You are on page 1of 64

National Highway Authority of India Request for Proposal – Bid Documents

SCHEDULE - B
(See Clause 2.1)

DEVELOPMENT OF THE PROJECT HIGHWAY

1 Development of the Project Highway

Development of the Project Highway shall include design and construction of the Project Highway
as described in this Schedule-B and in Schedule-C. The alignment plans of the Project Highway are
specified in Annex-III of Schedule A and shall be deemed to be part of this Schedule B. The
proposed profile of the project highway as indicated in the Annex-III of Schedule A shall be treated
as an approximate assessment. Based on site/design requirement specified in Schedule-D, the
Contractor shall design the alignment plans and profiles of the project highway with approval from
Authority Engineer within the available Right of Way.

2 Specifications and Standards

The Project Highway shall be designed and constructed in conformity with the Specifications and
Standards specified in Annex-I of Schedule-D.

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga road (NH-703)
near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near Khojewal village (Km 303+900 to km
319+400 of main expressway) and Junction with Jalandhar-Moga road (NH-703) near Kang Sahibu village to Junction with B-1
Kapurthala-Sultanpur Lodhi road (NH-703A) near Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on
EPC mode under Bharatmala Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

Annexure-I
(Schedule – B)

Description of the Project

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with


Jalandhar-Moga road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala
road (NH-703A) near Khojewal village (Km 303+900 to km 319+400 of main expressway) and
Junction with Jalandhar-Moga road (NH-703) near Kang Sahibu village to Junction with Kapurthala-
Sultanpur Lodhi road (NH-703A) near Isharwal village (km 0+000 to km 24+000 of Amritsar
connectivity) on EPC mode under Bharatmala Pariyojna in the state of Punjab.

1. Construction of Project Highway

1.1 The Project Highway shall follow the alignment shown in the plan and profile specified in Annex III
of Schedule-A, unless otherwise specified by the Authority. Notwithstanding anything to the
contrary contained in this Agreement or IRC:SP:99-2013, the proposed profile of the project
highway as indicated in the Annexure-III of Schedule-A shall be treated as an approximate
assessment. The Contractor shall design the alignment plans and profiles of the project highway
based on site/design requirement mentioned in Schedule D with approval from the Authority’s
Engineer within the available Right of Way. The same shall not constitute a change of scope, save
and except any variations arising out of a change of scope expressly undertaken in accordance with
the provision of Article 13.

1.2 Width of carriageway

1.2.1 Four-lane divided carriageway shall be undertaken. The paved carriageway shall be provided as
indicated below and referred to in paragraph 2.8 of this Schedule–B and Annex –I of Schedule–D.

1.2.2 There is no built-up area as the alignment passes through greenfield.

1.2.3 Except as otherwise provided in this Agreement, the width shall be adjusted to fit into appropriate
plans and cross sections developed in accordance with TCS enclosed.

1.2.4 Except as otherwise provided in this Agreement, but subject to provisions of Annex –I of this
Schedule–B, the width of the paved carriageway shall conform to Section 1.2.1 of Schedule B.

1.2.5 The entire cross-sectional elements shall be accommodated in the available/proposed ROW. If
required, suitable retaining structures shall be provided to accommodate the highway cross section
within the available/ proposed ROW and the same shall not constitute a Change of Scope, save and
except any variations in the length arising out of a Change of Scope expressly undertaken in
accordance with the provisions of Article 13.

Note:
a) In addition to width of paved carriageway mentioned in clauses above, additional lane/lanes
shall be given as acceleration/deceleration lane and taper for Loops/Ramps to the required
length shall be provided at interchange locations as per Specifications.

b) In addition to width of paved carriageway mentioned in clause above, at RE wall and


Retaining wall locations the width of paved carriageway including paved shoulder and edge
strip shall be as given in the corresponding TCS.

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga road (NH-703)
near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near Khojewal village (Km 303+900 to km
319+400 of main expressway) and Junction with Jalandhar-Moga road (NH-703) near Kang Sahibu village to Junction with B-2
Kapurthala-Sultanpur Lodhi road (NH-703A) near Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on
EPC mode under Bharatmala Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

2. Geometric design and general features

2.1 General

Geometric design and general features of the Project Highway shall be in accordance with Section 2
of the IRC: SP:99-2013.

2.2 Design speed

The design speed shall be the ruling/minimum design speed specified in Clause 2.2 of the IRC:
SP:99-2013.

2.3 Improvement of the existing road geometrics

In the following stretches, where improvement of the existing road geometrics to the prescribed
standards is not possible, the existing road geometrics shall be improved to the extent possible
within the given right of way and proper road signs and safety measures shall be provided:

Proposed Chainage (in km)


S. No. Type of Deficiency Remarks
Start End
Nil

2.4 Right of Way

Details of the Right of Way are given in Annex II of Schedule-A.

2.5 Type of shoulders

The shoulder specification shall be as per Section 2 and Section 5 of IRC: SP:99-2013. The
shoulder on the outer side (on either side of the carriageway) shall be 3m wide paved + 2m earthen.
The shoulder composition is as follows:

a) The compositions and specification of the paved shoulder and edge strip shall be as that of the
main carriageway.
b) The earthen shoulder shall be provided with 200 mm thick layer of granular material for
protection against erosion.

2.6 Service Roads/Slip Roads/Connecting Roads

Service Roads/ Slip Roads shall be constructed at the locations and for the lengths indicated below:

Phase-1 DKE Km 303+900 to km 319+400

Sl. Location of Service Right Hand Side Length Remarks


No. Roads/Slip Roads (Design (RHS)/Left (m)
Chainage in Km) Hand Side) or
From To Both Sides
A Slip Road
Entry and Exit Approach with Slip Roads for Way Side Access to Wayside
Amenities mentioned in Schedule C Section 2.4.1 (A) to be Amenities
provided as per Appendix C -1 with proper acceleration and
Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga road (NH-703)
near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near Khojewal village (Km 303+900 to km
319+400 of main expressway) and Junction with Jalandhar-Moga road (NH-703) near Kang Sahibu village to Junction with B-3
Kapurthala-Sultanpur Lodhi road (NH-703A) near Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on
EPC mode under Bharatmala Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

Sl. Location of Service Right Hand Side Length Remarks


No. Roads/Slip Roads (Design (RHS)/Left (m)
Chainage in Km) Hand Side) or
From To Both Sides
Deceleration lanes.

B Service Road
Nil
C Connecting Roads
1 304+650 305+000 RHS 350 -
2 305+000 305+230 LHS 230 -
3 305+390 305+480 LHS 90 -
4 308+650 308+970 LHS 650 -
5 309+280 309+310 RHS 30 -
6 309+630 309+650 RHS 20 -
7 310+350 310+410 RHS 60 -
8 310+350 310+420 LHS 70 -
9 311+290 311+420 LHS 130 -
10 311+400 311+500 RHS 100 -
11 311+930 311+980 RHS 50 -
12 313+940 314+000 LHS 60 -
13 314+260 314+290 LHS 30 -
14 314+280 314+320 RHS 40 -
15 318+100 318+200 LHS 100 -

Amritsar Connectivity 0+000 to km 24+000

Sl. Location of Service Right Hand Side Length Remarks


No. Roads/Slip Roads (Design (RHS)/Left (m)
Chainage in Km) Hand Side) or
From To Both Sides
A Slip Road
Entry and Exit Approach with Slip Roads for Way Side
Amenities mentioned in Schedule C Section 2.4.1 (A) to be Access to Wayside
provided as per Appendix C -1 with proper acceleration and Amenities
Deceleration lanes.
B Service Road
Nil
C Connecting Roads
1 0+490 0+740 LHS 250 -
2 0+520 0+625 RHS 105 -
3 2+100 2+340 RHS 240 -
4 2+130 2+280 LHS 150 -
5 3+240 3+620 LHS 380 -
6 5+350 5+580 RHS 230 -
7 16+700 16+900 RHS 200 -
8 18+000 18+270 RHS 270 -
9 18+970 19+190 LHS 220 -
10 18+970 19+210 RHS 240 -
11 20+550 20+700 RHS 150 -
12 23+730 23+920 LHS 190 -
Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga road (NH-703)
near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near Khojewal village (Km 303+900 to km
319+400 of main expressway) and Junction with Jalandhar-Moga road (NH-703) near Kang Sahibu village to Junction with B-4
Kapurthala-Sultanpur Lodhi road (NH-703A) near Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on
EPC mode under Bharatmala Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

Note:

1. Above length of the service/ slip/ connecting roads is indicative and minimum specified. The actual
length of the service/ slip/ connecting roads shall be determined by the Contractor in accordance with
the IRC: SP:99-2013 requirements with approval from the Authority’s Engineer. Any increase in the
length specified in this Clause of Schedule-B shall not constitute a Change of Scope, save and except
any variations in the length arising out of a Change of Scope expressly undertaken in accordance
with the provisions of Article 13.

2. The realignment of existing track to the SVUP/LVUP/Flyover outside the PROW and connecting
roads between consecutive underpasses wherever required as per plan & profile uploaded with bid
document and specified in Annex III of schedule A is to be constructed by the contractor as per site
requirement in consultation with Authority Engineer and the same would not constitute any change
of scope.

3. Length of service roads given in above table excludes length across the project Expressway for
proper connectivity of cross roads on either side of project expressway as given in the alignment plan
enclosed at Annex-III, Schedule-A which shall be deemed to be included in the scope of work.

4. Width of connecting road shall not be less than the existing road and in no case less than as specified
in paragraph 2.12.3 of IRC:SP:99-2013.

5. Entry and exit approaches with slip road shall be provided for all way side amenities mentioned in
Schedule C with proper acceleration / deceleration lane. The structures falling within this stretches
shall also be constructed and the same shall not constitute a Change of Scope.

2.7 Grade separated structures

2.7.1 Grade separated structures shall be provided as per paragraph 2.13 of the IRC: SP:99-2013.
Proposed levels at structure locations as shown in plan & profile specified in Annex III of schedule
A are only for guidance and any changes in levels shall not constitute any change of scope. The
requisite particulars are given below:

SVUP

Sl. Chainage Type of Span Arrangement Skew Deck Width of Open


No. (Km) Structure (Clear opening) (m) Angle Configuration (m) Median (m)
Phase-1 DKE Km 303+900 to km 319+400
1 304+998 RCC BOX 1x7x4.5 13 deg 2x13.75 19.5
2 308+556 RCC BOX 1x7x4.5 23 deg 2x13.75 19.5
3 309+872 RCC BOX 1x7x4.5 6 deg 2x13.75 19.5
4 310+420 RCC BOX 1x7x4.5 6 deg 2x13.75 19.5
5 310+781 RCC BOX 1x7x4.5 0 deg 2x13.75 19.5
6 311+935 RCC BOX 1x7x4.5 0 deg 2x13.75 19.5
7 312+865 RCC BOX 1x7x4.5 0 deg 2x13.75 19.5
Amritsar Connectivity Km 0+000 to km 24+000
1 0+625 RCC BOX 1x7x4.5 0 deg 2x13.75 19.5
2 1+291 RCC BOX 1x7x4.5 0 deg 2x13.75 19.5
3 4+695 RCC BOX 1x7x4.5 0 deg 2x13.75 19.5
4 6+982 RCC BOX 1x7x4.5 23 deg 2x13.75 19.5
Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga road (NH-703)
near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near Khojewal village (Km 303+900 to km
319+400 of main expressway) and Junction with Jalandhar-Moga road (NH-703) near Kang Sahibu village to Junction with B-5
Kapurthala-Sultanpur Lodhi road (NH-703A) near Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on
EPC mode under Bharatmala Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

Sl. Chainage Type of Span Arrangement Skew Deck Width of Open


No. (Km) Structure (Clear opening) (m) Angle Configuration (m) Median (m)
5 12+265 RCC BOX 1x7x4.5 45 deg 2x13.75 19.5
6 15+538 RCC BOX 1x7x4.5 20 deg 2x13.75 19.5
7 16+705 RCC BOX 1x7x4.5 0 deg 2x13.75 19.5
8 18+498 RCC BOX 1x7x4.5 15 deg 2x13.75 19.5
9 18+970 RCC BOX 1x7x4.5 0 deg 2x13.75 19.5

LVUP

S. Design Type of Type of Span Skew Deck Width of


No. Chainage Crossing structure Arrangement Angle Configuration Open
(Km) (m) (m) Median (m)
Phase-1 DKE Km 303+900 to km 319+400
1 306+948 NH-71 to RCC BOX 1x12x4.5 45 deg 2x13.74 19.5
Singhpur Bt
road
2 307+695 Singh to RCC BOX 1x12x4.5 18 deg 2x13.75 19.5
Singhour Bt
road
3 308+367 Singh to RCC BOX 1x12x4.5 24 deg 2x13.75 19.5
Singhour Bt
road
4 310+191 Rampur to RCC BOX 1x12x4.5 18 deg 2x13.75 19.5
lallian kala
BT road
5 312+334 Kurali to RCC BOX 1x12x4.5 45deg 2x13.75 19.5
lallian kalan
Bt road
6 313+262 Kurali to RCC BOX 1x12x4.5 13 deg 2x13.75 19.5
Nijhran Bt
road
7 Jalandhar to RCC BOX 1x12x4.5 0 deg 2x13.75 19.5
316+125 kohala BT
road]
8 316+598 Sehjanghi RCC BOX 1x12x4.5 0 deg 2x13.75 19.5
cart track
9 317+209 Cart track RCC BOX 1x12x4.5 0 deg 2x13.75 19.5
10 317+868 Safipur to RCC BOX 1x12x4.5 0 deg 2x13.75 19.5
Gill cart
track
11 318+091 Safipur to RCC BOX 1x12x4.5 0 deg 2x13.75 19.5
Gill BT
road
12 318+537 Gill Cart RCC BOX 1x12x4.5 0 deg 2x13.75 19.5
track
13 319+200 Chamiara RCC BOX 1x12x4.5 4 deg 2x13.75 19.5
BT road
Amritsar Connectivity Km 0+000 to km 24+000
1 4+405 Earthen RCC BOX 1x12x5.5 0 deg 2x13.75 19.5
road for rice
Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga road (NH-703)
near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near Khojewal village (Km 303+900 to km
319+400 of main expressway) and Junction with Jalandhar-Moga road (NH-703) near Kang Sahibu village to Junction with B-6
Kapurthala-Sultanpur Lodhi road (NH-703A) near Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on
EPC mode under Bharatmala Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

S. Design Type of Type of Span Skew Deck Width of


No. Chainage Crossing structure Arrangement Angle Configuration Open
(Km) (m) (m) Median (m)
mill
2 4+930 Village BT RCC BOX 1x12x4.5 0 deg 2x13.75 19.5
Road
3 5+545 Uggi to RCC BOX 1x12x4.5 0 deg 2x13.75 19.5
village BT
Road
4 8+597 Rahimpur- RCC BOX 1x12x4.5 45 deg 2x13.75 19.5
Uggi BT Rd
5 9+521 Rahimpur to RCC BOX 1x12x4.5 18 deg 2x13.75 19.5
khiwa
Earthen
road
6 11+086 Adhi kalan RCC BOX 1x12x4.5 45 deg 2x13.75 19.5
BT Road
7 11+820 Adhi kalan RCC BOX 1x12x4.5 30 deg 2x13.75 19.5
BT Road
8 13+306 Kahalwan RCC BOX 1x12x4.5 45 deg 2x13.75 19.5
Earthen
Road
9 17+228 Salahpur RCC BOX 1x12x4.5 10 deg 2x13.75 19.5
dona
Earthen
road
10 18+002 Salhpur RCC BOX 1x12x4.5 15 deg 2x13.75 19.5
dona to
village BT
Road
11 20+553 Malian to RCC BOX 1x12x4.5 0 deg 2x13.75 19.5
mothan
wala BT
Road
12 21+690 Malian to RCC BOX 1x12x4.5 8 deg 2x13.75 19.5
mothan
wala BT
Road

VUP

S. Design Type of Crossing Type of Span Skew Deck Width of


No. Chainage Structure Arrangement Angle Configuration Open
(Km) (m) (m) Median
(m)
Phase-1 DKE Km 303+900 to km 319+400
1 311+417 Rampur to lallian RCC I 1x20 22 deg 2x13.75 19.5
kala BT road Girder
2 313+955 Jalandhar to PSC I 1x20 32 deg 2x13.75 19.5
Nijhran & Puar Bt Girder
road
Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga road (NH-703)
near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near Khojewal village (Km 303+900 to km
319+400 of main expressway) and Junction with Jalandhar-Moga road (NH-703) near Kang Sahibu village to Junction with B-7
Kapurthala-Sultanpur Lodhi road (NH-703A) near Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on
EPC mode under Bharatmala Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

S. Design Type of Crossing Type of Span Skew Deck Width of


No. Chainage Structure Arrangement Angle Configuration Open
(Km) (m) (m) Median
(m)
Amritsar Connectivity Km 0+000 to km 24+000
1 2+283 Chanian BT Road RCC I 1x20 0 deg 2x13.75 19.5
Girder
2 3+285 Uggi-Chitti BT RCC I 1x20 0 deg 2x13.75 19.5
Road Girder
3 8+090 Major district Road RCC I 1x20 0 deg 2x13.75 19.5
Girder
4 12+978 Dalla BT Road PSC I 1x20 39 deg 2x13.75 19.5
Girder
5 15+019 Sidhwan dona to RCC I 1x20 0 deg 2x13.75 19.5
Qualpur BT Road Girder
6 23+275 Ramp/loop RCC I 1x20 0 deg 2x13.75 19.5
Girder
7 23+728 Isharwal to RCC I 1x20 0 deg 2x13.75 19.5
Jeorgepur BT road Girder

FLYOVER

S. Design Type of Type of Span Skew Deck Width of


No. Chainage Crossing Structure Arrangement (m) Angle Configuration Open Median
(Km) (m) (m)
Phase-1 DKE Km 303+900 to km 319+400
Nil
Amritsar Connectivity Km 0+000 to km 24+000
Nil

INTERCHANGE

S. Design Type of Type of Span Skew Deck Width of


No. Chainage Crossing Structure Arrangement Angle Configuration Open
(Km) (m) (m) Median (m)
Phase-1 DKE Km 303+900 to km 319+400
1 306+354 NH-71 Steel 2x30 45 deg 2x13.75 19.5
(Nakodar - Girder
Jalandhar Rd)
Amritsar Connectivity Km 0+000 to km 24+000
1 0+000 NH-71 PSC I 4x30 0 deg 2x13.75 19.5
(Nakodar - Girder
Jalandhar Rd)

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga road (NH-703)
near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near Khojewal village (Km 303+900 to km
319+400 of main expressway) and Junction with Jalandhar-Moga road (NH-703) near Kang Sahibu village to Junction with B-8
Kapurthala-Sultanpur Lodhi road (NH-703A) near Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on
EPC mode under Bharatmala Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

STRUCTURE AT LOOP AND RAMPS

Sl. Chainage Connecting Structure Clear Span Skew Deck Total Width
No. (Km) Roads Type (m) Angle Configuration length of
(m) C/C of Open
Exp. Median
Joint (m)
(m)
Phase-1 DKE Km 303+900 to km 319+400
1 306+354 Interchange on NH-71-Expressway
a. VOP on PSC I 2x30 37 deg 2x10.75 64.37 -
Loop-1 Girder
b. VUP on PSC I 21.5 16 deg 2x13.75 24.512 19.5
Loop-2 Girder
c. LVUP on RCC BOX 1x12x4.5 30 deg 22.255 13.6 -
Loop-1
d. LVUP on RCC BOX 1x12x4.5 0 deg 11.5 13.2 -
Ramp-1
Amritsar Connectivity Km 0+000 to km 24+000
1 0+000 a. VOP on Steel 2x46.692 35 deg 1x13.75 93.384 -
Loop Girder (Exp. To
Exp.)
2 22+343 a. MJB at PSC I 3x35 (Exp. 0 deg 1x12.5 105 -
Ramp-1 Girder To Exp.)
b. MJB at PSC I 3x35 (Exp. 0 deg 1x12.5 105 -
Ramp-3 Girder To Exp.)

DETAIL OF LOOP AND RAMP:

Minimum lane configurations of Loops / Ramps for each interchange are as follows:

Phase-1 DKE Km 303+900 to km 319+400

Interchange No Ramp Description Lane Length TCS


& Chainage /Loop No Configuration (km) Type
(Km)
Interchange-1 L-01 Entry to DKE 2 0.215 10B
306+352 (From Jalandhar to DKE Delhi
Side)
L-02 Exit from DKE 2 0.155 10B
(From DKE Delhi Side to
Nakodar)
R-01 Exit from DKE 2 0.220 10C
(From DKE Katra Side to
Jalandhar)
R-02 Entry to DKE 2 0.300 10C
(From Nakodar to DKE Katra
Side)
R-03 Exit from DKE 2 0.450 10C
(From DKE Delhi Side to
Nakodar)

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga road (NH-703)
near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near Khojewal village (Km 303+900 to km
319+400 of main expressway) and Junction with Jalandhar-Moga road (NH-703) near Kang Sahibu village to Junction with B-9
Kapurthala-Sultanpur Lodhi road (NH-703A) near Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on
EPC mode under Bharatmala Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

Interchange No Ramp Description Lane Length TCS


& Chainage /Loop No Configuration (km) Type
(Km)
R-04 Entry to DKE 2 0.190 10C
(From Nakodar to DKE Katra
Side)
R-05 Exit from DKE 2 0.130 10C
(From DKE Delhi Side to
Jalandhar)
R-06 Entry to DKE 2 0.175 10C
(From Jalandhar to DKE Katra
Side)
Slip Road Between DKE and Nakodar- 2+2 2.140 10A
Jalandhar Road

Amritsar Connectivity Km 0+000 to km 24+000

Interchange No Ramp Description Lane Length TCS


& Chainage /Loop No Configuration (km) Type
(Km)
Interchange-2 R-01 Entry to Amritsar Connectivity 2 0.610 8
0+000 (From Nakodar to Amritsar Side)
R-02 Exit from Amritsar Connectivity 2 0.920 8
(From Amritsar side to Jalandhar)
R-03 Entry to DKE 2 1.250 8
(From Amritsar Connectivity to
DKE Delhi Side)
R-04 Entry to Amritsar Connectivity 2 0.810 8
(From Nakodar to Amritsar Side)

Interchange No Ramp Description Lane Length TCS


& Chainage /Loop No Configuration (km) Type
(Km)
Interchange-3 L-01 U-Turn Facility for Entry or Exit 2 1.260 10B
from DKE
22+120 (From Sultanpur Lodhi-
Kapurthala Road to DKE)
R-01 Entry to DKE 2 0.920 10C
(From Sultanpur Lodhi to DKE
Side)
R-02 Entry to Amritsar Connectivity 2 0.370 10C
(From Sultanpur Lodhi to
Amritsar Side)
R-03 Exit from DKE 2 0.980 10C
(From DKE Side to Kapurthala)
R-04 Exit from Amritsar Connectivity 2 0.390 10C
(From Amritsar side to
Kapurthala)

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga road (NH-703)
near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near Khojewal village (Km 303+900 to km
319+400 of main expressway) and Junction with Jalandhar-Moga road (NH-703) near Kang Sahibu village to Junction with B - 10
Kapurthala-Sultanpur Lodhi road (NH-703A) near Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on
EPC mode under Bharatmala Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

Note:

1. The minimum vertical clearance of all LVUP and SVUP structures shall be as mentioned in tables
above.

2. The minimum vertical clearance of all VUP, VOP, Fly-over and interchange structures shall be 5.5m.

3. Wherever liquefaction is observed in Open foundation and Raft Structures, Ground improvement
shall be done to compact the soil to increase its penetration resistance and satisfy clause 8.4.4 (v) of
IRC114.

4. Project Expressway is proposed to be constructed to four lane configuration with provision for
widening to Eight-lane configuration in future. As such, superstructure of all the structures
mentioned above is to be designed for edge movement of the vehicle considering stitching of new
superstructure in future due to widening for additional lane.

5. Special vehicle loading is to be considered in Design of structures.

6. Since the subject project is Access Controlled, therefore, Congestion factor is not to be considered in
calculation of live load.

7. The realignment of existing track to the SVUP/LVUP/Flyover outside the PROW and connecting
roads between consecutive underpasses wherever required as per plan & profile uploaded with bid
document and specified in Annex III of schedule A is to be constructed by the contractor as per site
requirement in consultation with Authority Engineer and the same would not constitute any change
of scope.

8. Any other structures falling within acceleration / deceleration lane /taper length of the interchanges
shall be constructed to the required width within the scope of work. This shall not be treated as
change of scope, save and except any variations arising out of a Change of Scope expressly
undertaken in accordance with the provisions of Article 13.

9. The length of loops and ramps are minimum and likely to get changed as per site requirement. Any
change as per site requirement may not constitute change of scope, save and except any variations in
the length arising out of a Change of Scope expressly undertaken in accordance with the provisions
of Article 13.

10. The width of Paved Carriageway for the loops and ramps of the interchanges shall be minimum as
given in TCS. However, where toll plaza has to be constructed, the width of Paved Carriageway shall
be as per the width of toll plaza lane configuration given in Schedule C including taper length as per
manual.

11. The lane configuration and width of all structures shall be as per respective paragraph of this
schedule.

12. The above lengths are tentative and minimum specified without acceleration / deceleration lane and
taper length. The acceleration / deceleration lane and taper shall be constructed as per Schedule D.

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga road (NH-703)
near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near Khojewal village (Km 303+900 to km
319+400 of main expressway) and Junction with Jalandhar-Moga road (NH-703) near Kang Sahibu village to Junction with B - 11
Kapurthala-Sultanpur Lodhi road (NH-703A) near Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on
EPC mode under Bharatmala Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

Interchange 1

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga road (NH-703) near Kang Sahibu village to Junction
with Jalandhar-Kapurthala road (NH-703A) near Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near Isharwal village (km 0+000 to km 24+000 of Amritsar B - 12
connectivity) on EPC mode under Bharatmala Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

Interchange 2

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga road (NH-703) near Kang Sahibu village to Junction
with Jalandhar-Kapurthala road (NH-703A) near Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near Isharwal village (km 0+000 to km 24+000 of Amritsar B - 13
connectivity) on EPC mode under Bharatmala Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

Interchange 3

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga road (NH-703) near Kang Sahibu village to Junction
with Jalandhar-Kapurthala road (NH-703A) near Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near Isharwal village (km 0+000 to km 24+000 of Amritsar B - 14
connectivity) on EPC mode under Bharatmala Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

2.8 Typical Cross Section of Project Highway

Phase-1 DKE Km 303+900 to km 319+400

Sl. Design Chainage Length Description TCS


No. From To (m) Type
1 303+900 304+333 433 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-7
LVUP/SVUP APPROACH WITH DEPRESSED
MEDIAN
2 304+333 304+438 105 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT TCS-2
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
3 304+438 304+994 556 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-7
LVUP/SVUP APPROACH WITH DEPRESSED
MEDIAN
4 304+994 305+001 7 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT TCS-2
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
5 305+001 305+320 319 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-7
LVUP/SVUP APPROACH WITH DEPRESSED
MEDIAN
6 305+320 305+725 405 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-6B
ROB\FLYOVER\VUP APPROACH(EMB HEIGHT
BELOW 4.5M) WITH DEPRESSED MEDIAN
7 305+725 306+320 595 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-6A
ROB\FLYOVER\VUP APPROACH(EMB HEIGHT
ABOVE 4.5M) WITH DEPRESSED MEDIAN
8 306+320 306+385 65 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT TCS-3
INTERCHANGE LOCATION WITH DEPRESSED
MEDIAN
9 306+385 306+942 557 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-
ROB\FLYOVER\VUP APPROACH(EMB HEIGHT 6AA
ABOVE 4.5M) WITH DEPRESSED MEDIAN
10 306+942 306+954 12 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT TCS-2A
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
11 306+954 307+211 257 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-
ROB\FLYOVER\VUP APPROACH(EMB HEIGHT 6AA
ABOVE 4.5M) WITH DEPRESSED MEDIAN
12 306+942 307+235 293 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT TCS-5A
ROB\FLYOVER\VUP LOCATION WITH DEPRESSED
MEDIAN
13 307+235 307+689 454 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-
ROB\FLYOVER\VUP APPROACH(EMB HEIGHT 6AA
ABOVE 4.5M) WITH DEPRESSED MEDIAN
14 307+689 307+701 12 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT TCS-2A
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
15 307+701 308+105 404 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-7A
LVUP/SVUP APPROACH WITH DEPRESSED
MEDIAN
16 308+105 308+135 30 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT TCS-2A
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
17 308+135 308+361 226 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-7A
Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga
road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 15
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

Sl. Design Chainage Length Description TCS


No. From To (m) Type
LVUP/SVUP APPROACH WITH DEPRESSED
MEDIAN
18 308+361 308+373 12 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT TCS-2A
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
19 308+373 308+552 179 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-7A
LVUP/SVUP APPROACH WITH DEPRESSED
MEDIAN
20 308+552 308+559 7 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT TCS-2A
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
21 308+559 308+920 361 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-7A
LVUP/SVUP APPROACH WITH DEPRESSED
MEDIAN
22 308+920 309+360 440 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-1A
PLAIN & ROLLNG TERRAIN WITH DEPRESSSED
MEDIAN
23 309+360 309+868 508 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-7A
LVUP/SVUP APPROACH WITH DEPRESSED
MEDIAN
24 309+868 309+875 7 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT TCS-2A
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
25 309+875 310+185 310 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-7A
LVUP/SVUP APPROACH WITH DEPRESSED
MEDIAN
26 310+185 310+197 12 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT TCS-2A
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
27 310+197 310+416 219 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-7A
LVUP/SVUP APPROACH WITH DEPRESSED
MEDIAN
28 310+416 310+423 7 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT TCS-2A
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
29 310+423 310+777 354 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-
ROB\FLYOVER\VUP APPROACH(EMB HEIGHT 6BB
BELOW 4.5M) WITH DEPRESSED MEDIAN
30 310+777 310+784 7 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT TCS-2A
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
31 310+784 311+407 623 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-
ROB\FLYOVER\VUP APPROACH(EMB HEIGHT 6AA
ABOVE 4.5M) WITH DEPRESSED MEDIAN
32 311+407 311+429 22 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT TCS-5A
ROB\FLYOVER\VUP LOCATION WITH DEPRESSED
MEDIAN
33 311+429 311+931 502 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-
ROB\FLYOVER\VUP APPROACH(EMB HEIGHT 6AA
ABOVE 4.5M) WITH DEPRESSED MEDIAN
34 311+931 311+938 7 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT TCS-2A
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga


road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 16
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

Sl. Design Chainage Length Description TCS


No. From To (m) Type
35 311+938 312+328 390 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-
ROB\FLYOVER\VUP APPROACH(EMB HEIGHT 6BB
BELOW 4.5M) WITH DEPRESSED MEDIAN
36 312+328 312+340 12 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT TCS-2A
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
37 312+340 312+861 521 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-7A
LVUP/SVUP APPROACH WITH DEPRESSED
MEDIAN
38 312+861 312+868 7 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT TCS-2A
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
39 312+868 313+256 388 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-7A
LVUP/SVUP APPROACH WITH DEPRESSED
MEDIAN
40 313+256 313+268 12 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT TCS-2A
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
41 313+268 313+667 399 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-
ROB\FLYOVER\VUP APPROACH (EMB HEIGHT 6AA
ABOVE 4.5M) WITH DEPRESSED MEDIAN
42 313+667 313+703 36 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT TCS-2A
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
43 313+703 313+943 240 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-
ROB\FLYOVER\VUP APPROACH (EMB HEIGHT 6AA
ABOVE 4.5M) WITH DEPRESSED MEDIAN
44 313+943 313+967 24 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT TCS-5A
ROB\FLYOVER\VUP LOCATION WITH DEPRESSED
MEDIAN
45 313+967 314+425 458 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-
ROB\FLYOVER\VUP APPROACH (EMB HEIGHT 6AA
ABOVE 4.5M) WITH DEPRESSED MEDIAN
46 314+425 314+515 90 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-
ROB\FLYOVER\VUP APPROACH (EMB HEIGHT 6BB
BELOW 4.5M) WITH DEPRESSED MEDIAN
47 314+515 315+600 1085 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-1A
PLAIN & ROLLNG TERRAIN WITH DEPRESSSED
MEDIAN
48 315+600 316+119 519 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-7A
LVUP/SVUP APPROACH WITH DEPRESSED
MEDIAN
49 316+119 316+131 12 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT TCS-2A
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
50 316+131 316+592 461 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-7A
LVUP/SVUP APPROACH WITH DEPRESSED
MEDIAN
51 316+592 316+604 12 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT TCS-2A
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
52 316+604 317+203 599 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-7A
LVUP/SVUP APPROACH WITH DEPRESSED

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga


road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 17
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

Sl. Design Chainage Length Description TCS


No. From To (m) Type
MEDIAN
53 317+203 317+215 12 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT TCS-2A
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
54 317+215 317+862 647 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-7A
LVUP/SVUP APPROACH WITH DEPRESSED
MEDIAN
55 317+862 317+874 12 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT TCS-2A
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
56 317+874 318+085 211 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-7A
LVUP/SVUP APPROACH WITH DEPRESSED
MEDIAN
57 318+085 318+097 12 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT TCS-2A
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
58 318+097 318+531 434 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-7A
LVUP/SVUP APPROACH WITH DEPRESSED
MEDIAN
59 318+531 318+543 12 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT TCS-2A
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
60 318+543 318+847 304 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-7A
LVUP/SVUP APPROACH WITH DEPRESSED
MEDIAN
61 318+847 318+872 25 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT TCS-2A
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
62 318+872 319+194 322 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-7A
LVUP/SVUP APPROACH WITH DEPRESSED
MEDIAN
63 319+194 319+206 12 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT TCS-2A
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
64 319+206 319+327 121 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-7A
LVUP/SVUP APPROACH WITH DEPRESSED
MEDIAN
65 319+327 319+347 20 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT TCS-2A
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
66 319+347 319+400 53 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR TCS-7A
LVUP/SVUP APPROACH WITH DEPRESSED
MEDIAN

Amritsar Connectivity Km 0+000 to Km 24+000

Sl. Design Chainage Length Description TCS


No. From To (m) Type
1 0+000 0.06 60 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT 3
INTERCHANGE LOCATION WITH DEPRESSED
MEDIAN
2 0+060 0+28 220 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 8
RAMP OF ROTARY INTERCHANGE
Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga
road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 18
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

Sl. Design Chainage Length Description TCS


No. From To (m) Type
3 0+280 0+32 40 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT 9
TOLL PLAZA OF ROTARY INTERCHANGE
4 0+320 0+622 302 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 8
RAMP OF ROTARY INTERCHANGE
5 0+622 0+629 7 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT 2
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
6 0+629 0+655 26 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 8
RAMP OF ROTARY INTERCHANGE
7 0+655 1+288 633 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 7
LVUP/SVUP APPROACH WITH DEPRESSED MEDIAN
8 1+288 1+295 7 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT 2
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
9 1+295 1+72 425 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 7
LVUP/SVUP APPROACH WITH DEPRESSED MEDIAN
10 1+720 2+273 553 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 6A
ROB/FLYOVER/VUP APPROACH(EMB HEIGHT
ABOVE 4.5M) WITH DEPRESSED MEDIAN
11 2+273 2+293 20 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT 5
ROB/FLYOVER/VUP LOCATION WITH DEPRESSED
MEDIAN
12 2+293 2+854 561 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 6A
ROB/FLYOVER/VUP APPROACH(EMB HEIGHT
ABOVE 4.5M) WITH DEPRESSED MEDIAN
13 2+854 2+892 38 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT 2
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
14 2+892 3+275 383 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 6A
ROB/FLYOVER/VUP APPROACH(EMB HEIGHT
ABOVE 4.5M) WITH DEPRESSED MEDIAN
15 3+275 3+295 20 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT 5
ROB/FLYOVER/VUP LOCATION WITH DEPRESSED
MEDIAN
16 3+295 3+86 565 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 6A
ROB/FLYOVER/VUP APPROACH(EMB HEIGHT
ABOVE 4.5M) WITH DEPRESSED MEDIAN
17 3+860 4+399 539 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 7
LVUP/SVUP APPROACH WITH DEPRESSED MEDIAN
18 4+399 4+411 12 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT 2
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
19 4+411 4+692 281 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 7
LVUP/SVUP APPROACH WITH DEPRESSED MEDIAN
20 4+692 4+699 7 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT 2
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
21 4+699 4+924 225 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 7
LVUP/SVUP APPROACH WITH DEPRESSED MEDIAN
22 4+924 4+936 12 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT 2
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
23 4+936 5+45 514 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 7

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga


road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 19
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

Sl. Design Chainage Length Description TCS


No. From To (m) Type
LVUP/SVUP APPROACH WITH DEPRESSED MEDIAN
24 5+450 5+539 89 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 6A
ROB/FLYOVER/VUP APPROACH(EMB HEIGHT
ABOVE 4.5M) WITH DEPRESSED MEDIAN
25 5+539 5+551 12 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT 2
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
26 5+551 5+856 305 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 6A
ROB/FLYOVER/VUP APPROACH(EMB HEIGHT
ABOVE 4.5M) WITH DEPRESSED MEDIAN
27 5+856 5+883 27 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT 5
ROB/FLYOVER/VUP LOCATION WITH DEPRESSED
MEDIAN
28 5+883 6+22 337 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 6A
ROB/FLYOVER/VUP APPROACH(EMB HEIGHT
ABOVE 4.5M) WITH DEPRESSED MEDIAN
29 6+220 6+47 250 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 6B
ROB/FLYOVER/VUP APPROACH(EMB HEIGHT
BELOW 4.5M) WITH DEPRESSED MEDIAN
30 6+470 6+979 509 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 7
LVUP/SVUP APPROACH WITH DEPRESSED MEDIAN
31 6+979 6+986 7 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT 2
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
32 6+986 7+28 294 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 7
LVUP/SVUP APPROACH WITH DEPRESSED MEDIAN
33 7+280 7+5 220 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 1
PLAIN & ROLLNG TERRAIN WITH DEPRESSSED
MEDIAN
34 7+500 7+6 100 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 6B
ROB/FLYOVER/VUP APPROACH(EMB HEIGHT
BELOW 4.5M) WITH DEPRESSED MEDIAN
35 7+600 8+08 480 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 6A
ROB/FLYOVER/VUP APPROACH(EMB HEIGHT
ABOVE 4.5M) WITH DEPRESSED MEDIAN
36 8+080 8+1 20 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT 5
ROB/FLYOVER/VUP LOCATION WITH DEPRESSED
MEDIAN
37 8+100 8+591 491 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 6A
ROB/FLYOVER/VUP APPROACH(EMB HEIGHT
ABOVE 4.5M) WITH DEPRESSED MEDIAN
38 8+591 8+603 12 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT 2
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
39 8+603 8+808 205 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 7
LVUP/SVUP APPROACH WITH DEPRESSED MEDIAN
40 8+808 8+83 22 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT 2
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
41 8+830 9+515 685 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 7
LVUP/SVUP APPROACH WITH DEPRESSED MEDIAN
42 9+515 9+527 12 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT 2
MJB,MNB, LVUP/SVUP LOCATION WITH

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga


road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 20
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

Sl. Design Chainage Length Description TCS


No. From To (m) Type
DEPRESSED MEDIAN
43 9+527 9+97 443 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 7
LVUP/SVUP APPROACH WITH DEPRESSED MEDIAN
44 9+970 10+5 530 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 1
PLAIN & ROLLNG TERRAIN WITH DEPRESSSED
MEDIAN
45 10+500 11+08 580 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 7
LVUP/SVUP APPROACH WITH DEPRESSED MEDIAN
46 11+080 11+092 12 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT 2
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
47 11+092 11+814 722 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 7
LVUP/SVUP APPROACH WITH DEPRESSED MEDIAN
48 11+814 11+826 12 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT 2
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
49 11+826 12+262 436 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 7
LVUP/SVUP APPROACH WITH DEPRESSED MEDIAN
50 12+262 12+269 7 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT 2
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
51 12+269 12+411 142 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 6A
ROB/FLYOVER/VUP APPROACH(EMB HEIGHT
ABOVE 4.5M) WITH DEPRESSED MEDIAN
52 12+411 12+436 25 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT 2
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
53 12+436 12+968 532 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 6A
ROB/FLYOVER/VUP APPROACH(EMB HEIGHT
ABOVE 4.5M) WITH DEPRESSED MEDIAN
54 12+968 12+988 20 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT 5
ROB/FLYOVER/VUP LOCATION WITH DEPRESSED
MEDIAN
55 12+988 13+3 312 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 6A
ROB/FLYOVER/VUP APPROACH(EMB HEIGHT
ABOVE 4.5M) WITH DEPRESSED MEDIAN
56 13+300 13+312 12 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT 2
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
57 13+312 13+5 188 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 6A
ROB/FLYOVER/VUP APPROACH(EMB HEIGHT
ABOVE 4.5M) WITH DEPRESSED MEDIAN
58 13+500 13+67 170 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 6B
ROB/FLYOVER/VUP APPROACH(EMB HEIGHT
BELOW 4.5M) WITH DEPRESSED MEDIAN
59 13+670 14+08 410 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 1
PLAIN & ROLLNG TERRAIN WITH DEPRESSSED
MEDIAN
60 14+080 14+2 120 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 6B
ROB/FLYOVER/VUP APPROACH(EMB HEIGHT
BELOW 4.5M) WITH DEPRESSED MEDIAN
61 14+200 15+009 809 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 6A
ROB/FLYOVER/VUP APPROACH(EMB HEIGHT

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga


road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 21
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

Sl. Design Chainage Length Description TCS


No. From To (m) Type
ABOVE 4.5M) WITH DEPRESSED MEDIAN
62 15+009 15+029 20 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT 5
ROB/FLYOVER/VUP LOCATION WITH DEPRESSED
MEDIAN
63 15+029 15+535 506 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 6A
ROB/FLYOVER/VUP APPROACH(EMB HEIGHT
ABOVE 4.5M) WITH DEPRESSED MEDIAN
64 15+535 15+542 7 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT 2
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
65 15+542 15+85 308 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 6B
ROB/FLYOVER/VUP APPROACH(EMB HEIGHT
BELOW 4.5M) WITH DEPRESSED MEDIAN
66 15+850 16+702 852 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 7
LVUP/SVUP APPROACH WITH DEPRESSED MEDIAN
67 16+702 16+709 7 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT 2
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
68 16+709 17+222 513 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 7
LVUP/SVUP APPROACH WITH DEPRESSED MEDIAN
69 17+222 17+234 12 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT 2
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
70 17+234 17+996 762 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 7
LVUP/SVUP APPROACH WITH DEPRESSED MEDIAN
71 17+996 18+008 12 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT 2
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
72 18+008 18+495 487 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 7
LVUP/SVUP APPROACH WITH DEPRESSED MEDIAN
73 18+495 18+502 7 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT 2
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
74 18+502 18+967 465 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 7
LVUP/SVUP APPROACH WITH DEPRESSED MEDIAN
75 18+967 18+974 7 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT 2
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
76 18+974 19+41 436 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 7
LVUP/SVUP APPROACH WITH DEPRESSED MEDIAN
77 19+410 20+21 800 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 1
PLAIN & ROLLNG TERRAIN WITH DEPRESSSED
MEDIAN
78 20+210 20+547 337 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 7
LVUP/SVUP APPROACH WITH DEPRESSED MEDIAN
79 20+547 20+559 12 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT 2
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
80 20+559 20+92 361 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 7
LVUP/SVUP APPROACH WITH DEPRESSED MEDIAN
81 20+920 21+25 330 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 1
PLAIN & ROLLNG TERRAIN WITH DEPRESSSED
MEDIAN

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga


road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 22
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

Sl. Design Chainage Length Description TCS


No. From To (m) Type
82 21+250 21+335 85 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 7
LVUP/SVUP APPROACH WITH DEPRESSED MEDIAN
83 21+335 21+684 349 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 6A
ROB/FLYOVER/VUP APPROACH(EMB HEIGHT
ABOVE 4.5M) WITH DEPRESSED MEDIAN
84 21+684 21+696 12 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT 2
MJB,MNB, LVUP/SVUP LOCATION WITH
DEPRESSED MEDIAN
85 21+696 22+004 308 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 6A
ROB/FLYOVER/VUP APPROACH(EMB HEIGHT
ABOVE 4.5M) WITH DEPRESSED MEDIAN
86 22+004 22+428 424 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT 5&2
ROB/FLYOVER/VUP and MJB,MNB, LVUP/SVUP
LOCATION WITH DEPRESSED MEDIAN
87 22+428 22+67 242 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 6A
ROB/FLYOVER/VUP APPROACH(EMB HEIGHT
ABOVE 4.5M) WITH DEPRESSED MEDIAN
88 22+670 22+925 255 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 6B
ROB/FLYOVER/VUP APPROACH(EMB HEIGHT
BELOW 4.5M) WITH DEPRESSED MEDIAN
89 22+925 23+265 340 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 6A
ROB/FLYOVER/VUP APPROACH(EMB HEIGHT
ABOVE 4.5M) WITH DEPRESSED MEDIAN
90 23+265 23+285 20 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT 5
ROB/FLYOVER/VUP LOCATION WITH DEPRESSED
MEDIAN
91 23+285 23+718 433 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 6A
ROB/FLYOVER/VUP APPROACH(EMB HEIGHT
ABOVE 4.5M) WITH DEPRESSED MEDIAN
92 23+718 23+738 20 TYPICAL CROSS SECTION FOR 4 LANE (2X2) AT 5
ROB/FLYOVER/VUP LOCATION WITH DEPRESSED
MEDIAN
93 23+738 24+000 262 TYPICAL CROSS SECTION FOR 4 LANE (2X2) FOR 6A
ROB/FLYOVER/VUP APPROACH(EMB HEIGHT
ABOVE 4.5M) WITH DEPRESSED MEDIAN

Typical Cross sections are attached in Appendix B-1.

Note: TCS schedule as given above shall be treated as an approximate assessment. Actual length of the
TCS schedule shall be prepared by the contractor based on detailed investigations and site
requirements. Any variation in length of respective TCS specified in Schedule B shall not
constitute a change of scope, save and except any variations in the length arising out of a change
of scope expressly undertaken in accordance with the provisions of Article 13

3. Intersections and grade separators

All intersections and grade separators shall be as per Section 3 of the IRC: SP:99-2013. Properly
designed intersections shall be provided at the locations and of types and features given in the
tables below:

(a) At-grade intersections: NIL

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga


road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 23
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

(b) Grade separated intersection with/without ramps

The grade separated intersection shall be provided as specified in paragraph 2.7 of Annexure-I of
schedule B.

Note:

(i) Type of Junction to be improved as per IRC:SP:99-2013 and MOST type design for intersection
on National Highways, 1992.

(ii) Any other junction not mentioned above but observed during the construction of the project
shall be improved as per IRC:SP:99-2013 requirements. The same shall not constitute a Change
of Scope, save and except any variations arising out of a Change of Scope expressly undertaken
in accordance with the provisions of Article 13. However, since the project is access controlled,
any additional SVUP/LVUP/VUP at crossroad location not provided for in the Schedule B but
required during the execution of work will be dealt under the provisions of Article 13.

(iii) The contractor shall take up ‘Detailed Engineering study’ to ascertain further details of all
intersections and treatment of the intersections shall be designed in accordance with the latest
guidelines mentioned out in section-3 of IRC:SP:99-2013. The same shall not constitute a
Change of Scope, save and except any variations arising out of a Change of Scope expressly
undertaken in accordance with the provisions of Article 13.

(iv) Junction improvement under grade separators shall be carried out as per IRC IRC:SP:99-2013
with proper entry/exit to cross roads and slip/service roads.

(v) Location and span arrangement of grade-separated structures are indicative. Exact location may
be decided in consultation with Authority Engineer. Any Change in span arrangement shall not
be treated as change of scope, save and except any variations in the length arising out of a
Change of Scope expressly undertaken in accordance with the provisions of Article 13.

4 Road embankment and cut section

4.1 Construction of new road embankment/cuttings shall conform to the Specifications and Standards
given in section 4 of the IRC: SP:99-2013 and the specified cross-sectional details.

Notwithstanding anything to the contrary contained in this Agreement or IRC: SP:99-2013, the
proposed profile of the project highway as indicated in the Annex-III of Schedule A shall be
deemed to be part of this Schedule B and shall be treated as an approximate assessment. Based on
site/design requirement specified in Schedule-D, the Contractor shall design the alignment plans
and profiles of the project highway within the available Right of Way.

4.2 Raising of the existing road: NIL

5 Pavement design

5.1 Pavement design shall be carried out in accordance with Section-5 of the IRC: SP:99-2013 and IRC
37 & IRC 58.

5.2 Type of pavement

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga


road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 24
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

a) The pavement shall be long-life perpetual flexible pavement for the main carriageway
including paved shoulders for the entire length of project highway and loop/ramps at
interchange locations.

b) For connecting road/Service road/Slip Road and access road to wayside amenities, flexible
pavement shall be proposed.

c) Rigid Pavement shall be provided at Toll Plaza location.

5.3 Design requirements

5.3.1 Design Period and strategy

(a) Perpetual flexible pavement shall be constructed for the main carriageway including paved
shoulders for the entire length of project highway and loop/ramps at interchange locations.
Perpetual flexible pavement shall be designed for a minimum design period of 50 years
and minimum sub grade CBR of 12.

(b) For slip/ service roads including access to wayside amenities and interconnecting roads to
VUPs/ LVUPs/ SVUPs, flexible pavement shall be provided for minimum 10 MSA traffic
and subgrade CBR of 12.

(c) Rigid pavement shall be provided at proposed toll plazas/toll booths. Rigid pavement shall be
designed for a design period of 30 years.

(d) Stage construction shall not be permitted.

5.3.2 Recommended Pavement Design and Design Traffic

Notwithstanding anything to the contrary contained in this Agreement or the IRC:SP:99-2013,


the Contractor shall design the pavement of main carriageway including paved shoulder, loop
ramp at interchange locations as long life perpetual pavement for minimum effective subgrade
CBR of 12. The pavement for connecting/service/slip road/ Approaches to VOP’s shall be
designed for design traffic of 10 MSA while the pavement at toll plaza shall be designed by the
Contractor as rigid pavement.

In order to meet the intended functional requirement of respective pavement layers as well as
compaction of heavy bituminous layers on main carriageway, the minimum thickness of
respective pavement layers for main carriageway, interchanges, toll plaza and connecting/
service/slip road shall, however, in no case be less than as given below.

Main carriageway and Loops, Ramps of Interchanges including paved shoulders

Pavement layer Pavement Minimum Minimum Crust


Type Subgrade layer thickness
CBR (mm)
Stone Matrix Asphalt (SMA) as Wearing course Perpetual 12 50
Bituminous base course Flexible 250
Non-bituminous base course 150
Sub-base course 200

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga


road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 25
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

Note: Bituminous Base Course shall be laid in three layers with bottom fatigue and bending resistant
bitumen rich DBM Gr-II layer of thickness not less than 70mm.

Connecting/Service/slip road/ /Cross Roads at Interchange/Grade Separator (Flexible)

Pavement layer Pavement Minimum Minimum Crust


Type Subgrade CBR layer thickness (mm)
Bituminous Concrete (BC) as wearing Course Flexible 40
Dense Bituminous Concrete 12 50
Wet Mix Macadam 250
Sub-base Course (GSB) 200

Toll Plaza

Pavement Composition Pavement Type Minimum Crust Thickness (mm)


Pavement Quality Concrete (PQC) Rigid 300
Dry Lean Concrete (DLC) 150
Granular Sub-base (GSB) 200

Note: De-bonding interlayer of polythene sheet having a minimum thickness of 125 micron is
recommended separation layer between DLC and PQC.

5.4 Reconstruction of stretches

The following stretches of the existing road shall be reconstructed. These shall be designed as
new pavement.

Design Chainage
S. No. Remarks
From To
Nil

6 Road side drainage

Drainage system including surface and subsurface drains for the Project Highway shall be
provided as per Section 9 of the IRC:SP:99-2013. Lined and Unlined Drains (except at ROB
location) which gets terminated at all cross road locations shall be provided in the entire
project corridor as per the TCS referred in paragraph 2.8 of the Annex-I of Schedule B and
Annex-I of Schedule D.

7 Design of structures

7.1 General

7.1.1 All bridges, culverts and structures shall be designed and constructed in accordance with section-
6 of the IRC: SP:99-2013 and shall conform to the cross-sectional features and other details
specified therein. Project Highway is proposed to be constructed to four lane configuration with
provision for inner-side widening to eight-lane configuration in future. As such, superstructure of
all bridges, culverts and structures is to be designed for edge movement of the vehicle
considering stitching of new superstructure in future due to widening for additional lane. Special

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga


road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 26
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

vehicle loading is to be considered in Design of structures. Since the subject project is Access
Controlled, Congestion factor is not to be considered in calculation of live load.

7.1.2 Width of the carriageway of new bridges and structures more than 60.0 m length having
carriageway width less than 7.5m shall be as follows:

S. No. Bridge at Km Width of carriageway and cross-sectional features


NIL

7.1.3 The following structures shall be provided with footpaths:

S. No. Design Chainage (Km) Remarks


NIL

7.1.4 All bridges shall be high-level bridges.

7.1.5 The following structures shall be designed to carry utility services specified in table below:

S. No. Design Chainage (Km) Utility service to be carried Remarks


All Bridges to be Designed to carry Utility Services

7.1.6 Cross-section of all structures including new culverts and bridges at deck level for the Project
Highway shall conform to the typical cross-sections given in section 6 of the IRC: SP:99-2013
and TCS in Para 2.8 of Annex-I of this Schedule B.

7.2 Culverts

7.2.1 The minimum Overall width of all culverts shall be equal to the roadway width of the
approaches.

7.2.2 Reconstruction of existing culverts:

Sl. No. Culvert Proposed Span/Opening (m) Total Width(m) Remarks, if any*
location
Nil

7.2.3 Widening of existing culverts:

All existing culverts at the following location which are not to be reconstructed shall be widened.

Sl. No. Culvert location Type, span, height and width of Repairs to be carried out
existing culvert (m) [specify]
Nil

7.2.4 New culverts (given in table below) shall be constructed for width equal to the roadway width of
the Project Highway & as per typical cross-section given in the TCS specified in Para 2.11 and
alignment plan. The details are given as under:
Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga
road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 27
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

S. No. Design Chainage Type of structure Proposed Span (m) TCS type
Phase-1 DKE Km 303+900 to km 319+400
1 303+991 RCC BOX 1x6x4 7
2 304+246 RCC BOX 1x2x2 7
3 304+672 RCC BOX 1x4x3 7
4 305+265 RCC BOX 1x2x2 7
5 305+482 RCC BOX 1x6x4 6B
6 306+605 RCC BOX 1x2x2 6AA
7 307+507 RCC BOX 1x6x4 6AA
8 307+903 RCC BOX 1x6x4 7A
9 308+234 RCC BOX 1X4X3 7A
10 309+003 RCC BOX 1x2x2 1A
11 309+281 RCC BOX 1x4x3 1A
12 309+631 RCC BOX 1x4x3 7A
13 310+050 RCC BOX 1x2x2 7A
14 311+157 RCC BOX 1x6x4 6AA
15 311+615 RCC BOX 1x6x4 6AA
16 311+798 RCC BOX 1x2x2 6AA
17 312+127 RCC BOX 1x4x3 6BB
18 312+621 RCC BOX 1x2x2 7A
19 313+043 RCC BOX 1x2x2 7A
20 313+464 RCC BOX 1x4x3 6AA
21 314+131 RCC BOX 1x2x2 6AA
22 314+280 RCC BOX 1x6x4 6AA
23 314+611 RCC BOX 1x6x4 1A
24 314+898 RCC BOX 1x4x3 1A
25 315+096 RCC BOX 1x2x2 1A
26 315+280 RCC BOX 1x4x3 1A
27 315+760 RCC BOX 1x4x3 7A
28 315+977 RCC BOX 1x2x2 7A
29 316+483 RCC BOX 1x4x3 7A
30 316+725 RCC BOX 1x2x2 7A
31 316+963 RCC BOX 1x4x3 7A
32 317+330 RCC BOX 1x4x3 7A
33 317+450 RCC BOX 1x4x3 7A
34 317+734 RCC BOX 1x4x3 7A
35 318+723 RCC BOX 1x2x2 7A
36 319+022 RCC BOX 1x2x2 7A
Amritsar Connectivity Km 0+000 to km 24+000
1 0+400 RCC BOX 1x2x2 8
2 0+900 RCC BOX 1x2x2 7
3 1+500 RCC BOX 1x4x3 7
4 1+768 RCC BOX 1x4x3 6A
5 1+950 RCC BOX 1x2x2 6A
6 2+595 RCC BOX 1x6x4 6A
7 3+050 RCC BOX 1x2x2 6A
8 3+860 RCC BOX 1x2x2 7

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga


road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 28
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

S. No. Design Chainage Type of structure Proposed Span (m) TCS type
9 4+070 RCC BOX 1x4x3 7
10 4+342 RCC BOX 1x2x2 7
11 4+600 RCC BOX 1x2x2 7
12 5+235 RCC BOX 1x2x2 7
13 5+305 RCC BOX 1x6x4 7
14 5+932 RCC BOX 1x4x3 6A
15 6+230 RCC BOX 1x4x3 6B
16 6+510 RCC BOX 1x2x2 7
17 6+750 RCC BOX 1x2x2 7
18 7+355 RCC BOX 1x2x2 1
19 7+700 RCC BOX 1x4x3 6A
20 8+395 RCC BOX 1x2x2 6A
21 9+310 RCC BOX 1x2x2 7
22 10+160 RCC BOX 1x4x3 1
23 10+791 RCC BOX 1x6x4 7
24 11+494 RCC BOX 1x6x4 7
25 11+700 RCC BOX 1x4x3 7
26 12+050 RCC BOX 1x6x4 7
27 12+600 RCC BOX 1x2x2 6A
28 13+720 RCC BOX 1x4x3 1
29 14+250 RCC BOX 1x4x3 6A
30 14+650 RCC BOX 1x6x4 6A
31 15+315 RCC BOX 1x2x2 6A
32 15+900 RCC BOX 1x4x3 7
33 16+390 RCC BOX 1x4x3 7
34 17+090 RCC BOX 1x2x2 7
35 17+650 RCC BOX 1x4x3 7
36 18+275 RCC BOX 1x4x3 7
37 18+707 RCC BOX 1x6x4 7
38 18+870 RCC BOX 1x6x4 7
39 19+200 RCC BOX 1x2x2 7
40 19+400 RCC BOX 1x4x3 7
41 20+000 RCC BOX 1x4x3 1
42 20+200 RCC BOX 1x2x2 1
43 20+900 RCC BOX 1x2x2 7
44 21+160 RCC BOX 1x4x3 1
45 21+390 RCC BOX 1x2x2 6A
46 21+860 RCC BOX 1x2x2 6A
47 22+941 RCC BOX 1x6x4 6A
48 23+557 RCC BOX 1x6x4 6A

7.2.5 Culverts at Loop and Ramps:

S. Design Type of Proposed Type Location


No. Chainage structure Span (m) of TCS
Phase-1 DKE Km 303+900 to km 319+400
1 Loop-1 RCC BOX 1x2x2 10B Interchange at 306+354

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga


road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 29
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

2 Loop-2 RCC BOX 1x2x2 10B


3 Loop-2 RCC BOX 1x2x2 10B
4 Ramp-1 RCC BOX 1x2x2 10B
5 Ramp-2 RCC BOX 1x2x2 10B
6 Ramp-4 RCC BOX 1x2x2 10B
7 Ramp-6 RCC BOX 1x2x2 10B
Amritsar Connectivity Km 0+000 to km 24+000
1 Loop-1 RCC BOX 1x2x2 10B MJB cum Interchange cum ROC at 22+216
2 Loop-1 RCC BOX 1x2x2 10B
3 Ramp-1 RCC BOX 1x6x4 10B
4 Ramp-2 RCC BOX 1x2x2 10B
5 Ramp-3 RCC BOX 1x6x4 10B
6 Ramp-4 RCC BOX 1x2x2 10B

7.2.6 In addition to above new culverts, additional 40 (forty) no. of Pipe culverts of 1200mm (min)
diameter shall be provided across the expressway for local canal/ field canal/ utility crossings as
per the site requirement. Location for such culverts shall be finalized in consultation with
Authority Engineer and NHAI.

Note:

1. The overall width of the above culverts shall be equal to Roadway width only (excluding
median). In case of connecting road culvert also to be provided in the gap between main
carriageway & connecting road and connecting road. In cases of the culverts with fill, culvert to
be provided though out Roadway width and median width. Any additional length required as per
site conditions shall not constitute a Change of Scope.

2. Any additional Barrel length required as per site conditions shall not constitute a Change of
Scope, save and except any variations arising out of a Change of Scope expressly undertaken in
accordance with the provisions of Article 13.

3. Location of the above culverts are indicative and span arrangement is minimum specified. Exact
location of these culverts shall be decided in consultation with Authority Engineer. The actual
vent way/span arrangements of culverts shall be determined on the basis of detailed
investigations by the Contractor in accordance with the Specifications and Standards. Any
variations in vent way/span arrangements specified in this Schedule-B shall not constitute a
Change of Scope, save and except any variations in the length arising out of a Change of Scope
expressly undertaken in accordance with the provisions of Article 13.

7.2.7 Repairs/replacements of railing/parapets, flooring and protection works of the existing culverts
shall be undertaken as follows:

Existing Span Arrangement


Overall Type of
Sl. Design Span
Structure No of Width Repair
No. Chainage Type length
Number Spans Required
(Km) (m) (m)
NIL

7.2.8 Floor protection works shall be as specified in the relevant IRC Codes and Specifications.

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga


road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 30
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

7.2.9 In case of culverts proposed for widening/repair as per details in Clause 7.2.3 above, the same
shall be re-constructed if the design shows that these are unsafe for design loads. No change of
scope shall be considered in such cases.
7.3 Bridges

7.3.1 Existing bridges to be re-constructed/widened

The existing bridges at the following locations shall be re-constructed/widened: Nil

7.3.2 New bridges

New bridges at the following locations on the Project Highway shall be constructed. GADs for the
new bridges are attached in the drawings folder.

Major Bridge cum Interchange cum ROB:

Sl. Design Span Skew Type of Deck Width of Remarks


No. Chainage Arrangement structure Configuration Open
(In Km) (m) (m) median (m)
Phase-1 DKE Km 303+900 to km 319+400
Nil
Amritsar Connectivity Km 0+000 to km 24+000
1 22+216 LHS=1x30+1x 0 deg PSC I 2x13.75 19.5 Major
63.5+2x35+4x Girder+ Bridge
30+4x35 Bow over
RHS=1x25+1x String Black
63.5+3x35+3x Bein
30+4x35 Nalla
Major Bridges (OVER RIVERS/ STREAMS/ NALLAS):

Sl. Design Span Skew Type of Deck Width of Remarks


No. Chainage Arrangement structure Configuration Open
(In Km) (m) (m) median (m)
Phase-1 DKE Km 303+900 to km 319+400
1 304+386 3x35 0 deg PSC I 2x13.75 19.5 East/White
Girder Bein Nalla
Amritsar Connectivity Km 0+000 to km 24+000
Nil

Major Bridges (OVER IRRIGATION CANALS):

Sl. Design Span Skew Type of Deck Width of Remarks


No. Chainage Arrangement structure Configuration Open
(In Km) (m) (m) median (m)
Phase-1 DKE Km 303+900 to km 319+400
Nil
Amritsar Connectivity Km 0+000 to km 24+000
Nil

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga


road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 31
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

Major Bridges cum VUP (OVER IRRIGATION CANALS):

Sl. Design Span Skew Type of Deck Width of Remarks


No. Chainage Arrangement structure Configuration Open
(In Km) (m) (m) median (m)
Phase-1 DKE Km 303+900 to km 319+400
Nil
Amritsar Connectivity Km 0+000 to km 24+000
Nil

Major Bridges cum LVUP (OVER IRRIGATION CANALS):

Sl. Design Span Skew Type of Deck Width of Remarks


No. Chainage Arrangement structure Configuration Open
(In Km) (m) (m) median (m)
Phase-1 DKE Km 303+900 to km 319+400
Nil
Amritsar Connectivity Km 0+000 to km 24+000
Nil

Major Bridges cum SVUP (OVER IRRIGATION CANALS):

Sl. Design Span Skew Type of Deck Width of Remarks


No. Chainage Arrangement structure Configuration Open
(In Km) (m) (m) median (m)
Phase-1 DKE Km 303+900 to km 319+400
Nil
Amritsar Connectivity Km 0+000 to km 24+000
Nil
Minor Bridges (OVER RIVERS/ STREAMS/ NALLAS):

Sl. Design Span Skew Type of Deck Width of Remarks


No. Chainage Arrangement structure Configuration Open
(In Km) (m) (m) median
(m)
Phase-1 DKE Km 303+900 to km 319+400
Nil
Amritsar Connectivity Km 0+000 to km 24+000
1 2+873 1x38.661 23 deg PSC I 2X13.75 19.5 Seasonal
Girder drain &
Pond

Minor Bridges (OVER IRRIGATION CANALS):

Sl. Design Span Skew Type of Deck Width of Remarks


No. Chainage Arrangement structure Configuration Open median
(In Km) (m) (m) (m)
Phase-1 DKE Km 303+900 to km 319+400
Nil

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga


road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 32
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

Amritsar Connectivity Km 0+000 to km 24+000


Nil

Minor Bridge cum VUP (OVER IRRIGATION CANALS):

Sl. Design Span Skew Type of Deck Width of Remarks


No. Chainage Arrangement structure Configuration Open median
(In Km) (m) (m) (m)
Phase-1 DKE Km 303+900 to km 319+400
Nil
Amritsar Connectivity Km 0+000 to km 24+000
Nil

Minor Bridge cum LVUP (OVER IRRIGATION CANALS):

Sl. Design Span Skew Type of Deck Width of Remarks


No. Chainage Arrangement structure Configuration Open
(In Km) (m) (m) median (m)
Phase-1 DKE Km 303+900 to km 319+400
1 313+685 1x35.355 45 deg Steel 2x13.75 19.5 Jalandhar
composite disty.
Girder Canal
2 318+860 1x25 0 deg PSC I 2x13.75 19.5 Kalupur
Girder Minor
canal
3 319+337 4x5 (clear) 28 deg RCC BOX 2x13.75 19.5 Kalasingha
drain
Amritsar Connectivity Km 0+000 to km 24+000
Nil

Minor Bridge cum SVUP (OVER IRRIGATION CANALS):

Sl. Design Span Skew Type of Deck Width of Remarks


No. Chainage Arrangement structure Configuration Open
(In Km) (m) (m) median (m)
Phase-1 DKE Km 303+900 to km 319+400
Nil
Amritsar Connectivity Km 0+000 to km 24+000
1 8+819 1x22.736 41 PSC I 2X13.75 19.5 Canal
deg Girder
2 12+423 1x25 0 deg PSC I 2X13.75 19.5 Nalla with
Girder earthen
track

Note:

1. The minimum vertical clearance from Cross road in case of all Major/Minor Bridge Cum SVUP
/LVUP structures shall be 4.50 m.

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga


road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 33
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

2. The minimum vertical clearance from Cross road in case of all Major /Minor Bridge cum VUP
structures shall be 5.5m.

3. The Deck level of the Major/Minor Bridge on River stream and Nalla should be governed by
HFL of stream/Navigational HFL and Clearance as per guidelines of Inland Waterways
Authority of India.

4. The Deck level of the Major/Minor Bridge on canal should be governed by Full supply level of
Canal.

5. The span arrangements and vertical clearance are tentative and the same shall be followed as per
approved GAD by the concern Irrigation Authority and any change shall not be treated as change
in scope of work.

6. Wherever liquefaction is observed in Open foundation and Raft Structures, Ground improvement
shall be done to compact the soil to increase its penetration resistance and satisfy clause 8.4.4 (v)
of IRC114.

7. Project Expressway is proposed to be constructed to four lane configuration with provision for
widening to Eight-lane configuration in future. As such, superstructure of all bridges, culverts
and structures is to be designed for edge movement of the vehicle considering stitching of new
superstructure in future due to widening for additional lane.

8. Special vehicle loading is to be considered in Design of structures.

9. Since the subject project is Access Controlled, therefore, Congestion factor is not to be
considered in calculation of live load.

Viaducts (OVER GAS/OIL PIPELINES):

S. Design Span Skew Type of Deck Width of Remarks


No. Chainage Arrangement Angle structure Configuration Open
(Km) (m) (m) median (m)
Phase-1 DKE Km 303+900 to km 319+400
1 308+120 1x29.522 49 deg Steel 2x13.75 19.5 Gas pipe
Composite
Girder
Amritsar Connectivity Km 0+000 to km 24+000
1 5+869 1x27 0 deg PSC I Girder 2x13.75 19.5 Gas Pipe
Line

Note:

1. The span arrangements and vertical clearance are tentative and the same shall be followed as per
approved GAD by the concern GAS/OIL Authority and any change shall not be treated as change
in scope of work.

2. Wherever liquefaction is observed in Open foundation and Raft Structures, Ground improvement
shall be done to compact the soil to increase its penetration resistance and satisfy clause 8.4.4 (v)
of IRC114.

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga


road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 34
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

3. Project Expressway is proposed to be constructed to four lane configuration with provision for
widening to Eight-lane configuration in future. As such, superstructure of all bridges, culverts
and structures is to be designed for edge movement of the vehicle considering stitching of new
superstructure in future due to widening for additional lane.

4. Special vehicle loading is to be considered in Design of structures.

5. Since the subject project is Access Controlled, therefore, Congestion factor is not to be
considered in calculation of live load.

7.3.3 The railings of existing bridges shall be replaced by crash barriers at the following locations: Nil

7.3.4 Repair/replacements of railing/parapets of the existing bridges shall be undertaken as follows:


Nil

7.3.5 Drainage system for bridge decks

An effective drainage system for bridge decks shall be provided as specified in paragraph 6.12 of
the IRC: SP:99-2013

7.3.6 Structures in marine environment: Nil

7.4 Rail-road bridges

7.4.1 Design, construction and detailing of ROB/RUB shall be as specified in section 6 of the IRC:
SP:99-2013

7.4.2 Road over bridges (road over rail) shall be provided at the following locations, as per GAD
drawings attached:

Sl. Design Span Skew Type of Deck Width of Remarks


No. Chainage Arrangement structure Configuration Open median
(In Km) (m) (m) (m)
Phase-1 DKE Km 303+900 to km 319+400
Refer 7.2.3 for Major bridge cum Interchange cum ROB
Amritsar Connectivity Km 0+000 to km 24+000
Nil

Note:
1. The minimum vertical clearance of all ROB structures shall be 6.550m.

2. Wherever liquefaction is observed in Open foundation and Raft Structures, Ground improvement
shall be done to compact the soil to increase its penetration resistance and satisfy clause 8.4.4 (v)
of IRC114.

3. Project Expressway is proposed to be constructed to four lane configuration with provision for
widening to Eight-lane configuration in future. As such, superstructure of all bridges, culverts
and structures is to be designed for edge movement of the vehicle considering stitching of new
superstructure in future due to widening for additional lane.

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga


road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 35
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

4. Special vehicle loading is to be considered in Design of structures.

5. Since the subject project is Access Controlled, therefore, Congestion factor is not to be
considered in calculation of live load.

7.4.3 Road under bridges (road under railway line) shall be provided at the following level crossings, as
per GAD drawings attached: Nil

7.5 Grade separated structures

The grade separator shall be provided as specified at para 2.7 of Annex-I of Schedule B

7.6 Repairs and strengthening of Bridge/Structures

The existing structures to be repaired/ strengthened, and the nature and extent of repairs
strengthening required: Nil

7.7 List of Major Bridges and Structures

The following is the list of the Major Bridges and Structures:

Sl. No. Name of structures Total Numbers


A Phase-1 DKE Km 303+900 to km 319+400
1 ROB 0
2 Interchange 1
3 Flyover 0
4 Major Bridge 1
5 Major Bridge cum LVUP 0
6 Major Bridge cum SVUP 0
7 Major Bridge cum VUP 0
8 Minor Bridge 0
9 Minor Bridge cum LVUP 3
10 Minor Bridge cum SVUP 0
11 Minor Bridge cum VUP 0
12 VUP 2
13 LVUP 13
14 SVUP 7
15 Viaduct 1
16 Culvert 36
17 Structures on Loops of Interchange (VUP, LVUP & VOP) 4
18 Culverts on Loops of Interchange 7
B Amritsar Connectivity Km 0+000 to km 24+000
1 ROB 0
2 MJB cum Interchange cum ROB 1
3 Interchange 1
4 Flyover 0
5 Major Bridge 0
6 Major Bridge cum LVUP 0
7 Major Bridge cum SVUP 0

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga


road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 36
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

Sl. No. Name of structures Total Numbers


8 Major Bridge cum VUP 0
9 Minor Bridge 1
10 Minor Bridge cum LVUP 0
11 Minor Bridge cum SVUP 2
12 Minor Bridge cum VUP 0
13 VUP 7
14 LVUP 12
15 SVUP 9
16 Viaduct 1
17 Culvert 48
18 Structures on Loops & Ramps (VUP, MJB & VOP) 3
19 Culverts on Loops of Interchange 6
C Additional culverts 40
Total (A+B+C) 206

8. Traffic control devices and road safety works

8.1 Traffic control devices and road safety works shall be provided in accordance with Section 10 of
the IRC: SP:99-2013.

(a) Traffic Signs:

Traffic signs include roadside signs, overhead signs and curb mounted signs along the entire
Project Highway.

(b) Pavement Marking:

Pavement markings shall cover road marking for the entire Project Highway.

(c) Safety Barrier:

Thrie beam metal crash barriers shall be provided in entire length on outer side earthen shoulder
of each main carriageway and Loops/ Ramps of interchanges as per TCS referred to in this
Schedule-B but excluding stretches covered by bridges/structures and reinforced earth/ retaining
walls, where concrete crash barriers shall be provided as specified in Schedule B.

8.2 Sheeting shall be provided in accordance with section 10.2.5 of the IRC: SP:99-2013.

9. Roadside furniture

9.1 Roadside furniture like km/Hectometer Stones, Railings, Traffic Impact Attenuators, Delineators
shall be provided in accordance with the provisions of Section 10 and Section 12 of IRC: SP:99-
2013 and Traffic Signage plan as indicated in Annexure-III of Schedule-A and deemed to be part
of this Schedule-B.

S. No. Project Facility Location Design Requirements


Traffic Signs and Pavement
1 Entire length of project road As per Schedule D
Markings

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga


road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 37
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

S. No. Project Facility Location Design Requirements


2 Kilometer and 200m stones Entire length of project road As per Schedule D
3 Road side Delineators Horizontal curves of project road As per Schedule D

9.2 RCC boundary wall shall be provided along the entire length on either side (including transverse
requirements at structure locations) in accordance with typical drawing enclosed with bid
document.

9.3 Traffic Signs (excluding overhead signs at Toll Plaza). Traffic sign boards as per details given
below shall be provided in the project highway as per the road signage plan indicated in
Annexure-III of Schedule-A and deemed to be part of this Schedule-B

Sl. No. Type of Sign

1 One Way Object Hazard Marker (OHM)


2 Two Way Object Hazard Marker (OHM)
3 Height restriction (Regulatory Sign)
4 Speed Limit Signs (Regulatory Sign)
5 Merging Traffic Ahead (Cautionary Sign)
6 Compulsory Keep Left Sign (Regulatory Sign)
7 Compulsory Ahead Sign (Regulatory Sign)
8 U-Turn Prohibited Sign (Regulatory Sign)
9 Give way sign (Regulatory Sign)
10 Chevron Marker (At Curves)
11 Triple Chevron Marker (At roundabout)
12 Reassurance Sign (Direction & Place Identification Sign)
13 Roundabout Sign (Cautionary Sign)
14 Left/ Right Hand Curve (Cautionary Sign)
15 Expressway Route Marker Sign
16 Entry/ Exit Expressway Sign (Information Sign)
17 End of Expressway Sign
18 Map type Advance Direction Sign
19 Flag type Advance Direction Sign
20 Advance Direction Sign on ROB Viaduct Superstructure
21 Advance Directional Sign (Overhead Cantilever/ Gantry)
22 Rest Area Information Sign (Overhead Cantilever/ Gantry)
23 Slogan Gantry

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga


road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 38
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

Note: The type, numbers and location of Traffic Signages shown in Traffic Signage plan as indicated in
Annexure-III of Schedule-A are tentative and minimum specified. The actual numbers and
location of Traffic Signages shall be determined by the Contractor in accordance with the
IRC:SP:99-2013 requirements with approval from the Authority’s Engineer. Any variation in the
number and type of road sign boards specified in this Clause of Schedule-B shall not constitute a
Change of Scope, save and except any variations in the length arising out of a Change of Scope
expressly undertaken in accordance with the provisions of Article 13. Adequate signs for toll
plaza shall be provided as given in this schedule and manual.

10. Compulsory Afforestation

Minimum 31080 no. of trees are required to be planted by the contractor as compensatory
afforestation in accordance with IRC: SP:99-2013 keeping in view IRC: SP:21-2009. Any
increase in no. of trees shall not be treated as change of scope, save and except any variations
arising out of a Change of Scope expressly undertaken in accordance with the provisions of
Article 13

11. Hazardous Locations

The safety barriers shall also be provided at the following hazardous locations as per site
requirement in consultation with the NHAI/Authority Engineer and in accordance with the
provisions of IRC: SP:99-2013.

12. Retaining Wall/ Breast Wall

Retaining walls and protection works shall be provided at locations as indicated below and as
provided in TCS schedule in cl. 2.8 of schedule-B.

Sl. No. Design Chainage (Km) Length (m) Side Remarks


From To
Nil

RE Wall

Phase-1 DKE Km 303+900 to km 319+400

Sl. No. Design Chainage (Km) Length (m) Side Remarks


From To
1 305+725 306+320 595 Both Side -
2 306+385 307+211 826 Both Side -
3 307+235 307+341 106 Both Side -
4 307+348 307+689 342 Both Side -
5 310+781 311+401 620 Both Side -
6 311+423 311+928 504 Both Side -
7 313+265 313+681 416 Both Side -
8 313+703 313+943 240 Both Side -
9 313+967 314+425 458 Both Side -

Amritsar Connectivity Km 0+000 to km 24+000

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga


road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 39
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

Sl. No. Design Chainage (Km) Length (m) Side Remarks


From To
1 0+060 0+280 220 Both Side -
2 0+320 0+622 302 Both Side -
3 0+629 0+655 27 Both Side -
4 1+720 2+273 553 Both Side -
5 2+293 2+854 561 Both Side -
6 2+892 3+275 383 Both Side -
7 3+295 3+860 565 Both Side -
8 5+450 5+574 124 Both Side -
9 5+586 5+856 270 Both Side -
10 5+883 6+220 338 Both Side -
11 7+600 8+080 480 Both Side -
12 8+100 8+591 491 Both Side -
13 12+269 12+411 142 Both Side -
14 12+436 12+967 531 Both Side -
15 12+989 13+300 311 Both Side -
16 13+312 13+500 188 Both Side -
17 14+200 15+009 809 Both Side -
18 15+029 15+535 506 Both Side -
19 21+335 21+684 349 Both Side -
20 21+696 21+998 302 Both Side -
21 22+396 22+670 275 Both Side -
22 22+925 23+263 338 Both Side -
23 23+287 23+718 431 Both Side -
24 23+738 24+000 262 Both Side -

Note: Above length and height of Retaining wall/ Reinforced Earth Wall is tentative and minimum
specified. The actual length and height of Retaining wall/ Reinforced Earth Wall shall be
determined by the Contractor in accordance with the IRC: SP:99-2013 requirements with
approval from the Authority’s Engineer. Any variation in the length and height specified in this
Clause of Schedule-B shall not constitute a Change of Scope, save and except any variations in
the length arising out of a Change of Scope expressly undertaken in accordance with the
provisions of Article 13.

13. Special Requirement for Hill Roads Nil

14. Diversion of Irrigation Canal/ Drain/Field channel

Contractor shall shift the Irrigation canal/ drain/field channels at the locations detailed below for
construction of project highway. The typical cross-section of the proposed canal/ local stream is
enclosed at appendix B-2 for reference.

Sl. No. Design Chainage (Km) Side Length (m) Remarks


From To
Phase-1 DKE Km 303+900 to km 319+400
1 307+610 307+690 RHS 80 Cross section as per Appendix-B-2
2 311+815 311+890 RHS 75 Cross section as per Appendix-B-2
3 312+610 312+650 RHS 40 Cross section as per Appendix-B-2
4 313+250 313+340 LHS 90 Cross section as per Appendix-B-2
Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga
road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 40
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

Sl. No. Design Chainage (Km) Side Length (m) Remarks


From To
5 313+464 313+620 RHS 156 Cross section as per Appendix-B-2
Amritsar Connectivity Km 0+000 to km 24+000
1 1+100 1+300 LHS 200 Cross section as per Appendix-B-2

Note: The actual cross-section of canal/ stream to be shifted and extent of such shifting (length) shall
be determined by the Contractor as per the site/ design requirement with approval of concerned
irrigation authority & Authority’s Engineer. Any variation in the cross-section and length
specified in this Clause of Schedule-B shall not constitute a Change of Scope, save and except
any variations in the length arising out of a Change of Scope expressly undertaken in accordance
with the provisions of Article 13.

15. Embankment Protection

In addition to slope protection at Bridges/ ROBs/ Flyover/ Underpasses & Chute Drain locations,
Road embankment shall be protected for complete stretch by providing suitable protection
measure except above mentioned locations

Sl. Design Chainage (Km) Length (m) Side Remarks


No. From To
Nil

Note: Above length of protection measure for embankment protection is tentative and minimum
specified. The actual length of boulder pitching shall be determined by the Contractor in
accordance with the IRC: SP:99-2013 requirements based on site investigations with approval
from the Authority’s Engineer. Any variation in the length specified in this Clause of Schedule-B
shall not constitute a Change of Scope, save and except any variations in the length arising out of
a Change of Scope expressly undertaken in accordance with the provisions of Article 13.

16. Rainwater Harvesting

As per Ministry of Environment and Forests Notification, New Delhi dated 14.01.1997 (as
amended on 13.01.1998, 05.01.1999 & 6.11.2000), the construction of rain water harvesting
structure is mandatory in and around Water Crisis area, notified by the Central Ground Water
Board. Accordingly, the provision of rainwater harvesting shall be provided at every 500m in the
entire project length and shall be executed as per requirement of IRC SP: 42-2014 and IRC SP:
50-2013.

17. Shifting of Utilities

Shifting of obstructing utilities to an appropriate location in accordance with the standards and
specifications of concern Utility department is a part of scope of work for the Contractor.
Shifting of all over-underground and underground utilities including electrical/power utilities
shall be responsibility of the Contractor, whether indicated in Schedule-B or not. Utilities, if any,
not included in the Schedule-B shall be treated as Change of Scope. The bidder may visit the site
and assess the quantum of shifting of utilities for the project before submission of their bid.
Copy of Utility relocation plan is enclosed. The specifications are to be as per the specification
of concerned utility owning department.

Brief Details of shifting of utilities are as below:


Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga
road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 41
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

(i) Electrical Utilities

(a) Extra High-Tension Lines (EHT Lines)

Chainage Crossing Poles Conductor


Type of No.
S. No. Circuit Tower Truss/ (Length Size
From To Line KV (SC/DC/TC) UG OH No Name
Unipole in
km.)*
Main Expressway
1 304+700 304+700 400 DC 1 Tower Truss 1 1.1 Moose conductor 500 sqmm
2 305+170 305+170 400 DC 1 Tower Truss 3 1.3 Moose conductor 500 sqmm
3 305+305 305+305 400 SC 1 Tower Truss 4 2.0 Moose conductor 500 sqmm
4 306+185 306+185 220 DC 1 Tower Truss 11 2.9 Moose conductor 400 sqmm
5 306+405 306+405 132 SC 1 Tower Truss 22 7.1 ACSR ZEBRA CONDUCTOR 200 sqmm
6 308+525 308+525 220 DC 1 Tower Truss 3 1.1 Moose conductor 400 sqmm
7 309+050 309+050 220 DC 1 Tower Truss 5 2.0 Moose conductor 400 sqmm
8 310+570 310+570 220 DC 1 Tower Truss 4 1.5 Moose conductor 400 sqmm
9 311+570 311+570 220 DC 1 Tower Truss 4 1.5 Moose conductor 400 sqmm
10 312+100 312+100 220 DC 1 Tower Truss 13 5.2 Moose conductor 400 sqmm
11 315+795 315+795 220 DC 1 Tower Truss 6 2.5 Moose conductor 400 sqmm
Amritsar
Connectivity
12 0+810 0+810 220 DC 1 Tower Truss 4 1.5 Moose conductor 400 sqmm
13 2+410 2+410 400 DC 1 Tower Truss 3 1.5 Moose conductor 500 sqmm
14 7+610 7+610 220 DC 1 Tower Truss 4 1.5 Moose conductor 400 sqmm
15 13+070 13+070 400 DC 1 Tower Truss 3 1.5 Moose conductor 500 sqmm

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga


road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 42
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

16 23+615 23+615 400 DC 1 Tower Truss 3 1.5 Moose conductor 500 sqmm
Total 16 93 35.4

*PS Length is Ckt length

TC-Triple Circuit, DC-Double Circuit, SC-Single Circuit, *- Shifting not required

(b) Low/High Tension Lines (LT/HT Lines)

Chainage Poles Conductor Line Crossing Transformer


Type of
S. Capacit
Circuit Length Under Over
No. From To Type No No. Size Type y No.
(SC/DC/ TC) (m)* Ground Head
(KVA)
Main
Expressway
ACSR 100 sqmm Dog
303+9 304+0
1 SC 9 M PSC 3 conductor + 3 CX185 sqmm 11
00 00
XLPE cable
3 CX95 sqmm+ 1CX70
SC 9 M PSC 1 sqmm+1CX16 sqmm+( 3 LT
CX50 sqmm+1CX30 sqmm
ACSR 100 sqmm Dog
304+0 305+0
2 SC 9 M PSC 5 3 conductor + 3 CX185 sqmm 494.4 11 1 25 4
00 00
XLPE cable
3 CX95 sqmm+ 1CX70
SC 9 M PSC 11 1 sqmm+1CX16 sqmm+( 3 315 LT 3
CX50 sqmm+1CX30 sqmm
ACSR 100 sqmm Dog
305+0 306+0
3 SC 9 M PSC 3 3 conductor + 3 CX185 sqmm 247.2 11 1 16 2
00 00
XLPE cable

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga


road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 43
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

Chainage Poles Conductor Line Crossing Transformer


Type of
S. Capacit
Circuit Length Under Over
No. From To Type No No. Size Type y No.
(SC/DC/ TC) (m)* Ground Head
(KVA)
3 CX95 sqmm+ 1CX70
SC 9 M PSC 16 1 sqmm+1CX16 sqmm+( 3 472.5 LT 3 63 2
CX50 sqmm+1CX30 sqmm
3 CX95 sqmm+ 1CX70
SC 9 M PSC 1 sqmm+1CX16 sqmm+( 3 100 2
CX50 sqmm+1CX30 sqmm
ACSR 100 sqmm Dog
306+0 307+0
4 SC 9 M PSC 14 3 conductor + 3 CX185 sqmm 1606.8 11 3 16 1
00 00
XLPE cable
3 CX95 sqmm+ 1CX70
SC 9 M PSC 10 1 sqmm+1CX16 sqmm+( 3 283.5 LT 2 63
CX50 sqmm+1CX30 sqmm
ACSR 100 sqmm Dog
307+0 308+0
5 SC 9 M PSC 7 3 conductor + 3 CX185 sqmm 741.6 11 2
00 00
XLPE cable
3 CX95 sqmm+ 1CX70
SC 9 M PSC 9 1 sqmm+1CX16 sqmm+( 3 252 LT 2
CX50 sqmm+1CX30 sqmm
ACSR 100 sqmm Dog
308+0 309+0
6 SC 9 M PSC 11 3 conductor + 3 CX185 sqmm 1236 11 2 16 3
00 00
XLPE cable
3 CX95 sqmm+ 1CX70
SC 9 M PSC 12 1 sqmm+1CX16 sqmm+( 3 346.5 LT 3 63 1
CX50 sqmm+1CX30 sqmm
ACSR 100 sqmm Dog
309+0 310+0
7 SC 9 M PSC 13 3 conductor + 3 CX185 sqmm 1483.2 11 3 16 2
00 00
XLPE cable
Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga
road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 44
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

Chainage Poles Conductor Line Crossing Transformer


Type of
S. Capacit
Circuit Length Under Over
No. From To Type No No. Size Type y No.
(SC/DC/ TC) (m)* Ground Head
(KVA)
3 CX95 sqmm+ 1CX70
SC 9 M PSC 7 1 sqmm+1CX16 sqmm+( 3 189 LT 2
CX50 sqmm+1CX30 sqmm
ACSR 100 sqmm Dog
310+0 311+0
8 SC 9 M PSC 12 3 conductor + 3 CX185 sqmm 1359.6 11 3
00 00
XLPE cable
3 CX95 sqmm+ 1CX70
SC 9 M PSC 25 1 sqmm+1CX16 sqmm+( 3 756 LT 4
CX50 sqmm+1CX30 sqmm
ACSR 100 sqmm Dog
311+0 312+0
9 SC 9 M PSC 15 3 conductor + 3 CX185 sqmm 1730.4 11 4
00 00
XLPE cable
3 CX95 sqmm+ 1CX70
SC 9 M PSC 3 1 sqmm+1CX16 sqmm+( 3 63 LT 1
CX50 sqmm+1CX30 sqmm
ACSR 100 sqmm Dog
312+0 313+0
10 SC 9 M PSC 23 3 conductor + 3 CX185 sqmm 2719.2 11 4 16 1
00 00
XLPE cable
3 CX95 sqmm+ 1CX70
SC 9 M PSC 9 1 sqmm+1CX16 sqmm+( 3 252 LT 2
CX50 sqmm+1CX30 sqmm
ACSR 100 sqmm Dog
313+0 314+0
11 SC 9 M PSC 10 3 conductor + 3 CX185 sqmm 1112.4 11 3 16 1
00 00
XLPE cable
3 CX95 sqmm+ 1CX70
SC 9 M PSC 1 sqmm+1CX16 sqmm+( 3 LT
CX50 sqmm+1CX30 sqmm
Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga
road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 45
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

Chainage Poles Conductor Line Crossing Transformer


Type of
S. Capacit
Circuit Length Under Over
No. From To Type No No. Size Type y No.
(SC/DC/ TC) (m)* Ground Head
(KVA)
ACSR 100 sqmm Dog
314+0 315+0
12 SC 9 M PSC 23 3 conductor + 3 CX185 sqmm 2719.2 11 3 25 3
00 00
XLPE cable
3 CX95 sqmm+ 1CX70
SC 9 M PSC 1 sqmm+1CX16 sqmm+( 3 LT
CX50 sqmm+1CX30 sqmm
ACSR 100 sqmm Dog
315+0 316+0
13 SC 9 M PSC 3 3 conductor + 3 CX185 sqmm 247.2 11 1 16 1
00 00
XLPE cable
3 CX95 sqmm+ 1CX70
SC 9 M PSC 12 1 sqmm+1CX16 sqmm+( 3 346.5 LT 2
CX50 sqmm+1CX30 sqmm
ACSR 100 sqmm Dog
316+0 317+0
14 SC 9 M PSC 16 3 conductor + 3 CX185 sqmm 1854 11 3 25 1
00 00
XLPE cable
3 CX95 sqmm+ 1CX70
SC 9 M PSC 1 sqmm+1CX16 sqmm+( 3 LT
CX50 sqmm+1CX30 sqmm
ACSR 100 sqmm Dog
317+0 318+0
15 SC 9 M PSC 26 3 conductor + 3 CX185 sqmm 3090 11 4 63 1
00 00
XLPE cable
3 CX95 sqmm+ 1CX70
SC 9 M PSC 1 sqmm+1CX16 sqmm+( 3 LT 16 1
CX50 sqmm+1CX30 sqmm
ACSR 100 sqmm Dog
318+0 319+0
16 SC 9 M PSC 4 3 conductor + 3 CX185 sqmm 370.8 11 1 16 1
00 00
XLPE cable
Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga
road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 46
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

Chainage Poles Conductor Line Crossing Transformer


Type of
S. Capacit
Circuit Length Under Over
No. From To Type No No. Size Type y No.
(SC/DC/ TC) (m)* Ground Head
(KVA)
3 CX95 sqmm+ 1CX70
SC 9 M PSC 9 1 sqmm+1CX16 sqmm+( 3 252 LT 2
CX50 sqmm+1CX30 sqmm
ACSR 100 sqmm Dog
319+0 319+4
17 SC 9 M PSC 6 3 conductor + 3 CX185 sqmm 618 11 2
00 00
XLPE cable
3 CX95 sqmm+ 1CX70
SC 9 M PSC 9 1 sqmm+1CX16 sqmm+( 3 252 LT 2
CX50 sqmm+1CX30 sqmm
Amritsar
Connectivity
ACSR 100 sqmm Dog
1 0+000 1+000 SC 9 M PSC 30 3 conductor + 3 CX185 sqmm 3584.4 11 4
XLPE cable
3 CX95 sqmm+ 1CX70
SC 9 M PSC 4 1 sqmm+1CX16 sqmm+( 3 94.5 LT
CX50 sqmm+1CX30 sqmm
ACSR 100 sqmm Dog
2 1+000 2+000 SC 9 M PSC 16 3 conductor + 3 CX185 sqmm 1854 11 2
XLPE cable
ACSR 100 sqmm Dog
3 2+000 3+000 SC 9 M PSC 29 3 conductor + 3 CX185 sqmm 3460.8 11 6
XLPE cable
ACSR 100 sqmm Dog
4 3+000 4+000 SC 9 M PSC 17 3 conductor + 3 CX185 sqmm 1977.6 11 2
XLPE cable

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga


road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 47
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

Chainage Poles Conductor Line Crossing Transformer


Type of
S. Capacit
Circuit Length Under Over
No. From To Type No No. Size Type y No.
(SC/DC/ TC) (m)* Ground Head
(KVA)
ACSR 100 sqmm Dog
5 4+000 5+000 SC 9 M PSC 27 3 conductor + 3 CX185 sqmm 3213.6 11 6
XLPE cable
ACSR 100 sqmm Dog
6 5+000 6+000 SC 9 M PSC 10 3 conductor + 3 CX185 sqmm 1112.4 11 6
XLPE cable
3 CX95 sqmm+ 1CX70
SC 9 M PSC 6 1 sqmm+1CX16 sqmm+( 3 157.5 LT
CX50 sqmm+1CX30 sqmm
ACSR 100 sqmm Dog
7 6+000 7+000 SC 9 M PSC 21 3 conductor + 3 CX185 sqmm 2472 11 6
XLPE cable
ACSR 100 sqmm Dog
8 7+000 8+000 SC 9 M PSC 12 3 conductor + 3 CX185 sqmm 1359.6 11 4
XLPE cable
ACSR 100 sqmm Dog
9 8+000 9+000 SC 9 M PSC 19 3 conductor + 3 CX185 sqmm 2224.8 11 4
XLPE cable
ACSR 100 sqmm Dog
10+00
10 9+000 SC 9 M PSC 31 3 conductor + 3 CX185 sqmm 3708 11 6
0
XLPE cable
ACSR 100 sqmm Dog
10+00 11+00
11 SC 9 M PSC 38 3 conductor + 3 CX185 sqmm 4573.2 11 10
0 0
XLPE cable
3 CX95 sqmm+ 1CX70
SC 9 M PSC 3 1 sqmm+1CX16 sqmm+( 3 63 LT
CX50 sqmm+1CX30 sqmm
Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga
road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 48
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

Chainage Poles Conductor Line Crossing Transformer


Type of
S. Capacit
Circuit Length Under Over
No. From To Type No No. Size Type y No.
(SC/DC/ TC) (m)* Ground Head
(KVA)
ACSR 100 sqmm Dog
11+00 12+00
12 SC 9 M PSC 18 3 conductor + 3 CX185 sqmm 2101.2 11 4
0 0
XLPE cable
ACSR 100 sqmm Dog
12+00 13+00
13 SC 9 M PSC 11 3 conductor + 3 CX185 sqmm 1236 11 4
0 0
XLPE cable
ACSR 100 sqmm Dog
13+00 14+00
14 SC 9 M PSC 19 3 conductor + 3 CX185 sqmm 2224.8 11 6
0 0
XLPE cable
ACSR 100 sqmm Dog
14+00 15+00
15 SC 9 M PSC 27 3 conductor + 3 CX185 sqmm 3213.6 11 6
0 0
XLPE cable
ACSR 100 sqmm Dog
15+00 16+00
16 SC 9 M PSC 7 3 conductor + 3 CX185 sqmm 741.6 11 4
0 0
XLPE cable
ACSR 100 sqmm Dog
16+00 17+00
17 SC 9 M PSC 5 3 conductor + 3 CX185 sqmm 494.4 11 2
0 0
XLPE cable
3 CX95 sqmm+ 1CX70
SC 9 M PSC 2 1 sqmm+1CX16 sqmm+( 3 31.5 LT
CX50 sqmm+1CX30 sqmm
ACSR 100 sqmm Dog
17+00 18+00
18 SC 9 M PSC 25 3 conductor + 3 CX185 sqmm 2966.4 11 6
0 0
XLPE cable
ACSR 100 sqmm Dog
18+00 19+00
19 SC 9 M PSC 31 3 conductor + 3 CX185 sqmm 3708 11 8
0 0
XLPE cable
Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga
road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 49
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

Chainage Poles Conductor Line Crossing Transformer


Type of
S. Capacit
Circuit Length Under Over
No. From To Type No No. Size Type y No.
(SC/DC/ TC) (m)* Ground Head
(KVA)
ACSR 100 sqmm Dog
19+00 20+00
20 SC 9 M PSC 10 3 conductor + 3 CX185 sqmm 1112.4 11 4
0 0
XLPE cable
ACSR 100 sqmm Dog
20+00 21+00
21 SC 9 M PSC 24 3 conductor + 3 CX185 sqmm 2842.8 11 8
0 0
XLPE cable
ACSR 100 sqmm Dog
21+00 22+00
22 SC 9 M PSC 24 3 conductor + 3 CX185 sqmm 2842.8 11 6
0 0
XLPE cable
ACSR 100 sqmm Dog
22+00 23+00
23 SC 9 M PSC 19 3 conductor + 3 CX185 sqmm 2224.8 11 6
0 0
XLPE cable
ACSR 100 sqmm Dog
23+00 24+00
24 SC 9 M PSC 15 3 conductor + 3 CX185 sqmm 1730.4 11 4
0 0
XLPE cable
3 CX95 sqmm+ 1CX70
SC 9 M PSC 1 sqmm+1CX16 sqmm+( 3 LT
CX50 sqmm+1CX30 sqmm
Total 823 146 82736 192 27

*PS Length is conductor length


Conductor type assumed is a mid type of conductor and no COS will be payable against change in
any conductor type

TC-Triple Circuit, DC-Double Circuit, SC-Single Circuit, U/G-Underground, *- Shifting not required

Utility Shifting Plan and Detailed Drawings enclosed as Appendix HT1/LT1 and HT2/LT2 respectively.
Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga
road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 50
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

(ii) Public Health Utilities (Water/Sewage Pipelines)

The site includes the following Public Health Utilities: -

Sl. No. Chainage (Km) Type of Lines, Pipe Sluice Crossings


Pressure/under Gravity Valves
From To Type No. Size Nos. Nos. Length
Nil

Note:
a) The type/spacing/size/specifications of poles/towers/lines/cables to be used in shifting work are as per the guidelines of utility owning department
and it is solely between the Contractor and the utility owning department. No change of scope shall be eligible or no cost shall be paid for using
different type/spacing /size/specifications in shifted work in comparison to those in the existing or for making any overhead crossings to
underground as per requirement of utility owning department/construction of project highway. The Contractor shall carry out joint inspection with
utility owning department and get the estimates sanctioned from utility owning department. The assistance of the Authority is limited to giving
forwarding letter on the proposal of Contractor to utility owning department whenever asked by the Contractor. The decision/approval of utility
owning department shall be binding on the Contractor. No Cos or no cost shall be eligible on any account.

b) The supervision charges at the rates/charges applicable between implementing agencies of MoRTH and utility owning department shall be paid
directly by the by the Authority to the Utility Owning Entity as and when Contractor furnishing a demand of Utility Owning Department along
with a copy of sanctioned estimate.

c) The credit of dismantled materials has been accounted for in the estimated cost. The dismantled material/scrap of existing Utility to be
shifted/dismantled shall belong to the Contractor who would be free to dispose-off the dismantled material as deemed fit by them. If the
Contractor is forced to deposit the dismantled material to utility owning department then the amount of credit for dismantled material indicated in
the sanctioned estimates of utility owning department will be reimbursed to the Contractor after submitting the duly authenticated receipt of the
dismantled material from utility owning department to the Authority.

d) The utilities shall be handed over after shifting work is completed to Utility Owning Department up to their entire satisfaction. The maintenance
liability shall rest with the Utility Owning Department after handing over process is complete as far as utility shifting works are concerned.

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga


road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 51
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

18. Change of Scope

The length of structures and bridges specified hereinabove, except for structures over existing water bodies like ponds, lakes etc. shall be treated as
an approximate assessment. The proposed span arrangement of structures may be changed based on innovative design of structure, latest
construction techniques and aesthetics of structures. Actual lengths of structures and bridges as required on the basis of detailed investigations
shall be determined by the Contractor in accordance with the Specifications and Standards. Existing water bodies like ponds, lakes etc., which are
to be preserved from environment impact mitigation point of view, shall be bridged to the extent of full ponding level at peak rainy season as per
requirement of EMP submitted to MoEF at the time of Environmental Clearance. Any variations in the lengths specified in this Schedule-B shall
not constitute a Change of Scope, save and except any variations in the length arising out of a Change of Scope expressly undertaken in
accordance with the provisions of Article13.

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga


road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 52
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.
National Highway Authority of India Request for Proposal – Bid Documents

Appendix-B-1

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga road (NH-703) near Kang Sahibu village to Junction
with Jalandhar-Kapurthala road (NH-703A) near Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near Isharwal village (km 0+000 to km 24+000 of Amritsar B - 53
connectivity) on EPC mode under Bharatmala Pariyojna in the state of Punjab.
National Highways Authority of India Request for Proposal – Bid Documents

Appendix-B-1

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga road (NH-703) near Kang Sahibu village to Junction
with Jalandhar-Kapurthala road (NH-703A) near Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near Isharwal village (km 0+000 to km 24+000 of Amritsar B - 54
connectivity) on EPC mode under Bharatmala Pariyojna in the state of Punjab.
National Highways Authority of India Request for Proposal – Bid Documents

Appendix-B-1

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga road (NH-703) near Kang Sahibu village to Junction
with Jalandhar-Kapurthala road (NH-703A) near Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near Isharwal village (km 0+000 to km 24+000 of Amritsar B - 55
connectivity) on EPC mode under Bharatmala Pariyojna in the state of Punjab.
National Highways Authority of India Request for Proposal – Bid Documents

Appendix-B-1

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga road (NH-703) near Kang Sahibu village to Junction
with Jalandhar-Kapurthala road (NH-703A) near Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near Isharwal village (km 0+000 to km 24+000 of Amritsar B - 56
connectivity) on EPC mode under Bharatmala Pariyojna in the state of Punjab.
National Highways Authority of India Request for Proposal – Bid Documents

Appendix B-1

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga road (NH-703) near Kang Sahibu village to Junction
with Jalandhar-Kapurthala road (NH-703A) near Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near Isharwal village (km 0+000 to km 24+000 of Amritsar B - 57
connectivity) on EPC mode under Bharatmala Pariyojna in the state of Punjab.
National Highways Authority of India Request for Proposal – Bid Documents

Appendix B-1

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga road (NH-703) near Kang Sahibu village to Junction
with Jalandhar-Kapurthala road (NH-703A) near Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near Isharwal village (km 0+000 to km 24+000 of Amritsar B - 58
connectivity) on EPC mode under Bharatmala Pariyojna in the state of Punjab.
National Highways Authority of India Request for Proposal – Bid Documents

Appendix B-1

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga road (NH-703) near Kang Sahibu village to Junction
with Jalandhar-Kapurthala road (NH-703A) near Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near Isharwal village (km 0+000 to km 24+000 of Amritsar B - 59
connectivity) on EPC mode under Bharatmala Pariyojna in the state of Punjab.
National Highways Authority of India Request for Proposal – Bid Documents

Appendix B-1

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga road (NH-703) near Kang Sahibu village to Junction
with Jalandhar-Kapurthala road (NH-703A) near Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near Isharwal village (km 0+000 to km 24+000 of Amritsar B - 60
connectivity) on EPC mode under Bharatmala Pariyojna in the state of Punjab.
National Highways Authority of India Request for Proposal – Bid Documents

Appendix B-1

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga road (NH-703) near Kang Sahibu village to Junction
with Jalandhar-Kapurthala road (NH-703A) near Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near Isharwal village (km 0+000 to km 24+000 of Amritsar B - 61
connectivity) on EPC mode under Bharatmala Pariyojna in the state of Punjab.
National Highways Authority of India Request for Proposal – Bid Documents

Appendix B-2

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga road (NH-703) near Kang Sahibu village to Junction
with Jalandhar-Kapurthala road (NH-703A) near Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga road
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near Isharwal village (km 0+000 to km 24+000 of Amritsar B - 62
connectivity) on EPC mode under Bharatmala Pariyojna in the state of Punjab.
National Highways Authority of India

(Schedule B-1)
OF TREES
1. The shifting of utilities and felling of trees shall be carried out by the Contractor. The
cost of the same shall be borne by the Authority. The details of utilities are as follows:

Sr. Type of Utility Unit Quantity Location/stretch


No (LHS/RHS)
A Electrical Utilities
A1 Electrical Poles Nos. 680 372/308
A2 Electrical HT Lines Nos. 17 17
Intersection towers
A3 Transformers Nos. 27 12/15
B Water/Sewage pipeline
B1 Hand Pumps Nos. 0 00/00
B2 Water pipeline crossing Nos. 00 00/00
C Telephone Poles & OFC
C1 Telephone Poles Nos. 00 00/00
C2 OFC Crossing Nos. 00 00/00
D Gas pipeline crossing Nos. 01 1/_
E Felling of Trees Nos. 3108

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga road (NH-703) near Kang Sa
with Jalandhar-Kapurthala road (NH-703A) near Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction wit
(NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near Isharwal village (km 0+000 to
connectivity) on EPC mode under Bharatmala Pariyojna in the state of Punjab.
National Highways Authority of India Request for Proposal – Bid Documents

Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga


road (NH-703) near Kang Sahibu village to Junction with Jalandhar-Kapurthala road (NH-703A) near
Khojewal village (Km 303+900 to km 319+400 of main expressway) and Junction with Jalandhar-Moga
road (NH-703) near Kang Sahibu village to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) near B - 64
Isharwal village (km 0+000 to km 24+000 of Amritsar connectivity) on EPC mode under Bharatmala
Pariyojna in the state of Punjab.