1. Preamble
M/s. Gujarat Gas Limited, Gandhinagar proposes to set up Natural Gas (PNG Network)
within different cities of Gujarat State and also in Palghar District of Maharashtra State to
supply Natural Gas (PNG) for various industrial, commercial & residential consumers within
and around city.
GGL proposes to lay Palghar Spurline which will originate from Dahanu Spurline Option - I
(TP 21) and terminates at Village Palghar at Ch. 18/627.38 Km in the District of Palghar of
Maharashtra State.
2. Introduction
In view of above, GGL has planned to establish PNG Network of Palghar District of
Maharashtra State. For Palghar city and around, GGL proposes to lay pipeline network within
and outside the city limit from GSPL/GSPC GAS/GGL SV/Tap off station, within the existing
Roads RoU Network.
To achieve the objective stated above, M/s. Gujarat Gas Limited, Gandhinagar has awarded the
work to SECON Private Limited for carrying out Reconnaissance Survey, Detailed Engineering
Route Survey, Soil Investigation, Soil Resistivity and Cadastral Survey including obtaining
Statutory Clearances and RoU Acquisition.
The present report covers Detailed Engineering Route Survey including Soil Stratification and
Corrosion survey for Palghar Spurline.
3. Length of Pipeline
1
DERS Report
Ch. RL
Particulars Village Taluka District State
(Km) (m)
2
DERS Report
A. Palghar Spurline:
Total 18/627.38
Based on the terrain configuration, surface features and land use for both Spurline route has been
considered as one section and described below :
A. Palghar Spurline :
Generally, the pipeline route has been proposed parallel to existing roads from take-off to
terminal point. The detail of pipeline alignment is furnished below:
A. Palghar Spurline :
3
DERS Report
4 9/708.32 10/407.27 0/698.95 Dudh River Crossing and Water Log area
Total 18/627.38
8. Crossing Details
Both the proposed pipeline route crosses no. of Roads, Canals, Nalas, Underground Utilities, etc.
The number of major & minor crossings under each category is furnished below :
Sl.
Type of Crossing No. of Crossings
No.
1 MDR/Asphalted/Metalled /RCC Road 41
2 River 1
5 Underground Utilities 24
7 Power line 80
Total 238
- Safety of public lives and property and safety of the pipeline from Engineering and other
considerations.
4
DERS Report
- Easy and favorable terrain condition free of large water bodies, low lying marshy lands,
obstacles like ravines, depressions and unstable grounds, meandering rivers, etc.
- Ground profile for pipeline hydraulics and avoidance of steep rising and falling ground, hills
and valleys having sloping right of way.
- Availability of infrastructure and access to the pipeline route during construction and
maintenance.
- Avoidance of rugged and intricate grounds with hard strata, exposed rocks, boulders and
quarries.
- Existing and future developments in the region, such as roads, rail lines, canal network,
reservoirs, townships, industrial units, etc.
Route selection is a process of identifying constraints, avoiding undesirable areas and maintaining
the economic feasibility of the pipeline. Diversion of pipeline around obstacles can be very costly.
The ideal route, of course, would be a straight line from the origin to the terminal point. However,
physio-graphic, environmental, design and construction constraints usually alter the route. The
following factors would be considered while selecting the optimal route of the pipeline both for
cross-country as well as in the city area.
The information supplied by GGL regarding of Take-Off and Terminal locations has been
transferred to 1:25.000 scale map based on the maps which are covered by GGL pipeline were
identified. Since part of the area falls under restricted zone, pipeline route was transferred to
available maps and refined to the extent possible. All the alternatives were studied in the office
during desktop study and later on it was verified physically on the ground and the best Alignment
has been surveyed which was approved by GGL.
5
DERS Report
The route has been selected confirming to the requirement of GGL. The major constraints along
the route are avoiding the developments to the extent possible.
In addition to above, pipeline route has been selected to avoid the following:
- Forest
- Difficulty in obtaining the environmental clearance
- Difficulty in construction, operation and maintenance
Keeping the entire above requirement, constraints, etc. the pipeline route has been selected.
Efforts were made to avoid forest land and undulated / rugged areas as far as possible.
All efforts have been made to select the shortest possible route. Pipeline route so selected also
meets the requirement of economics, safety, constructibility and availability of ROU including
scope for further expansion.
Based on the route finalized, during reconnaissance survey, route maps have been developed and
pipeline route shown thereon.
Along the approved route, detailed reconnaissance survey has been carried out.
Cement concrete pillars have been embedded at TPs & IPs location regular intervals.
Vertical control has been established by transferring levels from nearest GTS Benchmark (after
stability check) to the site.
Levels have been transferred using Automatic Level to all the Bench mark Point.
The originating point was transferred and fixed on the ground by transferring exactly the point from
the 1:25,000 scale route map using Differential Global Positioning System (DGPS).
Reconnaissance survey was carried out by the advance party between the flag control points.
Total station was installed on the starting point and the alignment was made to progress in the
same direction. Places where the alignment could not be progressed further, due to obstructions
or developments such as, wells, graveyards, forest boundary, private layouts, tanks, quarry areas,
etc. Turning Points were fixed at suitable locations for getting smooth alignment and avoiding
sharp bends.
Establishment of center line has been carried out using high-end Total Station based on the DGPS
control points (X, Y & Z) and established the Turning Points and Intermediate Points.
6
DERS Report
All Turning Point and Intermediate Point have been embedded with cement concrete for details
regarding the total number of TPs / IPs.
Based on the Turning Points established, Alignment strip survey has been carried out for a
corridor width of 50m on either side of the trench center line using high-end Total Station and all
Topographical features have been recorded in the following format.
Point ID
XYZ
FC
Join Code
Remarks
9.6 Validation
The survey data collected is validated for its positional accuracy (X & Y – horizontal control) as
well as elevation (Z – vertical control) before processing the data and generating the drawing.
Information / data captured is down loaded to the computer and analysed in order to export the
data to various modules which includes:
- Alignment sheets
Original Survey of India Topo map was old. Route map has been generated after incorporating all
the details for a width of 5 Km on either side of the pipeline centre line.
In addition, all the major developments including roads, rail lines, forest boundary, etc., which
have come-up since the last survey has been shown on the map.
Pipeline center line including details of TPs, crossing locations etc., has also been shown.
A Route map on a scale of 1 : 25,000 has been shown on the route map, showing the major
towns, roads, railway lines and the center line of proposed pipeline.
For details of Route map for the Spurline, refer Drawing No. SECON/GGL/THANE GA/ RM-02
Pipeline route survey was carried out along the recommended pipeline route in December 2015.
Generally, the pipeline runs parallel within RoW of existing roads from take-off to terminal point.
7
DERS Report
Based on the terrain configuration and land use, the entire pipeline route has been considered as
one section and described as below:
Proposed Palghar Spurline will take-off from Dahanu Spurline Option - I (TP-21) (RL 08m). Take-off
point of Palghar Spurline is located at Village Boisar, Taluka & District Palghar.
Take-off site is located at the Industrial Area MIDC, Tarapur and runs parallel to Tarapur MIDC Internal
Road, Boisar City Internal Road and State Highway-04 & 31 upto terminal point at Palghar Village at
Ch: 18/627.38 Km (RL 11m) at Taluka & Dist. - Palghar.
From take-off point at Km 00/00 (RL 08m) to 0/24 Km, pipeline runs in South direction parallel to
Asphalted Road (MIDC). Moreover, Ch: 0/24 Km to 03/92 Km Pipeline runs in West direction parallel to
Asphalted Road (MIDC).
In between, Pipeline crosses Asphalted Road (Boisar To Muramba) at Ch: 0/014 Km, RCC Road
[Asphalted Road (Boisar-Muramba) To Tarapur MIDC] at Ch. 1/115 Km, Asphalted Road [Asphalted
Road(MIDC)(Boisar- Muramba) To Tarapur MIDC] at Ch. 2/063 Km and Asphalted Road [Asphalted
Road (MIDC)(Boisar- Muramba) To Samrudh Health Care Ltd] at Ch. 3/112 Km.
Thereafter, from Ch: 03/92 Km to 08/79 Km pipeline runs in South-West direction parallel to Asphalted
Road (MIDC) and Asphalted Road [Asp Road(Boisar – Navapur) to Muramba] respectively.
Further From, Ch: 08/79 Km to 17/67 Km Pipeline runs in South-East direction parallel to Metalled
Road [Asp Road(Boisar – Muramba) to Dudh River] (Ch. 08/79 Km to 9/55 KM), RCC Road (Dudh
River to Dandipada) (Ch. 9/55 Km to 10/65 Km), Asphalted Road (Dandipada to SH-4) (Ch. 10/65 km to
17/21 Km) and SH-4 (Boisar to Palghar) (Ch. 17/21 Km to 17/67 Km) respectively.
In between, pipeline crosses Dudh River at Ch. 9/708 Km, Nala at Ch. 14/520 Km and Asphalted Road
[Asphalted Road (SH-04-Dandipada) To SDSM College] at Ch. 16/606 Km.
Thereafter, from Ch: 17/67 Km upto Terminal Point at 18/627.38 Km pipeline runs in South-West
direction parallel to SH-34 (Palghar to Mahim).
In between, pipeline crosses RCC Road [SH-34 (Mahim - Palghar Char Rasta) To Palghar] at Ch.
18/493 Km and no. of Asphalted roads, cart track, under ground utilities, Nala, etc.
Gently flat terrain. Surface soil is silty clay interpersed with marshy land & weathered rocks with
seasonal rivers & nalas. Communication Network is very Good.
8
DERS Report
Proposed Palghar Spurline will take-off from Proposed Dahanu Spurline Option - I (TP-21). Take-
off point of Palghar Spurline is located at Village Boisar, Taluka & District Palghar in Maharashtra
State.
The site is located at 7.58m above mean sea level (MSL). The geographical location of the site is
Latitude 19° 47' 15.96" N and Longitude 72° 45' 11.15" E.
The proposed pipeline will terminate at @ Ch. 18/627.38 Km at Palghar Village, Taluka & District
Palghar of Maharashtra State.
The site is located at 11.24m above mean sea level (MSL). The geographical location of the site
is Latitude 19° 41' 56.18" N and Longitude 72° 45' 43.88" E.
A. Palghar Spurline :
Ch. RL
Particulars Village Taluk District State
(Km) (m)
13. Elevation
Elevation difference between take-off & terminal point is nominal with respect to length of pipeline.
The information regarding elevation that will govern the pipeline hydraulics along the pipeline
route is furnished below:
A. Palghar Spurline :
Sl. Progressive
Details of Crossing RL (m)
No. Chainage (m)
9
DERS Report
Sl. Progressive
Details of Crossing RL (m)
No. Chainage (m)
RCC Road [Asphalted Road (MIDC)(Boisar-Muramba) To Galaxy
4 5.00 1/844.86
Ltd]
Asphalted Road [Asphalted Road (MIDC)(Boisar- Muramba) To
5 9.86 2/705.28
Navapura Road]
Asphalted Road [Asphalted Road (Boisar- Muramba) To
6 7.88 3/778.12
Kumbhavali Naka]
Asphalted Road [Asphalted Road (Boisar-Dudh River) To
7 4.46 8/565.13
Nandgaon]
8 Dudh River -2.35 9/708.32
Asphalted Road [Asphalted Road(SH-04-Dandipada) To
9 2.69 11/705.27
Maharpada]
10 Nala 1.35 14/520.07
Asphalted Road [Asphalted Road (SH-04-Dandipada) To
11 9.09 16/606.43
SDSM College]
Asphalted Road [Asphalted Road (Boisar-Palghar Char Rasta) To
12 10.50 17/213.94
Palghar]
13 Terminal point 11.24 18/627.38
Bore hole shall be carried out at an interval of 250 m along the pipeline route. In addition to this
boring shall be carried out for Canal, Stream and River crossing. One bore hole shall be carried
out on either bank and one at a centre of dry bed. Boring shall be carried up to depth of 3 mtr.
below natural ground level. For major River, Canal and Nala crossing boring shall be carried out
up to 5m depth or on top if rock is encountered at depth of less than 5m.
General sub-soil profile Surface soil is mainly silty gravel, silty sand underlain by weathered rock
has been observed a
long the surveyed route. The information regarding surface and subsoil stratification based on
visual classification, along the pipeline is furnished below.
A. Palghar Spurline :
Total 18/627.38
The logs of bore holes carried out along the entire pipeline with rivers, canals and highways
crossings by auger boring has been enclosed. Detail of soil stratification from take-off to terminal
point along the pipeline is tabulated in Annexure - G. The drawing of bore logs along the center
line has been prepared and enclosed as Annexure - H.
10
DERS Report
In this configuration, all the four electrodes are kept equidistant (know as “electrode separation”
‘a’) along a straight line symmetrically over the measuring point. The resistance (R) values
measured for each separation is multiplied by the configuration factor 2πa to get apparent
resistivity (pa) i.e.
ρa = 2πa R
The apparent resistivity n is considered as the average resistivity of the formation from the
surface up to a depth of ‘a’ (i.e. electrode separation).
The soil resistivity has been classified into five groups as below as per standard norms.
11
DERS Report
Soil resistivity was measured at two depths of 150 cm and 250 cm below ground level at 250m
interval along the pipeline.
A. Palghar Spurline :
Analysis of Resistivity values indicate about 34.90 % of the readings are “Very Highly
Aggressive”, 18.64 % are “High Aggressive”, 33.04 % readings are “Medium Aggressive” and
13.42 % readings are “Low Corrosive” Condition has been observed along the pipeline.
16. Drawings
The Following drawings have been prepared and submitted in CD-soft copy along this report.
A. Palghar Spurline :
Sl.
Particulars Drawing No.
No.
1 Route Map (1:25,000 scale) SECON/GGL/THANE GA/RM-02
17. Acknowledgement
We record our sincere thanks to officers of all Government officials for providing valuable
information for preparation of this report.
We also record our sincere thanks to officers of Gujarat Gas Ltd., for their excellent guidance and
co-operation received during preparation of this report.
12
DERS Report
ANNEXURE - A
Palghar Spurline
Section : Dahanu Spurline Option-I (TP-21) to Palghar
LIST OF MAJOR CROSSINGS
Progressive
Sl. Width of Location of
Details of Crossing RL (m) Chainage
No. Crossing Occurrence
(km)
13
DERS Report
Progressive
Sl. Width of Location of
Details of Crossing RL (m) Chainage
No. Crossing Occurrence
(km)
33 RCC Road (Dandi Pada To Dudh River) 2.27 5.65 TP143-TP144 10/486.79
14
DERS Report
Progressive
Sl. Width of Location of
Details of Crossing RL (m) Chainage
No. Crossing Occurrence
(km)
Asphalted Road [Asphalted Road (SH-04-
43 9.09 19.13 TP227-TP228 16/606.43
Dandipada) To SDSM College]
Asphalted Road [Asphalted Road(SH-04-
44 8.80 3.76 TP233-TP234 16/797.27
Dandipada) To Banjarpara]
15
DERS Report
28 RCC Road (Dandi Pada To Dudh River) 2.27 5.65 TP143-TP144 10/486.79 33
16
DERS Report
Progressive
Sl. Width of Location of
Details of Crossing RL (m) Chainage CS No.
No. Crossing Occurrence
(km)
17
DERS Report
1 Unmetalled Road (Asp Road (MIDC) to Tarapur MIDC) TP2 – TP3 0/101.29
2 Unmetalled Road (Asp Road (MIDC) to Ganesh Dhaba) TP5 – TP6 0/325.05
3 Unmetalled Road (Asp Road (MIDC) to G.R. Engg. Pvt. Ltd.) TP6 – TP7 0/372.73
4 Unmetalled Road (Asp Road (MIDC) to G.R. Engg. Pvt. Ltd.) TP8 – TP9 0/448.12
5 Unmetalled Road (Asp Road (MIDC) to Tarapur MIDC) TP13 – TP14 0/841.94
6 Unmetalled Road (Asp Road (MIDC) to Tarapur MIDC) TP13 – TP14 0/862.17
7 Unmetalled Road (Asp Road (MIDC) to Viraj Alloys.) TP15 – TP16 0/921.26
8 Unmetalled Road (Asp Road (MIDC) to Dicitex Furnishing) TP26 – TP27 1/836.32
9 Unmetalled Road (Asp Road (MIDC) to Tarapur MIDC) TP28 – TP29 1/980.25
10 Unmetalled Road (Asp Road (MIDC) to Arati Drugs Plot G60) TP32 – TP33 2/119.09
11 Unmetalled Road (Asp Road (MIDC) to Arati Drugs Plot G60) TP33 – TP34 2/290.47
12 Unmetalled Road (Asp Road (MIDC) to Arati Drugs Plot G60) TP34 – TP35 2/355.13
13 Unmetalled Road (Asp Road (MIDC) to Sheet House) TP38 – TP39 2/731.47
14 Unmetalled Road (Asp Road (MIDC) to Tarapur MIDC) TP39 – TP40 2/820.35
15 Unmetalled Road (Asp Road (MIDC) to Tarapur MIDC) TP39 – TP40 2/832.65
16 Unmetalled Road (Asp Road (MIDC) to Tarapur MIDC) TP39 – TP40 2/890.15
17 Unmetalled Road (Asp Road (MIDC) to Tarapur MIDC) TP40 – TP41 2/920.26
18 Unmetalled Road (Asp Road (MIDC) to Tarapur MIDC) TP41 – TP42 3/067.81
19 Unmetalled Road (Asp Road (MIDC) to Tarapur MIDC) TP44 – TP45 3/278.48
20 Unmetalled Road (Asp Road (MIDC) to Tarapur MIDC) TP45 – TP46 3/552.92
21 Unmetalled Road (Asp Road (MIDC) to Tarapur MIDC) TP46 – TP47 3/591.60
22 Unmetalled Road (Asp Road (MIDC) to Tarapur MIDC) TP46 – TP47 3/625.74
18
DERS Report
23 Unmetalled Road (Asp Road (MIDC) to Tarapur MIDC) TP47 – TP48 3/677.39
24 Unmetalled Road (Asp Road (MIDC) to Tarapur MIDC) TP47 – TP48 3/720.59
25 Unmetalled Road (Asp Road (MIDC) to Tarapur MIDC) TP52 – TP53 3/833.86
26 Unmetalled Road (Asp Road (MIDC) to Tarapur MIDC) TP53 – TP54 3/856.01
27 Unmetalled Road (Asp Road (MIDC) to Tarapur MIDC) TP56 – TP57 3/954.70
28 Unmetalled Road (Asp Road (MIDC) to Tarapur MIDC) TP56 – TP57 3/977.94
29 Unmetalled Road (Asp Road (MIDC) to Tarapur MIDC) TP57 – TP58 4/015.33
30 Unmetalled Road (Asp Road (MIDC) to Tarapur MIDC) TP57 – TP58 4/035.45
31 Unmetalled Road (Asp Road (MIDC) to Tarapur MIDC) TP57 – TP58 4/059.35
19
DERS Report
1 U/G Existing 8'' Tarapur MIDC ATPL Gail Pipeline TP0 – TP1 0/019.51
20
DERS Report
21
DERS Report
22
DERS Report
23
DERS Report
24
DERS Report
25
DERS Report
ANNEXURE - B
LIST OF DEFLECTION ANGLE, CHAINAGE AND REDUCED LEVEL
Palghar Spurline
1 TP0 00° 00' 00'' 0.00 0.00 7.58 Take off Point
26
DERS Report
27
DERS Report
28
DERS Report
29
DERS Report
30
DERS Report
31
DERS Report
32
DERS Report
33
DERS Report
34
DERS Report
ANNEXURE - C
LIST OF EASTING - NORTHING CO-ORDINATES
Palghar Spurline
35
DERS Report
36
DERS Report
37
DERS Report
38
DERS Report
39
DERS Report
40
DERS Report
41
DERS Report
42
DERS Report
43
DERS Report
ANNEXURE - D
LIST OF BENCHMARKS
Palghar Spurline
Engraved & Marked with yellow paint on top of the Gail SV Station RCC
1 ATPL-8 9.151
Basement.
Engraved & Marked with yellow paint on RCC Road near Bombay Region
4 BMA-1 Fashion Ltd. Company near connecting road of MIDC Boisar to 8.061
Kambhavali Murbe.
Engraved & Marked with yellow paint on top of RCC Piller Stone Near 4
5 BMA-2 corner road near Unitec Fibers (P) Ltd. The connecting road of MIDC 7.945
Boisar to Kambhavali Murbe Village.
Engraved & Marked with yellow paint ontop of Culvert's safety RCC wall
6 BMA-3 near Vitthal Rakhunai Vasanat (53 Nagar) Kumbhavali Eklare Village. The 11.424
connecting Road from Boisar to Murbe.
Engraved & Marked with yellow paint on top of RCC Drain near
7 GGLT-30 10.145
Kumbhavali Bus Stop.
Engraved & Marked with yellow paint on top of RCC Safety Wall Stone on
8 GGLT-30R 9.787
Kumbhavali Village Road.
Engraved & Marked with yellow paint on top of the Culvert near connecting
9 BMP-1 7.987
road from Boisar to Murbe.
Engraved & Marked with yellow paint on top of Culvert side of Asp Road
10 BMP-2 8.392
connecting from Kumbhavali to Murbe East side of 11KV Power Line.
Engraved & Marked with yellow paint on top of Culvert side of Asp Road
11 BMP-3 4.622
about 30m North side of RCC House & 1m South side of 11KV Power Line.
44
DERS Report
Engraved & Marked with yellow paint on top of the Murbe Khadhi CC
13 GGLT-31R 0.735
Basement.
Engraved & Marked with yellow paint on top of CC Wall side of Road,
14 BMP-4 4.375
about 20m North side of 11KV Power Line and East side of RCC House.
Engraved & Marked with yellow paint on top of Culvert side of Asp road
15 BMP-5 connecting from Kharekuran to Palghar, about 500m North side of Cart 2.270
track & 200m North side of RCC House.
Engraved & Marked with yellow paint on top of Culvert side of Asp road
16 BMP-6 connecting from Kharekuran to Palghar, about 10m West side of 11KV 7.061
Power Line & 50m East side of RCC House.
Engraved & Marked with yellow paint on top of Stone side of Asp Road
17 GGLT-32 connecting from Kharekuran to Palghar, about 30m East side of RCC 5.735
House.
Engraved & Marked with yellow paint on top of Culvert side of Asp road
18 GGLT-32R connecting from Kharekuran to Palghar, 10m East side of RCC House & 3.128
200m South side of Cart track.
Engraved & Marked with yellow paint on top of KM Stone No. 14 side of
19 BMP-7 Asp Road connecting from Kharekuran to Palghar about 20m East side of 11.795
11KV Power Line.
Engraved & Marked with yellow paint on top of CC Basement side of SH-4
20 BMR-18 road connecting from Boisar to Palghar about 30m East side of Palghar 11.624
School.
Engraved & Marked with Yellow paint on top of CC Basement side of SH-
34 road connecting from Palghar to Mahim. The point is located about 20m
21 BMR-19 12.949
West side of Indian Oil Petrol Pump & about 100m west side of Shivangi
Chowk Palghar.
Engraved & Marked with Yellow paint on top of culvert side of SH-34 road
22 GGLT-21 connecting from Palghar to Mahim. The point is located about 10m from 11.571
Bharat Petrol Pump & about 30m West side of Chowk.
Engraved & Marked with Yellow paint on top of culvert side of SH-34 road
connecting from Palghar to Mahim. The point is located about 70m East
23 GGLT-21R 11.134
side from Chowk, about 100m East side of Bharat Petrol Pump & about
70m East side of Shirgaon Road.
45
DERS Report
ANNEXURE – E
LIST OF POPULATION DENSITY INDEX
Palghar Spurline
5 6020.57 6 1 Building
7 6364.28 78 2 Building
8 6538.67 13 1 Building
9 7591.43 16 2 Building
11 8534.97 5 1 Building
13 8746.56 63 1 Building
14 8753.56 59 1 Building
18 10949.89 2 1 Temple
25 13320.32 15 2 Building
46
DERS Report
28 13445.52 35 2 Building
31 13720.09 25 1 Building
32 13740.09 13 1 Building
35 14099.15 9 1 Building
38 14432.21 29 2 Building
48 16151.47 31 2 Building
47
DERS Report
ANNEXURE - F
TABULATION OF RESISTIVITY READINGS
Palghar Spurline
Pin Resistivity
Location Offset Resistance Degree of
Chainage (m) Spacing 'a' e=2PaR Remarks
TP/IP (m) R (ohm) Corrosivity
(m) (ohm m)
48
DERS Report
Pin Resistivity
Location Offset Resistance Degree of
Chainage (m) Spacing 'a' e=2PaR Remarks
TP/IP (m) R (ohm) Corrosivity
(m) (ohm m)
49
DERS Report
Pin Resistivity
Location Offset Resistance Degree of
Chainage (m) Spacing 'a' e=2PaR Remarks
TP/IP (m) R (ohm) Corrosivity
(m) (ohm m)
50
DERS Report
ANNEXURE - G
DETAILS OF SOIL STRATIFICATION
Palghar Spurline
Bore
Sr. Location Depth Type of
TP / IP Chainage (m) Hole Remarks
No. Offset (m) (m) Soil
No.
1 TP0 2.00 2.00 1 1.80 CI
Take Off Side
1 2.00 WR
2 2.00 WR
3 1.90 WR
4 2.00 WR
5 1.70 WR
6 1.70 WR
7 1.70 WR
8 1.60 WR
9 1.70 WR
10 1.60 WR
11 1.50 WR
12 1.20 WR
13 1.20 WR
14 0.90 WR
51
DERS Report
Bore
Sr. Location Depth Type of
TP / IP Chainage (m) Hole Remarks
No. Offset (m) (m) Soil
No.
15 1.00 WR
16 1.80 WR
17 1.40 WR
18 1.40 WR
19 1.30 WR
20 1.60 WR
21 1.70 WR
22 1.70 WR
23 1.50 WR
24 0.70 WR
25 0.80 WR
26 0.70 WR
27 0.80 WR
28 0.60 WR
29 0.60 WR
30 0.70 WR
52
DERS Report
Bore
Sr. Location Depth Type of
TP / IP Chainage (m) Hole Remarks
No. Offset (m) (m) Soil
No.
31 0.90 WR
32 0.80 WR
33 0.50 WR
34 0.70 WR
35 0.70 WR
36 0.70 WR
37 0.80 WR
38 0.70 WR
39 0.90 WR
41 1.40 WR
42 1.20 WR
43 0.70 WR
44 1.50 WR
45 1.70 WR
46 1.20 WR
47 1.70 WR
53
DERS Report
Bore
Sr. Location Depth Type of
TP / IP Chainage (m) Hole Remarks
No. Offset (m) (m) Soil
No.
48 TP183 10.00 12152.79 48 1.40 CI
48 1.60 WR
49 1.70 GM
49 1.90 WR
50 2.50 GM
50 2.70 WR
51 3.00 GM
53 3.00 GM
54 3.00 GM
55 3.00 GM
56 3.00 GM
57 3.00 GM
58 1.20 WR
59 1.50 WR
60 2.20 WR
61 1.90 WR
62 2.20 WR
54
DERS Report
Bore
Sr. Location Depth Type of
TP / IP Chainage (m) Hole Remarks
No. Offset (m) (m) Soil
No.
63 1.90 WR
64 1.50 WR
65 1.20 WR
66 1.40 WR
67 1.70 WR
68 1.90 WR
69 1.80 WR
70 2.20 WR
71 2.20 WR
72 2.00 WR
73 1.70 WR
74 1.70 WR
75 1.50 WR
55