SCHEDULE - B
(See Clause 2.1)
Development of the Project Highway shall include design and construction of the Project Highway
as described in this Schedule-B and in Schedule-C. The alignment plans of the Project Highway
are specified in Annex-III of Schedule A and shall be deemed to be part of this Schedule B. The
proposed profile of the project highway as indicated in the Annex-III of Schedule A shall be treated
as an approximate assessment. Based on site/design requirement specified in Schedule-D, the
Contractor shall design the alignment plans and profiles of the project highway with approval from
the Authority’s Engineer within the available Right of Way.
The Project Highway shall be designed and constructed in conformity with the Specifications and
Standards specified in Annex-I of Schedule-D.
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-1
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India
Annexure-I
(Schedule – B)
1.1 The Project Highway shall follow the horizontal alignment shown in the plan and profile specified
in Annex III of Schedule-A, unless otherwise specified by the Authority. Notwithstanding anything
to the contrary contained in this Agreement or IRC:SP:99-2013, the proposed profile of the project
highway as indicated in the Annexure-III of Schedule-A shall be treated as an approximate
assessment. Based on site/design requirement, the Contractor shall design the alignment plans and
profiles of the project highway based on site/design requirement mentioned in Schedule D with
approval from the Authority’s Engineer within the available Right of Way. The same shall not
constitute a change of scope, save and except any variations arising out of a change of scope
expressly undertaken in accordance with the provision of Article 13.
1.2.1 Eight-lane divided carriageway shall be undertaken. The paved carriageway shall be provided as
indicated below and referred to in paragraph 2.8 of this Schedule–B and Annex –I of Schedule–D.
1.2.3 Except as otherwise provided in this Agreement, the width shall be adjusted to fit into appropriate
plans and cross sections developed in accordance with TCS enclosed.
1.2.4 Except as otherwise provided in this Agreement, but subject to provisions of Annex –I of this
Schedule–B, the width of the paved carriageway shall conform to Section 1.2.1 of Schedule B.
1.2.5 The entire cross-sectional elements shall be accommodated in the available/proposed ROW. If
required, suitable retaining structures shall be provided to accommodate the highway cross section
within the available/ proposed ROW and the same shall not constitute a Change of Scope, save and
except any variations in the length arising out of a Change of Scope expressly undertaken in
accordance with the provisions of Article 13.
2.1 General
Geometric design and general features of the Project Highway shall be in accordance with Section
2 of the IRC:SP:99-2013.
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-2
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India
In the following stretches, where improvement of the existing road geometrics to the prescribed
standards is not possible, the existing road geometrics shall be improved to the extent possible
within the given right of way and proper road signs and safety measures shall be provided:
Nil
The shoulder specification shall be as per Section 2 and Section 5 of IRC:SP:99-2013. The
shoulder on the outer side (of either side carriageway) shall be 3m wide paved + 2m earthen. The
shoulder composition is as follows:
a) The compositions and specification of the paved shoulder and edge strip shall be as that of the
main carriageway.
b) The earthen shoulder shall be provided with 200mm thick layer of granular material.
Service Roads/ Slip Roads shall be constructed at the locations and for the lengths indicated
below:
Diversion of existing SH
Under proposed under proposed ROB. To
1 173+324 173+453 200
ROB be improved as 2-Lane +
Paved Shoulder
VOP Approach Road
LHS 370m Shall be developed as per
2 174+411 TCS shown in VOP
RHS 136m GAD.
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-3
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India
Note: 1. Above length of the service/slip/ connecting roads/ VOP Approach road is indicative and
minimum specified. The actual length of the service/ slip/ connecting roads shall be determined
by the Contractor in accordance with the IRC:SP:99-2013 requirements with approval from the
Authority’s Engineer. Any increase in the length specified in this Clause of Schedule-B shall
not constitute a Change of Scope, save and except any variations in the length arising out of a
Change of Scope expressly undertaken in accordance with the provisions of Article 13.
2. The realignment of existing track to the SVUP outside the PROW and connecting roads between
consecutive underpasses wherever required as per plan & profile uploaded with bid document
and specified in Annex III of schedule A is to be constructed by the contractor as per site
requirement in consultation with Authority Engineer and the same would not constitute any
change of scope.
3. Length of service roads given in above table excludes length across the project Expressway for
proper connectivity of cross roads on either side of project expressway as given in the alignment
plan enclosed at Annex-III, Schedule-A which shall be deemed to be included in the scope of
work.
4. Width of connecting road shall not be less than the existing road and in no case less than as
specified in paragraph 2.12.3 of IRC:SP:99-2013.
2.7.1 Grade separated structures shall be provided as per paragraph 2.13 of the IRC:SP:99-2013.
Proposed levels at structure locations as shown in plan & profile specified in Annex III of schedule
A are only for guidance and any changes in levels shall not constitute any change of scope. The
requisite particulars are given below:
SVUP
LVUP
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-4
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India
VUP
Sl. No. Design Chainage (Km) Span Arrangement (m) Total Width (m) Remarks
1 159+668 1 x 25.0 2 x 21.25
2 160+114 1 x 35.0 2 x 21.25
VOP
FLYOVER
INTERCHANGE
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-5
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India
Note: The length of loops and ramps are minimum and likely to get changed as per site requirement; Any
change as per site requirement may not constitute change of scope, save and except any variations
in the length arising out of a Change of Scope expressly undertaken in accordance with the
provisions of Article 13.
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-6
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-7
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-8
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-9
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-10
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-11
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-12
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India
Note: TCS schedule as given above shall be treated as an approximate assessment. Actual length of the
TCS schedule shall be prepared by the contractor based on detailed investigations and site
requirements. Any variation in length of respective TCS specified in Schedule B shall not
constitute a change of scope, save and except any variations in the length arising out of a change
of scope expressly undertaken in accordance with the provisions of Article 13.
All intersections and grade separators shall be as per Section 3 of the IRC:SP:99-2013. Properly
designed intersections shall be provided at the locations and of types and features given in the
tables below:
The grade separated intersection shall be provided as specified in paragraph 2.7 of Annexure-I of
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-13
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India
schedule B.
Note:
(i) Type of Junction to be improved as per IRC:SP:99-2013 and MOST type design for intersection
on National Highways, 1992.
(ii) Any other junction not mentioned above but observed during the construction of the project shall
be improved as per IRC:SP:99-2013 requirements. The same shall not constitute a Change of
Scope, save and except any variations arising out of a Change of Scope expressly undertaken in
accordance with the provisions of Article 13. However, since the project is access controlled, any
additional SVUP/LVUP/VUP at cross-road locations not provided for in the Schedule B but
required during the execution of work will be dealt under the provisions of Article 13.
(iii) The contractor shall take up ‘Detailed Engineering study’ to ascertain further details of all
intersections and treatment of the intersections shall be designed in accordance with the latest
guidelines mentioned out in section-3 of IRC:SP:99-2013. The same shall not constitute a Change
of Scope, save and except any variations arising out of a Change of Scope expressly undertaken in
accordance with the provisions of Article 13.
(iv) Junction improvement under grade separators/ interchanges shall be carried out as per IRC:SP:99-
2013 with proper entry/exit to cross roads and slip/service roads and pavement composition as
indicated in clause 5.3 of this Schedule B.
(v) Location and span arrangement of grade-separated structures are indicative. Exact location may
be decided in consultation with Authority Engineer. Any Change in span arrangement shall not
be treated as change of scope, save and except any variations in the length arising out of a Change
of Scope expressly undertaken in accordance with the provisions of Article 16.
4.1 Construction of new road embankment/cuttings shall conform to the Specifications and Standards
given in section 4 of the IRC:SP:99-2013 and the specified cross sectional details.
5 Pavement design
5.1 Pavement design shall be carried out in accordance with Section-5 of the IRC:SP:99-2013 and IRC 37.
a) The pavement shall be long-life perpetual flexible pavement for the main carriageway
including loop/ramps at interchange locations for the entire length of project highway.
(b) For connecting road/Service road/Slip Road and access road to wayside amenities, flexible
pavement shall be proposed.
(c) Rigid Pavement shall be provided at Toll Plaza location.
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-14
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India
(a) Perpetual flexible pavement shall be constructed for the main carriageway including paved
shoulders and loop/ramps at interchange locations for the entire length of project highway.
Perpetual flexible pavement shall be designed for a minimum design period of 50 years and
minimum sub grade CBR of 8%.
(b) For slip/service roads including access to wayside amenities and interconnecting roads to
VUPs/LVUPs/SVUPs, flexible pavement shall be provided for minimum 10 MSA traffic and
subgrade CBR of 8%.
(c) Stage construction shall not be permitted.
In order to meet the intended functional requirement of respective pavement layers as well as
compaction of heavy bituminous layers on main carriageway, the minimum thickness of
respective pavement layers for main carriageway, interchanges, toll plaza and connecting/
service/slip road shall, however, in no case be less than as given below:
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-15
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India
Toll Plaza
Note: de-bonding interlayer of polythene sheet having a minimum thickness of 125 micron is
recommended separation layer between DLC and PQC
The following stretches of the existing road shall be reconstructed. These shall be designed as new
pavement.
Design Chainage
Sl. No. Remarks
From To
Nil
Drainage system including surface and subsurface drains for the Project Highway shall be provided
as per Section 9 of the IRC:SP:99-2013. Lined and Unlined Drains (except at ROB location) which
gets terminated at all cross road locations shall be provided in the entire project corridor as per the
TCS referred in paragraph 2.8 of the Annex-I of Schedule B and Annex-I of Schedule D.
7 Design of structures
7.1 General
7.1.1 All bridges, culverts and structures shall be designed and constructed in accordance with section-
6 of the IRC:SP:99-2013 and shall conform to the cross-sectional features and other details
specified therein. Project Highway is proposed to be constructed to eight lane configuration with
provision for inner-side widening to twelve-lane configuration in future. As such, superstructure
of all bridges, culverts and structures is to be designed for edge movement of the vehicle
considering stitching of new superstructure in future due to widening for additional lane. Special
vehicle loading is to be considered in Design of structures. Since, the subject project is Access
Controlled, therefore, Congestion factor is not to be considered in calculation of live load.
7.1.2 Width of the carriageway of new bridges and structures more than 60.0 m length having
carriageway width less than 7.5m shall be as follows:
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-16
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India
7.1.5 The following structures shall be designed to carry utility services specified in table below:
7.2 Culverts
7.2.1 Overall width of all culverts shall be equal to the roadway width of the approaches.
7.2.4 New culverts (given in table below) shall be constructed for width equal to the roadway width of
the Project Highway & as per typical cross-section given in the TCS specified in Para 2.11 and
alignment plan. The details are given as under:
Sl. Span
Design Chainage (Km) Structure Type
No. Arrangement (m)
1 150+371 1 x 3.0 x 3.0 RCC Box
2 154+800 1 x 2.0 x 2.0 RCC Box
3 155+160 1 x 3.0 x 3.0 RCC Box
4 155+488 1 x 2.0 x 2.0 RCC Box
5 156+458 1 x 3.0 x 3.0 RCC Box
6 156+845 1 x 3.0 x 3.0 RCC Box
7 157+043 1 x 3.0 x 3.0 RCC Box
8 157+955 1 x 2.0 x 2.0 RCC Box
9 160+700 1 x 2.0 x 2.0 RCC Box
10 161+450 1 x 5.0 x 3.0 RCC Box
11 162+066 1 x 5.0 x 3.0 RCC Box
12 163+344 1 x 5.0 x 3.0 RCC Box
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-17
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India
Sl. Span
Design Chainage (Km) Structure Type
No. Arrangement (m)
13 170+284 1 x 3.0 x 3.0 RCC Box
14 170+350 1 x 3.0 x 3.0 RCC Box
14 * 1 x 2.0 x 2.0 RCC Box
173+359
15 174+722 1 x 3.0 x 3.0 RCC Box
In addition to above, additional 25 nos. box culverts of size 2m x 2m shall be provided as per site
requirements for facilitating access of farmers to field channels on either side of the carriageway.
The location of such culverts shall be decided in consultation with Authority Engineer.
Note:
1. The overall width of the above culverts shall be equal to Roadway width including the gap between
main carriageway & service road, in case there is any service road. Any additional Barrel length
required as per site conditions shall not constitute a Change of Scope, save and except any
variations arising out of a Change of Scope expressly undertaken in accordance with the provisions
of Article 13.
2. Location of the above culverts are indicative and span arrangement is minimum specified. Exact
location of these culverts shall be decided in consultation with Authority Engineer. The actual
ventway/span arrangements of culverts shall be determined on the basis of detailed investigations
by the Contractor in accordance with the Specifications and Standards. Any variations in
ventway/span arrangements specified in this Schedule-B shall not constitute a Change of Scope,
save and except any variations in the length arising out of a Change of Scope expressly undertaken
in accordance with the provisions of Article 13.
7.2.5 Repairs/replacements of railing/parapets, flooring and protection works of the existing culverts
shall be undertaken as follows:
7.2.6 Floor protection works shall be as specified in the relevant IRC Codes and Specifications.
7.2.7 In case of culverts proposed for widening/repair as per details in Clause 7.2.3 above, the same
shall be re-constructed if the design shows that these are unsafe for design loads. No change of
scope shall be considered in such cases.
7.2.8 Utility ducts in form of NP-4 Hume Pipe dia 1.2m shall be provided across the Project Highway
and along with inspection chamber for crossing of underground utilities in Built-up areas as per
IRC:SP:99-2013 requirements. Location for such utility crossing shall be finalized in consultation
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-18
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India
7.3 Bridges
New bridges at the following locations on the Project Highway shall be constructed. GADs for the
new bridges are attached in the drawings folder.
Major Bridges:
Minor Bridges:
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-19
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India
7.3.3 The railings of existing bridges shall be replaced by crash barriers at the following locations: Nil
Nil
An effective drainage system for bridge decks shall be provided as specified in paragraph 9.80 of
the IRC:SP:99-2013
7.4.1 Design, construction and detailing of ROB/RUB shall be as specified in section 6 of the IRC:SP:99-
2013
7.4.2 Road over bridges (road over rail) shall be provided at the following locations, as per GAD drawings
attached:
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-20
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India
7.4.3 Road under bridges (road under railway line) shall be provided at the following level crossings, as
per GAD drawings attached: Nil
The existing structures to be repaired/ strengthened, and the nature and extent of repairs
strengthening required: Nil
8.1 Traffic control devices and road safety works shall be provided in accordance with Section 10 of
the IRC:SP:99-2013.
Traffic signs include roadside signs, overhead signs and curb mounted signs along the entire
Project Highway.
Pavement markings shall cover road marking for the entire Project Highway.
Thrie beam metal crash barriers shall be provided in entire project length on outer side earthen
shoulder of each main carriageway and Loops/Ramps of interchanges as per TCS referred in this
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-21
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India
Schedule-B but excluding stretches covered by bridges and RE wall structures, where concrete
barriers to be provided.
8.2 Sheeting shall be provided in accordance with section 10.2.5 of the IRC:SP:99-2013.
9. Roadside furniture
9.1 Roadside furniture like km/Hectometer Stones, Railings, Traffic Impact Attenuators, Delineators
shall be provided in accordance with the provisions of Section 10 and Section 12 of IRC:SP:99-
2013 and Traffic Signage plan as indicated in Annexure-III of Schedule-A and deemed to be part
of this Schedule-B.
9.2 RCC boundary wall shall be provided along the entire length on either side (including transverse
requirements at structure locations) in accordance with typical drawing enclosed with bid
document.
9.3 Traffic Signs (excluding overhead signs at Toll Plaza). Traffic sign boards as per details given
below shall be provided in the project highway as per the road signage plan indicated in Annexure-
III of Schedule-A and deemed to be part of this Schedule-B
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-22
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India
Note: The numbers and location of Traffic Signages shown in Traffic Signage plan as indicated in
Annexure-III of Schedule-A are tentative and minimum specified. The actual numbers and location
of Traffic Signages shall be determined by the Contractor in accordance with the IRC:SP:99-2013
requirements with approval from the Authority’s Engineer. Any variation in the number and type
of road sign boards specified in this Clause of Schedule-B shall not constitute a Change of Scope,
save and except any variations arising out of a Change of Scope expressly undertaken in
accordance with the provisions of Article 13.
Minimum 10,000 no. of trees are required to be planted by the contractor as compensatory
afforestation in accordance with IRC:SP:99-2013 keeping in view IRC:SP:21-2009. Any increase
in no. of trees as per forest clearance obtained from MoEF&CC, shall not be treated as change of
scope, save and except any variations arising out of a Change of Scope expressly undertaken in
accordance with the provisions of Article 13.
Safety barriers shall be provided at the following hazardous location in consultation with the
NHAI/Authority Engineer. Nil
Retaining walls/ breast wall and protection works shall be provided at locations as indicated below
and as provided in TCS schedule in cl. 2.8 of schedule-B.
Retaining Wall
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-23
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India
Breast Wall
Note: Above length and height of Retaining wall/ breast wall is tentative and minimum specified. The
actual length and height of Retaining wall/ breast wall shall be determined by the Contractor in
accordance with the IRC:SP:99-2013 requirements with approval from the Authority’s Engineer.
Any variation in the length and height specified in this Clause of Schedule-B shall not constitute a
Change of Scope, save and except any variations in the length arising out of a Change of Scope
expressly undertaken in accordance with the provisions of Article 13.
Contractor shall shift the Irrigation canal/local streams at the locations detailed below for
construction of project highway. The typical cross-section of the proposed canal/local stream is
enclosed at appendix B-2 for reference.
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-24
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India
Note: The actual cross-section of canal/ stream to be shifted and extent of such shifting (length) shall be
determined by the Contractor as per the site/ design requirement with approval of concerned
irrigation authority & Authority’s Engineer. Any variation in the cross-section and length specified
in this Clause of Schedule-B shall not constitute a Change of Scope, save and except any variations
in the length arising out of a Change of Scope expressly undertaken in accordance with the
provisions of Article 13.
In addition to slope protection at Bridges/ ROBs/ Flyover/ Underpasses & Chute Drain locations,
Road embankment shall be protected at following locations by providing boulder pitching on
slopes.
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-25
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India
Note: Above length of boulder pitching for embankment protection is tentative and minimum specified.
The actual length of boulder pitching shall be determined by the Contractor in accordance with the
IRC:SP:99-2013 requirements based on site investigations with approval from the Authority’s
Engineer. Any variation in the length specified in this Clause of Schedule-B shall not constitute a
Change of Scope, save and except any variations in the length arising out of a Change of Scope
expressly undertaken in accordance with the provisions of Article 13.
As per Ministry of Environment and Forests Notification, New Delhi dated 14.01.1997 (as
amended on 13.01.1998, 05.01.1999 & 6.11.2000), the construction of rain water harvesting
structure is mandatory in and around Water Crisis area, notified by the Central Ground Water
Board. The provision of rain water harvesting shall be provided at every 500m in the entire project
length and shall be executed as per requirement of IRC SP: 42-2014 and IRC SP: 50-2013.
The length of Structures and bridges specified hereinabove shall be treated as an approximate
assessment. The proposed span arrangement of above structures may be changed based on
innovative design of structure, latest construction techniques and aesthetics of structures and the
actual lengths of Structures and bridges as required on the basis of detailed investigations shall be
determined by the Contractor in accordance with the Specifications and Standards. Any variations
in the lengths specified in this Schedule-B shall not constitute a Change of Scope, save and except
any variations in the length arising out of a Change of Scope expressly undertaken in accordance
with the provisions of Article 13.
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-26
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Bid Documents
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-27
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Bid Documents
Appendix-B-2
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-28
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Bid Documents
Appendix-B-2
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-29
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Bid Documents
Appendix-B-2
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-30
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Bid Documents
Appendix-B-2
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-31
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Bid Documents
Appendix-B-2
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-32
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Bid Documents
Appendix-B-2
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-33
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Bid Documents
Appendix-B-2
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-34
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Bid Documents
Appendix-B-2
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-35
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Bid Documents
Appendix-B-2
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-36
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Bid Documents
Appendix-B-2
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-37
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Bid Documents
Appendix-B-2
Appendix-B-2
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-38
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Bid Documents
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-39
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Bid Documents
Appendix-B-3a
Appendix-B-3b
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-40
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Bid Documents
Appendix-B-3c
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-41
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Bid Documents
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-42
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh
National Highways Authority of India Bid Documents
1. The shifting of utilities and felling of trees shall be carried out by the Contractor. The
cost of the same shall be borne by the Authority. The details of utilities are as follows:
No (LHS/RHS)
A Electrical Utilities
A3 Transformers Nos. 26
B Water/Sewage -
pipeline
B1 Sewage meters -
Construction of Eight Lane access controlled expressway from Kandarwasa village to Bawadi Page B-43
village (near Shivgarh) of Ratlam district (Ch. 602+420 to 627+420; design Ch. 150+000 to
175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under
Bharatmala Pariyojana in the State of Madhya Pradesh