You are on page 1of 18

GOVERNMENT OF MAHARASHTRA

PUBLIC WORKS DEPARTMENT EAST DIVISION PUNE

HAM pakage No.29 improvements to Bhele-loni-pabal-shikrapur-Ashtapur-Uralikanchan-jejuri-New


NH-Wathar-Satara Road SH 117 km 0/000-km 136.500 district -pune section in the state of
Maharashtrs Hybrid Annuity Mode-(Part-2 Telegaon Dhamdhere to jejuri km 63.774 to km 111.679
excluding overlap length of 1.113)(PN 29)

Stage Payment Certificate No.02 Measurement Up to 25.05.2021


(100% Certification)

Client
Chief Engineer, PWD EAST DIVISION PUNE

Authority's Engineer
GLOBAL INFRA SOLUTIONS IN JV WITH MS CONSULTANTS

Contractor
M/S PCIL HAM Telegaon Dhamdhere Jejuri PVT.LTD
Name of the Project : HAM PN 29Improvements to Belhe -loni -Pabal -Shikrapur-Ashtapur-Uralikanchan-jejuri-new NH-wather -satara road sh-117 km 0/000 -km 136/500 district -pune section in the
state of Maharashtra Hybrid Aannuity mode ,(part-2 Telegaon Dhamdhere to jejuri km 63/774 to km 111/679 excluding overlap length of 1.113km)(pn-29)

Name of Employer : PWD east division Pune


Authority's Engineer : GLOBAL INFRA SOLUTIONS IN JV WITH MS CONSULTANTS
Name of Contractor :M/S PCIL HAM TELEGAON DHAMDHERE JEJURI PVT.LTD
Contract Agreement No : Date 02-08-2018 Contract Amount : 1460000000
ABSTRACT OF STAGE PAYMENT OF WORKS
IPC-2 (15TH RA BILL)
CONTRACT AMOUNT VALUE OF WORK EXECUTED (INR)
S.No Item
(INR) Cumulative Upto Previous This Period

A Road works including Culverts etc (84%)

1.Earthwork up to top of Subgrade 119428000.00 102719265.12 62,846,089.76 39873175.36


2.Granular work 315944000.00 257054529.90 121,913,430.92 135141098.98
wmm 163666000.00 128944122.51 55,467,957.50 73476165.01
DBM 223234000.00 157979267.31 26,383,998.91 131595268.40
BC 177244000.00 0.00 - 0.00
DLC/PQC 71978000.00 19488628.16 9,614,389.89 9874238.27
WIDENING AND REPEARING OF CULVERT 16352000.00 0.00 - 0.00
CULVERT 38252000.00 24751294.12 17,250,901.96 7500392.16
SHOULDER 44238000.00 0.00 - 0.00
TOTAL (I) 1170336000.00 690937107 - 397460338
B Other works (16%) -
ii) Toll plaza 0.00 0.00 - 0.00
iii) Road side drains 85994000.00 69669129.56 - 69669129.56
iv) Road signs, markings, Km stones ,Boundry stones 22922000.00 0.00 - 0.00
v) Project Facilities -
a) Bus bays 0.00 0.00 - 0.00
b) Bus/Passenger shelter 1752000.00 0.00 - 0.00
vi) c) Proving crash barriers 9490000.00 0.00 - 0.00
viii) Protection works (Breast wall,Retaining wall, Guard wall etc.) 146146000.00 19207760.00 - 19207760.00
ix) Miscellaneous items 22922000.00 0.00 - 0.00
x) Water harvesting structures 0.00 0.00 - 0.00
TOTAL (II) 289226000.00 88876889.56 - 88876889.56
TOTAL = (I)+(II) 1459562000.00 779813997 293,476,768.95 486337228

Withheld for pending permanent activities mandatory as per


xi) 0 0 0
details enclosed

TOTAL (III) 0 0 0
TOTAL (I)+ (II)- (III) 0 0 0

Contractor Authorised Signature Authorised Signature of Authority's Enginner


PROGRESS AS ON DATE 30-04-2022
Name of the Project : HAM PN 29 Improvements to Belhe -loni -Pabal -Shikrapur-Ashtapur-Uralikanchan-jejuri-new NH-wather -satara road sh-117 km 0/000 -km 136/500 district -Pune section in the state of Maharashtra Hybrid Aannuity mode ,(part-2 Telegaon Dhamdhere to jejuri km 63/774 to km 111/679 excluding overlap length of 1.113km)(pn-29)
Name of Employer : PWD East division Pune
Authority's Engineer : GLOBAL INFRA SOLUTIONS IN JV WITH MS CONSULTANTS
Name of Contractor :M/S PCIL HAM TELEGAON DHAMDHERE JEJURI PVT.LTD 1460000000
Contract Agreement No :Date 02-08-2018 Contract Amount : 1460000000

Payment Schedule
Interim Payment Certificate No. 02(03 st RA Bill)
% Weightage to Amount Unit Rate Completed length (Km/No). Amount (INR)
Stage for Payment Unit Scope Remarks
Particular (As per Contract) per Km/No. Cumulative Cumulative% IPC 1 IPC 1 % IPC 2 IPC 2 % IPC 3 IPC 3 % Cumulative IPC 1 1PC 2 1PC 3
A Road Works including culverts etc(100%)
1 Earthwork up to top of sub-grade 8.18% Km 46.767 119,428,000.00 2553681.01 40.22 7.04 24.61 4.305 12.52 2.190 3.094 0.541 102,719,265.12 62,846,089.76 31,972,086.30 7,901,089.06
0.00 0.000 - - - -

2 ii) Granular work (sub-base, ) 21.64% Km 46.767 315,944,000.00 6755703.81 38.05 17.61 18.05 8.35 9.78 4.53 10.224 4.731 257,054,529.90 121,913,430.92 66,070,783.24 69,070,315.74

WMM 11.21% KM 43.997 163,666,000.00 3719935.45 34.66 8.83 14.91 3.80 8.52 2.17 11.232 2.862 128,944,122.51 55,467,957.50 31,693,850.04 41,782,314.98

i) Bituminous work - DBM ( As per approved


15.29% Km 43.997 223,234,000.00 5073845.94 31.14 10.82 5.20 1.81 13.15 4.57 12.786 4.443 157,979,267.31 26,383,998.91 66,721,074.16 64,874,194.24
bifurcation )

ii) Bituminous work - BC ( As per approved bifurcation ) 12.14% Km 43.997 177,244,000.00 4028547.40 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0.000 - - - -

RIGID PAVMENT(PQC) 4.93% KM 2.770 71,978,000.00 25984837.55 0.75 1.33 0.37 0.66 0.37 0.66 0.010 0.018 19,488,628.16 9,614,389.89 9,614,389.89 259,848.38
SHOULDER 3.03% KM 46.767 44,238,000.00 945923.41 0.00 0.00 0.00 0.00 0.00 0.000 0.000 - - - -

4 Culverts 2.62% Nos. 51.000 38,252,000.00 750039.22 33.00 1.70 23.00 1.18 10.00 0.51 0.000 0.000 24,751,294.12 17,250,901.96 7,500,392.16 -

WIDENING AND REPAIR OF CULVERTS 1.12% NOS 9.000 16,352,000.00 1816888.89 0.00 0.00 0.00 0.000 - - - -
WIDENING AND REPAIR OF MINOR BRIDGES 3 - 0.00 0.00 0.00 0.00 0.000 - - - -
TOTAL AMOUNT(A) 1,170,336,000.00 0.00 0.000 - - - -
B Other Works 0.00 0.000 - - - -

ii) Toll plaza 0.00% Nos 0.000 0.00 0.00 0.00 0.00 0.00 0.000 - - - -

iii) Road side drains 5.89% Km 92.574 85,994,000.00 928921.73 75.00 4.77 0.00 75.00 4.77 0.000 69,669,129.56 - 69,669,129.56 -
iv) Road signs, markings, Km stones ,Boundry stones 1.57% Km 46.767 22,922,000.00 490131.93 0.00 0.00 0.00 0.000 - - - -
v) Project Facilities 0.00 0.00 0.00 0.00 0.000 - - - -
a) Bus bays 0.00% Nos 0.000 0.00 0.00 0.00 0.00 0.00 0.000 - - - -
b) Bus/Passenger shelter 0.12% Nos 8.000 1,752,000.00 219000.00 0.00 0.00 0.00 0.000 - - - -
vi) c) Proving crash barriers 0.65% Km 2.70 9,490,000.00 3514814.81 0.00 0.00 0.00 0.000 - - - -
viii) TOE WALL/RETAINING WALL 10.01% Km 1.75 146,146,000.00 83512000.00 0.23 1.32 0.00 0.23 1.32 0.000 19,207,760.00 - 19,207,760.00 -
x) Miscellaneous items 1.57% Km 0.00 22,922,000.00 0.00 0.00 0.79 0.00 0.00 0.000 - - - -
xi) Water harvesting structures 0.00% Nos 0.00 0.00 0.00 0.00 0.00 0.00 0.000 - - - -
(B). Total Amount = 289,226,000.00 779,813,996.69 293,476,768.95 302,449,465.35 183,887,762.39
Total Amount = (A)+ (B) 1,459,562,000.00 54.20 20.10 20.72 12.60 779,813,996.69 293,476,768.95 302,449,465.35 183,887,762.39

Contractor Authorised Signature Authorised Signature of Authority's Enginner


M/S PCIL HAM Telegao Dhamdhere Jejuri PVT.LTD
Price Variation Details
Bid Date Of Project 23.04.2018
Appointment Date Of Project. 07.03.2019
Bid cost 1460000000.00

As Per Concession Aggrement Aticle -23 Clause no 23.2.3 The Price Variation Of Preceddong of bid to
Appointment date between Variation as per Price Index Multiple.

1 Bid Cost & date 1460000000.00 Apr-18


BILL AMOUNT 70% 30%
This bill
175200000 122640000 52560000
Appointment Date Mar-19
A WPI 70% 122640000
As Per GR PWD Break-UP 70:30 Ratio
B CPI 30% 52560000
2
A WPI Mar-18 116.3
As Per Gr PWD WE Follow Price Index Bid date &
B Apr-21 132
Appointment Date Before 1 month.
C PIM 1.135
* Note- 2B/2A=2C
3(A) CPI Mar-18 292
B Apr-21 379.64
C PIM 1.300
* Note- 3B/3A=3C
4 Adjusted Bid Cost
A WPI 139195872.7429 NOTE-1A*2C
B CPI 68334840 NOTE-1B*3C
AS PER PRICE VARIATION COST 207530713 RESULT
Bill Amount 175200000
Diffrence 32330713
Total Paylable in this bill price Escalation 32330713
WPI (follow this OFFICE OF THE ECONOMIC ADVISER
Department) DEPARTMENT FOR PROMOTION OF INDUSTRY AND INTERNAL TRADE
CPI INDUSTRIAL WORKER
PN-29 - Improvements to Belhe-Loni - Pabal - Shikrapur - Ashtapur - UraliKanchan-Jejuri-New NH –
Wathar-Satara Road SH-117 Km 0/000- Km 136/500 District–Pune section in the State of Maharashtra
Hybrid Annuity Mode. (Part-II TalegaonDhamdhere to Jejuri Km 63/774 to Km 111/679 excluding
overlap Length of 1.113 Km)

SUBGRADE TOP

From To Side Length Factor Net Length in KM Remark

63.830 70.065 LHS 6.235 0.5 3.118


70.065 73.260 LHS 3.195 0.5 1.598
73.440 74.915 LHS 1.475 0.5 0.738
75.020 77.080 LHS 2.060 0.5 1.030
77.300 77.490 LHS 0.190 0.5 0.095
77.530 77.920 LHS 0.390 0.5 0.195
78.240 78.990 LHS 0.750 0.5 0.375
79.400 81.310 LHS 1.910 0.5 0.955
81.450 82.700 LHS 1.250 0.5 0.625
82.980 85.720 LHS 2.740 0.5 1.370
86.000 86.667 LHS 0.667 0.5 0.334
88.200 92.300 LHS 4.100 0.5 2.050
92.750 92.900 LHS 0.150 0.5 0.075
93.050 95.000 LHS 1.950 0.5 0.975
95.000 95.200 LHS 0.200 0.5 0.100
97.000 99.920 LHS 2.920 0.5 1.460
99.970 105.670 LHS 5.700 0.5 2.850
105.720 105.960 LHS 0.240 0.5 0.120
105.980 106.260 LHS 0.280 0.5 0.140
106.370 108.130 LHS 1.760 0.5 0.880
108.170 108.480 LHS 0.310 0.5 0.155
108.650 109.430 LHS 0.780 0.5 0.390
109.470 111.640 LHS 2.170 0.5 1.085
0.000 0.5 0.000
63.830 70.065 RHS 6.235 0.5 3.118
70.065 73.350 RHS 3.285 0.5 1.643
73.440 73.800 RHS 0.360 0.5 0.180
74.500 74.900 RHS 0.400 0.5 0.200
75.020 75.380 RHS 0.360 0.5 0.180
75.450 77.090 RHS 1.640 0.5 0.820
77.300 77.520 RHS 0.220 0.5 0.110
77.540 77.920 RHS 0.380 0.5 0.190
78.570 78.900 RHS 0.330 0.5 0.165
78.900 78.990 RHS 0.090 0.5 0.045
79.400 81.310 RHS 1.910 0.5 0.955
81.450 82.700 RHS 1.250 0.5 0.625
82.980 85.750 RHS 2.770 0.5 1.385
86.000 86.665 RHS 0.665 0.5 0.333
88.400 88.950 RHS 0.550 0.5 0.275
89.000 90.100 RHS 1.100 0.5 0.550
90.120 91.820 RHS 1.700 0.5 0.850
92.750 92.930 RHS 0.180 0.5 0.090
93.040 93.280 RHS 0.240 0.5 0.120
93.280 94.990 RHS 1.710 0.5 0.855
94.990 95.200 RHS 0.210 0.5 0.105
97.000 97.500 RHS 0.500 0.5 0.250
97.530 97.580 RHS 0.050 0.5 0.025
97.600 97.820 RHS 0.220 0.5 0.110
97.820 97.870 RHS 0.050 0.5 0.025
98.050 99.120 RHS 1.070 0.5 0.535
99.180 99.920 RHS 0.740 0.5 0.370
99.970 101.810 RHS 1.840 0.5 0.920
101.830 102.150 RHS 0.320 0.5 0.160
102.170 103.220 RHS 1.050 0.5 0.525
103.230 103.600 RHS 0.370 0.5 0.185
103.700 104.160 RHS 0.460 0.5 0.230
104.190 105.670 RHS 1.480 0.5 0.740
105.720 105.960 RHS 0.240 0.5 0.120
105.980 106.260 RHS 0.280 0.5 0.140
106.370 108.110 RHS 1.740 0.5 0.870
108.110 108.130 RHS 0.020 0.5 0.010
108.170 108.480 RHS 0.310 0.5 0.155
108.650 109.430 RHS 0.780 0.5 0.390
109.470 109.960 RHS 0.490 0.5 0.245
110.000 110.790 RHS 0.790 0.5 0.395
110.790 110.880 RHS 0.090 0.5 0.045
111.010 111.130 RHS 0.120 0.5 0.060
111.170 111.640 RHS 0.470 0.5 0.235
40.244
PN-29 - Improvements to Belhe-Loni - Pabal - Shikrapur - Ashtapur - UraliKanchan-Jejuri-New NH
– Wathar-Satara Road SH-117 Km 0/000- Km 136/500 District–Pune section in the State of
Maharashtra Hybrid Annuity Mode. (Part-II TalegaonDhamdhere to Jejuri Km 63/774 to Km
111/679 excluding overlap Length of 1.113 Km)
GSB TOP

Net Length in
From To Side Length Factor Remark
KM

63.830 69.970 LHS 6.140 0.5 3.070


70.065 73.260 LHS 3.195 0.5 1.598
73.440 73.900 LHS 0.460 0.5 0.230
74.500 75.040 LHS 0.540 0.5 0.270
75.040 77.040 LHS 2.000 0.5 1.000
77.300 77.520 LHS 0.220 0.5 0.110
77.530 77.920 LHS 0.390 0.5 0.195
77.920 78.240 LHS 0.320 0.5 0.160
78.240 78.990 LHS 0.750 0.5 0.375
79.400 81.310 LHS 1.910 0.5 0.955
81.450 82.700 LHS 1.250 0.5 0.625
82.980 85.720 LHS 2.740 0.5 1.370
86.000 86.665 LHS 0.665 0.5 0.333
88.200 88.950 LHS 0.750 0.5 0.375
89.020 89.580 LHS 0.560 0.5 0.280
89.940 91.800 LHS 1.860 0.5 0.930
92.750 92.900 LHS 0.150 0.5 0.075
93.050 93.250 LHS 0.200 0.5 0.100
93.250 95.000 LHS 1.750 0.5 0.875
95.000 95.200 LHS 0.200 0.5 0.100
97.000 97.500 LHS 0.500 0.5 0.250
97.530 97.810 LHS 0.280 0.5 0.140
97.880 99.120 LHS 1.240 0.5 0.620
99.180 99.770 LHS 0.590 0.5 0.295
99.970 103.620 LHS 3.650 0.5 1.825
103.700 105.760 LHS 2.060 0.5 1.030
105.980 106.260 LHS 0.280 0.5 0.140
106.370 108.130 LHS 1.760 0.5 0.880
108.170 108.515 LHS 0.345 0.5 0.173
108.590 109.610 LHS 1.020 0.5 0.510
109.610 110.440 LHS 0.830 0.5 0.415
110.440 111.640 LHS 1.200 0.5 0.600
0.000 0.5 0.000
63.800 70.065 RHS 6.265 0.5 3.133
70.065 73.350 RHS 3.285 0.5 1.643
73.440 73.800 RHS 0.360 0.5 0.180
74.500 74.600 RHS 0.100 0.5 0.050
74.600 74.640 RHS 0.040 0.5 0.020
74.640 74.900 RHS 0.260 0.5 0.130
74.900 77.040 RHS 2.140 0.5 1.070
77.310 77.920 RHS 0.610 0.5 0.305
77.920 78.500 RHS 0.580 0.5 0.290
78.500 78.980 RHS 0.480 0.5 0.240
79.400 81.310 RHS 1.910 0.5 0.955
81.450 82.700 RHS 1.250 0.5 0.625
82.980 85.740 RHS 2.760 0.5 1.380
86.020 86.665 RHS 0.645 0.5 0.323
88.200 88.950 RHS 0.750 0.5 0.375
89.020 91.060 RHS 2.040 0.5 1.020
91.060 91.130 RHS 0.070 0.5 0.035
91.130 91.470 RHS 0.340 0.5 0.170
91.470 91.630 RHS 0.160 0.5 0.080
91.630 91.820 RHS 0.190 0.5 0.095
92.750 92.860 RHS 0.110 0.5 0.055
93.050 93.280 RHS 0.230 0.5 0.115
93.280 94.990 RHS 1.710 0.5 0.855
94.990 95.200 RHS 0.210 0.5 0.105
97.000 97.500 RHS 0.500 0.5 0.250
97.530 97.580 RHS 0.050 0.5 0.025
97.600 97.820 RHS 0.220 0.5 0.110
100.120 101.760 RHS 1.640 0.5 0.820
101.830 102.150 RHS 0.320 0.5 0.160
102.170 103.220 RHS 1.050 0.5 0.525
103.230 103.600 RHS 0.370 0.5 0.185
103.700 104.160 RHS 0.460 0.5 0.230
104.190 104.678 RHS 0.488 0.5 0.244
104.678 105.600 RHS 0.922 0.5 0.461
105.980 106.260 RHS 0.280 0.5 0.140
106.370 108.110 RHS 1.740 0.5 0.870
108.270 108.480 RHS 0.210 0.5 0.105
109.610 109.850 RHS 0.240 0.5 0.120
110.000 110.790 RHS 0.790 0.5 0.395
111.010 111.130 RHS 0.120 0.5 0.060
111.240 111.640 RHS 0.400 0.5 0.200
38.050
PN-29 - Improvements to Belhe-Loni - Pabal - Shikrapur - Ashtapur - UraliKanchan-
Jejuri-New NH – Wathar-Satara Road SH-117 Km 0/000- Km 136/500 District–Pune
section in the State of Maharashtra Hybrid Annuity Mode. (Part-II TalegaonDhamdhere
to Jejuri Km 63/774 to Km 111/679 excluding overlap Length of 1.113 Km)

WMM TOP
Net
From To Side Length Factor Length in Remark
KM
63.774 69.970 LHS 6.196 0.5 3.098
70.220 73.260 LHS 3.040 0.5 1.520
73.440 73.820 LHS 0.380 0.5 0.190
74.500 74.915 LHS 0.415 0.5 0.208
75.340 77.040 LHS 1.700 0.5 0.850
77.320 77.920 LHS 0.600 0.5 0.300
77.920 78.280 LHS 0.360 0.5 0.180
78.280 78.990 LHS 0.710 0.5 0.355
79.400 81.310 LHS 1.910 0.5 0.955
81.450 82.700 LHS 1.250 0.5 0.625
82.980 85.750 LHS 2.770 0.5 1.385
86.000 86.665 LHS 0.665 0.5 0.333
88.400 89.580 LHS 1.180 0.5 0.590
89.940 90.150 LHS 0.210 0.5 0.105
90.150 91.800 LHS 1.650 0.5 0.825
93.050 93.250 LHS 0.200 0.5 0.100
93.250 95.000 LHS 1.750 0.5 0.875
97.000 97.500 LHS 0.500 0.5 0.250
97.590 97.810 LHS 0.220 0.5 0.110
97.820 97.860 LHS 0.040 0.5 0.020
97.890 99.890 LHS 2.000 0.5 1.000
99.970 101.200 LHS 1.230 0.5 0.615
101.320 103.600 LHS 2.280 0.5 1.140
103.700 104.760 LHS 1.060 0.5 0.530
104.760 105.600 LHS 0.840 0.5 0.420
105.970 106.200 LHS 0.230 0.5 0.115
106.370 108.110 LHS 1.740 0.5 0.870
108.160 108.510 LHS 0.350 0.5 0.175
108.590 110.440 LHS 1.850 0.5 0.925
110.440 111.640 LHS 1.200 0.5 0.600
0.000 0.5 0.000
63.774 69.970 RHS 6.196 0.5 3.098
70.220 73.350 RHS 3.130 0.5 1.565
73.440 73.800 RHS 0.360 0.5 0.180
74.500 77.040 RHS 2.540 0.5 1.270
77.310 77.920 RHS 0.610 0.5 0.305
77.920 78.500 RHS 0.580 0.5 0.290
78.500 78.980 RHS 0.480 0.5 0.240
79.400 81.310 RHS 1.910 0.5 0.955
81.450 82.650 RHS 1.200 0.5 0.600
82.980 85.750 RHS 2.770 0.5 1.385
86.000 86.664 RHS 0.664 0.5 0.332
88.400 89.580 rhs 1.180 0.5 0.590
89.950 91.150 RHS 1.200 0.5 0.600
91.150 91.800 RHS 0.650 0.5 0.325
92.750 92.860 RHS 0.110 0.5 0.055
93.050 93.280 RHS 0.230 0.5 0.115
93.280 94.990 RHS 1.710 0.5 0.855
94.990 95.200 RHS 0.210 0.5 0.105
102.200 103.030 RHS 0.830 0.5 0.415
103.230 103.600 RHS 0.370 0.5 0.185
103.700 104.678 RHS 0.978 0.5 0.489
104.678 105.600 RHS 0.922 0.5 0.461
105.970 106.200 RHS 0.230 0.5 0.115
106.370 108.110 RHS 1.740 0.5 0.870
34.663
PN-29 - Improvements to Belhe-Loni - Pabal - Shikrapur - Ashtapur - UraliKanchan-Jejuri-New NH –
Wathar-Satara Road SH-117 Km 0/000- Km 136/500 District–Pune section in the State of Maharashtra
Hybrid Annuity Mode. (Part-II TalegaonDhamdhere to Jejuri Km 63/774 to Km 111/679 excluding
overlap Length of 1.113 Km)

DBM TOP

Net
From To Side Length Factor Length in Remark
KM
63.774 69.970 LHS 6.196 0.5 3.098
70.260 73.260 LHS 3.000 0.5 1.500
73.440 73.800 LHS 0.360 0.5 0.180
74.500 74.910 LHS 0.410 0.5 0.205
75.080 77.070 LHS 1.990 0.5 0.995
77.320 77.920 LHS 0.600 0.5 0.300
77.920 78.500 LHS 0.580 0.5 0.290
78.500 78.980 LHS 0.480 0.5 0.240
79.400 81.310 LHS 1.910 0.5 0.955
82.980 84.980 LHS 2.000 0.5 1.000
88.400 89.580 LHS 1.180 0.5 0.590
89.940 91.800 LHS 1.860 0.5 0.930
93.250 95.000 LHS 1.750 0.5 0.875
97.000 97.500 LHS 0.500 0.5 0.250
97.570 97.855 LHS 0.285 0.5 0.143
97.900 99.880 LHS 1.980 0.5 0.990
99.970 103.620 LHS 3.650 0.5 1.825
103.700 104.730 LHS 1.030 0.5 0.515
104.730 105.600 LHS 0.870 0.5 0.435
106.370 107.930 LHS 1.560 0.5 0.780
107.930 108.110 LHS 0.180 0.5 0.090
108.165 108.515 LHS 0.350 0.5 0.175
108.590 109.765 LHS 1.175 0.5 0.587
109.765 111.640 LHS 1.875 0.5 0.938
0.000 0.5 0.000
63.774 69.820 RHS 6.046 0.5 3.023
70.260 73.350 RHS 3.090 0.5 1.545
73.440 73.780 RHS 0.340 0.5 0.170
74.500 74.640 RHS 0.140 0.5 0.070
74.640 74.900 RHS 0.260 0.5 0.130
75.050 77.040 RHS 1.990 0.5 0.995
77.320 77.920 RHS 0.600 0.5 0.300
77.920 78.500 RHS 0.580 0.5 0.290
78.500 78.980 RHS 0.480 0.5 0.240
79.400 81.310 RHS 1.910 0.5 0.955
82.310 84.980 RHS 2.670 0.5 1.335
88.400 89.580 RHS 1.180 0.5 0.590
89.940 90.580 RHS 0.640 0.5 0.320
90.580 91.800 RHS 1.220 0.5 0.610
92.760 92.810 RHS 0.050 0.5 0.025
93.050 93.280 RHS 0.230 0.5 0.115
93.280 93.500 RHS 0.220 0.5 0.110
93.500 95.000 RHS 1.500 0.5 0.750
103.985 104.678 RHS 0.693 0.5 0.346
104.678 105.6 RHS 0.922 0.5 0.461
106.37 108.11 RHS 1.740 0.5 0.870
TOTAL 31.136
PN-29 - Improvements to Belhe-Loni - Pabal - Shikrapur - Ashtapur - UraliKanchan-Jejuri-
New NH – Wathar-Satara Road SH-117 Km 0/000- Km 136/500 District–Pune section in the
State of Maharashtra Hybrid Annuity Mode. (Part-II TalegaonDhamdhere to Jejuri Km
63/774 to Km 111/679 excluding overlap Length of 1.113 Km)

SHOULDER FILLING

Net
From To Side Length Factor Length in Remark
KM
63.840 64.520 LHS 0.680 0.5 0.340
64.700 65.440 LHS 0.740 0.5 0.370
65.610 65.910 LHS 0.300 0.5 0.150
66.220 67.980 LHS 1.760 0.5 0.880
68.180 69.440 LHS 1.260 0.5 0.630
69.040 69.130 LHS 0.090 0.5 0.045
69.440 69.800 LHS 0.360 0.5 0.180
70.260 73.260 LHS 3.000 0.5 1.500
73.440 73.800 LHS 0.360 0.5 0.180
74.500 74.910 LHS 0.410 0.5 0.205
75.080 77.070 LHS 1.990 0.5 0.995
77.320 77.920 LHS 0.600 0.5 0.300
79.400 81.310 LHS 1.910 0.5 0.955
82.980 84.980 LHS 2.000 0.5 1.000
89.940 90.650 LHS 0.710 0.5 0.355
93.540 95.000 LHS 1.460 0.5 0.730
97.000 97.500 LHS 0.500 0.5 0.250
97.570 97.855 LHS 0.285 0.5 0.143
97.900 99.880 LHS 1.980 0.5 0.990
99.970 103.620 LHS 3.650 0.5 1.825
103.700 104.730 LHS 1.030 0.5 0.515
107.930 108.110 LHS 0.180 0.5 0.090
108.165 108.515 LHS 0.350 0.5 0.175
108.590 109.765 LHS 1.175 0.5 0.587
0.000 0.5 0.000
63.830 64.520 RHS 0.690 0.5 0.345
64.700 65.450 RHS 0.750 0.5 0.375
65.620 66.200 RHS 0.580 0.5 0.290
66.400 67.980 RHS 1.580 0.5 0.790
68.180 69.820 RHS 1.640 0.5 0.820
70.260 73.350 RHS 3.090 0.5 1.545
73.440 73.780 RHS 0.340 0.5 0.170
74.500 74.640 RHS 0.140 0.5 0.070
74.640 74.900 RHS 0.260 0.5 0.130
75.050 77.040 RHS 1.990 0.5 0.995
77.320 77.920 RHS 0.600 0.5 0.300
79.400 81.310 RHS 1.910 0.5 0.955
82.940 84.980 RHS 2.040 0.5 1.020
90.120 90.580 RHS 0.460 0.5 0.230
90.580 90.910 RHS 0.330 0.5 0.165
92.760 92.810 RHS 0.050 0.5 0.025
93.280 93.500 RHS 0.220 0.5 0.110
93.720 95.000 RHS 1.280 0.5 0.640
104.678 105.6 RHS 0.922 0.5 0.461
106.37 108.11 RHS 1.740 0.5 0.870
TOTAL 23.696
PN-29 - Improvements to Belhe-Loni - Pabal - Shikrapur - Ashtapur -
UraliKanchan-Jejuri-New NH – Wathar-Satara Road SH-117 Km 0/000- Km
136/500 District–Pune section in the State of Maharashtra Hybrid Annuity
Mode. (Part-II TalegaonDhamdhere to Jejuri Km 63/774 to Km 111/679
excluding overlap Length of 1.113 Km)

Sr No Chainage Remark
1 66.440 COMPLETED
2 66.655 COMPLETED
3 69.078 COMPLETED
4 70.220 COMPLETED
5 72.580 COMPLETED
6 72.886 COMPLETED
7 76.168 COMPLETED
8 76.940 COMPLETED
9 77.043 COMPLETED
10 78.330 COMPLETED
11 78.482 COMPLETED
12 80.007 COMPLETED
13 80.195 COMPLETED
14 80.917 COMPLETED
15 83.139 COMPLETED
16 83.490 COMPLETED
17 90.258 COMPLETED
18 91.696 COMPLETED
19 93.500 COMPLETED
20 93.655 COMPLETED
21 93.758 COMPLETED
22 97.523 COMPLETED
23 97.590 COMPLETED
24 98.485 COMPLETED
25 98.876 COMPLETED
26 99.368 COMPLETED
27 99.585 COMPLETED
28 100.518 COMPLETED
29 101.825 COMPLETED
30 102.106 COMPLETED
31 103.223 COMPLETED
32 104.180 COMPLETED
33 106.987 COMPLETED
34 107.420 COMPLETED
35 107.585 COMPLETED
36 109.459 COMPLETED
37 111.163 COMPLETED
COMPLETED 37
RETAINING WALL

Quantity Quantity
Date From To Side Length Width Depth
( Cum ) ( Sqm )
Remark

76.600 76.780 LHS 0.180


77.440 77.490 RHS 0.050
0.230
PN-29 - Improvements to Belhe-Loni - Pabal - Shikrapur - Ashtapur -
UraliKanchan-Jejuri-New NH – Wathar-Satara Road SH-117 Km 0/000-
Km 136/500 District–Pune section in the State of Maharashtra Hybrid
Annuity Mode. (Part-II TalegaonDhamdhere to Jejuri Km 63/774 to Km
111/679 excluding overlap Length of 1.113 Km)

SIDE DRAIN

Net Length
Date From To Side Length Factor
in KM

63.830 64.520 LHS 0.690 0.5 0.345


64.690 65.440 LHS 0.750 0.5 0.375
65.550 69.970 LHS 4.420 0.5 2.210
70.065 73.260 LHS 3.195 0.5 1.598
73.440 74.915 LHS 1.475 0.5 0.738
75.020 77.080 LHS 2.060 0.5 1.030
77.300 77.490 LHS 0.190 0.5 0.095
77.530 77.920 LHS 0.390 0.5 0.195
78.240 78.990 LHS 0.750 0.5 0.375
79.400 81.310 LHS 1.910 0.5 0.955
82.980 85.720 LHS 2.740 0.5 1.370
88.200 92.300 LHS 4.100 0.5 2.050
92.750 92.900 LHS 0.150 0.5 0.075
93.500 95.000 LHS 1.500 0.5 0.750
97.000 99.920 LHS 2.920 0.5 1.460
99.970 105.670 LHS 5.700 0.5 2.850
105.720 105.960 LHS 0.240 0.5 0.120
105.980 106.260 LHS 0.280 0.5 0.140
106.370 108.130 LHS 1.760 0.5 0.880
108.170 108.480 LHS 0.310 0.5 0.155
108.650 109.430 LHS 0.780 0.5 0.390
109.470 111.640 LHS 2.170 0.5 1.085
0.000 0.5 0.000
63.830 69.970 RHS 6.140 0.5 3.070
70.065 73.350 RHS 3.285 0.5 1.643
73.440 73.800 RHS 0.360 0.5 0.180
74.500 74.900 RHS 0.400 0.5 0.200
75.020 75.380 RHS 0.360 0.5 0.180
75.450 77.090 RHS 1.640 0.5 0.820
77.320 77.520 RHS 0.200 0.5 0.100
77.540 77.920 RHS 0.380 0.5 0.190
78.600 78.820 RHS 0.220 0.5 0.110
78.900 78.990 RHS 0.090 0.5 0.045
79.400 81.310 RHS 1.910 0.5 0.955
82.980 85.750 RHS 2.770 0.5 1.385
88.300 88.950 RHS 0.650 0.5 0.325
89.000 90.100 RHS 1.100 0.5 0.550
90.120 91.820 RHS 1.700 0.5 0.850
92.750 92.930 RHS 0.180 0.5 0.090
93.280 94.990 RHS 1.710 0.5 0.855
97.000 97.500 RHS 0.500 0.5 0.250
97.530 97.580 RHS 0.050 0.5 0.025
97.600 97.820 RHS 0.220 0.5 0.110
97.820 97.870 RHS 0.050 0.5 0.025
98.050 99.120 RHS 1.070 0.5 0.535
99.180 99.920 RHS 0.740 0.5 0.370
99.970 101.810 RHS 1.840 0.5 0.920
101.830 102.150 RHS 0.320 0.5 0.160
102.170 103.220 RHS 1.050 0.5 0.525
103.230 103.600 RHS 0.370 0.5 0.185
103.700 104.160 RHS 0.460 0.5 0.230
104.190 105.670 RHS 1.480 0.5 0.740
105.720 105.960 RHS 0.240 0.5 0.120
105.980 106.260 RHS 0.280 0.5 0.140
106.370 108.110 RHS 1.740 0.5 0.870
108.110 108.130 RHS 0.020 0.5 0.010
108.170 108.480 RHS 0.310 0.5 0.155
108.650 109.430 RHS 0.780 0.5 0.390
109.470 109.960 RHS 0.490 0.5 0.245
110.000 110.790 RHS 0.790 0.5 0.395
110.790 110.880 RHS 0.090 0.5 0.045
111.010 111.130 RHS 0.120 0.5 0.060
111.170 111.640 RHS 0.470 0.5 0.235
37.528
PQC

Quantity Quantity
Date From To Side Length Width Depth
( Cum ) ( Sqm )
Remark

84.980 85.740 LHS 0.760


84.980 85.720 RHS 0.740

0.750
PN-29 - Improvements to Belhe-Loni - Pabal - Shikrapur - Ashtapur - UraliKanchan-Jejuri-New
NH – Wathar-Satara Road SH-117 Km 0/000- Km 136/500 District–Pune section in the State of
Maharashtra Hybrid Annuity Mode. (Part-II TalegaonDhamdhere to Jejuri Km 63/774 to Km
111/679 excluding overlap Length of 1.113 Km)

DBM TOP

From To Side Length Remark

63.774 69.970 BHS 6.196


70.260 73.260 BHS 3.000
73.440 73.800 BHS 0.360
74.500 74.910 BHS 0.410
75.080 77.070 BHS 1.990
77.320 77.920 BHS 0.600
78.500 78.980 BHS 0.480
79.400 81.310 BHS 1.910
82.980 84.980 BHS 2.000
88.400 89.580 BHS 1.180
89.940 91.800 BHS 1.860
93.080 95.000 BHS 1.920
TOTAL 21.906