(See Clauses 2.1 & 8.1)
Site for Two-Laning with Paved Shoulders of Project Highway
Dhad to Bhokardan to Sillod
THE SITE
1.1 Site of the Two Lane with Paved Shoulders Project Highway shall include the land,
buildings, structures and road works as described in Annex-I of this Schedule-A.
1.2 The dates of handing over the Right of Way to the Contractor are specified in Annex-II of
this Schedule-A.
1.3 An inventory of the Site including the land, buildings, structures, road works, trees and
any other immovable property on, or attached to, the Site shall be prepared jointly by the
Authority Representative and the Contractor, and such inventory shall form part of the
memorandum referred to in clause 8.2.1 of the Agreement.
1.4 The alignment plans of the Project Highway are specified in Annex-III. In the case of
sections where no modification in the existing alignment of the Project Highway is
contemplated, the alignment plan has not been provided. Alignment plans have only been
given for sections where the existing alignment is proposed to be modified. The proposed
profile of the Project Highway shall be followed by the contractor with minimum FRL as
indicated in the alignment plan. The contractors however, improve/upgrade the Road
Profile as indicated in Annex-III based on site/design requirement.
1.5 The status of the environment clearances obtained or awaited is given in Annex IV.
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 1
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
Annex - I
(Schedule-A)
Site for Two-Laning with Paved Shoulders of Project Highway
1. The Site
1.1 The Site of the Project Highway comprises Package II – Dhad to Bhokardan to Sillod from
existing Km 28+000 (Dhad) to Km 67+600 Bhokardan Town junction Meeting SH 178 at its
Chainage of 12+500 to Km 0+000 Sillod . Carriageway and structures comprising the Site are
described below. Total length 54.5 including existing byepass of Dhad town
1.2 Referencing System
As the State PWD chainages are not convenient to adapt, new chainage referencing system is
adapted from Hatni (0+000) to Bhokardan (67+600), & From Sillod (0+000) to Km Bhokardan
(12+500). It is called the “Existing Chainage”. During topography survey with Total Station,
observations are made to these Km stones and after finalization of alignment by improving the
existing geometry the chainage has been referred to “Design Chainage”. The relationship
between the “Existing Chainage” and the “Design Chainage” as per field surveys of the location
of existing stones using the total station for the “Project Highway” is given below. At
Appendix A-I. The existing length of project road is 39.60 + Existing Bypass of Dhad
2.40km + 12.500Km (Bhokardan –Sillod) and design length of project is 54.50 km.
2. Land
The Site of the Project Highway comprises the land (sum total of land already in
possession and land to be possessed) as described below:
24
2 28+200 28+600 0.400 18m
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 2
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 3
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 4
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 5
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
3. Carriageway
The existing carriageway of the project highway is 5.50 to m wide. The type of the existing
pavement is flexible.
Existing Chainage
Carriageway Width (m) Earthen Shoulders (m)
From To
Dhad to Bhokardan
28+000 32+000 5.50m – 6.0m
32+000 35+500 8-9.0m
35+500 49+800 5.50m – 6.0m
1.0 to 1.5m on either side
49+800 52+700 7.0m to 9.0m
52+700 66+200 5.50m – 6.0m
66+200 67+600 9.0m
Bhokardan to Sillod
11+450 12+500 14
12/500 0+500 7m 1.0 to 1.5m on either side
0+500 0+000 10
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 6
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
Table A – 1
Culverts
Major Minor Slab / Grade
Type HP ROB RUB
Bridges Bridges Box Separator
Culvert
Culvert
Existing
Structure 02 14 14 40 00 00 00
(Nos)
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 7
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
Type of Structure
No. of Spans
Chainage
S. No. with span Width
(km) Foundation Superstructure
length (m) (m)
---------------------------- Nil ------------------------------
Sillod to Bhokardan
3.5
11 2+374 2+374 4 10.5
(2 x 6 + 1
12 2+900 2+900 3 10.8
x 3)
13 10+920 10+920 4 2 8.2
(2 x 2.3
14 12+270 12+270 3 10.8
+1 x 2.4)
Existing Railway
Sr No Level Crossing no Remark
Chainage Chainage
---------------------------- Nil ------------------------------
Design No. of
Exist Ch. TYPE Span
Span Length Width RTL
Ch.
Bhokardan to Sillod
Slab Drain
9 1+020 1 3 6.3 10.50
Slab Drain
10 2+361 1 2 6.3 10.50
Slab Drain
11 2+893 1 3 6.3 10.50
The details of bus Shelters on both side of road and are as follows:
SI.
Chainage (km) Location Side Remark
No.
1 37+060 RHS
2 61+110 RHS
3 58+190 LHS
Bhokardan to Sillod
RHS (Bhokardan to
4 2+810 Pimpri Varud
Sillod)
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 10
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
SI.
Chainage (km) Location Side Remark
No.
Nil
Type of Drain
Existing Chainage (Km)
Existing Design
Sr. No. Side Type Connecting Road
Chainage Chainage
Dhad to Bhokardan
1 29+190
2 29+380 L K L
3 32+315 L Y L
4 32+630 R&L + R&L
5 32+660 R --| R
6 32+690 R --| R
7 32+710 R --| R
8 32+790 R&L R&L
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 11
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 12
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
51 66+900 R --| R
52 67+050 R --| R
SIllod to Bhokardan
53 1/590 1/590 R T R
54 2/860 2/860 R T R
55 3/096 3/096 R T R
56 4/710 4/710 R T R
57 5/015 5/015 L T L
58 5/200 5/200 R T R
59 5/230 5/230 L T L
60 5/240 5/240 R T R
61 5/330 5/330 L T L
62 5/430 5/430 R T R
63 5/440 5/440 L Y L
64 6/120 6/120 R Y R
65 6/150 6/150 L Y L
66 7/380 7/380 R T R
67 7/510 7/510 L Y L
68 7/600 7/600 R Y R
69 7/700 7/700 L Y L
70 8/110 8/110 R Y R
71 8/885 8/885 +
72 9/860 9/860 L Y L
73 9/890 9/890 R Y R
74 11/285 11/285 L T L
75 12/720 12/720 L + Bhokardan Village
76 12/870 12/870 R T Bhokardan Village
77 12/890 12/890 L T Bhokardan Village
78 13/065 13/065 R T Bhokardan Village
79 13/140 13/140 L T Bhokardan Village
80 13/180 13/180 + Bhokardan Village
81 13/280 13/280 Y Bhokardan Village
Dhad to Bhokardan
16. Bypasses: - 1
Carriageway
Name of Chainage
S. Length
bypass (km) From
No. (in Km) Width
(town) km to km Type
(m)
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 13
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
Annex - II
(Schedule-A)
The dates on which the Authority shall provide Right of Way to the Contractor on different
stretches of the Site are stated below:
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 14
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 15
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 16
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 17
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
* The dates specified herein shall in no case be beyond 365 (three hundred and sixty five) days
after the Appointed Date.
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 18
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
Annex - III
(Schedule-A)
Alignment Plans
The existing alignment of the Project Highway shall be modified in the following sections as
per the alignment plan indicated below:
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 19
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
Annex - IV
(Schedule-A)
Environment Clearances
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 20
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
Appendix A- I
Sr. Design
Existing Chainage Remarks
No. Chainage
Dhad to Bhokardan
1 28/000 28/000
2 28/226 28/217
3 28/330 28/320
4 28/496 28/485
5 29/200 29/214
6 29/281 29/269
7 29/667 29/655
8 30/514 30/525
9 31/126 31/115
10 31/800 31/777
11 32/037 32/025
12 33/010 33/000
13 33/152 33/138
14 33/497 33/478
15 33/810 33/768
16 34/190 34/171
17 34/773 34/753
18 35/224 35/205
19 35/750 35/731
20 38/484 38/462
21 39/057 39/035
22 39/174 39/155
23 39/458 39/428
24 40/076 40/050
25 40/104 40/075
26 40/352 40/334
27 40/426 40/390
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 21
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
Sr. Design
Existing Chainage Remarks
No. Chainage
28 40/818 40/785
29 40/850 40/807
30 41/209 41/174
31 41/641 41/605
32 43/347 43/310
33 43/600 43/563
34 44/043 44/050
35 45/195 45/205
36 45/285 45/295
37 46/900 46/862
38 47/214 47/316
39 47/375 47/435
40 48/609 48/665
41 49/626 49/676
42 50/136 50/225
43 50/495 50/430
44 50/820 50/774
45 51/112 51/065
46 51/490 51/444
47 52/465 52/410
48 53/110 53/063
49 54/712 54/665
50 55/500 55/450
51 55/780 55/775
52 56/448 56/400
53 57/300 57/260
54 58/370 58/315
55 60/355 60+305
56 60+555 60+510
57 61/310 61/260
58 61/710 61/895
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 22
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
Sr. Design
Existing Chainage Remarks
No. Chainage
59 61/940 61/895
60 62/163 62/100
61 63/163 63/110
62 63/640 63/590
63 64/425 64/375
64 65/236 65/185
65 65/753 65/700
66 66/652 66/600
.67 67/15 67/160
68 67/365 67/310
Sillod to Bhokardan
69 1+000 1+000
70 2+000 2+000
71 3+000 3+020
72 4+000 4+020
73 5+000 5+020
74 6+000 6+055
75 7+000 7+090
76 8+000 8+110
77 9+000 9+120
78 10+000 10+120
79 11+000 11+120
80 12+000 12+135
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 23
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
Annex - I
(See Clauses 2.1 & 8.1)
Site for Two-Laning with Paved Shoulders of Project Highway
Dhad to Bhokardan to Sillod
THE SITE
1.1 Site of the Two Lane with Paved Shoulders Project Highway shall include the land,
buildings, structures and road works as described in Annex-I of this Schedule-A.
1.2 The dates of handing over the Right of Way to the Contractor are specified in Annex-II of
this Schedule-A.
1.3 An inventory of the Site including the land, buildings, structures, road works, trees and
any other immovable property on, or attached to, the Site shall be prepared jointly by the
Authority Representative and the Contractor, and such inventory shall form part of the
memorandum referred to in clause 8.2.1 of the Agreement.
1.4 The alignment plans of the Project Highway are specified in Annex-III. In the case of
sections where no modification in the existing alignment of the Project Highway is
contemplated, the alignment plan has not been provided. Alignment plans have only been
given for sections where the existing alignment is proposed to be modified. The proposed
profile of the Project Highway shall be followed by the contractor with minimum FRL as
indicated in the alignment plan. The contractors however, improve/upgrade the Road
Profile as indicated in Annex-III based on site/design requirement.
1.5 The status of the environment clearances obtained or awaited is given in Annex IV.
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 1
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
Annex - I
(Schedule-A)
Site for Two-Laning with Paved Shoulders of Project Highway
1. The Site
1.1 The Site of the Project Highway comprises Package II – Dhad to Bhokardan to Sillod from
existing Km 28+000 (Dhad) to Km 67+600 Bhokardan Town junction Meeting SH 178 at its
Chainage of 12+500 to Km 0+000 Sillod . Carriageway and structures comprising the Site are
described below. Total length 54.5 including existing byepass of Dhad town
1.2 Referencing System
As the State PWD chainages are not convenient to adapt, new chainage referencing system is
adapted from Hatni (0+000) to Bhokardan (67+600), & From Sillod (0+000) to Km Bhokardan
(12+500). It is called the “Existing Chainage”. During topography survey with Total Station,
observations are made to these Km stones and after finalization of alignment by improving the
existing geometry the chainage has been referred to “Design Chainage”. The relationship
between the “Existing Chainage” and the “Design Chainage” as per field surveys of the location
of existing stones using the total station for the “Project Highway” is given below. At
Appendix A-I. The existing length of project road is 39.60 + Existing Bypass of Dhad
2.40km + 12.500Km (Bhokardan –Sillod) and design length of project is 54.50 km.
2. Land
The Site of the Project Highway comprises the land (sum total of land already in
possession and land to be possessed) as described below:
24
2 28+200 28+600 0.400 18m
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 2
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 3
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 4
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 5
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
3. Carriageway
The existing carriageway of the project highway is 5.50 to m wide. The type of the existing
pavement is flexible.
Existing Chainage
Carriageway Width (m) Earthen Shoulders (m)
From To
Dhad to Bhokardan
28+000 32+000 5.50m – 6.0m
32+000 35+500 8-9.0m
35+500 49+800 5.50m – 6.0m
1.0 to 1.5m on either side
49+800 52+700 7.0m to 9.0m
52+700 66+200 5.50m – 6.0m
66+200 67+600 9.0m
Bhokardan to Sillod
11+450 12+500 14
12/500 0+500 7m 1.0 to 1.5m on either side
0+500 0+000 10
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 6
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
Table A – 1
Culverts
Major Minor Slab / Grade
Type HP ROB RUB
Bridges Bridges Box Separator
Culvert
Culvert
Existing
Structure 02 14 14 40 00 00 00
(Nos)
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 7
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
Type of Structure
No. of Spans
Chainage
S. No. with span Width
(km) Foundation Superstructure
length (m) (m)
---------------------------- Nil ------------------------------
Sillod to Bhokardan
3.5
11 2+374 2+374 4 10.5
(2 x 6 + 1
12 2+900 2+900 3 10.8
x 3)
13 10+920 10+920 4 2 8.2
(2 x 2.3
14 12+270 12+270 3 10.8
+1 x 2.4)
Existing Railway
Sr No Level Crossing no Remark
Chainage Chainage
---------------------------- Nil ------------------------------
Design No. of
Exist Ch. TYPE Span
Span Length Width RTL
Ch.
Bhokardan to Sillod
Slab Drain
9 1+020 1 3 6.3 10.50
Slab Drain
10 2+361 1 2 6.3 10.50
Slab Drain
11 2+893 1 3 6.3 10.50
The details of bus Shelters on both side of road and are as follows:
SI.
Chainage (km) Location Side Remark
No.
1 37+060 RHS
2 61+110 RHS
3 58+190 LHS
Bhokardan to Sillod
RHS (Bhokardan to
4 2+810 Pimpri Varud
Sillod)
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 10
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
SI.
Chainage (km) Location Side Remark
No.
Nil
Type of Drain
Existing Chainage (Km)
Existing Design
Sr. No. Side Type Connecting Road
Chainage Chainage
Dhad to Bhokardan
1 29+190
2 29+380 L K L
3 32+315 L Y L
4 32+630 R&L + R&L
5 32+660 R --| R
6 32+690 R --| R
7 32+710 R --| R
8 32+790 R&L R&L
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 11
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 12
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
51 66+900 R --| R
52 67+050 R --| R
SIllod to Bhokardan
53 1/590 1/590 R T R
54 2/860 2/860 R T R
55 3/096 3/096 R T R
56 4/710 4/710 R T R
57 5/015 5/015 L T L
58 5/200 5/200 R T R
59 5/230 5/230 L T L
60 5/240 5/240 R T R
61 5/330 5/330 L T L
62 5/430 5/430 R T R
63 5/440 5/440 L Y L
64 6/120 6/120 R Y R
65 6/150 6/150 L Y L
66 7/380 7/380 R T R
67 7/510 7/510 L Y L
68 7/600 7/600 R Y R
69 7/700 7/700 L Y L
70 8/110 8/110 R Y R
71 8/885 8/885 +
72 9/860 9/860 L Y L
73 9/890 9/890 R Y R
74 11/285 11/285 L T L
75 12/720 12/720 L + Bhokardan Village
76 12/870 12/870 R T Bhokardan Village
77 12/890 12/890 L T Bhokardan Village
78 13/065 13/065 R T Bhokardan Village
79 13/140 13/140 L T Bhokardan Village
80 13/180 13/180 + Bhokardan Village
81 13/280 13/280 Y Bhokardan Village
Dhad to Bhokardan
16. Bypasses: - 1
Carriageway
Name of Chainage
S. Length
bypass (km) From
No. (in Km) Width
(town) km to km Type
(m)
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 13
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
Annex - II
(Schedule-A)
The dates on which the Authority shall provide Right of Way to the Contractor on different
stretches of the Site are stated below:
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 14
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 15
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 16
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 17
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
* The dates specified herein shall in no case be beyond 365 (three hundred and sixty five) days
after the Appointed Date.
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 18
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
Annex - III
(Schedule-A)
Alignment Plans
The existing alignment of the Project Highway shall be modified in the following sections as
per the alignment plan indicated below:
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 19
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
Annex - IV
(Schedule-A)
Environment Clearances
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 20
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
Appendix A- I
Sr. Design
Existing Chainage Remarks
No. Chainage
Dhad to Bhokardan
1 28/000 28/000
2 28/226 28/217
3 28/330 28/320
4 28/496 28/485
5 29/200 29/214
6 29/281 29/269
7 29/667 29/655
8 30/514 30/525
9 31/126 31/115
10 31/800 31/777
11 32/037 32/025
12 33/010 33/000
13 33/152 33/138
14 33/497 33/478
15 33/810 33/768
16 34/190 34/171
17 34/773 34/753
18 35/224 35/205
19 35/750 35/731
20 38/484 38/462
21 39/057 39/035
22 39/174 39/155
23 39/458 39/428
24 40/076 40/050
25 40/104 40/075
26 40/352 40/334
27 40/426 40/390
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 21
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
Sr. Design
Existing Chainage Remarks
No. Chainage
28 40/818 40/785
29 40/850 40/807
30 41/209 41/174
31 41/641 41/605
32 43/347 43/310
33 43/600 43/563
34 44/043 44/050
35 45/195 45/205
36 45/285 45/295
37 46/900 46/862
38 47/214 47/316
39 47/375 47/435
40 48/609 48/665
41 49/626 49/676
42 50/136 50/225
43 50/495 50/430
44 50/820 50/774
45 51/112 51/065
46 51/490 51/444
47 52/465 52/410
48 53/110 53/063
49 54/712 54/665
50 55/500 55/450
51 55/780 55/775
52 56/448 56/400
53 57/300 57/260
54 58/370 58/315
55 60/355 60+305
56 60+555 60+510
57 61/310 61/260
58 61/710 61/895
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 22
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2
Sr. Design
Existing Chainage Remarks
No. Chainage
59 61/940 61/895
60 62/163 62/100
61 63/163 63/110
62 63/640 63/590
63 64/425 64/375
64 65/236 65/185
65 65/753 65/700
66 66/652 66/600
.67 67/15 67/160
68 67/365 67/310
Sillod to Bhokardan
69 1+000 1+000
70 2+000 2+000
71 3+000 3+020
72 4+000 4+020
73 5+000 5+020
74 6+000 6+055
75 7+000 7+090
76 8+000 8+110
77 9+000 9+120
78 10+000 10+120
79 11+000 11+120
80 12+000 12+135
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 23