MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

SCHEDULE - B
(See Clause 2.1)
DEVELOPMENT OF THE PROJECT HIGHWAY

1. Development of the Project Highway

Development of the Project Highway shall include design and construction of


the Project Highway as described in this Schedule-B and in Schedule-C. The
alignment plans of the Project Highway are specified in Annex-III of
Schedule A. In the case of sections where no modification in the existing
alignment of the Project Highway is contemplated, the alignment plan has not
been provided. Alignment plans have only been given for sections where
the existing alignment is proposed to be modified. The contractor however,
improve/upgrade the Road Profile as indicated in Annex-III based on IRC-SP-
73-2015 & IRC-SP-84-2014 requirement.

2. Rehabilitation and augmentation


Rehabilitation, upgradation and augmentation shall include Two-Laning with
Paved Shoulder and widening/reconstruction/new construction of the total
Project Highway as described in Annex-I of this Schedule-B and Schedule-C.

3. Specifications and Standards

The Project Highway shall be designed and constructed in conformity with the
Specifications and Standards specified in Annex-I of Schedule-D.

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km


28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 1
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

Annex - I
(Schedule-B)

DESCRIPTION OF TWO LANING WITH PAVED SHOULDER

1. REHABILITATION, UPGRADATION & WIDENING OF THE EXISTING


HIGHWAY

1.1 The Site of the Project Highway comprises section of NH-753(M) and
(principally declared highway) 753H Package II – Dhad to Bhokardan to Sillod
from existing Km 28+000 (Dhad) to Km 67+600 Bhokardan Town junction
Meeting SH 178 at its Chainage of 12/500 on road from Sillod to Jalna. Total
Project Length is 54.50Km. The land, carriageway and structures comprising
the Site are described below. The project highway Two Lane with Paved
Shoulders shall be constructed as per Schedule D.

The Project Highway shall follow the existing alignment unless otherwise
specified by the Authority and shown in the alignment plans specified in Annex
III of Schedule-A. Geometric deficiencies, if any, in the existing horizontal
and vertical profiles shall be corrected as per the prescribed Manual
standards for plain/rolling terrain to the extent land is available. Any
consequent shift of the centerline of this alignment within the existing ROW
shall be incidental to work and shall not be considered as change of scope.

1.2 WIDTH OF CARRIAGEWAY

1.2.1 Two Lane with paved shoulder: - Two-Laning with paved shoulders shall
be constructed with rigid pavement. The paved carriageway shall be 10 m
(7m+1.5m+1.5m) wide in open country in accordance with the typical cross
sections drawings as per the Manual (IRC:SP 73-2015) as mentioned in the
Table below.
Sr.No. From To Length Fully paved Typical
(Km) (Km) (Km) shoulders/footpaths cross section
(Ref. to
Manual)
Dhad to Bhokardan
1 28+000 32+300 4.30 Paved Shoulder TCS-2
2 35+100 49+900 15.0 Paved Shoulder TCS-2
3 51+600 66+000 14.4 Paved Shoulder TCS-2
Bhokardan to Sillod
4 0+000 12+500 13.45 Paved Shoulder TCS-2

Design Chainage
Length (m) Type of Cross section
From To
28+000 32+300 4300 TCS-2 T
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km
28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 2
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

Design Chainage
Length (m) Type of Cross section
From To
32+300 32+400 100 TCS-3 T
32+400 35+000 2600 TCS-1 T
35+000 35+100 100 TCS-3 T
35+100 49+900 15000 TCS-2
49+900 50+000 100 TCS-3
50+000 51+500 1500 TCS-1 T
51+500 51+600 100 TCS-3
51+600 66+000 14400 TCS-2
66+000 66+100 100 TCS-3
66+100 67+600 1500 TCS-1
Sillod to Bhokardan
0+000 0+500 500 TCS-1
0+500 0+600 100 TCS-3
0+600 12+400 11800 TCS-2
12+400 12+500 100 TCS-3

Note:
1) Cross-section at Major/Minor Bridge approaches are to be followed
matching to adjoining cross-sections with suitable transition.
2) Where cross-section changes from two lanes to four lanes a transition
shall be provided as per the Manual (IRC: SP 73-2015)
3) Where Bus Bays constructed as per Schedule C a transition shall be
provided as per the Manual (IRC: SP 73-2015)
The chainages given in above table are indicative and stretches may increase
or decrease depending upon profile designed by contractor as IRC-SP-73-2015,
however, this shall not be treated as change of scope.
1.2.2 Carriageway in built up area: - Two Lane/Four Lane with paved shoulder
shall be constructed in built-up area.

Sr Chainage Carriage way Remarks


in m excluding
width of
median
Dhad to Bhokardan
1 28+800 – 29+600 10 Dhalsawangi
2 32+400 – 35+000 14 Dhad
3 39+850 – 40+550 10 Mhasala KH
4 44+000 – 44+500 10 Jamb
5 50+000 – 51+500 14 Mahora
6 63+100 – 63+700 10 Viregaon
7 66+100 – 67+600 14 Bhokardan
Sillod to Bhokardan
8 0+000 – 0+500 14 Sillod
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km
28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 3
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

9 12+500 – 12+500 Existing 4 lane


14 Not Consider
in Scope

Note:
1. For crossing of utilities at every 200m interval utility ducts are provided
and paver block flooring shall be constructed.
2. Where Bus Bays & Truck Lay Byes constructed as per Schedule C a
transition shall be provided as per the Manual (IRC: SP 73-2015).
3. At built-ups, the available space after paved shoulder up to drain shall be
laid with 100 mm thick, paver block of M-40 grade and shall be used as
parking space.
4. Design and specifications of paved shoulders and granular material shall
confirm to the requirements specified in paragraphs 5.10 and 5.11 of the
Manual. (IRC: SP 73-2015).
5. The chainages given in above table are indicative and stretches may
increase or decrease depending upon profile designed by contractor as
IRC-SP-73-2015, however, this shall not be treated as change of scope.

1.2.3 Two lane with Slip Road: - Two lane with paved shoulder in Grade Separated
Structure approach section with Slip road shall be constructed in accordance
with the typical cross sections drawings in the Manual (IRC:SP 73-2015)
constructed as mentioned in table below:

Sr. Design Chainage Length Carriageway Typical cross


No. (km) Width (m) section (Ref.
From To to Manual)
(Km) (Km)
Nil

1.2.4 In Toll Plaza Location: 1 no.

Sr. No. Design Chainage in Figure (As per IRC-SP-73-


Km. 2015)
1 28+500

1.2.5 Except as otherwise provided in this Agreement, the Linear dimension


and width of the paved Carriageway and cross-sectional features shall
conform to paragraph 1.2 above & Cross Sections given at Schedule D. Invert
levels of the longitudinal drains shall be decided as per adjoining draining
area and properties.

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km


28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 4
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

2. GEOMETRIC DESIGN AND GENERAL FEATURES

2.1 General

Geometric design and general features of the Project Highway shall be in


accordance with Section 2 of the Manual. (IRC: SP 73-2015).

2.2 Design Speed

The design speed shall be the minimum design speed of 100 km per hr for
plain/ rolling terrain. In urban stretch of Bhokardan town portions, design
speed is restricted to 40/80 km per hr. as the development is proposed
within the extent of available land.
Details of curves with less than 100 km/hr speed.
Design Minimum Radius /
Chainage Speed Transition Remark
(Kmph) Length
(Km)
Dhad to Bhokardan
32+894.3 50 150
32+993.8 20 30
33+188 20 200
33+137 20
33+074 20 400
34+077 40 240
39+153.5 30 60
39+428.5 30 60
40+075.3 30 60
40+321.24 30 60
40+544.6 30 400
40+788 30 60
41+223 60 60
50+774.5 20 40
67+157.1 50 150

2.3 Improvement of the existing road geometrics


In the following sections, where improvement of the existing road
geometrics to the prescribed standards is not possible, the existing road
geometrics shall be improved to the extent possible within the given right of
way and proper road signs and safety measures shall be provided for safe
regulation of fast moving, slow moving and pedestrian traffic:
Sr. Design Chainage Type of Deficiency Remarks
No
From To
Nil

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km


28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 5
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

2.4 Right of Way

Details of the Right of Way are given in Annex II of Schedule A.

2.5 Type of shoulders


(a) In built-up sections, four lane c/way with fully paved shoulders and paver blocks
with appropriate subbase abd subgrade with median shall be constructed in the
following stretches. Modified four lane section shall be adopted in urban areas.

Sr.No. From To Length Fully paved Typical


(Km) (Km) (Km) shoulders/footpaths cross
section (Ref.
to Manual)
1 32+400 35+000 2.60 1.5m Paved Shoulder, TCS-1
2.0m Earthen Shoulder
on Both Side
2 50+000 51+500 1.50 1.5m Paved Shoulder, TCS-1
2.0m Earthen Shoulder
on Both Side

3 66+100 67+600 1.50


1.5m Paved Shoulder, TCS-1
2.0m Earthen Shoulder
on Both Side
Sillod to Bhokardan
4 0+00 0+500 0.50 1.5m Paved Shoulder, TCS-1
2.0m Paver blocks with
Hard Earthen Shoulder
on Both Side
Note: The thickness of the Paver blocks shall be 100 mm with M40 Grade of
Concrete. The chainages given in above table are indicative and stretches may
increase or decrease depending upon profile designed by contractor as IRC-SP-
73-2015, however, this shall not be treated as change of scope.
(a) In open country Two Lane with paved shoulders of 1.5 m width shall be provided
and balance 2.0 m width shall be covered with 150 mm thick compacted layer of
granular material.

Sr.No. From To Length Fully paved Typical cross


(Km) (Km) (Km) shoulders/footpaths section (Ref.
to Manual)
1 28+000 32+300 4.3 Paved Shoulder TCS-2
2 35+100 49+900 15.0 Paved Shoulder TCS-2
3 51+600 66+000 14.4 Paved Shoulder TCS-2
Sillod to Bhokardan
4 0+00 0+500 0.5 Paved Shoulder TCS-2

(b) In Grade Separated Structure approaches, footpaths/fully paved shoulders and


walkway shall be constructed by paver blocks in the following stretches with FRP
frame with cover drains.
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km
28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 6
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

Sr.
Built-up Location
Length
Fully paved Typical cross
No.
stretch From To (km)
shoulders/fo section (Ref. to
(township) (Km) (Km) otpaths Manual)
NIL
(c) Design and specifications of paved shoulders and granular material shall confirm
to the requirements specified in paragraphs 5.10 and 5.11 of the Manual. (IRC:
SP 73-2015).

2.6 Lateral and vertical clearances at underpasses

2.6.1. Lateral and vertical clearances at underpasses and provision of guardrails/crash


barriers shall be as per paragraph 2.11 of the Manual (IRC: SP: 73-2015).

2.6.2. Vehicular Underpasses shall be constructed at following locations:-

Design Name of Proposed Span Total Width of


S. No. Chainage Intersecting arrangement the Structure Remark
Roads (in m) (in m)
NIL

Note: Approach Gradient & RE Walls: Approach and exit gradient of road
crossing through underpass shall be maintained. Service/Slip road shall be
provided on all four sides as per availability of land

2.7 Lateral and vertical clearances at overpasses :

2.7.1 Lateral and vertical clearances at overpasses shall be as per paragraph 2.12
of the Manual.

2.7.2 Lateral and vertical clearances at overpasses shall be as per paragraph 2.11
of the Manual (IRC: SP 73-2015). Overpass shall be constructed at following
locations:-
Design Name of Proposed Span Total Width of
S. No. Chainage Intersecting arrangement the Structure Remark
Roads (in m) (in m)
NIL

2.8 (a) Service/Slip roads:-

Service/Slip roads shall be constructed at the following locations and as per


cross sections shown at Schedule D.
Location of Service Right hand side Length (Km) of Remark
Sr. Road (Design (RHS)/Left hand side Service Road
No. Chainage) (LHS)/or Both side
From (km) To (km)
------- NIL -------

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km


28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 7
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

b) Slip roads:-
5.50m wide Slip Road at Grade Separated structure approaches portion shall be
provided on both sides. Slip roads shall be constructed at the following locations and
as per cross sections shown at Schedule D.
Location of Service Right hand side Length (Km) of Remark
Sr. Road (Design (RHS)/Left hand side Service Road
No. Chainage) (LHS)/or Both side
From (km) To (km)
------- NIL -------

Above length of the Service/Slip Road is indicative and minimum specified. The actual
length of the service/slip road shall be determined by the contractor in accordance
with the Manual requirements with approval from the Authority’s Engineer. Any
Increase in the Length specified in the clause of Schedule B shall not constitute a
Change of Scope. Any New location as per site requirement and directed by Authority
Engineer will be considered under a Change of Scope.

2.9 Grade separated structures


2.9.1 Grade separated/viaduct structures shall be constructed as per paragraph
2.13 of the Manual IRC: SP:73-2015.
Sr. Location Length Number Approach Remarks,
No. of (m) & length Gradient if any
structure of span & RE Walls
(m)
(Design
Ch.)
NIL

Note: Approach Gradient & RE Walls: Approach and exit gradient of road crossing
through underpass shall be provided as per Manual (IRC: SP: 73-2015). Slip
road shall be provided on all four sides as per availability of land.

2.9.2 In the case of grade separated structures, the type of structure and the level
of the Project Highway and the cross roads shall be as follows: [Refer to
paragraphs 2.13 of the Manual and specify the type of vehicular under
pass/ overpass structure and whether the cross road is to be carried at the
existing level, raised or lowered.

2.10 Cattle and pedestrian underpass /overpass :


Cattle/pedestrian underpasses and provision of guardrails/crash barriers shall
be as per paragraph 2.10 & 2.13 of the Manual (IRC: SP: 73-2015).
A. Wherever existing slab/box culverts allow a vertical clearance of more
than 2 m, these can be used in dry season for pedestrian and cattle
crossing by providing necessary flooring.

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km


28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 8
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

B. However, the provisions shall be made at every one km if the requirement


under point A is not satisfied.
C. Locations of proposed cattle underpasses 10 nos. other than slab/box
culverts shall be finalized in consultation with Authority Engineer.

2.11 Typical cross-sections of the Project Highway

Design Chainage
Length (m) Type of Cross section
From To
28+000 32+300 4300 TCS-2 T
32+300 32+400 100 TCS-3 T
32+400 35+000 2600 TCS-1 T
35+000 35+100 100 TCS-3 T
35+100 49+900 15000 TCS-2
49+900 50+000 100 TCS-3
50+000 51+500 1500 TCS-1 T
51+500 51+600 100 TCS-3
51+600 66+000 14400 TCS-2
66+000 66+100 100 TCS-3
66+100 67+600 1500 TCS-1
Sillod to Bhokardan
0+000 0+500 500 TCS-1
0+500 0+600 100 TCS-3
0+600 12+400 11800 TCS-2
12+400 12+500 100 TCS-3

Note 1: The cross section schedule given in above table is indicative and
stretches may increase or decrease depending upon profile designed by
contractor however, this shall not be treated as change of scope
Note 2: Width of paver block, shall be determined, as per availability of land,
by contractor in consultation with the Authority’s Engineer, however, this
shall not be treated as change of scope.
Note 3: The chainages given in above table are indicative and stretches may
increase or decrease depending upon profile designed by contractor as IRC-
SP-73-2015, however, this shall not be treated as change of scope.

3. INTERSECTIONS AND GRADE SEPARATORS

All intersections and grade separators shall be as per Section 3 of the Manual
(IRC: SP 73-2015). Existing intersections which are deficient shall be
improved to the prescribed standards. For improvement of intersections and
at grade junction standards and type plan MoRT&H and IRC: SP: 41-1994

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km


28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 9
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

shall be followed.

Properly designed intersections shall be provided at the locations and of the


types and features given in the tables below:

3.1 At-grade intersections


1. Major Junction – 06 Nos.

Existing Design
Sr. No. Side Type Category of Cross Road
Chainage Chainage
1 32+400 L Y
2 33+050
3 33+150 R T
4 34+500 L T
5 50+800 L Y
Sillod to Bhokardan
6 12+500 13+845 L T SH-178 (Mahora Road)

2. Minor Junction –81 Nos.


Existing Design
Sr. No. Side Type Connecting Road
Chainage Chainage
Dhad to Bhokardan
1 29+190
2 29+380 L K L
3 32+315 L Y L
4 32+630 R&L + R&L
5 32+660 R --| R
6 32+690 R --| R
7 32+710 R --| R
8 32+790 R&L R&L
9 32+850 R&L + R&L
10 32+900 L |-- L
11 32+930 R&L + R&L
12 32+980 L |-- L
13 33+270 L |-- L
14 33+320 L |-- L
15 33+705 L |-- L
16 33+740 L |-- L
17 34+290 R&L + R&L
18 35+010 R --| R
19 35+290 R --| R
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km
28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 10
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

20 35+690 R --| R
21 35+730 R --| R
22 36+225 L |-- L
23 36+660 R --| R
24 37+030 R /| R
25 37+670 L |\ L
26 39+230 L |/ L
27 40+100 R&L R&L
28 40+350 L |\ L
29 42+830 L |/ L
30 44+270 R --| R
31 46+130 R&L + R&L
32 48+710 R&L + R&L
33 50+580 L |-- L
34 50+050 R --| R
35 52+780 L |-- L
36 52+920 R --| R
37 54+720 L |-- L
38 54+900 R --| R
39 57+250 R --| R
40 57+680 L |-- L
41 57+930 R --| R
42 58+180 L |-- L
43 58+630 L |-- L
44 61+110 L |-- L
45 62+190 R --| R
46 62+400 L |-- L
47 66+150 R --| R
48 66+580 R --| R
49 66+610 R --| R
50 66+850 L |-- L
51 66+900 R --| R
52 67+050 R --| R
SIllod to Bhokardan
53 1/590 1/590 R T R
54 2/860 2/860 R T R
55 3/096 3/096 R T R
56 4/710 4/710 R T R
57 5/015 5/015 L T L
58 5/200 5/200 R T R
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km
28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 11
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

59 5/230 5/230 L T L
60 5/240 5/240 R T R
61 5/330 5/330 L T L
62 5/430 5/430 R T R
63 5/440 5/440 L Y L
64 6/120 6/120 R Y R
65 6/150 6/150 L Y L
66 7/380 7/380 R T R

67 7/510 7/510 L Y L

68 7/600 7/600 R Y R
69 7/700 7/700 L Y L
70 8/110 8/110 R Y R
71 8/885 8/885 +
72 9/860 9/860 L Y L
73 9/890 9/890 R Y R
74 11/285 11/285 L T L
75 12/720 12/720 L + Bhokardan Village
76 12/870 12/870 R T Bhokardan Village
77 12/890 12/890 L T Bhokardan Village
78 13/065 13/065 R T Bhokardan Village
79 13/140 13/140 L T Bhokardan Village
80 13/180 13/180 + Bhokardan Village
81 13/280 13/280 Y Bhokardan Village

Rumble Strips: - The cross road junctions as mentioned above shall be


provided with Rumble strips by thermoplastic paint at the approach of
junctions as per IRC: 99-1988.

Note: - It is clarified that if any other deficient junctions with cross BT/CC
roads is identified during development period in addition to those
mentioned above shall be improved as per standard set forth in Schedule
‘D’. Any Increase in the junction specified in the clause of Schedule B shall
not constitute a Change of Scope.

Minimum 50-100 m approach roads joining the project road shall be


constructed to match the level and it should be in conformity with the IRC
specifications, For cross road drainage facility new HP culverts on cross
roads shall be constructed as per Clause 7.2.4 (c) of this Schedule and
shall be as per Manual.

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km


28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 12
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

3.2 Grade separated intersection with/without ramps

Minimum length
Location Road to be
Sr. Salient of viaduct to be
(Design Ch.) carried under
No. features provided
(Km) the structures
(m)
NIL

4. ROAD EMBANKMENT AND CUT SECTION

4.1 Reconstruction and up-gradation of the existing road embankment/cuttings


and construction of new road embankment, cuttings shall conform to the
Specifications and Standards given in section 4 of the Manual and the
specified cross sectional details. Deficiencies in the plan and profile of the
existing road shall be corrected. The raised section of road shall be treated as
raising above the clause 4.2 of IRC: SP-73-2015

4.2 Raising of the existing road: -


Provision of retaining wall shall be made in the stretches of insufficient ROW
in order to raise the stretches; the IRC SP 73 clause 4.2 shall be followed.
Tentative length of retaining wall in the current package is approximately
12km. the exact length may vary s per the design provided by the
concessioner.
The existing road shall be raised in the following sections:
Design Design
Sr.No. Chainage Chainage Length (km) Remark
From (Km) To (Km)
Dhad to Bhokardan

1 28+00 28+300 0.300

2 29+640 29+900 0.260

3 30+800 30+960 0.160

4 34+740 34+820 0.80

5 36+380 36+600 0.220

6 38+220 38+340 0.120

7 39+000 39+060 0.060

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km


28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 13
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

Design Design
Sr.No. Chainage Chainage Length (km) Remark
From (Km) To (Km)
8 41+560 41+700 0.140

9 43+240 43+340 0.100

10 47+300 47+440 0.140

11 47+840 48+000 0.160

12 48+000 48+640 0.640

13 49+000 49+720 0.720

14 63+540 63+820 0.280

15 64+040 64+500 0.460

Note: The chainages given in above table are indicative and stretches may
increase or decrease depending upon profile designed by contractor, the raising
for Reconstruction/ New Construction in approaches of Major/Minor Bridges
shall be carried out by contractor as per Schedule D and in consultation with the
Authority’s Engineer and as per availability of land, however, this shall not be
treated as change of scope.

5. PAVEMENT DESIGN

5.1 Pavement design shall be carried out in accordance with Section 5 of the
Manual (IRC: SP 73-2015), IRC SP: 84- 2014, IRC 58:2015, IRC 81: 1997, IRC
relevant codes and International Standards.

5.2 Type of pavement: -

A. Rigid Pavement – Rigid Pavement shall be constructed in entire length of


from km 28.000 to km 67.600 (Dhad to Bhokardan) & Km 0.000 to Km
12.500 (Sillod to Bhokardan) project highway.
B. Flexible Pavement– Strengthening is not Proposed

Rigid Pavement shall be constructed in full length of Main Carriageway.

5.3 Design requirements

5.3.1 Design Period and strategy

Rigid pavement shall be constructed for new pavements and reconstruction


of the existing road. Rigid pavement shall be designed for a minimum design
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km
28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 14
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

period of 30 (Thirty) years and minimum CBR of subgrade should be 8%.


Design of rigid pavement shall confirm to the guidelines of IRC: 58-2015.
Overlay design shall confirm to IRC 81-1997. Stage construction shall not be
permitted.

5.3.2 Design Traffic

Notwithstanding anything to the contrary contained in this Agreement or the


Manual, the Contractor shall design the pavement for design traffic of
minimum 4100 CVPD (In Year 2016) considering future traffic projections for
design life or as per the actual traffic whichever is higher. Minimum
pavement composition should be adopted for new pavement/reconstruction
of road as below:-

a) Main Carriageway: -

S. Description Minimum Crust Composition of Rigid Pavement


No.
Dhad to Bhokardan Sillod to Bhokardan
1 PQC 250 mm 270 mm
2 DLC 150 mm 150 mm
3 GSB 150 mm 150 mm
4 Subgrade 500mm As per Requirment of
Plan and Profile
Total 1050 mm 1070 mm

b) Slip Road: Slip road shall be provided as per 2.8

S. Description Minimum Crust


No. Composition
…Nil…

c) Crust below Paver Block: Paver Block flooring 100 mm thick with M40
Grade of Concrete at Built-up portion shall be provided on both sides as per
availability of space for parking. Minimum pavement composition should be
adopted for paver block flooring as below
S. Description Minimum Crust
No. Composition below paver
block
1 Paver Block 100 mm
2 DLC 150 mm
3 WMM 150 mm
4 GSB 150 mm
Total 550 mm

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km


28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 15
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

Note: -
In clayey soil areas (black cotton soil) excavate 600mm depth and
replace it with minimum 10% CBR subgrade material. If the soil below
600mm does not satisfy 97% of compaction and MDD of lab results,
then excavate further 500mm and replace entire excavation with buffer
layer.

d) The Crust Composition for Truck Lay Byes shall be as per Main
Carriageway Clause 5.3.2 (a) above.

e) The Crust composition for Minor roads, Bus bay shall be as per section 5 of
IRC SP 73-2015.
f) The Crust composition of Paved shoulder is same as of Main Carriageway.

5.4 Widening & Reconstruction of stretches

The following stretches of the existing road shall be widened &


reconstructed by scarifying the existing carriageway and laying fresh
pavement starting from subbase level. These shall be designed as rigid
pavement on the basis of “Modulus of subgrade reaction” and minimum
crust as per 5.3.2)

Design Chainages Design


Sr.
From To Length Remark
No.
(Km) (Km) (km)
As per manual IRC: SP
39.600 + 2.4
73-2015 specified in
(Existing
1 28.000 67.600 Alignment plan
Dhad
mentioned in Annex-III
Byepass)
of Schedule ‘A’.
2 0.000 12.500 12.500 Sillod to Bhokardan
Total Length = 54.500 km

Note - The chainages given in above table are indicative and stretches may
increase or decrease depending upon profile designed by contractor as IRC-SP-
73-2015, however, this shall not be treated as change of scope.

5.5 New Construction of Bypasses and Realignments: -

Rigid pavement shall be constructed for bypasses, realignment and geometric


improvements.

1. Realignments: -

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km


28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 16
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

Design Chainages Design


Sr.
From To Length Remark
No.
(Km) (Km) (km)
1
All other realignments are
Total Length = km within ROW

Note - The Proposed Realignments are within the ROW and details are shown in
the drawings chainages are as per the existing condition and are indicative and
stretches may increase or decrease depending upon profile designed by
contractor as IRC-SP-73-2015, however, this shall not be treated as change of
scope.

2. Bypasses:- 1
Design Chainages
Design Length
Sr. No. From To Remark
(Km)
(Km) (Km)
Existing Dhad
1 32+400 34+500 2.4
byepass

3. New Alignment (New Link):- Nil.

Design Chainages
Design Length
Sr. No. From To Remark
(Km)
(Km) (Km)
NIL

4. Geometric improvements: -
Note - The improvement locations given above are indicative and may vary
depending upon profile designed by contractor as per IRC-SP-73-2015.
However, this shall not be treated as change of scope.

6. ROADSIDE DRAINAGE

Built up concrete Drains are existing in the Habitated area of Bhokardan rest
of the length of the project is provided with open drains only

Drainage system including surface and subsurface drains for the Project
Highway shall be provided as per Section 6 of the Manual (IRC: SP 73-2015)/
IRC: SP: 84-2014. FRP frame with cover drains shall be provided in both side
of Built-Up areas at following locations.

The locations of Drains at roadway shall be as per cross section type given at
Schedule D. In all built up areas FRC frame with cover drains with Footpath
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km
28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 17
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

shall be provided. Suitable crossing shall be provided at approaches to


properties etc. invert levels of drains shall be decided on the basis of ground
slopes of adjoining properties and open grounds
In cutting portions FRP frame with cover drains of suitable size shall be
constructed in consultation with Authority Engineer.

The actual length of the lined drains shall be determined by the


Contractor keeping in view the drainage location and in accordance
with the Manual requirements with approval from the Authority's
Engineer. Any increase in the length of drain as specified in above
location shall not constitute a Change of Scope. Any New location as per
site requirement and directed by Authority Engineer will be considered
under a Change of Scope.

7 DESIGN OF STRUCTURES

7.1 General

7.1.1 All bridges, culverts and structures shall be designed and constructed in
accordance with section 7 of the Manual (IRC: SP 73-2015) and shall conform
to the cross-sectional features and other details specified therein. All designs
shall be in conforming with is IRC and International Codes. The deviation
shown in Schedule – D shall be taken in to considerations.

7.1.2 New Major and Minor bridge: Width of the carriageway of new Major bridges
and structures shall be as follows:
The width of carriageway of new Major and Minor bridges shall be 16m as
mentioned below.
a Span arrangement of Major and Minor Bridge shall be designed by
contractor on the basis of detailed surveys & investigations subject to
minimum specified in GAD as per para 7.3.2 of this schedule. Founding
levels shall be decided after detailed Geo-Technical investigation,
Waterway, road top level, soffit etc. shall be decided on the basis of land
survey conforming to various codal provision applicable

7.1.3 The following structures shall be provided with footpaths:

Sr. No. Location at Km Remarks


1 29+660 Minor Bridge
2 31+105 Minor Bridge
3 32+010 Minor Bridge
4 34+180 Minor Bridge
5 39+070 Major Bridge
6 41+190 Minor Bridge
7 43+300 Minor Bridge
8 44+040 Minor Bridge
9 46+860 Minor Bridge
10 52+410 Minor Bridge
11 53+060 Minor Bridge
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km
28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 18
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

Sr. No. Location at Km Remarks


12 56+400 Minor Bridge
13 57+260 Minor Bridge
14 65+180 Minor Bridge
15 65+700 Minor Bridge
16 67+280 Major Bridge
17 30+505 Box Culvert
18 33+490 Box Culvert
19 34+760 Box Culvert
20 35+730 Box Culvert
21 55+450 Box Culvert
22 61+660 Box Culvert
23 63+120 Box Culvert
24 63+590 Box Culvert
Sillod to Bhokardan
25 1+006 Box Culvert
26 2+361 Box Culvert
27 2+893 Box Culvert
28 3+075 Box Culvert
29 10+886 Box Culvert
30 12+268 Box Culvert

7.1.4 All bridges shall be high-level bridges.

7.1.5 The following structures shall be designed to carry utility services specified
in table below:

Sr. No. Bridge at Km Utility service to be carried Remark


1 29+660 Minor Bridge
2 31+105 Minor Bridge
3 32+010 Minor Bridge
4 34+180 Minor Bridge
5 39+070 Minor Bridge
6 41+190 Minor Bridge
7 43+300 Minor Bridge
8 44+040 Minor Bridge
9 46+860 Minor Bridge
10 52+410 OFC cables, electric Cable, Minor Bridge
11 53+060 Gas Pipe lines, etc. Minor Bridge
12 56+400 Minor Bridge
13 57+260 Minor Bridge
14 65+180 Minor Bridge
15 65+700 Minor Bridge
16 67+280 Minor Bridge
17 30+505 Box Culvert
18 33+490 Box Culvert
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km
28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 19
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

Sr. No. Bridge at Km Utility service to be carried Remark


19 34+760 Box Culvert
20 35+730 Box Culvert
21 55+450 Box Culvert
22 61+660 Box Culvert
23 63+120 Box Culvert
24 63+590 Box Culvert
Sillod to Bhokardan
25 1+006 Box Culvert
26 2+361 Box Culvert
27 2+893 OFC cables, electric Cable, Box Culvert
28 3+075 Gas Pipe lines, etc. Box Culvert
29 10+886 Box Culvert
30 12+268 Box Culvert

All Major / Minor Bridges, Box Culvert, Flyovers, Vehicular/Pedestrians


Structures shall be designed to carry utility services like OFC Cables,
Electricity Lines etc.

7.1.6 Cross-section of the new culverts and bridges at deck level for the Project
Highway shall conform to the typical cross-sections given in section 7 of the
Manual (IRC:SP 73-2015)/ IRC:SP:84-2014 and deviations given at Schedule D.

7.2 Culverts

7.2.1 Overall width of all culverts shall be equal to the roadway width of the
approaches. Barrel Length may change as per height of embankment and
shall get approval from Authority Engineer

7.2.2 Reconstruction of Existing Culverts

The existing culverts at the following locations shall be re-constructed as new


culverts.

Refer to paragraph 7.3 (ii) of the Manual (IRC: SP 73-2015).

(a) SLAB CULVERT / Box culvert : 14 Nos

Sr Existing Details Proposed Details Design


No Chainage
1 4 Row x 1.2m Dia. Double RCC Cell of 30+505
Size (2.0 x 2.0)m

2 Slab Drain (1 x 6)m Double RCC Cell of 33+490


Size (2.0 x 2.0)m

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km


28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 20
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

3 2 Row x 1.2m Dia. Single RCC Cell of 34+760


Size (3.0 x 4.0)m
4 2 Row x 1.2m Dia. Single RCC Cell of 35+730
Size (2.0 x 3.0)m
5 2 Row x 0.9m Dia. Double RCC Cell of 55+450
Size (3.0 x 2.0)m
6 2 Row x 0.9m Dia. Single RCC Cell of 61+660
Size (2.0 x 3.0)m
7 Slab Drain (1 x 6)m Double RCC Cell of 63+120
Size (3.0 x 3.0)m
8 Slab Drain (1 x 4.7)m Single RCC Cell of 63+590
Size (4.0 x 5.0)m
Sillod to Bhokardan

9 1 Span X 6m Slab Single RCC Box Cell 1+006


Drain of Size :- 3 x 3m

10 3 Span X 3m Slab Triple RCC Box Cell


2+361
Drain of Size : 3 x 3m

11 1 Span X 6m Slab Triple RCC Box Cell


2+893
Drain of Size : 3 x 3m

12 1 Span X 6m Slab Double RCC Box Cell 3+075


Drain of Size :- 2 x 3m

13 4 Span X 2m Stone Single RCC Box Cell 10+886


Masonry lab Drain of Size :- 3 x 4m

14 3 Span X 2.3m Stone Double RCC Box Cell 12+268


Masonry Slab Drain of Size :- 3 x 3m

Note – The span/opening given above are minimum and the proposed dimensions
shall be based on hydraulic calculations and approval from Authority Engineer. Any
change shall not be constitute a change of scope.

(b) PIPE CULVERTS: 40 Nos.

Sr Existing Proposed Chainag Proposal


No e

28+210
1 1 row x 0.9 m dia. DOUBLE Row RCC Reconstruction
NP 4 Pipe Culvert
28+320
2 1 row x 0.9 m dia. DOUBLE Row RCC Reconstruction
NP 4 Pipe Culvert
28+490
3 1 row x 0.9 m dia. DOUBLE Row RCC Reconstruction
NP 4 Pipe Culvert
29+270
4 2 row x 0.6 m dia. SINGLE Row RCC NP Reconstruction
4 Pipe Culvert
35+210
5 1 row x 1.2 m dia. DOUBLE Row RCC Reconstruction
NP 4 Pipe Culvert
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km
28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 21
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

35+460
6 1 row x 1.2 m dia. SINGLE Row RCC NP Reconstruction
4 Pipe Culvert
38+470
7 2 row x 1.2 m dia. DOUBLE Row RCC Reconstruction
NP 4 Pipe Culvert
40+060
8 2 row x 1.2 m dia. SINGLE Row RCC NP Reconstruction
4 Pipe Culvert
40+400
9 2 row x 1.2 m dia. DOUBLE Row RCC Reconstruction
NP 4 Pipe Culvert
40+800
10 2 row x 0.8 m dia. DOUBLE Row RCC Reconstruction
NP 4 Pipe Culvert
41+605
11 1 row x 1.1 m dia. DOUBLE Row RCC Reconstruction
NP 4 Pipe Culvert
43+580
12 2 row x 0.9 m dia. THREE Row RCC NP Reconstruction
4 Pipe Culvert
45+150
13 2 row x 1.0 m dia. THREE Row RCC NP Reconstruction
4 Pipe Culvert
47+310
14 1 row x 0.9 m dia. DOUBLE Row RCC Reconstruction
NP 4 Pipe Culvert
48+560
15 2 row x 0.9 m dia. DOUBLE Row RCC Reconstruction
NP 4 Pipe Culvert
49+580
16 2 row x 0.9 m dia. DOUBLE Row RCC Reconstruction
NP 4 Pipe Culvert
50+090
17 2 row x 0.9 m dia. DOUBLE Row RCC Reconstruction
NP 4 Pipe Culvert
50+460
18 2 row x 0.9 m dia. DOUBLE Row RCC Reconstruction
NP 4 Pipe Culvert
51+060
19 2 row x 0.9 m dia. DOUBLE Row RCC Reconstruction
NP 4 Pipe Culvert
51+440
20 2 row x 0.9 m dia. THREE Row RCC NP Reconstruction
4 Pipe Culvert
54+660
21 2 row x 0.9 m dia. DOUBLE Row RCC Reconstruction
NP 4 Pipe Culvert
55+730
22 2 row x 0.9 m dia. DOUBLE Row RCC Reconstruction
NP 4 Pipe Culvert

58+320
23 2 row x 0.9 m dia. SINGLE Row RCC NP Reconstruction
4 Pipe Culvert
61+890
24 2 row x 0.9 m dia. THREE Row RCC NP Reconstruction
4 Pipe Culvert

Sillod to Bhokardan
25 1 row x 0.7 m dia. SINGLE Row RCC NP 0+010 Reconstruction
4 Pipe Culvert
26 1 row x 0.8 m dia. SINGLE Row RCC NP 1+870 Reconstruction
4 Pipe Culvert
27 1 row x 0.9 m dia. SINGLE Row RCC NP 5+532 Reconstruction
4 Pipe Culvert
28 2 row x 0.9 m dia. DOUBLE Row RCC 5+825 Reconstruction
NP 4 Pipe Culvert
29 1 row x 0.9 m dia. SINGLE Row RCC NP 6+132 Reconstruction
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km
28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 22
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

4 Pipe Culvert
30 1 row x 0.9 m dia. SINGLE Row RCC NP 6+925 Reconstruction
4 Pipe Culvert
31 1 row x 0.9 m dia. SINGLE Row RCC NP 7+357 Reconstruction
4 Pipe Culvert

Note: - It is clarified that as per site requirement New HP Culverts if required


for drainage arrangement shall be identified & constructed if any during
development shall be constructed as per standard set forth in Schedule ‘D’& as
per instruction of Authority Engineer.
The pipe diameter and numbers given above are minimum and the proposed
dimensions shall be based on hydraulic calculations and approval from
Authority Engineer. Any changes to above dimensions shall not be constitute a
change of scope.

Barrel Length may change as per height of embankment and shall get approval
from Authority Engineer. Any change in the length specified in this Clause of
Schedule B shall not constitute a Change of Scope.

7.2.3 Widening of existing culverts


All existing culverts which are not to be reconstructed shall be widened to the
roadway width of the Project Highway as per the typical cross section given
in section 7 of the Manual. Repairs and strengthening of existing structures
where required shall be carried out.

(a) SLAB/BOX CULVERT: NIL

Details of Proposed
Details of Existing Structure
Existing Design structure
Sr.
Chainage Chainage
No. Span Width of Span Proposed
(Km) (Km) Type of
Arrang- Structure Arrang- Width Remark
Structure
ement (m) ement (m)
--NIL--

(b) PIPE CULVERT: NIL

Existing Details Proposed Details


Wide
Sr. carria Carriag ning
No. Chainage geway Pipe Chaina eway Width
Details
(Km) Width Details ge width (m)
(m) (Km) (m)
NIL

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km


28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 23
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

7.2.4 Additional new culverts shall be constructed as per particulars given in


the table below:

a. BOX CULVERT: NIL

Note: - It is clarified that as per site requirement New culverts if required for
drainage arrangement shall be identified & constructed if any during development
shall be constructed as per standard set forth in Schedule ‘D’& as per instruction
of Authority Engineer. The span/opening and numbers given above are minimum
and the proposed dimensions shall be based on hydraulic calculations and
approval from Authority Engineer. Any changes to above dimensions shall not be
constitute a change of scope.

b. SLAB CULVERT: NIL

c. PIPE CULVERTS: Nil


Design Proposed
Sr. No. x
Chainage Width Type Remark
No. Dia.(mm)
(Km) (m)

NIL

(b) PIPE CULVERTS AT CROSS ROAD JUNCTIONS: 104 Nos.

As per site requirement New HP Culvert shall be constructed for drainage


arrangement at following junctions as per standard set forth in Schedule ‘D’& as
per instruction of Authority Engineer.
For Junction Locations Refer Clause 3.1 of this Schedule B.

Sr. Type of Details of Proposed Structure


Nos.
No. Junction No. x Dia.(m) Proposed Width (m) Remark
The width of HPC shall be
1 x 1.20
1 X – Junction 10 as per Type Junction
on either side
Improvement (IRC SP 41)
The width of HPC shall be
T&Y–
2 84 1 x 1.20 as per Type Junction
Junction
Improvement (IRC SP 41)
Note: - It is clarified that if any other deficient junctions with cross BT/CC
roads is identified during development period shall be improved with
drainage facilities with pipe culvert & as per standard set forth in Schedule
‘D’. Any changes to above dimensions shall not be constitute a change of
scope.

7.2.5 Repairs/replacements of railing/parapets, flooring and protection works of the


existing culverts shall be undertaken as per Para 7.22 of manual (IRC: SP 73-
2015).
(a) SLAB/ BOX CULVERTS - NIL

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km


28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 24
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

Sr. Location of Type


Remark
No. Structure (km)
--NIL--

(b) PIPE CULVERTS - NIL

Sr. Location of Type


Remark
No. Structure (km)
--NIL--
(c) Cattle Under Passes- 10 Nos

Sr. Location of Type


Proposed
No. Structure (km)
Dhad to Bhokardan
Single RCC Box Cell CUP of
1 36+480 Size :- 2.0 m x 3.0 m

2 45+780
Single RCC Box Cell CUP of
Size :- 3.0 m x 2.0 m
3 47+170
Single RCC Box Cell CUP of
Size :- 2.0 m x 3.0 m
4 58+650
Single RCC Box Cell of Size :-
3.0 m x 3.0 m
5 59+580
Single RCC Box Cell of Size :-
3.0 m x 3.0 m
6 58+380
Single RCC Box Cell of Size :-
3.0 m x 3.0 m
7 59+500
Single RCC Box Cell CUP of
Size :- 2.0 m x 3.0 m
8 60+300
Single RCC Box Cell of Size :-
3.0 m x 3.0 m
9 61+260
Single RCC Box Cell of Size :-
2.0 m x 3.0 m
Sillod to Bhokardan
13 6+600
Single RCC Box Cell of Size
:- 2.0 m x 3.0 m
14 7+480
Single RCC Box Cell of Size
:- 2.0 m x 3.0 m
15 8+620
Single RCC Box Cell of Size
:- 2.0 m x 3.0 m
16 9+940
Single RCC Box Cell of Size
:- 2.0 m x 3.0 m
17 11+520
Single RCC Box Cell of Size
:- 2.0 m x 3.0 m
Tentative locations are given above; and the same shall be finalised in consultation
with AE at the time of execution.

7.2.6 Floor protection works shall be provided as specified in the relevant IRC Codes
and Specifications.
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km
28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 25
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

7.3 Bridges

7.3.1 Existing bridges to be re-constructed


The existing bridges at the following locations shall be re-constructed as new
Structures: [Refer to paragraph 7.3.2 of the Manual]

(a) MAJOR BRIDGES: - 2Nos.

Details of Proposed Remark


Details of Existing Structure
Existing Design structure
Sr.
Chainage Chainage Span Width of Span Proposed Type
No. Type of
(Km) (Km) Arrang- Structure Arrang- Width of
Structure
ement (m) ement (m) Bridge
Deck
Deck slab 10.0 x slab
1 39+070 6 x 16m 8.20 16
CC pier 10.0m CC
pier
Deck slab 7x
2 67+280 7 x 7.6 7.5 16
CC pier 10.0m

(b) MINOR BRIDGES: - 14 Nos.

Lowest Minimum
Soffit level length
of between inner
Sr. Design Span Arrangement
Proposed faces of dirt Remarks
No Chainage of Proposed Bridge
bridge (m) wall of
Proposed
bridge (m)
1 29+660 2 Span of 8.0m each 590.55 16.3
2 31+105 1 Span of 6.0m each 584.10 6.3
3 32+010 3 Span of 8.0m each 575.80 24.3
4 34+180 1 Span of 12.0m each 569.10 12.3
5 41+190 2 Span of 6.0m each 560.50 12.3
6 43+300 1 Span of 6.0m each 575.40 6.3

7 44+040 5 Span of 6.0m each 570.50 30.3


8 46+860 1 Span of 8.0m each 584.10 8.3
9 52+410 5 Span of 9.0m each 559.20 45.3
10 53+060 2 Span of 6.0m each 561.25 12.3

11 56+400 2 Span of 5.0m each 563.50 10.3

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km


28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 26
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

12 57+260 5 Span of 10.0m each 556.20 50.3

13 65+180 2 Span of 6.0m each 580.50 12.3

14 65+700 2 Span of 7.0m each 579.30 14.3

Where the Existing Bridge reconstructed as New Bridge at same place,


dismantling of Existing Major/Minor bridge shall be carried out with all lead and
lifts. A temporary diversion works shall be constructed as per Fig. 9.26 of
manual IRC SP 73-2015 and as per para 112 of standards and specifications of
Indian Roads Congress (MORTH) Fifth Revision-2013 with adequate cross
drainage structure and traffic safety and control devices. The diversions shall be
maintained in satisfactory condition till such time they are required and as
directed by the Authority Engineer.
Length of the proposed bridge mentioned above is minimum and it shall be designed
based on Hydraulic calculations and with approval from Authority Engineer. Minimum
RTL on structures shown on GAD shall be followed.

(i) The following narrow Bridges shall be widened including Strengthening &
repairing of Existing Bridge.

(a) MAJOR BRIDGES: - NIL

Sr. Design Existing Extent of Cross-section at deck


No. Chainage (Km) Width (m) widening (m) level for widening @
--NIL--

(b) MINOR BRIDGES: - Nil

Sr. Design Existing Extent of Cross-section at deck


No. Chainage (Km) Width (m) widening (m) level for widening @
NIL

7.3.2 Additional new bridges:

New bridges at the following locations on the Project Highway shall be


constructed. GADs for the new bridges are attached in the drawings folder.

(a) MAJOR BRIDGES: - Nil.

Sr. Soffit Level


Bridge at km Total Length of Total Width
No.
(Design Ch.) bridge (m) (m)
Nil

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km


28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 27
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

(b) MINOR BRIDGES: - NIL

Sr. Reduced
Bridge at km Total Length of Total Width
No. Soffit level
(Design Ch.) bridge (m) (m)
(minimum) (m)
NIL

(c) Cattle Under Passes: - 10 nos (as mentioned above)

Lowest Soffit level


Sr. Design Span Arrangement of
of Proposed CPU
No Chainage Proposed CPU
(m)
Single RCC Box Cell of Size
(2.0 x 3.0)m
1 36+480 574.70

Single RCC Box Cell of Size


(3.0 x 2.0)m
2 45+780 585.95

Single RCC Box Cell of Size


(2.0 x 3.0)m
3 47+170 587.30
Single RCC Box Cell of Size
(3.0 x 3.0)m
4 58+650 574.70
Single RCC Box Cell of Size
(2.0 x 3.0)m
5 59+580 585.80
Single RCC Box Cell of Size
(3.0 x 3.0)m
6 58+400 585.80
Single RCC Box Cell of Size
(2.0 x 3.0)m
7 59+500 585.80
Single RCC Box Cell of Size
(3.0 x 3.0)m
8 60+300 587.50
Single RCC Box Cell of Size
(2.0 x 3.0)m
9 61+260 589.70
single RCC Box Cell of Size
(2.0 x 3.0)m
10 64+370 586.80

7.3.3 The railings of all existing bridges shall be replaced by crash barriers as per
manual.
S. No. Location at km Remarks
--NIL--

7.3.4 Repairs/replacements of railing/parapets of the existing bridges shall be


undertaken as per manual.
S. No. Location at km. Remarks
--NIL--

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km


28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 28
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

7.3.5 Drainage system for bridge decks

An effective drainage system for bridge decks shall be provided as specified


in paragraph 7.21 of the Manual

7.3.6 Structures in marine environment: - NIL

7.4. Rail-road bridges: - RUB - nil

7.4.1. Design, Construction and detailing of ROB/RUB shall be specified in section 7 of


the Manual.
Proposed
Existing Design
Sr. span Width
Chainage Chainage Track Lane
No. arrangement (m)
(Km) (Km)
(m)
Nil

7.4.2. Road Over Bridges: NIL


Road over-bridge (road over rail) shall be provided at the following level
crossings, as per GAD drawings attached.
Proposed
Existing Design
SI. span Width
Chainage Chainage Track Lane
No. arrangement (m)
(Km) (Km)
(m)
--NIL--

7.5 Grade separated structures: - Nil.


The grade separator structures shall be provided at the location and of the type
and length specified in paragraph 2.9 and 3 of this Annex-I

7.6 Repairs and strengthening of bridges and structures

[Refer to paragraph 7.23 of the Manual and provide details]


The existing bridges and structures to be repaired / strengthened, and the
nature and extent of repairs /strengthening required are given below:

A. BRIDGES

(i) MAJOR BRIDGES: - Nil.

Sr. Location of bridge Nature and extent of repairs


No. (km) /strengthening to be carried out
--NIL--

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km


28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 29
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

(ii) MINOR BRIDGES: - NIL.

Sr. Design Chainage Nature and extent of repairs


No. (km) /strengthening to be carried out

--NIL--

Note: - It is clarified that above repairing & strengthening measures are indicative and
minimum specified. The condition survey of the existing structure shall be
carried out by the contractor as per IRC 35, & Strengthening / repairing shall be
carried out as per the requirement of site and as per instruction of Authority
Engineer, for pier, abutment sub structure & super structure, replacement of
bearings, expansion joints & wearing coat, providing railing on bridge, painting
& protection works etc. If any Increase in the specified above shall not
constitute a Change of Scope.
B. ROB/RUB
(i) ROB: - Nil
Sr.
Location of ROB (km) Remark
No.
- NIL -

(ii) RUB: - NIL


Sr.
Location of RUB (km) Remark
No.
- NIL -
Note: - It is clarified that above repairing & strengthening measures are
indicative and minimum specified any Increase in the specified above
shall not constitute a Change of Scope.

C. Overpasses/Underpasses and Other Structures: -NIL

Sr. Location of Nature and Extend of repairs /


No. Structures (Km) strengthening to be carried out
NIL

8 TRAFFIC CONTROL DEVICES AND ROAD SAFETY WORKS

8.1 Traffic control devices and road safety works shall be provided in accordance
with Section 9 of the Manual.
8.2 Specifications of the reflective sheeting shall be provided in accordance with
Section 9 of the Manual.
8.3 Details shall be as approved by Authority Engineer.
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km
28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 30
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

8.4 Reflective Traffic Safety Products/Round tree reflectors shall be provided on


tree for easy visibility at night.
8.5 Solar lights blinkers shall be provided at major & minor junctions etc.

9 ROADSIDE FURNITURE

10.1 Roadside furniture shall be provided in accordance with the provisions of


Section 11 of the Manual.

10.2 Overhead traffic signs: The locations are mentioned in below table and the size
shall be evolved based on design of sign boards given in IRC 67.
Location
S. No (Design Type Remark
Chainage)
1 32+400 Overhead Sign gantry
2 32+400 Cantilever overhead sign
3 33+050 Cantilever overhead sign
4 33+150 Cantilever overhead sign
5 34+500 Cantilever overhead sign
6 35+000 Overhead Sign gantry
7 50+000 Overhead Sign gantry
8 50+800 Cantilever overhead sign

9 51+500 Overhead Sign gantry

10 66+100 Overhead Sign gantry

11 67+600 Overhead Sign gantry

Sillod to Bhokardan

12 0+000 Cantilever overhead sign

13 0+500 Overhead Sign gantry

Note: All Traffic Signs for Road Users would be provided as per Manual.
However, the Contractor Shall provide minimum numbers of Cautionary,
Mandatory, Warning and Informatory Traffic Sign Boards as mentioned below:

S. No Location Numbers Size


At Junction, at curves 90 cm Equilateral
1 146
&Built-up Triangle
2 At Junction & Others 104 80X60 cm

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km


28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 31
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

S. No Location Numbers Size


Rectangular
80X60 cm
3 At Village 14
Rectangular
60X45 cm
4 At Junction &Village 158
Rectangular
5 Route Marker Sign At Every 10 Km. 0.9 Sqm
Delineators at Curve
80 – 100 cm High
6 , median openings & 50
above Ground
Structures
7 Hazard Marker 64 As per IRC

Above numbers of traffic signs are indicative and minimum specified. The
actual numbers of traffic signs shall be determined by the Contractor in
accordance with the Manual requirements with approval from the
Authority's Engineer. Any increase in the numbers specified in this Clause of
Schedule B shall not constitute a Change of Scope.

10 COMPULSORY AFFORESTATION
The number of trees which are required to be planted by the Contractor as
compensatory afforestation should be as per Forest Conservation Act, ten times
the number of trees cut as compensatory afforestation shall be as finalized by
the Authority’s Engineer. Plantation of trees shall be as per IRC SP-21-2009.

a) TREE PLANTATION
The Contractor shall work out appropriate plan for planting of trees as per
IRC IRC SP-21-2009 on the surplus land of the right-of way with a view to
beautify the highway and making the environment along the highway
pleasing. The existing trees / plants shall be retained to the extent possible.
The Transplantation of trees shall also be proposed wherever feasible.
Wherever trees are cut down due to shortage of land, trees shall be planted
10 times more than the felled/cut trees.

11 HAZARDOUS LOCATIONS

The safety barriers shall be provided at the hazardous locations as per Clause
7.18 of the Manual (IRC: SP 73-2015). W-Beam metal crash barriers shall
however be provided for a minimum length of 0.210 Km at all hazardous
locations. All hazardous locations shall be finalized in consultation with the
Authority Engineer.

a) W-Beam metal crash barriers:


Design Design
Sr Length
Chainage Chainage TO Side Total Length (m)
No (m)
From Km Km
1 28+00 28+300 300 Both
2 29+640 29+900 260 Both
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km
28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 32
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

3 30+800 30+960 160 Both


4 34+740 34+820 80 Both
5 36+380 36+600 220 Both
6 38+220 38+340 120 Both
7 39+000 39+060 60 Both
8 41+560 41+700 140 Both
9 43+240 43+340 100 Both
10 47+300 47+440 140 Both
11 47+840 48+000 160 Both
12 48+000 48+640 640 Both
13 49+000 49+720 720 Both
14 63+540 63+820 280 Both
15 64+040 64+500 460 Both
Total 3840m
Above length of the W-Beam metal crash barriers is indicative and minimum
specified. The actual length of the W-Beam metal crash barriers shall be
determined by the Contractor in accordance with the Manual requirements
with approval from the Authority's Engineer. Any increase in the length
specified in this Clause of Schedule B shall not constitute a Change of Scope.
12 SPECIAL REQUIREMENT FOR HILL ROADS: - NIL

13 CHANGE OF SCOPE

The lengths of Structures and bridges specified hereinabove are minimum.


The actual lengths as required on the basis of detailed investigations shall be
determined by the Contractor in accordance with the Specifications and
Standards. Any variations in the lengths specified in this Schedule-B shall not
constitute a Change of Scope, save and except any variations in the length
arising out of a Change of Scope expressly undertaken in accordance with the
provisions of Article 13.

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km


28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 33
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

Typical cross sections:-

I) TCS-2 Two Lane with Paved Shoulder Concrete road over 5.5m wide BT road

II) TCS-2 Two Lane with Paved Shoulder Concrete road over 5.5m wide BT road –
Raised Section

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km


28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 34
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

III) TCS-1 - Four Lane with Paved Shoulder Concrete road over 5.50m wide BT road

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km


28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 35
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km


28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 36
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km


28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 37
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km


28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 38
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km


28+000 (Dhad) to km 67+600 (Bhokardan) & Bhokardan (12+500)to Sillod (0+000) to Two lane with paved
shoulders/Four lane Configurations in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis
Contract.
Page 39