This document outlines the scope and design basis for the Umueje Gas Plant project in Nigeria. The plant will process 5 million standard cubic feet per day of natural gas into 4.5 million standard cubic feet per day of compressed natural gas, 220 barrels per day of propane, 160 barrels per day of butane, and 100 barrels per day of condensate. The document describes the project objectives, phases, equipment, reference conditions, design considerations, and engineering discipline basis.

Uploaded by

Anonymous qaI31H
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
238 views2 pages

Basis of Design Template

This document outlines the scope and design basis for the Umueje Gas Plant project in Nigeria. The plant will process 5 million standard cubic feet per day of natural gas into 4.5 million standard cubic feet per day of compressed natural gas, 220 barrels per day of propane, 160 barrels per day of butane, and 100 barrels per day of condensate. The document describes the project objectives, phases, equipment, reference conditions, design considerations, and engineering discipline basis.

Uploaded by

Anonymous qaI31H
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

Contents

1.0 Project Overview


1.1 Project Objectives
1.2 Project Phases
1.3 Project Phase Project Scope
2.0 Raw Gas Specifications
2.1 Temperature, pressure and flowrates
2.2 Composition of Feed Natural Gas
2.3 PRODUCT SPECIFICATION
3.0 Plant Inventory / Equipment
3.1 Block Flow Diagram
4.0 Reference Conditions
4.1 SITE CONDITIONS
4.2 STANDARD CONDITIONS
4.3 LANGUAGE / UNITS
5.0 DESIGN CONSIDERATIONS
6.0 DISCIPLINE DESIGN BASIS
6.1 Process Engineering Basis
6.1.1 Process Selection
6.1.2 Equipment Sizing Criteria
6.1.3 Line Sizing Criteria
6.1.4 Control Valve Sizing Criteria
6.1.5 Process Control Philosophy
6.2 MECHANICAL
6.3 PIPING DESIGN BASIS
6.4 ELECTRICAL
6.5 INSTRUMENTATION AND CONTROLS
6.6 CIVIL & STRUCTURE
6.7 CORROSION
7.0 DESIGN STANDARDS, CODES AND SPECIFICATIONS
1.0 Project Overview

Umueje Gas Plant is a gas processing facility, proposed to be located on the


Anambra River Field, in Anambra State, South East Nigeria. The facility is proposed to
process 5 MMSCF of gas daily.

The expected outputs from the Umueje gas plant stand at about 4.5 MMSCF of CNG
(predominantly Methane and Ethane) daily, 220 Barrel of Propane, 160 Barrel of Butane,
and about 100 Barrels of Condensate daily.