MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

Annex - I
(See Clauses 2.1 & 8.1)
Site for Two-Laning with Paved Shoulders of Project Highway
Dhad to Bhokardan to Sillod

THE SITE
1.1 Site of the Two Lane with Paved Shoulders Project Highway shall include the land,
buildings, structures and road works as described in Annex-I of this Schedule-A.

1.2 The dates of handing over the Right of Way to the Contractor are specified in Annex-II of
this Schedule-A.

1.3 An inventory of the Site including the land, buildings, structures, road works, trees and
any other immovable property on, or attached to, the Site shall be prepared jointly by the
Authority Representative and the Contractor, and such inventory shall form part of the
memorandum referred to in clause 8.2.1 of the Agreement.

1.4 The alignment plans of the Project Highway are specified in Annex-III. In the case of
sections where no modification in the existing alignment of the Project Highway is
contemplated, the alignment plan has not been provided. Alignment plans have only been
given for sections where the existing alignment is proposed to be modified. The proposed
profile of the Project Highway shall be followed by the contractor with minimum FRL as
indicated in the alignment plan. The contractors however, improve/upgrade the Road
Profile as indicated in Annex-III based on site/design requirement.

1.5 The status of the environment clearances obtained or awaited is given in Annex IV.

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 1
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

Annex - I

(Schedule-A)
Site for Two-Laning with Paved Shoulders of Project Highway

1. The Site
1.1 The Site of the Project Highway comprises Package II – Dhad to Bhokardan to Sillod from
existing Km 28+000 (Dhad) to Km 67+600 Bhokardan Town junction Meeting SH 178 at its
Chainage of 12+500 to Km 0+000 Sillod . Carriageway and structures comprising the Site are
described below. Total length 54.5 including existing byepass of Dhad town
1.2 Referencing System
As the State PWD chainages are not convenient to adapt, new chainage referencing system is
adapted from Hatni (0+000) to Bhokardan (67+600), & From Sillod (0+000) to Km Bhokardan
(12+500). It is called the “Existing Chainage”. During topography survey with Total Station,
observations are made to these Km stones and after finalization of alignment by improving the
existing geometry the chainage has been referred to “Design Chainage”. The relationship
between the “Existing Chainage” and the “Design Chainage” as per field surveys of the location
of existing stones using the total station for the “Project Highway” is given below. At
Appendix A-I. The existing length of project road is 39.60 + Existing Bypass of Dhad
2.40km + 12.500Km (Bhokardan –Sillod) and design length of project is 54.50 km.
2. Land
The Site of the Project Highway comprises the land (sum total of land already in
possession and land to be possessed) as described below:

Design Chainage Design


Sl. Existing Date of Providing Right of
From To Length Proposed
No ROW (m) Way
(km) (Km) (Km) ROW (M)
Packge : 2 – Section 2 - Dhad(28+00) to Bhokardan(67+600) &
Section 1- Bhokardan (12+500) to Sillod(0+000)

Chainages of Section 2 –Dhad (28+000) to Bhokardan (67+600)

1 28+000 28+200 0.200 25m

24
2 28+200 28+600 0.400 18m

Existing ROW will be provided


3 28+600 28+900 0.300 14m 24
immediately on award of work

4 28+900 29+100 0.200 26m 24

5 29+100 29+800 0.700 20m 24

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 2
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

Design Chainage Design


Sl. Existing Date of Providing Right of
From To Length Proposed
No ROW (m) Way
(km) (Km) (Km) ROW (M)

6 29+800 30+400 0.600 14m 24

7 30/400 30/900 0.50 22.00 24

8 30/900 31/200 0.30 20.00 24

9 31/200 32/000 0.80 24.00 24

10 32/000 32/500 0.50 20.00 24

11 32/500 33/200 0.70 22.00 24

12 33/200 33/900 0.70 27.00 24

13 33/900 34/400 0.50 24.00 24

14 34/400 35/000 0.60 20.00 24

15 35/000 35/500 0.50 18.00 24

16 35/500 36/000 0.50 20.00 24

17 36/000 36/600 0.60 17.00 24

18 36/600 36/900 0.30 15.00 24

19 36/900 37/300 0.40 19.00 24

20 37/300 37/600 0.30 21.00 24

21 37/600 38/000 0.40 17.00 24

22 38/000 38/700 0.70 24.00 24

23 38/700 39/000 0.30 23.00 24

24 39/000 39/300 0.30 21.00 24

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 3
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

Design Chainage Design


Sl. Existing Date of Providing Right of
From To Length Proposed
No ROW (m) Way
(km) (Km) (Km) ROW (M)

25 39/300 39/700 0.40 16.00 24

26 39/700 40/400 0.70 17.00 24

27 40/400 41/200 0.70 29.00 24

28 41/200 41/500 0.30 22.00 24

29 41/500 41/700 0.20 14.00 24

30 41/700 42/600 0.90 19.00 24

31 42/600 43/200 0.60 18.00 24

32 43/200 43/800 0.60 10.00 24

33 43/800 44/300 0.50 10.00 24

34 44/300 44/700 0.40 9.00 24

35 44/700 45/400 0.70 18.00 24

36 45/400 45/800 0.30 13.00 24

37 45/800 47/100 1.30 24.00 24

38 47/100 47/700 0.60 24.00 24

39 47/700 48/500 0.80 21.00 24

40 48/500 48/700 0.20 10.00 24

41 48/700 49/600 0.90 18.00 24

42 49/600 50/300 0.70 19.00 24

43 50/300 50/600 0.30 17.00 24

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 4
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

Design Chainage Design


Sl. Existing Date of Providing Right of
From To Length Proposed
No ROW (m) Way
(km) (Km) (Km) ROW (M)

44 50/600 50/900 0.30 16.00 24

45 50/900 51/400 0.50 24.00 24

46 51/400 52/000 0.60 22.00 24

47 52/000 52/400 0.40 24.00

48 52/400 53/300 0.90 24.00

49 53/300 54/100 0.80 24.00

50 54/100 55/300 1.20 24.00

51 55/300 56/100 0.80 24.00

52 56/100 57/400 1.30 24.00

53 57/400 58/200 0.80 24.00

54 58/200 59/000 0.80 24.00

55 59/000 59/800 0.80 24.00

56 59/800 61/300 0.50 24.00

57 61/300 61/900 0.60 24.00

58 61/900 62/200 0.30 18.00 24

59 62/200 62/900 0.70 18.00 24

60 62/900 63/100 0.20 24.00

61 63/100 63/500 0.40 24.00

62 63/500 64/300 0.80 25.00

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 5
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

Design Chainage Design


Sl. Existing Date of Providing Right of
From To Length Proposed
No ROW (m) Way
(km) (Km) (Km) ROW (M)

63 64/300 64/700 0.40 19.00 24

64 64/700 65/100 0.40 21.00 24

65 65/100 65/500 0.40 24.00

66 65/500 66/200 0.70 24.00

67 66/200 66/800 0.60 24.00

68 66/800 67/200 0.40 24.00

69 67/200 67/400 0.20 25.00

Chainages of Section 2 - Bhokardan (13+450) to Sillod (0+000)

70 0+000 12.500 20 24 Bhokardan-Sillod


12+500
Existing
55.45Km 24
Length

3. Carriageway
The existing carriageway of the project highway is 5.50 to m wide. The type of the existing
pavement is flexible.

Existing Chainage
Carriageway Width (m) Earthen Shoulders (m)
From To
Dhad to Bhokardan
28+000 32+000 5.50m – 6.0m
32+000 35+500 8-9.0m
35+500 49+800 5.50m – 6.0m
1.0 to 1.5m on either side
49+800 52+700 7.0m to 9.0m
52+700 66+200 5.50m – 6.0m
66+200 67+600 9.0m
Bhokardan to Sillod
11+450 12+500 14
12/500 0+500 7m 1.0 to 1.5m on either side
0+500 0+000 10

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 6
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

4. Cross Drainage Structures


The Project Highway site (Package 2) includes 2 Major Bridge, 11 Minor Bridges, 8 Slab
culverts, 40 Hume Pipe culverts, and 0 RUB along the existing alignment of the project
road. The detail of existing Major, Minor Bridges and existing Slab/Box & Pipe Culverts are
shown in Table A-1

Table A – 1
Culverts
Major Minor Slab / Grade
Type HP ROB RUB
Bridges Bridges Box Separator
Culvert
Culvert
Existing
Structure 02 14 14 40 00 00 00
(Nos)

4.1 Major Bridges: -


The Site includes the following Major Bridges:
Type of structure No. of
Overall
Sr. Existing Spans
Width
No. Chainage Type of Super x
Sub Structure ( m)
Foundation Structure length
RCC Solid 6 x 16m
1 39+015 Open 8.20
PCC Abutment Slab = 96.3m
Foundation
& Pier RCC Solid Slab 7 x 7.6m 7.50
2 67+300 = 53.6

5. Road over-bridges (ROB): NIL


The site includes following ROB (road over railway line)

Type of Structure No. of Spans


Existing Total Width
S. No Sub Super with Span
Chainage Foundation (m) ROB
Structure Structure Length (m)
-----NIL-----

5.1 Road under-bridges (RUB): NIL.


The site includes following RUB (road under railway line)
Existing Type of Structure No. of Spans
S. Total Width
Chainage Sub Super with Span
No Foundation (m) RUB
(km) Structure Structure Length (m)
-----NIL-----

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 7
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

6. Grade separators: - Nil

Type of Structure
No. of Spans
Chainage
S. No. with span Width
(km) Foundation Superstructure
length (m) (m)
---------------------------- Nil ------------------------------

7. Minor Bridges: - 14 Nos.


The Site includes the following Minor Bridges:
DHAD to BHOKARDAN
Existing Design No. of Type
Span Length RTL
Ch. Ch. Span
Open
1 29+665 29+690 3 5 15.2 594.63
Foundation
2 31+105 31+105 1 6 7
RCC Solid
Slab
3 41+190 41+180 2 6 14

4 32+030 32+060 5 2.1*2 + 3*3 14 577.57

5 52+450 52+450 5 9.5 47.8

6 53+100 53+180 2 4.7 10 564.94

7 55+780 55+905 2 3.5 7.5 568.75

8 56+440 56+580 2 6.6 13.6 566.21

9 57+290 57+440 3 14.5 44 562.7

10 65+745 65+925 3 4.5 14.2 582.38

Sillod to Bhokardan
3.5
11 2+374 2+374 4 10.5

(2 x 6 + 1
12 2+900 2+900 3 10.8
x 3)
13 10+920 10+920 4 2 8.2
(2 x 2.3
14 12+270 12+270 3 10.8
+1 x 2.4)

8. Railway level crossings


The Site includes the following Railway level crossings:
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 8
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

Existing Railway
Sr No Level Crossing no Remark
Chainage Chainage
---------------------------- Nil ------------------------------

9. Underpasses (vehicular, non-vehicular):- NIL


Chainage Type of No. of Spans with
Sr. No. Width (m)
(km) Structure span length (m)
--- Nil ---
10. Culverts:-40 Nos
(a) HP Culverts The Site includes the following Culverts:-

Sr Existing Outer Chainage


No width (m)
Dhad to Bhokardan
1 1 row x 0.9 m dia. 11.45 28/230
2 1 row x 0.9 m dia. 10.0 28/335
3 1 row x 0.9 m dia. 11.3 28/490
4 2 row x 0.6 m dia 7.15 29/285
5 4 row x 1.2 m dia. 17.8 30/555
6 2 row x 1.2 m dia. 9.60 34/770
7 1 row x 1.2 m dia. 9.12 35/220
8 1 row x 1.2 m dia. 10.00 35/465
9 2 row x 1.2 m dia. 8.30 35/750
10 2 row x 1.2 m dia. 6.80 38/340
11 2 row x 1.2 m dia. 10.30 38/485
12 2 row x 1.2 m dia. 6.20 40/425
13 2 row x 0.8 m dia. 9.35 40/840
14 5 row x 1.2 m dia. 8.45 41/205
15 1 row x 1.0 m dia. 9.25 41/645
16 3 row x 0.9 m dia. 7.50 43/345
17 2 row x 0.9 m dia. 9.75 43/600
18 5 row x 1.0 m dia. 8.20 44/060
19 2 row x 1.0 m dia. 8.20 45/190
20 2 row x 1.0 m dia. 8.20 46/900
21 3 row x 0.9 m dia. 8.20 47/210
22 1 row x 0.9 m dia. 8.10 47/355
23 2 row x 0.9 m dia. 12.50 48/612
24 2 row x 0.9 m dia. 12.50 49/620
25 2 row x 0.9 m dia. 12.50 50/135
26 2 row x 0.9 m dia. 12.50 50/495
27 2 row x 0.9 m dia. 12.50 51/110
28 2 row x 0.9 m dia. 8.50 51/485
29 2 row x 0.9 m dia. 12.50 54/710
30 2 row x 0.9 m dia. 12.50 55/500
31 2 row x 0.9 m dia. 12.00 60/350
32 2 row x 0.9 m dia. 12.00 61/305
33 2 row x 0.9 m dia. 12.00 61/700
34 2 row x 0.9 m dia. 12.00 61/935
Bhokardan(13+450) to Sillod(0+000)
35 1 row x 0.7 m dia. 11.2 0/000
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 9
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

36 6 row x 1.2 m dia. 11.2 1/020


37 1 row x 0.8 m dia. 12.5 1/880
38 1 row x 1.0 m dia. 12.3 5/550
39 1 row x 1.5 m dia. 11.2 5/846
40 1 row x 1.0 m dia. 1.1 6/952

(b) Slab Drain/Box Culverts: 14 Nos

Design No. of
Exist Ch. TYPE Span
Span Length Width RTL
Ch.

1 31+120 31+150 Slab Drain 1 6 7.7 8 585.35

2 33+500 33+570 Slab Drain 1 6 7.6 13.6 572.24

3 34+190 34+230 Slab Drain 1 6 18.5 10.8 572.83

4 55+450 55+450 Slab Drain 1 6 17.5 10.8 573.73

5 63+160 63+340 Box Culvert 1 6 7 8.6 589.35

6 63+642 63+813 Box Culvert 1 4.7 5 8 589.85

7 64+425 64+600 Box Culvert 1 3.6 4.1 8.15 588.25

8 65+230 65+410 Box Culvert 1 7 11.5 8 582.77

Bhokardan to Sillod
Slab Drain
9 1+020 1 3 6.3 10.50
Slab Drain
10 2+361 1 2 6.3 10.50
Slab Drain
11 2+893 1 3 6.3 10.50

12 3+080 3+080 Slab Drain 1 3 6.3 10.50


Slab Drain
13 10+886 1 3 6.3 10.50
Slab Drain
14 12+268 1 3 6.3 10.50

11. Bus Bays/Bus Shelters: - 04 Nos

The details of bus Shelters on both side of road and are as follows:

SI.
Chainage (km) Location Side Remark
No.
1 37+060 RHS
2 61+110 RHS
3 58+190 LHS
Bhokardan to Sillod
RHS (Bhokardan to
4 2+810 Pimpri Varud
Sillod)
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 10
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

12. Truck Lay byes: - Nil

SI.
Chainage (km) Location Side Remark
No.
Nil

13. Road side drains

The details of the roadside drains are as follows:

Type of Drain
Existing Chainage (Km)

Built up sections are available in habitated area.


Open Drains are in poor condition all over the length

14. Major junctions: - 6 Nos.

The details of the Major junctions are as follows:

Existing Design Category of


Sr. No. Side Type
Chainage Chainage Cross Road
1 32+400 Left Y
2 33+050 Left Y
3 33+150
4 34+500
5 50+800
Bhokardan to Sillod
6 13+450 T
(NH: National Highway, SH: State Highway, MDR: Major District Road)

15. Minor junctions: - 81 Nos.

The details of the Minor junctions are as below:

Existing Design
Sr. No. Side Type Connecting Road
Chainage Chainage
Dhad to Bhokardan
1 29+190
2 29+380 L K L
3 32+315 L Y L
4 32+630 R&L + R&L
5 32+660 R --| R
6 32+690 R --| R
7 32+710 R --| R
8 32+790 R&L R&L

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 11
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

9 32+850 R&L + R&L


10 32+900 L |-- L
11 32+930 R&L + R&L
12 32+980 L |-- L
13 33+270 L |-- L
14 33+320 L |-- L
15 33+705 L |-- L
16 33+740 L |-- L
17 34+290 R&L + R&L
18 35+010 R --| R
19 35+290 R --| R
20 35+690 R --| R
21 35+730 R --| R
22 36+225 L |-- L
23 36+660 R --| R
24 37+030 R /| R
25 37+670 L |\ L
26 39+230 L |/ L
27 40+100 R&L R&L
28 40+350 L |\ L
29 42+830 L |/ L
30 44+270 R --| R
31 46+130 R&L + R&L
32 48+710 R&L + R&L
33 50+580 L |-- L
34 50+050 R --| R
35 52+780 L |-- L
36 52+920 R --| R
37 54+720 L |-- L
38 54+900 R --| R
39 57+250 R --| R
40 57+680 L |-- L
41 57+930 R --| R
42 58+180 L |-- L
43 58+630 L |-- L
44 61+110 L |-- L
45 62+190 R --| R
46 62+400 L |-- L
47 66+150 R --| R
48 66+580 R --| R
49 66+610 R --| R
50 66+850 L |-- L

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 12
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

51 66+900 R --| R
52 67+050 R --| R
SIllod to Bhokardan
53 1/590 1/590 R T R
54 2/860 2/860 R T R
55 3/096 3/096 R T R
56 4/710 4/710 R T R
57 5/015 5/015 L T L
58 5/200 5/200 R T R
59 5/230 5/230 L T L
60 5/240 5/240 R T R
61 5/330 5/330 L T L
62 5/430 5/430 R T R
63 5/440 5/440 L Y L
64 6/120 6/120 R Y R
65 6/150 6/150 L Y L
66 7/380 7/380 R T R

67 7/510 7/510 L Y L

68 7/600 7/600 R Y R
69 7/700 7/700 L Y L
70 8/110 8/110 R Y R
71 8/885 8/885 +
72 9/860 9/860 L Y L
73 9/890 9/890 R Y R
74 11/285 11/285 L T L
75 12/720 12/720 L + Bhokardan Village
76 12/870 12/870 R T Bhokardan Village
77 12/890 12/890 L T Bhokardan Village
78 13/065 13/065 R T Bhokardan Village
79 13/140 13/140 L T Bhokardan Village
80 13/180 13/180 + Bhokardan Village
81 13/280 13/280 Y Bhokardan Village

Dhad to Bhokardan

16. Bypasses: - 1

The details of the bypasses are as follows:

Carriageway
Name of Chainage
S. Length
bypass (km) From
No. (in Km) Width
(town) km to km Type
(m)

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 13
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

Dhad Bypass Existing 2 Lane


/ Upgradation 32+400 to 5.50/Pro with
1 2.4
of Existing 34+500 posed Paved
Bypass 10.00m shoulder

17. Other structures: - NIL

Annex - II
(Schedule-A)

Dates for providing Right of Way

The dates on which the Authority shall provide Right of Way to the Contractor on different
stretches of the Site are stated below:

Design Chainage Design


Sl. Existing Date of Providing Right of
From To Length Proposed
No ROW (m) Way
(km) (Km) (Km) ROW (M)
Packge : 2 – Section 2 - Dhad(28+00) to Bhokardan(67+600) &
Section 1- Bhokardan (12+500) to Sillod(0+000)

Chainages of Section 2 –Dhad (28+000) to Bhokardan (67+600)

1 28+000 28+200 0.200 25m


Existing ROW will be provided
24 immediately on award of work
2 28+200 28+600 0.400 18m

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 14
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

Design Chainage Design


Sl. Existing Date of Providing Right of
From To Length Proposed
No ROW (m) Way
(km) (Km) (Km) ROW (M)

3 28+600 28+900 0.300 14m 24

4 28+900 29+100 0.200 26m 24

5 29+100 29+800 0.700 20m 24

6 29+800 30+400 0.600 14m 24

7 30/400 30/900 0.50 22.00 24

8 30/900 31/200 0.30 20.00 24

9 31/200 32/000 0.80 24.00 24

10 32/000 32/500 0.50 20.00 24

11 32/500 33/200 0.70 22.00 24

12 33/200 33/900 0.70 27.00 24

13 33/900 34/400 0.50 24.00 24

14 34/400 35/000 0.60 20.00 24

15 35/000 35/500 0.50 18.00 24

16 35/500 36/000 0.50 20.00 24

17 36/000 36/600 0.60 17.00 24

18 36/600 36/900 0.30 15.00 24

19 36/900 37/300 0.40 19.00 24

20 37/300 37/600 0.30 21.00 24

21 37/600 38/000 0.40 17.00 24

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 15
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

Design Chainage Design


Sl. Existing Date of Providing Right of
From To Length Proposed
No ROW (m) Way
(km) (Km) (Km) ROW (M)

22 38/000 38/700 0.70 24.00 24

23 38/700 39/000 0.30 23.00 24

24 39/000 39/300 0.30 21.00 24

25 39/300 39/700 0.40 16.00 24

26 39/700 40/400 0.70 17.00 24

27 40/400 41/200 0.70 29.00 24

28 41/200 41/500 0.30 22.00 24

29 41/500 41/700 0.20 14.00 24

30 41/700 42/600 0.90 19.00 24

31 42/600 43/200 0.60 18.00 24

32 43/200 43/800 0.60 10.00 24

33 43/800 44/300 0.50 10.00 24

34 44/300 44/700 0.40 9.00 24

35 44/700 45/400 0.70 18.00 24

36 45/400 45/800 0.30 13.00 24

37 45/800 47/100 1.30 24.00 24

38 47/100 47/700 0.60 24.00 24

39 47/700 48/500 0.80 21.00 24

40 48/500 48/700 0.20 10.00 24

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 16
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

Design Chainage Design


Sl. Existing Date of Providing Right of
From To Length Proposed
No ROW (m) Way
(km) (Km) (Km) ROW (M)

41 48/700 49/600 0.90 18.00 24

42 49/600 50/300 0.70 19.00 24

43 50/300 50/600 0.30 17.00 24

44 50/600 50/900 0.30 16.00 24

45 50/900 51/400 0.50 24.00 24

46 51/400 52/000 0.60 22.00 24

47 52/000 52/400 0.40 24.00

48 52/400 53/300 0.90 24.00

49 53/300 54/100 0.80 24.00

50 54/100 55/300 1.20 24.00

51 55/300 56/100 0.80 24.00

52 56/100 57/400 1.30 24.00

53 57/400 58/200 0.80 24.00

54 58/200 59/000 0.80 24.00

55 59/000 59/800 0.80 24.00

56 59/800 61/300 0.50 24.00

57 61/300 61/900 0.60 24.00

58 61/900 62/200 0.30 18.00 24

59 62/200 62/900 0.70 18.00 24

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 17
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

Design Chainage Design


Sl. Existing Date of Providing Right of
From To Length Proposed
No ROW (m) Way
(km) (Km) (Km) ROW (M)

60 62/900 63/100 0.20 24.00

61 63/100 63/500 0.40 24.00

62 63/500 64/300 0.80 25.00

63 64/300 64/700 0.40 19.00 24

64 64/700 65/100 0.40 21.00 24

65 65/100 65/500 0.40 24.00

66 65/500 66/200 0.70 24.00

67 66/200 66/800 0.60 24.00

68 66/800 67/200 0.40 24.00

69 67/200 67/400 0.20 25.00

Chainages of Section 2 - Bhokardan (13+450) to Sillod (0+000)

70 0+000 12.500 20 24 Bhokardan-Sillod


12+500
Existing
55.45Km 24
Length

* The dates specified herein shall in no case be beyond 365 (three hundred and sixty five) days
after the Appointed Date.

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 18
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

Annex - III
(Schedule-A)

Alignment Plans

The existing alignment of the Project Highway shall be modified in the following sections as
per the alignment plan indicated below:

Plan & profile is enclosed in digital form in a CD.

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 19
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

Annex - IV
(Schedule-A)

Environment Clearances

The following environment clearances have been obtained:


Environmental Clearance is not required as per new Notification of MoEF dated 22/08/2013.

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 20
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

Appendix A- I

DESIGN CHAINAGE CORRESPONDING TO EXISTING CHAINAGE

Sr. Design
Existing Chainage Remarks
No. Chainage
Dhad to Bhokardan
1 28/000 28/000
2 28/226 28/217
3 28/330 28/320
4 28/496 28/485
5 29/200 29/214
6 29/281 29/269
7 29/667 29/655
8 30/514 30/525
9 31/126 31/115
10 31/800 31/777
11 32/037 32/025
12 33/010 33/000
13 33/152 33/138
14 33/497 33/478
15 33/810 33/768
16 34/190 34/171
17 34/773 34/753
18 35/224 35/205
19 35/750 35/731
20 38/484 38/462
21 39/057 39/035
22 39/174 39/155
23 39/458 39/428
24 40/076 40/050
25 40/104 40/075
26 40/352 40/334
27 40/426 40/390

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 21
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

Sr. Design
Existing Chainage Remarks
No. Chainage
28 40/818 40/785
29 40/850 40/807
30 41/209 41/174
31 41/641 41/605
32 43/347 43/310
33 43/600 43/563
34 44/043 44/050
35 45/195 45/205
36 45/285 45/295
37 46/900 46/862
38 47/214 47/316
39 47/375 47/435
40 48/609 48/665
41 49/626 49/676
42 50/136 50/225
43 50/495 50/430
44 50/820 50/774
45 51/112 51/065
46 51/490 51/444
47 52/465 52/410
48 53/110 53/063
49 54/712 54/665
50 55/500 55/450
51 55/780 55/775
52 56/448 56/400
53 57/300 57/260
54 58/370 58/315
55 60/355 60+305
56 60+555 60+510
57 61/310 61/260
58 61/710 61/895
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 22
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

Sr. Design
Existing Chainage Remarks
No. Chainage
59 61/940 61/895
60 62/163 62/100
61 63/163 63/110
62 63/640 63/590
63 64/425 64/375
64 65/236 65/185
65 65/753 65/700
66 66/652 66/600
.67 67/15 67/160
68 67/365 67/310
Sillod to Bhokardan
69 1+000 1+000

70 2+000 2+000
71 3+000 3+020
72 4+000 4+020

73 5+000 5+020

74 6+000 6+055
75 7+000 7+090
76 8+000 8+110

77 9+000 9+120
78 10+000 10+120
79 11+000 11+120

80 12+000 12+135

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 23
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

Annex - I
(See Clauses 2.1 & 8.1)
Site for Two-Laning with Paved Shoulders of Project Highway
Dhad to Bhokardan to Sillod

THE SITE
1.1 Site of the Two Lane with Paved Shoulders Project Highway shall include the land,
buildings, structures and road works as described in Annex-I of this Schedule-A.

1.2 The dates of handing over the Right of Way to the Contractor are specified in Annex-II of
this Schedule-A.

1.3 An inventory of the Site including the land, buildings, structures, road works, trees and
any other immovable property on, or attached to, the Site shall be prepared jointly by the
Authority Representative and the Contractor, and such inventory shall form part of the
memorandum referred to in clause 8.2.1 of the Agreement.

1.4 The alignment plans of the Project Highway are specified in Annex-III. In the case of
sections where no modification in the existing alignment of the Project Highway is
contemplated, the alignment plan has not been provided. Alignment plans have only been
given for sections where the existing alignment is proposed to be modified. The proposed
profile of the Project Highway shall be followed by the contractor with minimum FRL as
indicated in the alignment plan. The contractors however, improve/upgrade the Road
Profile as indicated in Annex-III based on site/design requirement.

1.5 The status of the environment clearances obtained or awaited is given in Annex IV.

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 1
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

Annex - I

(Schedule-A)
Site for Two-Laning with Paved Shoulders of Project Highway

1. The Site
1.1 The Site of the Project Highway comprises Package II – Dhad to Bhokardan to Sillod from
existing Km 28+000 (Dhad) to Km 67+600 Bhokardan Town junction Meeting SH 178 at its
Chainage of 12+500 to Km 0+000 Sillod . Carriageway and structures comprising the Site are
described below. Total length 54.5 including existing byepass of Dhad town
1.2 Referencing System
As the State PWD chainages are not convenient to adapt, new chainage referencing system is
adapted from Hatni (0+000) to Bhokardan (67+600), & From Sillod (0+000) to Km Bhokardan
(12+500). It is called the “Existing Chainage”. During topography survey with Total Station,
observations are made to these Km stones and after finalization of alignment by improving the
existing geometry the chainage has been referred to “Design Chainage”. The relationship
between the “Existing Chainage” and the “Design Chainage” as per field surveys of the location
of existing stones using the total station for the “Project Highway” is given below. At
Appendix A-I. The existing length of project road is 39.60 + Existing Bypass of Dhad
2.40km + 12.500Km (Bhokardan –Sillod) and design length of project is 54.50 km.
2. Land
The Site of the Project Highway comprises the land (sum total of land already in
possession and land to be possessed) as described below:

Design Chainage Design


Sl. Existing Date of Providing Right of
From To Length Proposed
No ROW (m) Way
(km) (Km) (Km) ROW (M)
Packge : 2 – Section 2 - Dhad(28+00) to Bhokardan(67+600) &
Section 1- Bhokardan (12+500) to Sillod(0+000)

Chainages of Section 2 –Dhad (28+000) to Bhokardan (67+600)

1 28+000 28+200 0.200 25m

24
2 28+200 28+600 0.400 18m

Existing ROW will be provided


3 28+600 28+900 0.300 14m 24
immediately on award of work

4 28+900 29+100 0.200 26m 24

5 29+100 29+800 0.700 20m 24

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 2
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

Design Chainage Design


Sl. Existing Date of Providing Right of
From To Length Proposed
No ROW (m) Way
(km) (Km) (Km) ROW (M)

6 29+800 30+400 0.600 14m 24

7 30/400 30/900 0.50 22.00 24

8 30/900 31/200 0.30 20.00 24

9 31/200 32/000 0.80 24.00 24

10 32/000 32/500 0.50 20.00 24

11 32/500 33/200 0.70 22.00 24

12 33/200 33/900 0.70 27.00 24

13 33/900 34/400 0.50 24.00 24

14 34/400 35/000 0.60 20.00 24

15 35/000 35/500 0.50 18.00 24

16 35/500 36/000 0.50 20.00 24

17 36/000 36/600 0.60 17.00 24

18 36/600 36/900 0.30 15.00 24

19 36/900 37/300 0.40 19.00 24

20 37/300 37/600 0.30 21.00 24

21 37/600 38/000 0.40 17.00 24

22 38/000 38/700 0.70 24.00 24

23 38/700 39/000 0.30 23.00 24

24 39/000 39/300 0.30 21.00 24

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 3
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

Design Chainage Design


Sl. Existing Date of Providing Right of
From To Length Proposed
No ROW (m) Way
(km) (Km) (Km) ROW (M)

25 39/300 39/700 0.40 16.00 24

26 39/700 40/400 0.70 17.00 24

27 40/400 41/200 0.70 29.00 24

28 41/200 41/500 0.30 22.00 24

29 41/500 41/700 0.20 14.00 24

30 41/700 42/600 0.90 19.00 24

31 42/600 43/200 0.60 18.00 24

32 43/200 43/800 0.60 10.00 24

33 43/800 44/300 0.50 10.00 24

34 44/300 44/700 0.40 9.00 24

35 44/700 45/400 0.70 18.00 24

36 45/400 45/800 0.30 13.00 24

37 45/800 47/100 1.30 24.00 24

38 47/100 47/700 0.60 24.00 24

39 47/700 48/500 0.80 21.00 24

40 48/500 48/700 0.20 10.00 24

41 48/700 49/600 0.90 18.00 24

42 49/600 50/300 0.70 19.00 24

43 50/300 50/600 0.30 17.00 24

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 4
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

Design Chainage Design


Sl. Existing Date of Providing Right of
From To Length Proposed
No ROW (m) Way
(km) (Km) (Km) ROW (M)

44 50/600 50/900 0.30 16.00 24

45 50/900 51/400 0.50 24.00 24

46 51/400 52/000 0.60 22.00 24

47 52/000 52/400 0.40 24.00

48 52/400 53/300 0.90 24.00

49 53/300 54/100 0.80 24.00

50 54/100 55/300 1.20 24.00

51 55/300 56/100 0.80 24.00

52 56/100 57/400 1.30 24.00

53 57/400 58/200 0.80 24.00

54 58/200 59/000 0.80 24.00

55 59/000 59/800 0.80 24.00

56 59/800 61/300 0.50 24.00

57 61/300 61/900 0.60 24.00

58 61/900 62/200 0.30 18.00 24

59 62/200 62/900 0.70 18.00 24

60 62/900 63/100 0.20 24.00

61 63/100 63/500 0.40 24.00

62 63/500 64/300 0.80 25.00

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 5
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

Design Chainage Design


Sl. Existing Date of Providing Right of
From To Length Proposed
No ROW (m) Way
(km) (Km) (Km) ROW (M)

63 64/300 64/700 0.40 19.00 24

64 64/700 65/100 0.40 21.00 24

65 65/100 65/500 0.40 24.00

66 65/500 66/200 0.70 24.00

67 66/200 66/800 0.60 24.00

68 66/800 67/200 0.40 24.00

69 67/200 67/400 0.20 25.00

Chainages of Section 2 - Bhokardan (13+450) to Sillod (0+000)

70 0+000 12.500 20 24 Bhokardan-Sillod


12+500
Existing
55.45Km 24
Length

3. Carriageway
The existing carriageway of the project highway is 5.50 to m wide. The type of the existing
pavement is flexible.

Existing Chainage
Carriageway Width (m) Earthen Shoulders (m)
From To
Dhad to Bhokardan
28+000 32+000 5.50m – 6.0m
32+000 35+500 8-9.0m
35+500 49+800 5.50m – 6.0m
1.0 to 1.5m on either side
49+800 52+700 7.0m to 9.0m
52+700 66+200 5.50m – 6.0m
66+200 67+600 9.0m
Bhokardan to Sillod
11+450 12+500 14
12/500 0+500 7m 1.0 to 1.5m on either side
0+500 0+000 10

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 6
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

4. Cross Drainage Structures


The Project Highway site (Package 2) includes 2 Major Bridge, 11 Minor Bridges, 8 Slab
culverts, 40 Hume Pipe culverts, and 0 RUB along the existing alignment of the project
road. The detail of existing Major, Minor Bridges and existing Slab/Box & Pipe Culverts are
shown in Table A-1

Table A – 1
Culverts
Major Minor Slab / Grade
Type HP ROB RUB
Bridges Bridges Box Separator
Culvert
Culvert
Existing
Structure 02 14 14 40 00 00 00
(Nos)

4.1 Major Bridges: -


The Site includes the following Major Bridges:
Type of structure No. of
Overall
Sr. Existing Spans
Width
No. Chainage Type of Super x
Sub Structure ( m)
Foundation Structure length
RCC Solid 6 x 16m
1 39+015 Open 8.20
PCC Abutment Slab = 96.3m
Foundation
& Pier RCC Solid Slab 7 x 7.6m 7.50
2 67+300 = 53.6

5. Road over-bridges (ROB): NIL


The site includes following ROB (road over railway line)

Type of Structure No. of Spans


Existing Total Width
S. No Sub Super with Span
Chainage Foundation (m) ROB
Structure Structure Length (m)
-----NIL-----

5.1 Road under-bridges (RUB): NIL.


The site includes following RUB (road under railway line)
Existing Type of Structure No. of Spans
S. Total Width
Chainage Sub Super with Span
No Foundation (m) RUB
(km) Structure Structure Length (m)
-----NIL-----

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 7
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

6. Grade separators: - Nil

Type of Structure
No. of Spans
Chainage
S. No. with span Width
(km) Foundation Superstructure
length (m) (m)
---------------------------- Nil ------------------------------

7. Minor Bridges: - 14 Nos.


The Site includes the following Minor Bridges:
DHAD to BHOKARDAN
Existing Design No. of Type
Span Length RTL
Ch. Ch. Span
Open
1 29+665 29+690 3 5 15.2 594.63
Foundation
2 31+105 31+105 1 6 7
RCC Solid
Slab
3 41+190 41+180 2 6 14

4 32+030 32+060 5 2.1*2 + 3*3 14 577.57

5 52+450 52+450 5 9.5 47.8

6 53+100 53+180 2 4.7 10 564.94

7 55+780 55+905 2 3.5 7.5 568.75

8 56+440 56+580 2 6.6 13.6 566.21

9 57+290 57+440 3 14.5 44 562.7

10 65+745 65+925 3 4.5 14.2 582.38

Sillod to Bhokardan
3.5
11 2+374 2+374 4 10.5

(2 x 6 + 1
12 2+900 2+900 3 10.8
x 3)
13 10+920 10+920 4 2 8.2
(2 x 2.3
14 12+270 12+270 3 10.8
+1 x 2.4)

8. Railway level crossings


The Site includes the following Railway level crossings:
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 8
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

Existing Railway
Sr No Level Crossing no Remark
Chainage Chainage
---------------------------- Nil ------------------------------

9. Underpasses (vehicular, non-vehicular):- NIL


Chainage Type of No. of Spans with
Sr. No. Width (m)
(km) Structure span length (m)
--- Nil ---
10. Culverts:-40 Nos
(a) HP Culverts The Site includes the following Culverts:-

Sr Existing Outer Chainage


No width (m)
Dhad to Bhokardan
1 1 row x 0.9 m dia. 11.45 28/230
2 1 row x 0.9 m dia. 10.0 28/335
3 1 row x 0.9 m dia. 11.3 28/490
4 2 row x 0.6 m dia 7.15 29/285
5 4 row x 1.2 m dia. 17.8 30/555
6 2 row x 1.2 m dia. 9.60 34/770
7 1 row x 1.2 m dia. 9.12 35/220
8 1 row x 1.2 m dia. 10.00 35/465
9 2 row x 1.2 m dia. 8.30 35/750
10 2 row x 1.2 m dia. 6.80 38/340
11 2 row x 1.2 m dia. 10.30 38/485
12 2 row x 1.2 m dia. 6.20 40/425
13 2 row x 0.8 m dia. 9.35 40/840
14 5 row x 1.2 m dia. 8.45 41/205
15 1 row x 1.0 m dia. 9.25 41/645
16 3 row x 0.9 m dia. 7.50 43/345
17 2 row x 0.9 m dia. 9.75 43/600
18 5 row x 1.0 m dia. 8.20 44/060
19 2 row x 1.0 m dia. 8.20 45/190
20 2 row x 1.0 m dia. 8.20 46/900
21 3 row x 0.9 m dia. 8.20 47/210
22 1 row x 0.9 m dia. 8.10 47/355
23 2 row x 0.9 m dia. 12.50 48/612
24 2 row x 0.9 m dia. 12.50 49/620
25 2 row x 0.9 m dia. 12.50 50/135
26 2 row x 0.9 m dia. 12.50 50/495
27 2 row x 0.9 m dia. 12.50 51/110
28 2 row x 0.9 m dia. 8.50 51/485
29 2 row x 0.9 m dia. 12.50 54/710
30 2 row x 0.9 m dia. 12.50 55/500
31 2 row x 0.9 m dia. 12.00 60/350
32 2 row x 0.9 m dia. 12.00 61/305
33 2 row x 0.9 m dia. 12.00 61/700
34 2 row x 0.9 m dia. 12.00 61/935
Bhokardan(13+450) to Sillod(0+000)
35 1 row x 0.7 m dia. 11.2 0/000
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 9
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

36 6 row x 1.2 m dia. 11.2 1/020


37 1 row x 0.8 m dia. 12.5 1/880
38 1 row x 1.0 m dia. 12.3 5/550
39 1 row x 1.5 m dia. 11.2 5/846
40 1 row x 1.0 m dia. 1.1 6/952

(b) Slab Drain/Box Culverts: 14 Nos

Design No. of
Exist Ch. TYPE Span
Span Length Width RTL
Ch.

1 31+120 31+150 Slab Drain 1 6 7.7 8 585.35

2 33+500 33+570 Slab Drain 1 6 7.6 13.6 572.24

3 34+190 34+230 Slab Drain 1 6 18.5 10.8 572.83

4 55+450 55+450 Slab Drain 1 6 17.5 10.8 573.73

5 63+160 63+340 Box Culvert 1 6 7 8.6 589.35

6 63+642 63+813 Box Culvert 1 4.7 5 8 589.85

7 64+425 64+600 Box Culvert 1 3.6 4.1 8.15 588.25

8 65+230 65+410 Box Culvert 1 7 11.5 8 582.77

Bhokardan to Sillod
Slab Drain
9 1+020 1 3 6.3 10.50
Slab Drain
10 2+361 1 2 6.3 10.50
Slab Drain
11 2+893 1 3 6.3 10.50

12 3+080 3+080 Slab Drain 1 3 6.3 10.50


Slab Drain
13 10+886 1 3 6.3 10.50
Slab Drain
14 12+268 1 3 6.3 10.50

11. Bus Bays/Bus Shelters: - 04 Nos

The details of bus Shelters on both side of road and are as follows:

SI.
Chainage (km) Location Side Remark
No.
1 37+060 RHS
2 61+110 RHS
3 58+190 LHS
Bhokardan to Sillod
RHS (Bhokardan to
4 2+810 Pimpri Varud
Sillod)
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 10
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

12. Truck Lay byes: - Nil

SI.
Chainage (km) Location Side Remark
No.
Nil

13. Road side drains

The details of the roadside drains are as follows:

Type of Drain
Existing Chainage (Km)

Built up sections are available in habitated area.


Open Drains are in poor condition all over the length

14. Major junctions: - 6 Nos.

The details of the Major junctions are as follows:

Existing Design Category of


Sr. No. Side Type
Chainage Chainage Cross Road
1 32+400 Left Y
2 33+050 Left Y
3 33+150
4 34+500
5 50+800
Bhokardan to Sillod
6 13+450 T
(NH: National Highway, SH: State Highway, MDR: Major District Road)

15. Minor junctions: - 81 Nos.

The details of the Minor junctions are as below:

Existing Design
Sr. No. Side Type Connecting Road
Chainage Chainage
Dhad to Bhokardan
1 29+190
2 29+380 L K L
3 32+315 L Y L
4 32+630 R&L + R&L
5 32+660 R --| R
6 32+690 R --| R
7 32+710 R --| R
8 32+790 R&L R&L

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 11
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

9 32+850 R&L + R&L


10 32+900 L |-- L
11 32+930 R&L + R&L
12 32+980 L |-- L
13 33+270 L |-- L
14 33+320 L |-- L
15 33+705 L |-- L
16 33+740 L |-- L
17 34+290 R&L + R&L
18 35+010 R --| R
19 35+290 R --| R
20 35+690 R --| R
21 35+730 R --| R
22 36+225 L |-- L
23 36+660 R --| R
24 37+030 R /| R
25 37+670 L |\ L
26 39+230 L |/ L
27 40+100 R&L R&L
28 40+350 L |\ L
29 42+830 L |/ L
30 44+270 R --| R
31 46+130 R&L + R&L
32 48+710 R&L + R&L
33 50+580 L |-- L
34 50+050 R --| R
35 52+780 L |-- L
36 52+920 R --| R
37 54+720 L |-- L
38 54+900 R --| R
39 57+250 R --| R
40 57+680 L |-- L
41 57+930 R --| R
42 58+180 L |-- L
43 58+630 L |-- L
44 61+110 L |-- L
45 62+190 R --| R
46 62+400 L |-- L
47 66+150 R --| R
48 66+580 R --| R
49 66+610 R --| R
50 66+850 L |-- L

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 12
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

51 66+900 R --| R
52 67+050 R --| R
SIllod to Bhokardan
53 1/590 1/590 R T R
54 2/860 2/860 R T R
55 3/096 3/096 R T R
56 4/710 4/710 R T R
57 5/015 5/015 L T L
58 5/200 5/200 R T R
59 5/230 5/230 L T L
60 5/240 5/240 R T R
61 5/330 5/330 L T L
62 5/430 5/430 R T R
63 5/440 5/440 L Y L
64 6/120 6/120 R Y R
65 6/150 6/150 L Y L
66 7/380 7/380 R T R

67 7/510 7/510 L Y L

68 7/600 7/600 R Y R
69 7/700 7/700 L Y L
70 8/110 8/110 R Y R
71 8/885 8/885 +
72 9/860 9/860 L Y L
73 9/890 9/890 R Y R
74 11/285 11/285 L T L
75 12/720 12/720 L + Bhokardan Village
76 12/870 12/870 R T Bhokardan Village
77 12/890 12/890 L T Bhokardan Village
78 13/065 13/065 R T Bhokardan Village
79 13/140 13/140 L T Bhokardan Village
80 13/180 13/180 + Bhokardan Village
81 13/280 13/280 Y Bhokardan Village

Dhad to Bhokardan

16. Bypasses: - 1

The details of the bypasses are as follows:

Carriageway
Name of Chainage
S. Length
bypass (km) From
No. (in Km) Width
(town) km to km Type
(m)

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 13
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

Dhad Bypass Existing 2 Lane


/ Upgradation 32+400 to 5.50/Pro with
1 2.4
of Existing 34+500 posed Paved
Bypass 10.00m shoulder

17. Other structures: - NIL

Annex - II
(Schedule-A)

Dates for providing Right of Way

The dates on which the Authority shall provide Right of Way to the Contractor on different
stretches of the Site are stated below:

Design Chainage Design


Sl. Existing Date of Providing Right of
From To Length Proposed
No ROW (m) Way
(km) (Km) (Km) ROW (M)
Packge : 2 – Section 2 - Dhad(28+00) to Bhokardan(67+600) &
Section 1- Bhokardan (12+500) to Sillod(0+000)

Chainages of Section 2 –Dhad (28+000) to Bhokardan (67+600)

1 28+000 28+200 0.200 25m


Existing ROW will be provided
24 immediately on award of work
2 28+200 28+600 0.400 18m

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 14
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

Design Chainage Design


Sl. Existing Date of Providing Right of
From To Length Proposed
No ROW (m) Way
(km) (Km) (Km) ROW (M)

3 28+600 28+900 0.300 14m 24

4 28+900 29+100 0.200 26m 24

5 29+100 29+800 0.700 20m 24

6 29+800 30+400 0.600 14m 24

7 30/400 30/900 0.50 22.00 24

8 30/900 31/200 0.30 20.00 24

9 31/200 32/000 0.80 24.00 24

10 32/000 32/500 0.50 20.00 24

11 32/500 33/200 0.70 22.00 24

12 33/200 33/900 0.70 27.00 24

13 33/900 34/400 0.50 24.00 24

14 34/400 35/000 0.60 20.00 24

15 35/000 35/500 0.50 18.00 24

16 35/500 36/000 0.50 20.00 24

17 36/000 36/600 0.60 17.00 24

18 36/600 36/900 0.30 15.00 24

19 36/900 37/300 0.40 19.00 24

20 37/300 37/600 0.30 21.00 24

21 37/600 38/000 0.40 17.00 24

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 15
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

Design Chainage Design


Sl. Existing Date of Providing Right of
From To Length Proposed
No ROW (m) Way
(km) (Km) (Km) ROW (M)

22 38/000 38/700 0.70 24.00 24

23 38/700 39/000 0.30 23.00 24

24 39/000 39/300 0.30 21.00 24

25 39/300 39/700 0.40 16.00 24

26 39/700 40/400 0.70 17.00 24

27 40/400 41/200 0.70 29.00 24

28 41/200 41/500 0.30 22.00 24

29 41/500 41/700 0.20 14.00 24

30 41/700 42/600 0.90 19.00 24

31 42/600 43/200 0.60 18.00 24

32 43/200 43/800 0.60 10.00 24

33 43/800 44/300 0.50 10.00 24

34 44/300 44/700 0.40 9.00 24

35 44/700 45/400 0.70 18.00 24

36 45/400 45/800 0.30 13.00 24

37 45/800 47/100 1.30 24.00 24

38 47/100 47/700 0.60 24.00 24

39 47/700 48/500 0.80 21.00 24

40 48/500 48/700 0.20 10.00 24

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 16
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

Design Chainage Design


Sl. Existing Date of Providing Right of
From To Length Proposed
No ROW (m) Way
(km) (Km) (Km) ROW (M)

41 48/700 49/600 0.90 18.00 24

42 49/600 50/300 0.70 19.00 24

43 50/300 50/600 0.30 17.00 24

44 50/600 50/900 0.30 16.00 24

45 50/900 51/400 0.50 24.00 24

46 51/400 52/000 0.60 22.00 24

47 52/000 52/400 0.40 24.00

48 52/400 53/300 0.90 24.00

49 53/300 54/100 0.80 24.00

50 54/100 55/300 1.20 24.00

51 55/300 56/100 0.80 24.00

52 56/100 57/400 1.30 24.00

53 57/400 58/200 0.80 24.00

54 58/200 59/000 0.80 24.00

55 59/000 59/800 0.80 24.00

56 59/800 61/300 0.50 24.00

57 61/300 61/900 0.60 24.00

58 61/900 62/200 0.30 18.00 24

59 62/200 62/900 0.70 18.00 24

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 17
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

Design Chainage Design


Sl. Existing Date of Providing Right of
From To Length Proposed
No ROW (m) Way
(km) (Km) (Km) ROW (M)

60 62/900 63/100 0.20 24.00

61 63/100 63/500 0.40 24.00

62 63/500 64/300 0.80 25.00

63 64/300 64/700 0.40 19.00 24

64 64/700 65/100 0.40 21.00 24

65 65/100 65/500 0.40 24.00

66 65/500 66/200 0.70 24.00

67 66/200 66/800 0.60 24.00

68 66/800 67/200 0.40 24.00

69 67/200 67/400 0.20 25.00

Chainages of Section 2 - Bhokardan (13+450) to Sillod (0+000)

70 0+000 12.500 20 24 Bhokardan-Sillod


12+500
Existing
55.45Km 24
Length

* The dates specified herein shall in no case be beyond 365 (three hundred and sixty five) days
after the Appointed Date.

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 18
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

Annex - III
(Schedule-A)

Alignment Plans

The existing alignment of the Project Highway shall be modified in the following sections as
per the alignment plan indicated below:

Plan & profile is enclosed in digital form in a CD.

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 19
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

Annex - IV
(Schedule-A)

Environment Clearances

The following environment clearances have been obtained:


Environmental Clearance is not required as per new Notification of MoEF dated 22/08/2013.

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 20
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

Appendix A- I

DESIGN CHAINAGE CORRESPONDING TO EXISTING CHAINAGE

Sr. Design
Existing Chainage Remarks
No. Chainage
Dhad to Bhokardan
1 28/000 28/000
2 28/226 28/217
3 28/330 28/320
4 28/496 28/485
5 29/200 29/214
6 29/281 29/269
7 29/667 29/655
8 30/514 30/525
9 31/126 31/115
10 31/800 31/777
11 32/037 32/025
12 33/010 33/000
13 33/152 33/138
14 33/497 33/478
15 33/810 33/768
16 34/190 34/171
17 34/773 34/753
18 35/224 35/205
19 35/750 35/731
20 38/484 38/462
21 39/057 39/035
22 39/174 39/155
23 39/458 39/428
24 40/076 40/050
25 40/104 40/075
26 40/352 40/334
27 40/426 40/390

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 21
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

Sr. Design
Existing Chainage Remarks
No. Chainage
28 40/818 40/785
29 40/850 40/807
30 41/209 41/174
31 41/641 41/605
32 43/347 43/310
33 43/600 43/563
34 44/043 44/050
35 45/195 45/205
36 45/285 45/295
37 46/900 46/862
38 47/214 47/316
39 47/375 47/435
40 48/609 48/665
41 49/626 49/676
42 50/136 50/225
43 50/495 50/430
44 50/820 50/774
45 51/112 51/065
46 51/490 51/444
47 52/465 52/410
48 53/110 53/063
49 54/712 54/665
50 55/500 55/450
51 55/780 55/775
52 56/448 56/400
53 57/300 57/260
54 58/370 58/315
55 60/355 60+305
56 60+555 60+510
57 61/310 61/260
58 61/710 61/895
Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 22
MoRT&H, NH Division, (PWD), Maharashtra Schedules to Concession Agreement Package 2

Sr. Design
Existing Chainage Remarks
No. Chainage
59 61/940 61/895
60 62/163 62/100
61 63/163 63/110
62 63/640 63/590
63 64/425 64/375
64 65/236 65/185
65 65/753 65/700
66 66/652 66/600
.67 67/15 67/160
68 67/365 67/310
Sillod to Bhokardan
69 1+000 1+000

70 2+000 2+000
71 3+000 3+020
72 4+000 4+020

73 5+000 5+020

74 6+000 6+055
75 7+000 7+090
76 8+000 8+110

77 9+000 9+120
78 10+000 10+120
79 11+000 11+120

80 12+000 12+135

Rehabilitation and Up-gradation of Chikhali-Bhokardan-Sillod-Jalna National Highway Package: 2 from Design km 28+000 (Dhad)
to km 67+600 (Bhokardan) & Bhokardan(12+500) to Sillod(0+000) to Two lane with paved shoulders/Four lane Configurations in the
state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
. Page 23