You are on page 1of 2

Lucky Paragon ReadyMix Limited

Plant, Machinery & Equipment Breakdown Report


Date: 11-September-2019
LONG BREAK DOWN DETAILS:
Machineries & Equipment Status

Non
S#. Type Working Total
Working

1 Transit Mixers 22 6 28
2 Bulker 1 0 1
3 M.Concrete Pump 3 0 3
4 Stationary Pump 2 0 2
5 Plant 2 0 2
6 Loader 1 1 2
7 Cooling Tower 1 0 1
8 Generators 3 0 3
TOTAL NO OF ASSETS 42
TOTAL MACHINES BREAKDOWN 7
Non-Functional Machineries & Equipment
Equipment &
Sr # Defect/Fault Machineries Not Working Date

MAJOR BREAK DOWN LIST


1 Plentary Bearing Damage T.M # 06 20-Aug-19
2 Chasis not Aligned after accident T.M # 12 10-Jun-19
3 05 m3 Concrete Freeze T.M # 14 20-Mar-19
4 Injector Problem T.M # 17 6-Jul-19
5 break shoe service TM#16 11/09/2019
6 Streeing box problem TM#03 11/9/2019
7 break leather service & hyd
boom pump hyd leakage MCP#05 13/09/2019

DAILY WORK MECHANIC REPOR


pment
Total no. of Estimated Date of
Current Status Remarks (If any)
days. Repair.

In Progress 15 5-Sep-19
As per Noshad sb
Awaiting Decision 86 - (We should sell it)
In Progress 168 20-Sep-19
In Progress 60 6-Sep-19 testing
In Progress 1 10-Sep-19
In Progress 1 12-Sep-19 work complete

In Progress 1 15/09/2019 Brake Shoe Leather service from market

WORK MECHANIC REPORTS

You might also like