Professional Documents
Culture Documents
Culvert on Road B
1 39.500 40/1 Balancing 1 X 2.0M X 3.0M - Road B 17.0 16.000 - Flexible 31.837 NC 3.000 0.570 0.420 28.202 27.782
2 39.800 40/2 Balancing 1 X 2.0M X 3.0M - Road B 21.0 20.000 - Flexible 32.121 NC 3.000 0.620 0.420 28.436 28.016
3 40.193 41/1 Balancing 1 X 2.0M X 2.0M - Road B 14.0 13.000 - Flexible 31.680 3.500 2.000 2.455 0.350 0.380 28.810 28.430
Culvert on Road C
4 39.500 40/1 Balancing 1 X 2.0M X 3.0M - Road C 14.0 13.000 - Flexible 31.595 NC 3.000 0.533 0.420 27.998 27.578
5 39.800 40/2 Balancing 1 X 2.0M X 3.0M - Road C 21.0 20.000 - Flexible 32.455 NC 3.000 0.620 0.420 28.770 28.350
6 40.310 41/1 Balancing 1 X 2.0M X 3.0M - Road C 14.0 13.000 - Flexible 32.157 NC 3.000 0.533 0.420 28.559 28.139
DETAILED CROSS SECTION
PACKAGE-4(36.500KM-43.300KM)
NATIONAL HIGHWAYS AND INFRASTRUCTURE
DEVELOPMENT CORPORATION LIMITED. DETAILED CROSS SECTION DWG. NO. CET/2015/3636/NHIDCL/127 B/FDPR/DCS
NTS 3RD FLOOR, PTI BUILDING, 4-PARLIAMENT STREET,
PACKAGE-4(36.500 KM-43.300KM)
NEW DELHI - 110001
CE TESTING COMPANY PVT. LTD.
Consultancy Services for Feasibility Study and preparation of Detailed ROAD NAME: NH-127 B starting from Srirampur in the Drawn By. Design By. Checked By. Approved By.
R1 MAR,20 CHANGE OF H.F.L 124-A, N.S.C. Bose Road
Project Report for Construction & up-gradation of the newly declared NH-127 B state of Assam to the immediate approach of
proposed bridge over river Brahmaputra near Dhubri. Kolkata - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD. (Assam portion) starting from Srirampur on NH-27(old NH-31 C) at Chainage 0.00
March km to the immediate approach of proposed bridge over river Brahmaputra near
2020 PACKAGE NO: PWD - NH (R) / ABY / 2014 - 15 /02 U.Malik R. Mishra B.Das A.Nayak
REVISIONS Dhubri at chainage 55.700 km to NH standard (4 Lane)
NATIONAL HIGHWAYS AND INFRASTRUCTURE
DEVELOPMENT CORPORATION LIMITED. DETAILED CROSS SECTION DWG. NO. CET/2015/3636/NHIDCL/127 B/FDPR/DCS
NTS 3RD FLOOR, PTI BUILDING, 4-PARLIAMENT STREET,
PACKAGE-4(36.500 KM-43.300KM)
NEW DELHI - 110001
CE TESTING COMPANY PVT. LTD.
Consultancy Services for Feasibility Study and preparation of Detailed ROAD NAME: NH-127 B starting from Srirampur in the Drawn By. Design By. Checked By. Approved By.
R1 MAR,20 CHANGE OF H.F.L 124-A, N.S.C. Bose Road
Project Report for Construction & up-gradation of the newly declared NH-127 B state of Assam to the immediate approach of
proposed bridge over river Brahmaputra near Dhubri. Kolkata - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD. (Assam portion) starting from Srirampur on NH-27(old NH-31 C) at Chainage 0.00
March km to the immediate approach of proposed bridge over river Brahmaputra near
2020 PACKAGE NO: PWD - NH (R) / ABY / 2014 - 15 /02 U.Malik R. Mishra B.Das A.Nayak
REVISIONS Dhubri at chainage 55.700 km to NH standard (4 Lane)
NATIONAL HIGHWAYS AND INFRASTRUCTURE
DEVELOPMENT CORPORATION LIMITED. DETAILED CROSS SECTION DWG. NO. CET/2015/3636/NHIDCL/127 B/FDPR/DCS
NTS 3RD FLOOR, PTI BUILDING, 4-PARLIAMENT STREET,
PACKAGE-4(36.500 KM-43.300KM)
NEW DELHI - 110001
CE TESTING COMPANY PVT. LTD.
Consultancy Services for Feasibility Study and preparation of Detailed ROAD NAME: NH-127 B starting from Srirampur in the Drawn By. Design By. Checked By. Approved By.
R1 MAR,20 CHANGE OF H.F.L 124-A, N.S.C. Bose Road
Project Report for Construction & up-gradation of the newly declared NH-127 B state of Assam to the immediate approach of
proposed bridge over river Brahmaputra near Dhubri. Kolkata - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD. (Assam portion) starting from Srirampur on NH-27(old NH-31 C) at Chainage 0.00
March km to the immediate approach of proposed bridge over river Brahmaputra near
2020 PACKAGE NO: PWD - NH (R) / ABY / 2014 - 15 /02 U.Malik R. Mishra B.Das A.Nayak
REVISIONS Dhubri at chainage 55.700 km to NH standard (4 Lane)
NATIONAL HIGHWAYS AND INFRASTRUCTURE
DEVELOPMENT CORPORATION LIMITED. DETAILED CROSS SECTION DWG. NO. CET/2015/3636/NHIDCL/127 B/FDPR/DCS
NTS 3RD FLOOR, PTI BUILDING, 4-PARLIAMENT STREET,
PACKAGE-4(36.500 KM-43.300KM)
NEW DELHI - 110001
CE TESTING COMPANY PVT. LTD.
Consultancy Services for Feasibility Study and preparation of Detailed ROAD NAME: NH-127 B starting from Srirampur in the Drawn By. Design By. Checked By. Approved By.
R1 MAR,20 CHANGE OF H.F.L 124-A, N.S.C. Bose Road
Project Report for Construction & up-gradation of the newly declared NH-127 B state of Assam to the immediate approach of
proposed bridge over river Brahmaputra near Dhubri. Kolkata - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD. (Assam portion) starting from Srirampur on NH-27(old NH-31 C) at Chainage 0.00
March km to the immediate approach of proposed bridge over river Brahmaputra near
2020 PACKAGE NO: PWD - NH (R) / ABY / 2014 - 15 /02 U.Malik R. Mishra B.Das A.Nayak
REVISIONS Dhubri at chainage 55.700 km to NH standard (4 Lane)
NATIONAL HIGHWAYS AND INFRASTRUCTURE
DEVELOPMENT CORPORATION LIMITED. DETAILED CROSS SECTION DWG. NO. CET/2015/3636/NHIDCL/127 B/FDPR/DCS
NTS 3RD FLOOR, PTI BUILDING, 4-PARLIAMENT STREET,
PACKAGE-4(36.500 KM-43.300KM)
NEW DELHI - 110001
CE TESTING COMPANY PVT. LTD.
Consultancy Services for Feasibility Study and preparation of Detailed ROAD NAME: NH-127 B starting from Srirampur in the Drawn By. Design By. Checked By. Approved By.
R1 MAR,20 CHANGE OF H.F.L 124-A, N.S.C. Bose Road
Project Report for Construction & up-gradation of the newly declared NH-127 B state of Assam to the immediate approach of
proposed bridge over river Brahmaputra near Dhubri. Kolkata - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD. (Assam portion) starting from Srirampur on NH-27(old NH-31 C) at Chainage 0.00
March km to the immediate approach of proposed bridge over river Brahmaputra near
2020 PACKAGE NO: PWD - NH (R) / ABY / 2014 - 15 /02 U.Malik R. Mishra B.Das A.Nayak
REVISIONS Dhubri at chainage 55.700 km to NH standard (4 Lane)
NATIONAL HIGHWAYS AND INFRASTRUCTURE
DEVELOPMENT CORPORATION LIMITED. DETAILED CROSS SECTION DWG. NO. CET/2015/3636/NHIDCL/127 B/FDPR/DCS
NTS 3RD FLOOR, PTI BUILDING, 4-PARLIAMENT STREET,
PACKAGE-4(36.500 KM-43.300KM)
NEW DELHI - 110001
CE TESTING COMPANY PVT. LTD.
Consultancy Services for Feasibility Study and preparation of Detailed ROAD NAME: NH-127 B starting from Srirampur in the Drawn By. Design By. Checked By. Approved By.
R1 MAR,20 CHANGE OF H.F.L 124-A, N.S.C. Bose Road
Project Report for Construction & up-gradation of the newly declared NH-127 B state of Assam to the immediate approach of
proposed bridge over river Brahmaputra near Dhubri. Kolkata - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD. (Assam portion) starting from Srirampur on NH-27(old NH-31 C) at Chainage 0.00
March km to the immediate approach of proposed bridge over river Brahmaputra near
2020 PACKAGE NO: PWD - NH (R) / ABY / 2014 - 15 /02 U.Malik R. Mishra B.Das A.Nayak
REVISIONS Dhubri at chainage 55.700 km to NH standard (4 Lane)
NATIONAL HIGHWAYS AND INFRASTRUCTURE
DEVELOPMENT CORPORATION LIMITED. DETAILED CROSS SECTION DWG. NO. CET/2015/3636/NHIDCL/127 B/FDPR/DCS
NTS 3RD FLOOR, PTI BUILDING, 4-PARLIAMENT STREET,
PACKAGE-4(36.500 KM-43.300KM)
NEW DELHI - 110001
CE TESTING COMPANY PVT. LTD.
Consultancy Services for Feasibility Study and preparation of Detailed ROAD NAME: NH-127 B starting from Srirampur in the Drawn By. Design By. Checked By. Approved By.
R1 MAR,20 CHANGE OF H.F.L 124-A, N.S.C. Bose Road
Project Report for Construction & up-gradation of the newly declared NH-127 B state of Assam to the immediate approach of
proposed bridge over river Brahmaputra near Dhubri. Kolkata - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD. (Assam portion) starting from Srirampur on NH-27(old NH-31 C) at Chainage 0.00
March km to the immediate approach of proposed bridge over river Brahmaputra near
2020 PACKAGE NO: PWD - NH (R) / ABY / 2014 - 15 /02 U.Malik R. Mishra B.Das A.Nayak
REVISIONS Dhubri at chainage 55.700 km to NH standard (4 Lane)
NATIONAL HIGHWAYS AND INFRASTRUCTURE
DEVELOPMENT CORPORATION LIMITED. DETAILED CROSS SECTION DWG. NO. CET/2015/3636/NHIDCL/127 B/FDPR/DCS
NTS 3RD FLOOR, PTI BUILDING, 4-PARLIAMENT STREET,
PACKAGE-4(36.500 KM-43.300KM)
NEW DELHI - 110001
CE TESTING COMPANY PVT. LTD.
Consultancy Services for Feasibility Study and preparation of Detailed ROAD NAME: NH-127 B starting from Srirampur in the Drawn By. Design By. Checked By. Approved By.
R1 MAR,20 CHANGE OF H.F.L 124-A, N.S.C. Bose Road
Project Report for Construction & up-gradation of the newly declared NH-127 B state of Assam to the immediate approach of
proposed bridge over river Brahmaputra near Dhubri. Kolkata - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD. (Assam portion) starting from Srirampur on NH-27(old NH-31 C) at Chainage 0.00
March km to the immediate approach of proposed bridge over river Brahmaputra near
2020 PACKAGE NO: PWD - NH (R) / ABY / 2014 - 15 /02 U.Malik R. Mishra B.Das A.Nayak
REVISIONS Dhubri at chainage 55.700 km to NH standard (4 Lane)
NATIONAL HIGHWAYS AND INFRASTRUCTURE
DEVELOPMENT CORPORATION LIMITED. DETAILED CROSS SECTION DWG. NO. CET/2015/3636/NHIDCL/127 B/FDPR/DCS
NTS 3RD FLOOR, PTI BUILDING, 4-PARLIAMENT STREET,
PACKAGE-4(36.500 KM-43.300KM)
NEW DELHI - 110001
CE TESTING COMPANY PVT. LTD.
Consultancy Services for Feasibility Study and preparation of Detailed ROAD NAME: NH-127 B starting from Srirampur in the Drawn By. Design By. Checked By. Approved By.
R1 MAR,20 CHANGE OF H.F.L 124-A, N.S.C. Bose Road
Project Report for Construction & up-gradation of the newly declared NH-127 B state of Assam to the immediate approach of
proposed bridge over river Brahmaputra near Dhubri. Kolkata - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD. (Assam portion) starting from Srirampur on NH-27(old NH-31 C) at Chainage 0.00
March km to the immediate approach of proposed bridge over river Brahmaputra near
2020 PACKAGE NO: PWD - NH (R) / ABY / 2014 - 15 /02 U.Malik R. Mishra B.Das A.Nayak
REVISIONS Dhubri at chainage 55.700 km to NH standard (4 Lane)
NATIONAL HIGHWAYS AND INFRASTRUCTURE
DEVELOPMENT CORPORATION LIMITED. DETAILED CROSS SECTION DWG. NO. CET/2015/3636/NHIDCL/127 B/FDPR/DCS
NTS 3RD FLOOR, PTI BUILDING, 4-PARLIAMENT STREET,
PACKAGE-4(36.500 KM-43.300KM)
NEW DELHI - 110001
CE TESTING COMPANY PVT. LTD.
Consultancy Services for Feasibility Study and preparation of Detailed ROAD NAME: NH-127 B starting from Srirampur in the Drawn By. Design By. Checked By. Approved By.
R1 MAR,20 CHANGE OF H.F.L 124-A, N.S.C. Bose Road
Project Report for Construction & up-gradation of the newly declared NH-127 B state of Assam to the immediate approach of
proposed bridge over river Brahmaputra near Dhubri. Kolkata - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD. (Assam portion) starting from Srirampur on NH-27(old NH-31 C) at Chainage 0.00
March km to the immediate approach of proposed bridge over river Brahmaputra near
2020 PACKAGE NO: PWD - NH (R) / ABY / 2014 - 15 /02 U.Malik R. Mishra B.Das A.Nayak
REVISIONS Dhubri at chainage 55.700 km to NH standard (4 Lane)
NATIONAL HIGHWAYS AND INFRASTRUCTURE
DEVELOPMENT CORPORATION LIMITED. DETAILED CROSS SECTION DWG. NO. CET/2015/3636/NHIDCL/127 B/FDPR/DCS
NTS 3RD FLOOR, PTI BUILDING, 4-PARLIAMENT STREET,
PACKAGE-4(36.500 KM-43.300KM)
NEW DELHI - 110001
CE TESTING COMPANY PVT. LTD.
Consultancy Services for Feasibility Study and preparation of Detailed ROAD NAME: NH-127 B starting from Srirampur in the Drawn By. Design By. Checked By. Approved By.
R1 MAR,20 CHANGE OF H.F.L 124-A, N.S.C. Bose Road
Project Report for Construction & up-gradation of the newly declared NH-127 B state of Assam to the immediate approach of
proposed bridge over river Brahmaputra near Dhubri. Kolkata - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD. (Assam portion) starting from Srirampur on NH-27(old NH-31 C) at Chainage 0.00
March km to the immediate approach of proposed bridge over river Brahmaputra near
2020 PACKAGE NO: PWD - NH (R) / ABY / 2014 - 15 /02 U.Malik R. Mishra B.Das A.Nayak
REVISIONS Dhubri at chainage 55.700 km to NH standard (4 Lane)
NATIONAL HIGHWAYS AND INFRASTRUCTURE
DEVELOPMENT CORPORATION LIMITED. DETAILED CROSS SECTION DWG. NO. CET/2015/3636/NHIDCL/127 B/FDPR/DCS
NTS 3RD FLOOR, PTI BUILDING, 4-PARLIAMENT STREET,
PACKAGE-4(36.500 KM-43.300KM)
NEW DELHI - 110001
CE TESTING COMPANY PVT. LTD.
Consultancy Services for Feasibility Study and preparation of Detailed ROAD NAME: NH-127 B starting from Srirampur in the Drawn By. Design By. Checked By. Approved By.
R1 MAR,20 CHANGE OF H.F.L 124-A, N.S.C. Bose Road
Project Report for Construction & up-gradation of the newly declared NH-127 B state of Assam to the immediate approach of
proposed bridge over river Brahmaputra near Dhubri. Kolkata - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD. (Assam portion) starting from Srirampur on NH-27(old NH-31 C) at Chainage 0.00
March km to the immediate approach of proposed bridge over river Brahmaputra near
2020 PACKAGE NO: PWD - NH (R) / ABY / 2014 - 15 /02 U.Malik R. Mishra B.Das A.Nayak
REVISIONS Dhubri at chainage 55.700 km to NH standard (4 Lane)
NATIONAL HIGHWAYS AND INFRASTRUCTURE
DEVELOPMENT CORPORATION LIMITED. DETAILED CROSS SECTION DWG. NO. CET/2015/3636/NHIDCL/127 B/FDPR/DCS
NTS 3RD FLOOR, PTI BUILDING, 4-PARLIAMENT STREET,
PACKAGE-4(36.500 KM-43.300KM)
NEW DELHI - 110001
CE TESTING COMPANY PVT. LTD.
Consultancy Services for Feasibility Study and preparation of Detailed ROAD NAME: NH-127 B starting from Srirampur in the Drawn By. Design By. Checked By. Approved By.
R1 MAR,20 CHANGE OF H.F.L 124-A, N.S.C. Bose Road
Project Report for Construction & up-gradation of the newly declared NH-127 B state of Assam to the immediate approach of
proposed bridge over river Brahmaputra near Dhubri. Kolkata - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD. (Assam portion) starting from Srirampur on NH-27(old NH-31 C) at Chainage 0.00
March km to the immediate approach of proposed bridge over river Brahmaputra near
2020 PACKAGE NO: PWD - NH (R) / ABY / 2014 - 15 /02 U.Malik R. Mishra B.Das A.Nayak
REVISIONS Dhubri at chainage 55.700 km to NH standard (4 Lane)
NATIONAL HIGHWAYS AND INFRASTRUCTURE
DEVELOPMENT CORPORATION LIMITED. DETAILED CROSS SECTION DWG. NO. CET/2015/3636/NHIDCL/127 B/FDPR/DCS
NTS 3RD FLOOR, PTI BUILDING, 4-PARLIAMENT STREET,
PACKAGE-4(36.500 KM-43.300KM)
NEW DELHI - 110001
CE TESTING COMPANY PVT. LTD.
Consultancy Services for Feasibility Study and preparation of Detailed ROAD NAME: NH-127 B starting from Srirampur in the Drawn By. Design By. Checked By. Approved By.
R1 MAR,20 CHANGE OF H.F.L 124-A, N.S.C. Bose Road
Project Report for Construction & up-gradation of the newly declared NH-127 B state of Assam to the immediate approach of
proposed bridge over river Brahmaputra near Dhubri. Kolkata - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD. (Assam portion) starting from Srirampur on NH-27(old NH-31 C) at Chainage 0.00
March km to the immediate approach of proposed bridge over river Brahmaputra near
2020 PACKAGE NO: PWD - NH (R) / ABY / 2014 - 15 /02 U.Malik R. Mishra B.Das A.Nayak
REVISIONS Dhubri at chainage 55.700 km to NH standard (4 Lane)
NATIONAL HIGHWAYS AND INFRASTRUCTURE
DEVELOPMENT CORPORATION LIMITED. DETAILED CROSS SECTION DWG. NO. CET/2015/3636/NHIDCL/127 B/FDPR/DCS
NTS 3RD FLOOR, PTI BUILDING, 4-PARLIAMENT STREET,
PACKAGE-4(36.500 KM-43.300KM)
NEW DELHI - 110001
CE TESTING COMPANY PVT. LTD.
Consultancy Services for Feasibility Study and preparation of Detailed ROAD NAME: NH-127 B starting from Srirampur in the Drawn By. Design By. Checked By. Approved By.
R1 MAR,20 CHANGE OF H.F.L 124-A, N.S.C. Bose Road
Project Report for Construction & up-gradation of the newly declared NH-127 B state of Assam to the immediate approach of
proposed bridge over river Brahmaputra near Dhubri. Kolkata - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD. (Assam portion) starting from Srirampur on NH-27(old NH-31 C) at Chainage 0.00
March km to the immediate approach of proposed bridge over river Brahmaputra near
2020 PACKAGE NO: PWD - NH (R) / ABY / 2014 - 15 /02 U.Malik R. Mishra B.Das A.Nayak
REVISIONS Dhubri at chainage 55.700 km to NH standard (4 Lane)
NATIONAL HIGHWAYS AND INFRASTRUCTURE
DEVELOPMENT CORPORATION LIMITED. DETAILED CROSS SECTION DWG. NO. CET/2015/3636/NHIDCL/127 B/FDPR/DCS
NTS 3RD FLOOR, PTI BUILDING, 4-PARLIAMENT STREET,
PACKAGE-4(36.500 KM-43.300KM)
NEW DELHI - 110001
CE TESTING COMPANY PVT. LTD.
Consultancy Services for Feasibility Study and preparation of Detailed ROAD NAME: NH-127 B starting from Srirampur in the Drawn By. Design By. Checked By. Approved By.
R1 MAR,20 CHANGE OF H.F.L 124-A, N.S.C. Bose Road
Project Report for Construction & up-gradation of the newly declared NH-127 B state of Assam to the immediate approach of
proposed bridge over river Brahmaputra near Dhubri. Kolkata - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD. (Assam portion) starting from Srirampur on NH-27(old NH-31 C) at Chainage 0.00
March km to the immediate approach of proposed bridge over river Brahmaputra near
2020 PACKAGE NO: PWD - NH (R) / ABY / 2014 - 15 /02 U.Malik R. Mishra B.Das A.Nayak
REVISIONS Dhubri at chainage 55.700 km to NH standard (4 Lane)
NATIONAL HIGHWAYS AND INFRASTRUCTURE
DEVELOPMENT CORPORATION LIMITED. DETAILED CROSS SECTION DWG. NO. CET/2015/3636/NHIDCL/127 B/FDPR/DCS
NTS 3RD FLOOR, PTI BUILDING, 4-PARLIAMENT STREET,
PACKAGE-4(36.500 KM-43.300KM)
NEW DELHI - 110001
CE TESTING COMPANY PVT. LTD.
Consultancy Services for Feasibility Study and preparation of Detailed ROAD NAME: NH-127 B starting from Srirampur in the Drawn By. Design By. Checked By. Approved By.
R1 MAR,20 CHANGE OF H.F.L 124-A, N.S.C. Bose Road
Project Report for Construction & up-gradation of the newly declared NH-127 B state of Assam to the immediate approach of
proposed bridge over river Brahmaputra near Dhubri. Kolkata - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD. (Assam portion) starting from Srirampur on NH-27(old NH-31 C) at Chainage 0.00
March km to the immediate approach of proposed bridge over river Brahmaputra near
2020 PACKAGE NO: PWD - NH (R) / ABY / 2014 - 15 /02 U.Malik R. Mishra B.Das A.Nayak
REVISIONS Dhubri at chainage 55.700 km to NH standard (4 Lane)
NATIONAL HIGHWAYS AND INFRASTRUCTURE
DEVELOPMENT CORPORATION LIMITED. DETAILED CROSS SECTION DWG. NO. CET/2015/3636/NHIDCL/127 B/FDPR/DCS
NTS 3RD FLOOR, PTI BUILDING, 4-PARLIAMENT STREET,
PACKAGE-4(36.500 KM-43.300KM)
NEW DELHI - 110001
CE TESTING COMPANY PVT. LTD.
Consultancy Services for Feasibility Study and preparation of Detailed ROAD NAME: NH-127 B starting from Srirampur in the Drawn By. Design By. Checked By. Approved By.
R1 MAR,20 CHANGE OF H.F.L 124-A, N.S.C. Bose Road
Project Report for Construction & up-gradation of the newly declared NH-127 B state of Assam to the immediate approach of
proposed bridge over river Brahmaputra near Dhubri. Kolkata - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD. (Assam portion) starting from Srirampur on NH-27(old NH-31 C) at Chainage 0.00
March km to the immediate approach of proposed bridge over river Brahmaputra near
2020 PACKAGE NO: PWD - NH (R) / ABY / 2014 - 15 /02 U.Malik R. Mishra B.Das A.Nayak
REVISIONS Dhubri at chainage 55.700 km to NH standard (4 Lane)
NATIONAL HIGHWAYS AND INFRASTRUCTURE
DEVELOPMENT CORPORATION LIMITED. DETAILED CROSS SECTION DWG. NO. CET/2015/3636/NHIDCL/127 B/FDPR/DCS
NTS 3RD FLOOR, PTI BUILDING, 4-PARLIAMENT STREET,
PACKAGE-4(36.500 KM-43.300KM)
NEW DELHI - 110001
CE TESTING COMPANY PVT. LTD.
Consultancy Services for Feasibility Study and preparation of Detailed ROAD NAME: NH-127 B starting from Srirampur in the Drawn By. Design By. Checked By. Approved By.
R1 MAR,20 CHANGE OF H.F.L 124-A, N.S.C. Bose Road
Project Report for Construction & up-gradation of the newly declared NH-127 B state of Assam to the immediate approach of
proposed bridge over river Brahmaputra near Dhubri. Kolkata - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD. (Assam portion) starting from Srirampur on NH-27(old NH-31 C) at Chainage 0.00
March km to the immediate approach of proposed bridge over river Brahmaputra near
2020 PACKAGE NO: PWD - NH (R) / ABY / 2014 - 15 /02 U.Malik R. Mishra B.Das A.Nayak
REVISIONS Dhubri at chainage 55.700 km to NH standard (4 Lane)
NATIONAL HIGHWAYS AND INFRASTRUCTURE
DEVELOPMENT CORPORATION LIMITED. DETAILED CROSS SECTION DWG. NO. CET/2015/3636/NHIDCL/127 B/FDPR/DCS
NTS 3RD FLOOR, PTI BUILDING, 4-PARLIAMENT STREET,
PACKAGE-4(36.500 KM-43.300KM)
NEW DELHI - 110001
CE TESTING COMPANY PVT. LTD.
Consultancy Services for Feasibility Study and preparation of Detailed ROAD NAME: NH-127 B starting from Srirampur in the Drawn By. Design By. Checked By. Approved By.
R1 MAR,20 CHANGE OF H.F.L 124-A, N.S.C. Bose Road
Project Report for Construction & up-gradation of the newly declared NH-127 B state of Assam to the immediate approach of
proposed bridge over river Brahmaputra near Dhubri. Kolkata - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD. (Assam portion) starting from Srirampur on NH-27(old NH-31 C) at Chainage 0.00
March km to the immediate approach of proposed bridge over river Brahmaputra near
2020 PACKAGE NO: PWD - NH (R) / ABY / 2014 - 15 /02 U.Malik R. Mishra B.Das A.Nayak
REVISIONS Dhubri at chainage 55.700 km to NH standard (4 Lane)