
I ProjectInfo44at'ionMemorandum;
t.
I Develo
::,:,'.
'::::"
oct implementationandtimelineplan;
Era CommercialFeasibilityReport;
I .',,Fihtl CommercialFeasibilityReport;
OtherReportsshallinclude:
T . PC-I (for LandandVGF)
I
t - SukkurMotorwayProjecton BOT BasisunderPPPArrangement
ConsultancyServicesfor Hyderabad Page53 of 99
I
Termsof Reference
I F. DATA PROVISION
I submittedin the form and format acceptableto the Employai, thin Four (04)
monthsfrom the dateof Commencement of Consultancy-se AnotherOne (01)
month period shallbe requiredfor relevantexperts,so asto..help NHA on Technical
I Designmattersof the Projectduring Pre-Bidmeeting'andTechnicalBid Evaluation
stage.
I The Consultants
Report
Inception/Outline
:
shallsubmitfollowing'iep,orts/submissions
I -.D-fift Report
CommercialFeasi,rf;{lity
' Traffic StudyReport
I . FinanCiitYoaet
I : j
I EvaluationReport
> ",'Tedhnical Bid Comparative
t L SUBMISSIONOF DOCUMENTS
I
signedandstampedfailing which the documentwill not be consideredfor acceptance.
I All pagesandsheetsmustbe properlynumbered.
l soundness,andeconomyof submissions.
I
I
Requiringimprovement
I
I Wfn reservesthe right to developa detailedbreakdorvn/matrix for implementing
abovementionedratings.In additionto this, it is highlightedthatNHA Code(Revised
I
I
I - SukkurMotorwayProjecton BOT BasisunderPPPArrangement
Servicesfor Hyderabad
Consultancy Page55 of 99
I
Termsof Reference
..-
. t':
::':::'::.''.,':"
-:,:::,:::
=.
: ::] ::: ::
'':::==:::::
_:::::=.
:
::
Annexure-I
S. No. : lNos. ,
fou=rvrifuri
A. KEYPERSONNEL
I Senior Highway Engineer/ Team Leader I 4 ,'4'
2. StructuralEngineers 2 J 6
3. Traffrc Engineers 2 a
J
4, PavementDesignEngineer 1 I 1
a
5. PPPExpert I 1 J
6. FinancialExpert/CA I a
J
7. CorporateLaw Expert 1 2 2
8. ContractSpecialist I ,,'4 4
Sub-Total(A): t0 29
B. NONKEYPERSONNEL
9. QuantitySurveyors 2 2 4
a a
10, t J J
1 1 . CAD Operator 1 J J
Sub;Totsl (B): 4 IO
C. SUPPORTSTAFF
I t 2 . ComputerOp.uato?,=' ..
13.
I
a
J
a
J
4
J
12
I Sab-Total(C): 4
18
15
54
I :,4:
I
I
I tTh.
proposed person-months are as per Client's assessment; if the consultant has
regardingproposedperson-months
reservation/opinion/suggestion it may conveysamein writing during Pre-
Meeting but before the last date for seekingclarification,for
ProposalMeeting or even after Pre-Proposal
I reviewanddecisionof NHA whichwill be communicated to all theprospectivebidders.
I
I I I I I I I I I I - I J r I I I IT lr -
Terms of Reference
Annexure-II
.
lrhl
^i l
ption;
..'
:',t
i:
'!:i '.
: -r:,i
;rliii;
ti:i:i;:i
ir:ii;.n'11
I APPENDIX B
I
MAN.MONTH AND To estimate Consultant's inputs and costs for the
I ACTIVITY
SCHEDULE
assignment,man-monthand activity schedulesare to be
providedasper enclosedformat(FormsA7 andA8). These
should
two schedules correlate.
T
I
I *flT1+
'&tn,,.t#'
..
: .:.:::::::::
-:
I
t
I a
l .-::.
=
I :=:
I
I . .:'i:l
T -
:
I .,,:'
I
I
l
I - SukkurMotorwayProjecton BOT BasisunderPPPArrangement
ConsultancyServicesfor Hyderabad Page59 of 99
t
I
Client'sRequirements
from the Consultants
I APPENDIX C
I
T CLIENT'S
CLIENT'S REQUIREMENTSFROM THE CONSULTANTS
Someimportantrequirements
are:
I REQUIREMENTS
FROM THE
CONSULTANTS
t . Selectinga ConsultingEngineeris one of the most important
decisions an owner or Client makes. The most irqportant
I hown as possible.It
full providingall detailsas corre-,,tly
has been experiencedthat sq:Consultants try to hide
their deficienciesviz-a-viz the requirementsof TOR by
I andvisit
d. Viewing the projectsthat they haveaccomplished
'th,9
users.
I '
e. Visiting the premisesof the Consultantand examining
" systemsand method of works as well as hardwareand
software abilities available. Senior Management
I (minimum Director level) shall regularly visit the site at
least once a month and hold meetingwith the Client's
representative.
t f. The approachand methodologyproposedincluding work
plan, activity and man-month schedule should be
I meaningful and fully coordinated to judge the
understanding of the proposed assignment by the
Consultant.
I
I
t
I Servicesfor Hyderabad- SukkurMotorwayProjecton BOT BasisunderPPPArrangement
Consultancy Page60 of99
t
t Client'sRequirements
fromtheConsultants
I For Items (b) to (e), the inspection can be held any time
prior to or after award of work to the Consultants. During
I
I
I tlt'.
fiil::"
I {{,9
i\,s\
{
rlrQ.".
\rcij,
l
I
I
I
I
I
l
I
t
I
t
I - SukkurMotorwayProjecton BOT BasisunderPPPArangement
Servicesfor Hyderabad
Consultancy Page61 of99
t
Equipment,FacilitiesandOthersServicesto be Providedby the Client
Personnel,
APPENDIX D
AS PER TOR
6frtRN
( M'-ili!\'
!ir;;,r,,rt,
.'-::..,:t.
tt-
,
t:t'.
:
",:"
-.
I APPENDIX.E
I
I
I
I
I
I
I .:.
.
I
I
I
ffffi
\",,i*,t;ir11:)"
I
l
I
T
I
I
I - SukkurMotorwayProjecton BOT BasisunderPPPArangement
ConsultancyServicesfor Hyderabad Page63 of99
I
I Copyof Model Agreement
I
t
I Contractfor EngineeringConsultancyServices
T (Lump Sum)
I
I
I
I
I
I
I
'
ttttt""it-
,
,
I
.:a
T Fon
l
l (BRIEF SCOPEOF SERVICES)
t (NAME OF PROJECT)
I
Month and Year
l
t - SukkurMotorwayProjecton BOT BasisunderPPPArrangement
Servicesfor Hyderabad
Consultancy Page64 of 99
I
I
Copy of ModelAgreement
T TABLE OF CONTENTS
I FORM OF CONTRACT
I II.
1.
GENERAL CONDITIONS OF CONTRACT
GENERAL PROVISIONS
t 1.1
1.2
Definitions
Law Governinethe Contract
t 1.3
1.4
1.5
Language
Notices
Location
I 1.6
L7
AuthorizedRepresentatives
TaxesandDuties
::::::
:.:.
I 2 . 9 . 1 Bv the Client
2.9.2 By thg Consultants
2 . 9 . 3 Cessationof Services
3.1 General
t 3.2
3.3
3.4
Not to Benefitfrom Commissions,
Consultants
Confidentiality
Liability
Professional
etc.
Discounts,
I 3.5
3.6
3.7
OtherInstuanceto be takenout by the Consultants
Consultants'ActionsRequiringClient'sPriorApproval
ReportingObligations
T 3.8
3.9
Documents Prepared by the Consultants
EquipmentandMaterials Furnished by
to bethePropertyof the Client
the Client
I 3.10 Accounting,InspectionandAuditing
t 4.
A1
T. t
CONSULTANTS'PERSONNELAND SUBCONSULTANTS
Descriptionof Personnel
I AA
+.L
J.
RemovalandlorReplacementof Personnel
I 6.1
6.2
6.3
T 6.4
6.s
6.6
T 6.7
t 7.
7.I AmicableSettlement
DisputeSettlement,,,
I 7.2
8. INTEGRITY.E*CT
I 9.
9,7
THE RIGIITS.AND DUTIES OF THE CONSULTANTS
Obligati'ons
'P.,ayments
T 9.2
9.3
9;41
Indire
-
Rovalties
r.:_
:..
Provisionof ExpertTechnicalAdvice
I 9;5= -
ilI.,, .
;'Penalty
SPECIAL CONDITIONS OF'CONTRACT
[Detailsto be finalizedby the users]
t IV APPENDICES
t
t
I
l
I
T
t
t
,:.,,.,::' :t'
'i,,,
.
I
I
t
I
t
I
T
I - SukkurMotorwayProjecton BOT BasisunderPPPArrangement
ConsultancyServicesfor Hyderabad Page67of99
I
Copyof Model Agreement
I FORM OF CONTRACT
I [Notes:1. Use this Form of Contract when the Consultantsperform Services as Sole
Consultants.
legal@iesentatives
I and permitted assigns) and, on the ..,,-'=".-.-61.he-r'
. ,, .nu:U:
::,.,,:,. (hereinafter
resentatives
and
I permittedassigns).
WHEREAS
T (a) the Client has requestedthe Consultantsto provide certain consulting servicesas defined in
the General Conditions of Contract attached to this Contract (hereinafter called the
T "Services");and
,,t=,
t AppendixB ReportingRequirements
AppendixC Key PersonnelandSubconsultants
AppendixD : Breakdownof ContractPricein ForeignCurrency
t
t - SukkurMotorwayProjecton BOT BasisunderPPPArrangement
Servicesfor Hyderabad
Consultancy Page68 of99
T
I Copyof Model Agreement
I 2. The mutualrights and obligationsof the Client and the Consultantsshall be as set forth in
the Contract,in particular:
t
.:::::]:
I Witness (cLrENr)
Signatures Signatures
T Name Name
I Title Title
(Seal)
I
I For and on behalfof
I Witness (coNSULTANTS)
I Signatures Signatures
I Name
Title
Name
Title
T (Seal)
I
/gftbs,
I {iT{ H'J
''\r$))-._.-.
-/_':r/
T "'isil:illi#r
t
I Copy of Model Agreement
I 1. GENERAL PROVISIONS
I 1.1 Definitions
I
1l . l
"Effective Date" means the date on which.this COntractcomes into force and effect
pursuantto
Sub-Clause2.1i ,
T (e) "GC" meanstheseGeneralCoEdtio
':'::t:'t:_
,. .,,
Contract;
I
'::'::::l
O, ,':,.,I'Party" meansthe Client or the Consultants,as the casemay be, and "Parties" means
I : ; : : . ; : : . , ' ' ' ' '.
both:'ofthem;
:(k)
I .:
.::=:-:::
"Personnel" means persons hired by the Consultants or by any Sub consultant as
employees and assignedto the performanceof the Servicesor any part thereof;
J 0) "SC" means the Special Conditions of Contract by which the GC are amended or
supplemented;
T *
l.
t This Contract, its meaning and interpretation, and the relation between the Parties,shall be
governedby the Applicable Law.
'''' ' '.''"',,-1..'
I 1.3 Language
i,..
This Contracthas beenexecutedin the English languagewhich strall-, be the binding and
I controllinglanguagefor all mattersrelatingto the meaningor interpietationof this Contract.
All thereportsandcommunications shallbe in theEnglishlanguage.
t L.6
' :,,::..
Authori 1edRryes entatives
.,"..
or permittedto be taken,and any documentrequiredor permittedto be
I Any-Aet_iofiequired
executed,underthis Contractby the Client or the Consultantsshallbe takenor executedby
specifiedin the SC.
the AuthorizedRepresentatives
T In casethe Consultantsconsistof a joint ventureof more than one entity, the Consultants
his shallbejointly andseverallyboundto the Client for fulfillment of the termsof the Contract
I r.t .j-,J'+
I 2.1 of Contract
Effectiveness
I This Contractshall come into force and effect on the date (the "Effective Date") of the
Client'snotice to the Consultantsinstructingthe Consultantsto begin carrying out the
conditions,if any,listed in the SC
Services.This noticeshallconfirmthat the effectiveness
I )',
havebeenmet.
'r'
'"
Termination of Contract for Failure to BecomeEffective
T .,-' "..,,.,....,..-t:'=,tt:tj
If this Contracthas not becomeeffective within such time peiiod aft* the date of the
Contractsignedby the Partiesas shall be specifiedin the SC, either Partymay, by not less
I thantwenty eight(28) dayswrittennoticeto the otherParty,.d€e.'lare,,this
Contractto be null
and void, andin the eventof sucha declarationby eitherParty,neitherPartyshallhaveany
claim againstthe other Party exceptfor the work (if.'my) alreadydone or costs already
I incurredby a Partyat the requestof the otherParty ",'
.l:':::::.
The Consultantsshall begin canying outthe Servicesat the end of suchtime period after the
Effective Date as shall be specified in fu SCr.='
I 2.4 Expiration of Contract
t .='t,,',....1-"
2.5
I Mo.di{ieation
,t;:.,.'.:,'.':"
:t:'
is increased:
If the scopeor durationof the Services
I
T
I - SukkurMotorwayProjecton BOT BasisunderPPP
Servicesfor Hyderabad
Consultancy Page72of99
I
Copy of ModelAgreement
I 2,7 ForceMajeure
2,7,1 Definition
I (a) For the pu{posesof this Contract,"ForceMajeure"meansan eventwhich is beyond
the reasonablecontrol of a Party and which makes a Party'sperformanceof its
l obligationsunder the Contractimpossibleor so impracticalas to be considered
impossibleunderthe circumstances, and includes,but is not limited to, war, riots,
civil disorder,earthquake,fire, explosion,storm, flood or other adverseweather
I conditions,strikes,lockoutsor other industrialactions(exceptwher.e,.s-Uch.strikes,
lockoutsor otherindustrialactionsarewithin the powerof the PartyinvokingForce
Majeureto prevent),confiscationor any otheractionby governmentagencies.
I
=,,i=::::::_,:..
,.
The failure of a Party to fulfill any of':its obligationsunder the Contractshall not be
consideredto be a breachof, or defaultunderthis Contractinsofaras suchinability arises
from an eventof ForceMajeure,pwided that the Party affectedby suchan event;(a) has
I takenall reasonable precautirbns, dUecareand reasonablealternativemeasuresin order to
carry out the terms and condilions of this Contract;and (b) hasinformed the otherParty in
(15) daysfollowing the occurrence
writing not laterthq{r.,f1,,q9en of suchan event.
I 2.7.3 Extensiono-f=T
a,--a,a,aa .a=..
.,.
'.'...'
':
I :::::::l:: "':.::t: :
I During the period of their inability to performthe Servicesas a resultof an eventof Force
Majeure,the Consultantsshall be entitledto continueto be paid underthe terms of this
I this Contract,including the earrying out of the Services,provided that such notice of
suspension(i) shall specifi the natureof the failure, and(ii) shall requestthe Consultants
to
T remedy such failure within a period not exceedingthirty (30) days after receipt by the
Consultantsof suchnoticeof suspension.
t 2.9 Termination
I The Client may terminatethis Contract,by not lessthan thirty (30) dayswritten notice of
terminationto the Consultants,to be given after the occurrenceof any Qf.lhe events
I (a) through(e) of this Sub-Clause
specifiedin paragraphs
caseofthe event referred to in paragraph(f):
2.9.1and sixty (60),.daysi
in the
==
,,:,,
t (a) if the Consultantsdo not remedya failure in the performanee:'of, tkir obligations
underthe Contract,within thirty (30) daysafterbeingnotified or.'yvithinany further
periodasthe Clientmay havesubsequently approvedin writing;.1
I (b) if the Consultantsbecome(or, if the Consultants..c.ofi*$'6f-morethan one entity,if
any of their Membersbecomes)insolventor b- i i enterinto any agreements
I of any law for the benefitof
with their creditorsfor relief of debtor take.advantage
debtorsor go into liquidationor receivershlpwhether compulsoryor voluntary;
I
I :,.. .::::,_:::::::.
t (0
portionof theS.gryices for a periodof not lessthansixty (60) days;
t =:{a)
"':a,-
a.aa.t-.,;,,,.,
I (b)
receivingwrittennoticefrom the Consultants that suchpaymentis overdue;
I not remediedthe samewithin forty-five (a5) days (or such longer period as the
Consultants may havesubsequently
Clientof theConsultants'notice
approvedin writing) following the receiptby the
specifyingsuchbreach;
t
I - SukkurMotorwayProjecton BOT BasisunderPPPArrangement
for Hyderabad Page74of99
I
I
Copyof Model Agreement
t (d) if the Client fails to complywith any final decisionreachedas a resultof arbitration
proceedings pursuantto Clause7 hereof.
t
,:: l':.::..:;::::;..:'
I 3.1 General
I The Consultants shall perform the Services and carry out their obligations with all due
diligence, efficiency, and economy, in accordance with generc7lyacceptedprofessional
techniques and practices, and shall observe sound management practices, and employ
I 3) lsG
tu';{/
appropriate advancedtechnology and safe methods. The Consultants shall always act, in
of any matterrelatingto this Contractor to the Services,as faithful advisersto the
lr,i/
I >l
,,{.{
\o\
(\a). \
- SukkurMotorwayProjecton BOT BasisunderPPPArangement
for Hyderabad Page75of99
'+l:llf:ill'
I
Copy of ModelAgreement
The Consultantsare liable for the consequence of errorsand omissionson their part or on
t the part of their employeesin so far asthe designof the Projectis concernedto the extent
andwith the limitationsasspecifiedhei,einbelow.
I
_,1 - :
a-..,
I The liability of.lhe Consultantsexpiresafter one (1) year from the stipulateddate of
completionof Constructionor afterthree(3) yearsfrom the dateof final completionof the
t desiqnwhicheveris earlier.
..,,:.
'-.
The Co'6 ltantdmay, to protectthemselves,insurethemselvesagainsttheir liabilities but
t this !'s.-o.@ligatory. The extentof the insuranceshallbe up to the limit specifiedin second
p. d.i,abai* The Consultantsshall procurethe necessarycover before commencingthe
Sa*iiaS andthe costof procuringsuchcovershallbe borneby the Consultants up to a limit
t of,one percentof the total remunerationof the Consultantsfor the designphasefor every
yearof keepingsuchcovereffective.
t The Consultantsshall, at the requestof the Client, indemnifythe Client againstany or all
risks arisingout of the furnishingof professionalservicesby the Consultants
to the Client,
not coveredby the provisionscontainedin the first paraaboveand exceedingthe limits set
I
I Consultancy - SukkurMotorwayProjecton BOT BasisunderPPPArrangement Page76 of 99
I
Copyof Model Agreement
I are specifiedin the SC; and (b) at the Client'srequest,shallprovide evidenceto the Client
showing that such insurancehas been taken out and maintainedand that the current
premiumshavebeenpaid.
I
.
(a) Appointing suchPersonnelas are listed in Appendix-Crnergly.-by'-,ffebut not by
name;
T 3.7 ReportingObligations
writing, shall insurethem at the expenseof the Client in an amountequal to their full
replacement value.
Accounting,Inspectionand Auditing
4. CONSULTANTS'PERSONNELAND SUBCONSULTANi; ..
5.1.1 Assistance
I (a) Subconsultants
provideat no costto the Consultants, andPersonnelsuchdocuments
preparedby the Client or otherconsultingengineersappointedby the Client asshall
I (b)
available,areasspecifiedin the SC;
assistto obtain the existing datapertainingor relevantto the carrying out of the
, i
I 5.2 Accessto Lnnd
The Cli'ent **il, that the Consultantsshall have, free of charge,unimpeded accessto all
land of *hich accessis required for the performanceof the Services.
I 5.3 Changesin the Applicable Law
I
:',,;,t,','.
,
"
., If, afterthe dateof this Contract,thereis any changein the ApplicableLaw which increases
or decreases the cost of the Servicesrenderedby the Consultants,then the remunerations
and directcostsotherwisepayableto the Consultants underthis Contractshallbe increased
I or decreasedaccordingly,and correspondingadjustmentshall be made to the amounts
referredto in Sub-Clause 6.2 (a) or (b), asthe casemaybe.
1:-t.-
The Client shall make available to the Consultants,Sub consultantsand the Personnel, for
ii!il hr-
-:a-{:
the purpose of the Services and free of any charge, the services, facilities and property
I 3.f, Payments
I (a) Advance payment to the Consultantsshall be affected within the period specified in
the SC, after signing of the ContractAgreementbetweenthe Parties.
I (b) Any other amount due to the Consultantsshall be paid by the Client to the
Consultants
days in case
within twenty-eight(28) daysin caseof local currencyandfifty six (56)
of foreigncurrencyafterthe Consultants' invoicehasbeendeliveredto
I the Client.
I AdditionalServices
means:
I Appendix A; ]: t=
If the Client fails to malie the paymentof any of the Consultants'invoice (excludingthe
t advancepa,y-meng,
I 7.1 AmicableSettlement
7. SETTLEMENT OF DISPUTES
I t-.-,,ljk
o
I
I Copyof ModelAgreemenl
I 7,2 DisputeSettlement
I 8. INTEGRITY PACT
I
t Copyof Model Agreement
I L.1 Definitions
( p )"P r o j e ct
me a n "s................ ..................11?t,,,,,
I 1.2 Law Governingthe Contract ,
'
r
'
4,,.:a,,..
.*gi,I , "'
I 1,6 AuthorizedRepresentatives ,.. -,,*e*\f[r;.-
l.,"
TheAuthorizedRepresentatives arethe following: , ,::. ,--,.;,==:: -
I For the Client:
. ,r
'
, ;
'' ,.. '' t
:
,'
]
. .
I
Telephone
I Facsimile
E-Mail
(Nameof ProjectManager)
I (Project)
(Address)
I
I
t t.7
--:.:n:..===
with Pakistan
Payhientof Taxeswill be the responsibilityof the Consultantsin accordance
I Tax Laws.
t
I - SukkurMotorwayProjecton BOT BasisunderPPPArrangement
Servicesfor Hyderabad
Consultancy Page83 of99
t
I
Copyof Model Agreement
I [Note: If the Consultantsdo not consistof more than one entity, the Sub-Clause].8should
bedeleted.J
I 2.1 Effectiveness
of Contract
The date on which this Contractshall comeinto effect is the date when the Contractis
I signedby both the Parties.
',t,
.,,,=',,;t,-"
wrlung.
I 2,3 Commencementof Services
I The Consultant shall eommence the services immediately after signing of the Contract
Agreement or such other time as the Partiesmay agreein writing.
I arrdprofits."
"excludingov-er,treads
=
.,,'..',-$
I 3,4 ProfessionalI.riability
':-':
'
t_- t
: : ' : ,,:.
:::: ...=- - ,. -
_
;::t;'=:=....="t:t
. :.,i,'ri.,
- =.'
..'=t '
I (a)
='=-
Third Partymgtql,.vghicGliability insurancein respectof motorvehiclesoperatedin
PakistanUy,1@ Consultantsor their Personnelor any Sub-consultants or their
I (b)
Personnelr,with. a minimumcoverage
.-,..,..:..*iir,
lossof or damage
Iqsglpncg'against
of Rs.100,000/-.
purchased
to equipment in wholeor in partwith
I ryl$-Eo"ided
.. ''''
,..r:...
, ' ;.=.
undertheContract.
"i'.i"ii;;:,.}'
#il'+-lq;-\,
.,]t" !'l!/ A \r,:t
I - SukkurMotorwayProjecton
Servicesfor Hyderabad
Consultancy underPPP Page84 of 99
I Copyof Model Agreement
I 5.1.1 Assistance
(a) Date,the
The Client shallmakeavailablewithin ......daysfrom the Commencement
I documents namely
I
T (e) Client
I 5 . 1 . 2 Coordination
I
I 5.1.3
I 6.1
[Note: In casethere
I
I
I
I 6.2
I (a)
(b)
Theamountin foreigncurrencyis...........
The amountin local cwrencyis PakistaniRupees....
Thebreakup offoreign andlocal currenciesshallbe asunder:
I
'I
I.t.-.
\9:
l AS PER TOR
(a)
I
l Delayed Payments
t (i)
(ii)
for foreigncurrency
for local currency
t 6.6 Additional Services
I
I
9. Prioritv of Documents
I forming part of this Contract to resolve an
I ./
,/ ,j,.
t ,..4,t
':,
..:;.::..:
\ : . . , ..,/
4
,
'. :=:
I ::..-::.:.:.
::: . r { , , . "
,i::..'
..
I 10. Royalties
The Consultantsshall save harmless and indemnify the Client from and against all claims
I and proceedingson account of or for infringement of any patent right, design, trademark or
name or other protectedrights in respecttc any patenteddesigns,featuresor equipmentthey
t may use for carrying out the Services,and shall pay all royalties etc. thereto.
t
I Servicesfor Hyderabad-
Consultancy Projecton BOT BasisunderPPPAnangement Page86 of 99
T
I
Copyof ModelAgreement
t 11. Penalty
T If the Consultantsfails to comply with the time to completion as given in the Contract, the
Client will impose a penalty at the rate of 0.05% of the fee for incomplete portion of work
l
I
t
T
I
I
t
I
I
I
I
I
I
T
t
I
I - SukkurMotorwayProjecton BOT BasisunderPPPArrangement
Servicesfor Hyderabad
Consultancy Page87 of99
I
T
Copy of ModelAgreement
t
T
l
l
I ,:':t'::
:::::::.::
, ,:::
:
T
I
I
t
--t'i:
:::
-
-a,.,.-
I IV APPENDICES
':
,=
I ,,.1:i,,.;=.
: : :. :::.
':t't
t':t '
I
I
I ..........::
..
t : =: : - :
:=
::.
t
t
I
T Servicesfor Hyderabad- SukkurMotorwayProjecton BOT BasisunderPPPArrangement
Consultancy Page88 of 99
I
I
Copyof Model Agreement
T AppendixA
l
I
I
I
I ::
-i
T ::.::
I
I
I
I
I
I
T
T
T
I - SukkurMotorwayProjecton BOT BasisunderPPPArrangement
ConsultancyServicesfor Hyderabad Page89 of99
Copyof Model Agreement
Appendix B
ReportingRequirements
,#
,,'..
: l
::::::::
,,:tt:,,,:::
T AppendixC
t
I
T
I
I
t
I
t
I
I
T
t
I
T
I - SukkurMotorwayProjecton BOT BasisunderPPPArrangement
Servicesfor Hyderabad
Consultancy Page91 of99
t
I Copy of Model Agreement
t AppendixD
I
I
t
t
I
t
t
I
I
I
t
T
I
l
T
I - SukkurMotorwayProjecton BOT BasisunderPPPArrangement
ConsultancyServicesfor Hyderabad Page92of99
T
Copy of Model Agreement
t Appendix E
(D rentals;
relatedto:
't"t'
t (ii)
(iii)
furnishingandequipment; .
of office, offrce e.quipm*rtand furniture,office
operationand maintenance
supplies.
I
I : :. :::::::.
t 3. Total,remunerationandreimbursabledirectcostsexpenditure: (l + 2).
.
Note:
I 1.
: :: :.,::,,
Each item of reimbigble direct costsexpenditureshall be specifiedwhetherit is
payableon the basisof (a) lump sum monthlyrate; or (b) reimbursement
of actual
I expenditures.
2. for Additional
Thii"qppendixwill exclusivelybe usedfor determiningremuneration
I in a,ccordance
Servi,tus with Sub-Clause GC 6.6.1
I
t
I
T
t
T - SukkurMotorwayProjecton BOT BasisunderPPPArrangement
Servicesfor Hyderabad
Consultancy Page93 of99
I
I Copyof Model Agreement
I AppendixF
I As Per TOR
I
I
':::,:::
I ::,,:t :
'
I :,:.:.
I
t
T
t
t
I
I
I .,-:,'
I
I
I
t Servicesfor Hyderabad- SukkurMotorwayProjecton BOT BasisunderPPPArrangement
Consultancy Page94of99
t Copyof Model Agteement
I Appendix G
(INTEGRITY PACT)
I Declarationof Fees,Commissionand Brokerageetc.
Payableby the Suppliersof Goods,Services& Works in
ContractsWorth Rs.10.00MiIIion or More
I Contract No. Dated: ContractValue:
ContractTitle:
I
;f:il,"
il;;; ih;;;;;;;;.;;i ;'"1|;:i'ftti'iliJ,i":fin':tT :;
;lTil"u't"lfff
I benefit from Governmentof Pakistan(GOP) or any administrativesubdivisiono.r,agency
thereof or any other entity owned or controlledby GOP through any.comrpt.business
practice.Without limiting the generalityof the foregoing,fnameof Snpp,l represents and
I warrantsthat it has fully declaredthe brokerage,commission,fees etc. paid or payableto
anyoneandnot given or agreedto give andshallnot give or agreeto give to anyonewithin
or outsidePakistaneither directly or indirectly through any natural or juridical person,
t sponsoror subsidiar1,afry commission,gratification,,.bribe, 'f,inder's
shareholder,
including its affiliate, agentoassociate,broker,consultant,d.iieelar,.'promoter,
fee or kickback,
whetherdescribedas consultationfee or otherwise,with tlre objectof obtainingor inducing
t the procurementof a contract,right, interest,privilege oi other obligation or benefit in
whatsoeverform from GOP, exceptthat which hasbeeneipresslydeclaredpursuanthereto.
t and arrangements
.41'::':. - -
"t.:"'
t has not taken any action or will not t*e any actionto circumventthe abovedeclaration,
representationor warranty.
:
t fname of Supplier] accepasfull responsibilityand strict liability for making any false
declaration,not making' ll.disclosure,misrepresenting factsor taking any actionlikely to
defeat the purposeof this dee'laration,representationand warranty. It agreesthat any
T Nameof Seller/Supplier:.
Signature:
l ISeal]
t
I - SukkurMotorwayProjecton BOT BasisunderPPPArrangement
ConsultancyServicesfor Hyderabad Page95 of99
I
I
Copy of ModelAgreement
T
t CONTRACT FOR ENGINEERING CONSULTANCYSERVICES
I between
I
t (NAME OF THE CLIENT)
I :::.:: t.
':: :.
:..,,. .1
:.1,1_ :::.::.
t
.,,:
'-:4,a.
.
t and
I
I (NAME OF THE JOINT VENT
,:t,:'
iOtr'tUn CONSULTANTS)
I for
(NAME OF PROJECT)
t oF'
t .,:,,,,
:.,
I -,: :,',1
::::.
t
I
I - SukkurMotorwayProjecton BOT BasisunderPPPArrangement
ConsultancyServicesfor Hyderabad Page96 of 99
T
I
Copyof Model Agreement
I FORM OF CONTRACT
t
I which expressionshall includeits successors,
(hereinaftercollectivelycalledthe "Consultants"
legalrepresentativesandpermittedassigns). ," , ,,,.
I WHE,REAS 1a,,.
':'"
t
'1.,.,,,
I
I
Copyof Model Agreement
I 2. The mutualrights and obligationsof the Client and the Consultantsshall be as set forth in
I (b)
Contract;and
the Client shallmakepaymentsto the Consultantsin accordance
of the Contract.
with the provisions
I
CLIENT'SNAlt4E==
I Witness
Signature Signature
I Name
Title
Name
Title
(S€al).. '
I For
', 'r
andon
: ,.
t,,:...'.
behalfof
;
I Name of MemberNo. 1
I Witness
I Signature
Name
Signature
Name
Title
I Title
(Seal)
I Witness
Name of MemberNo. 2
I Signature
Name
I Title
(Seal)
I
I - SukkurMotorwayProjecton BOT BasisunderPPPArrangement
Servicesfor Hyderabad
Consultancy Page98 of99
I
I
Copyof Model Agreement
I Nameof MemberNo.3
I Witness
Signature Signature
I Name
Title
Name
Title
(Seal)
I
I
I
I
I
I
I
I =.
'=':::':'
I l
I
t
I
I
I
I
I Servicesfor Hyderabad- SukkurMotorwayProjecton BOT BasisunderPPPArangement
Consultancy Page99 of99