HALIÇ BRIDGE
P. 10 ISTANBUL—TURKEY
STRUCTURE
Magazine
P. 06 FOREVA® REPAIR SOLUTIONS
P. 07 CURRENT PROJECTS AROUND THE WORLD
P. 20 EARTHQUAKE PROTECTION WITH ISOSLAB
THE IMAGE
More about
MuCEM
Contents
06 The encounter
Alain Ghenassia and Alain Huynh
10 The major project
The Haliç Bridge in
20 The technology
Earthquake protection
talk about Foreva® repair solutions. the heart of Istanbul. with Isoslab.
02
07 Around the world
Freyssinet projects
12 Achievements
We take a look at some
22 The group
News in brief from other
in Malaysia, Australia, of our flagship Construction Soletanche Freyssinet 03
France and Saudi Arabia. and Repair projects. Group entities.
Welcome to the new Freyssinet magazine format. Structure Magazine, Freyssinet’s twice-yearly magazine
Communication Department: 1 bis, rue du Petit Clamart,
Structure Magazine is the successor to Soils 78148 Vélizy-Villacoublay Cedex, France ×
and Structures, providing a twice-yearly overview manager: Guillaume Billaroch × Õ
Juliette Dumoulin Õ Agnès
of our projects worldwide. The magazine complements Baranger, Isabelle Mennesson et Thomas Colombain
our web site www.freyssinet.com, which contains Design: â EMAPRESS æ
Telelingua â 4,000 copies in French, 8,000 copies
more news and information about our business. in English and 2,000 copies in SpanishÛååà pending
â Soletanche Freyssinet Photo Library,
Ian Hanning - REA, IDE, Malgorzata Kistryn - Fotolia.com,
Luc Benevello, Atkins, Thierry Chomel & Happy Day
Contact: structuremag@sf-group.com
582
The figure
metres
to new compact sheath
technology, which reduces
the wind resistance of the
stay cables by 20%.
The news
The contract
Freyssinet is set to design, ODAYERI
Sultan Yavuz
Selim Bridge
Black Sea
SARIYER
POYRAZKÖY
ISTANBUL
MASLAK
BULGARIA
Istanbul
Black
RUSSIA
PASAKÖY
TURKEY
ÇEKMEKÖY
FIB Mumbai
Freyssinet will be at the Fourth
International FIB Congress being held
in Mumbai, India, from 10 to 14 February
2014. This year’s congress is on the
theme of Improving Performance of
Concrete Structures. Come and see us
to find out about Freyssinet’s techniques
and solutions.
For more information, visit
http://www.fibcongress2014mumbai.com/
04
Foreva®˖
the quality repair label
Designing and applying structural reinforcement Stringent performance criteria
products requires continuous research «FOREVA® solutions incorporate structural design
into new solutions at our laboratories. methods, the manufacture of tested, approved products
We have been developing FOREVA® products ¶Ó
and solutions for over six years, and the range now Huynh. «This means that we can support our customers
consists of more than 200 systems for repairing at every stage of their project, from assistance with
structures, including chemical and electrochemical diagnosis and choosing the right solution to performing
treatments and mechanical strengthening methods ¶This label of excellence is applied to repair
FOREVA® solutions can be used for a wide range of solutions and products that are tested, approved and
problems, from treating cracks in concrete through applied under real conditions by production workers,
cathodic protection (to prevent reinforcement corrosion) technicians and sales representatives. The success of
and earthquake protection to additional prestressing. FOREVA® solutions lies in feedback from employees.
They are suitable for all types of structure, ancient or With a technical department that brings together civil
modern, including buildings, bridges, civil engineering, and chemical engineers and materials and corrosion
hydraulic and industrial structures, tunnels and arches. specialists, Freyssinet guarantees high quality solutions
µØʽ and products.
implemented in accordance with good practice and
ʽ¶Alain Ghenassia. Sustainable solutions
Freyssinet’s priority with FOREVA® is to provide long-
lasting solutions. «Our solutions also meet requirements
relating to structures’ compliance with standards. These
are issues of user safety, which are central to our
operations, from initial discussions to delivery of the
¶ says Alain Huynh.
Alain Ghenassia adds, µØáä×èÓŔ˃
development policy: improving, preserving and securing
structures means that we can conserve non-renewable
¶
Øáä×èÓŔʽ
ʽ
proving that comprehensive solutions (design, production
and on-site application) are exactly what customers want
and need.
ÓÞÓÛàÙÚ×àÓååÛÓÓàÖÓÞÓÛàÚçëàÚ
ßØáä×èÓŔ
You can order FOREVA® brochures at
www.freyssinet.com/reparation
Solutions
oreva
3RXUODYDORULVDWLRQ
RÉGION ILE-DE-FRANCE
COURONNE
RÉGION EST
1 rue Charles Sellier -
Tél. : 03 83 53 10 22 -
Z.A. des Egrez - 54180
Fax : 03 83
Óàæ×àà×åæäÓåÔá 56 78 70
27 Rue du Fossé des
67000 STRASBOURG
çäÙ
Treize
HOUDEMONT
Óàæ×àà×Ùä×àáÔ
9 avenue Paul Verlaine
Tél. : 04 76 48 12 46
RÉGION SUD-EST
Þ×
- 38030 GRENOBLE
- Fax : 04 76 48 15 43
Cedex 2
GXUDEOHGHYRVVWUXFWXUHV
Rue de la Vaserie - BP Tél. : 03 67 07 61 81 235 avenue de Coulins
4214 - 44342 BOUGUENAIS - Parc d’Activités - 13420
Tél. : 02 40 26 92 92 - Cedex Tél. : 04 42 32 72 00 - GÉMENOS
Fax : 02 40 32 06 01 AGENCE
SCCM (Câbles & Manutention) Fax : 04 42 32 19 54
Óàæ×àà×Ôä×åæ Óàæ×àà×àÛÕ×
1 bis rue du Petit Clamart
190 rue Hemingway – Bât. C - 78140 VÉLIZY 28 allée des Pêcheurs
- Bât. Kerviou - 29200 Tél. : 01 46 01 84 44 - VILLACOUBLAY - Z.I. Saint Laurent du
Tél. : 02 98 46 93 21 BREST Fax : 01 46 01 86 74 06700 SAINT LAURENT Var secteur A3
- Fax : 02 98 46 90 26 DU VAR
Óàæ×àà×æáçäå RÉGION
RHÔNE-ALPES Tél. : 04 92 04 27 67
- Fax : 04 92 04 83 30
2 rue Pablo Picasso - 39 rue Jules Guesde - Óàæ×àà×àđß×å
More about
37520 LA RICHE BP 82 - 69565 SAINT-GENIS-LAVAL
Tél. : 02 47 21 99 62 Tél. : 04 78 51 46 22 - Cedex Z.A. Km Delta - 200 avenue
- Fax : 02 47 37 12 85 Fax : 04 78 50 32 96 Maurice Trintignant
RÉGION
- AGENCE TP 30900 NÎMES
SUD-OUEST 39 rue Jules Guesde - Tél. : 04 66 29 12 68
4 imp. de Borde-Basse BP 82 - 69565 SAINT-GENIS-LAVAL - Fax : 04 66 29 18 68
- BP 24104 - Z.I. La Violette Tél. : 04 78 51 46 22 - Cedex
31241 L’UNION Cedex Fax : 04 78 50 32 96 RÉGION
NORD
- AGENCE BÂTIMENT
Tél. : 05 62 89 03 03 - 1ère avenue Espace entreprises
Fax : 05 61 09 96 24 75 chemin d’Yvours -
Solutions
Óàæ×àà×ÔáäÖ×Ó BP 23 - 69491 PIERRE-BÉNITE Port Fluvial – CS 50094
8QHH[SHUWLVH
([SHUWHQVROXWLRQVGHUÅSDUDWLRQ)UH\VVLQHWPHWVRQVDYRLUIDLUHDXVHUYLFHGHVFRQFHSWHXUV
HWGHVGRQQHXUVGpRUGUHHWOHVDFFRPSDJQH¼WRXVOHVVWDGHVGXSURMHWGHSXLVOpDLGH
DXGLDJQRVWLFDXFKRL[GHODVROXWLRQDSSURSULÅHMXVTXp¼ODUÅDOLVDWLRQGHVWUDYDX[
'HVVROXWLRQVHWSURGXLWVpSURXYpV
'RWÅGpXQGÅSDUWHPHQWWHFKQLTXHUHJURXSDQWGHVLQJÅQLHXUVGXJÅQLHFLYLOHWGHODFKLPLH
GHVVSÅFLDOLVWHVGHVPDWÅULDX[HWGHODFRUURVLRQ)UH\VVLQHWPÄQHXQHSROLWLTXHYRORQWDULVWH
GHGÅYHORSSHPHQWGHVROXWLRQVHWSURGXLWVGHUÅSDUDWLRQYDOLGÅVSDUÅSUHXYHVHQODERUDWRLUH
HWSDUUHWRXUVGpH[SÅULHQFHVFKDQWLHU
www.freyssinet.com
© 2012 Soletanche
Toute reproduction,
Freyssinet - Les textes,
photos et autres informations
représentation ou autre contenus dans le présent
Soletanche Freyssinet usage sans le consentement catalogue sont la propriété
encourage l’utilisation préalable de Soletanche du Groupe Soletanche
des pâtes à papier issues Freyssinet est illicite. Freyssinet.
Édition : 03/2012 -
R I 0 - Imprimé en France de la gestion durable
des forêts. Le papier
- Foreva® est une marque
déposée par Soletanche
A m é l i o r e r , P é r e n n i s e r , S é c u r i s e r
de ce catalogue a été Freyssinet.
certifié selon les règles
très strictes du programme
de reconnaissance
des certifications forestières
PEFC (Program for the
Endorsement of Forest
Certification).
'HVpTXLSHVVSpFLDOLVpHV
/HVDYRLUIDLUHGpÅTXLSHVVSÅFLDOLVÅHVSHUPHW¼)UH\VVLQHWGHUHVSHFWHUOHVH[LJHQFHV
GHVHVFOLHQWVHQWHUPHGHTXDOLWÅGHGÅODLVGHFR×WVGHVÅFXULWÅHWGpHQYLURQQHPHQW
8QUÅVHDXGHQVHGpLPSODQWDWLRQVIDYRULVHXQVHUYLFHGHSUR[LPLWÅHWRIIUHDX[FOLHQWV
XQHJUDQGHUÅDFWLYLWÅ
8QHQJDJHPHQWGDQVOHGpYHORSSHPHQWGXUDEOH
$PÅOLRUHUSÅUHQQLVHUHWVÅFXULVHUOHVVWUXFWXUHVFRQWULEXHQW¼ÅFRQRPLVHUOHVUHVVRXUFHV
QRQUHQRXYHODEOHVHW¼UÅGXLUHOHVJD]¼HIIHWGHVHUUH
5,
Malaysia
A SECOND BRIDGE
BETWEEN PENANG AND
THE MAINLAND
á ß
ťŧŢ ÝÞ
Freyssinet is carrying out post-tensioning
work as part of the construction
of the Penang Second Bridge. The major
new structure will link the island
of Penang to the mainland, stretching
a total of 24 km, and is scheduled
to open at the end of 2013.
06
07
Australia
MLC CENTRE
Ó
å
ŤŤŢ
ţūũŪ .
. Freyssinet is in charge
of the repairs, which include the installation of
innovative cathodic protection that will prevent
any future corrosion of the concrete.
An additional challenge lies in the need
to work on enclosed, soundproofed platforms
to minimise disruption to the building’s tenants.
France
HIGH-SPEED FREYSSINET
Ø
ÞÙèå×Ó (South Europe Atlantic
High-Speed Rail), for which 300 km of new
railway line will be built by 2017. The scale of
the project means that Freyssinet’s expertise
will be called upon in a number of areas,
including prestressing, structural accessories
(bearings and joints), jacking and heavy lifting.
Ť
Structure Magazine — 2nd semester 2013 — no. 228
The major project
HALIÇ
BRIDGE
The essentials
ISTANBUL—TURKEY
In Istanbul, the Haliç Bridge, the move up and down the Bosphorus.
fourth across the Golden Horn, has æ
˃
just been completed. The structure viaducts at either end, connecting them
is made up of two access viaducts, to the tunnels. The cable-stayed structure
a cable-stayed bridge and a swing comprises two steel towers 65 metres
bridge. Freyssinet produced and in height, with the platform and roof of
installed the stay cables, prestressing the metro station sitting between them
and bearings and lifted the segments. on the main span of the bridge.
The bridge, which is built on a
historical site, enables the extension A project in keeping with the
of a metro line in a city plagued surrounding historical heritage
ʾ
Because the Haliç Bridge is built on a
There were previously three bridges çà×åÕáʽ
across the Bosphorus, the Golden Horn site, particular care was taken during
Bridge, the Atatürk Bridge and the Galata the work to preserve the archaeological
Bridge. They were joined by the Haliç remains in the area. The main challenges
Metro Bridge in mid-2013. The new link were protecting the archaeological
combines a cable-stayed bridge with a remains during the digging of the
metro station. foundations, and preserving the view The bridge, which carries
At 919 metres long, the bridge connects of the Süleymaniye Mosque. the extension of the M2 metro
two metro tunnels located on either The pier foundations were therefore line, will help improve Istanbul’s
public transport system.
side of the estuary and will enable dug by hand, and the planned height
the extension of the M2 metro line of the towers was reduced from
beyond the Yenikapi terminus to Taksim 82 metres to 65 metres to limit the The partners
Square, thus increasing the transport visual impact of the structure. — Contracting authority:
capacity from 200,000 to around Istanbul Metropolitan Municipality
750,000 passengers per day. — Architect: Hakan Kiran
— General contractor: Astaldi-
Several types of structure
The bridge consists of three main parts,
the largest being the 387 metre long 919 Gulermak JV
— Main subcontractors:
Freysaş-Freyssinet
Wiecon (construction surveys)
cable-stayed section over the Golden
Horn. It has a 180-metre central span and
two 90-metre side spans. The structure is
metres
Total length of the structure.
Waagner Biro (swing bridge
mechanism)
GREECE
TURKEY TEPEBASI
IRAN
BALAT
Golden
GALATASARAY CUKURKUMA
SYRIA Horn
CYPRUS IRAQ Nusretiye Mosque
Atatürk Bridge
Galata Tower
KARAKÖY
Fatih Sultan Mehmet Bridge Bosphorus
ATATÜRK
Blue Mosque
YENIKAPI
10
11
ßÓäæÛàPROJECT MANAGER
More about
”Enhancing the site and using modern the Haliç Bridge.
Construction
Repairs
Canada
HEBRON GBS
Ø
Úʺ , Freyssinet has signed
another significant contract in Newfoundland. Freyssinet has won the
contract to supply and install the prestressing for the Hebron GBS
(Gravity Based Structure) on behalf of oil company Exxon. This imposing
concrete structure, designed to store barrels of crude oil, will be placed
in the Atlantic Ocean at a depth of 90 metres, 350 km off the Canadian
coast. The structure is made up of 130,000 m3 of concrete and will be
reinforced with around 3,000 tonnes of prestressing to ensure that it is
watertight and iceberg resistant.
The essentials
Ú×ÔäáàÙÔå
— The project: A 130 m-diameter
gravity base with seven storage
compartments, surrounded
by seven ice walls to protect
against icebergs.
— General contractor:
Kiewit-Kværner Contractors
— Implementation: Supply
and installation of 3,000 tonnes
of offshore prestressing, with
ducts laid during the slipforming
of the structure. The operations
take place in the dry dock and
then offshore when the platform
is floated.
— Duration: The entire project
is scheduled for completion by
the end of 2015.
DAMMAM
BRIDGE
Ø
Ö
on the east coast of Saudi Arabia. The structure will
be comprised of 48 spans of varying lengths
(between 16.4 and 55 metres), 714 segments
and 1,000 tonnes of external prestressing. During
the installation phase, the team will be using a
launching gantry specially developed by the
Freyssinet technical department. «The existing
launcher has been completely adapted to suit
the characteristics of the project. This piece of
equipment completes our range of installation
tools and will be a major asset for future projects»
says Vincent Butty, Project Manager.
The essentials
ÖÓßßÓßÔäÛÖÙ×
— The project: a precast
segmental bridge intended
to make traffic run more
smoothly on the roads
between the city and port
of Dammam.
— Implementation:
Freyssinet is providing
technical support for the
setting up of the precasting
area, supplying four
segment precasting units,
performing geometric
inspections, supervising
the installation of the deck
and supplying and installing
the prestressing.
12
13
United States
BOY SCOUT
BRIDGE
ÛßÚéè
Freyssinet
(Freyssinet Inc. and Freyssinet Major Projects) worked
as the general contractor on the construction of a
suspended footbridge - the «CONSOL Energy Wing Tip
Bridge». Also nicknamed the «Boy Scout Bridge», this
footbridge spans a nature reserve within the New River
Gorge national park, which played host in July 2013
to the National Scout Jamboree (held by the Boy Scouts
of America and featuring 50,000 people).
The essentials
ÔáëåÕáçæÔäÛÖÙ×
— The project: a
suspended footbridge
approximately 30 metres
above the ground.
— Objective: to reduce
the time required to cross
the valley from 45 minutes
to 2 minutes.
— Implementation: the
carrier tendons were fitted
using a travelling carriage
system along a temporary
cable made of strands,
allowing the locked-coil
cables to be supported and
moved above the valley.
A cableway was used to fit
the segments.
— Duration: Work
commenced in March 2012
and was completed in
mid-2013.
OLD TOH
áÞÖæáÚæçÕÝäáÓÖ
éÓä×Úáçå×å
— The project:
WAREHOUSES
Ø ʽ
to take very heavy loads and
allow for the movement of
delivery vehicles.
— Implementation:
Designed to be split into several goods 26,700 m2 of prestressed
warehouses, the building had to be able to take heavy loads while floors and over 300 tonnes
retaining plenty of clear space for moving around. Prestressing by of prestressing strands were
post-tensioning was identified as the optimum solution for the project. installed.
The Freyssinet team was involved very early on in the design of the — Duration: work started
building, and then supplied and installed the prestressing. in August 2012 and was
completed in February 2013.
.
14
15
Construction
Repairs
Romania
BUCHAREST
CITY HALL
Ø
ÔÕÚ, which was
built over 100 years ago. Isolating the structure
from its foundations is often the best solution for
protecting historical buildings in high earthquake
risk areas like Romania. The isolation devices were
successfully tested at the University of San Diego
and comply with new European Standard
EN 15129 on anti-seismic devices.
The essentials
ÔçÕÚÓä×åæÕÛæëÚÓÞÞ
— The project: protecting
a very old building against
earthquake risk.
— Implementation:
Freyssinet has installed
a total of 262 isolators.
Each device is over 1 m in
diameter and 58 cm tall, and
weighs more than 2 tonnes.
The team is also carrying out
the loading and load transfer
using flat jacks.
— Duration: the project
is scheduled for completion
at the end of 2013, after two
years of work.
ANZAC
BRIDGE
æÓ
å
commissioned in 1995, holds the country’s
record for the longest cable-stayed bridge,
with a span of 345 m. Freyssinet won the
contract to solve the bridge’s structural
problems, namely abnormal stay cable
vibration due to wind and rain, the risk of
profound damage linked to the increas
e in the number of lanes on the structure
over the years, and fire protection of the
retaining cables.
The essentials
ÓàìÓÕÔäÛÖÙ×
— The project: repairing
and strengthening the
structure, which had
shown failings since it
was opened to traffic, and
solving a complex vibration 16
phenomenon.
— Implementation:
the Freyssinet teams used
innovative solutions to 17
reinforce the HDPE sheaths,
install special dampers,
protect the most critical
More about cables against fire and install
Freyssinet’s work improved stay cable anchor
on the Anzac Bridge. protection.
— Duration: approximately
three years; throughout the
work, the bridge’s eight lanes
remained open to traffic.
United Kingdom
HAMMERSMITH
BRIDGE
Ó ˃Þ, this road bridge
carries the A4 over the Hammersmith Roundabout. Following the
detection of a significant corrosion problem, the bridge was closed
to traffic in December 2011 and then partly reopened. After a short
design phase, Freyssinet carried out the emergency strengthening
work in record time ready for the bridge to be completely
reopened before the London 2012 Olympics.
The essentials
ÚÓßß×äåßÛæÚÔäÛÖÙ×
— The project: repairing
one of the oldest reinforced
concrete flyovers in
existence (completed
in 1961) at a strategic
London traffic point.
— Implementation:
additional prestressing
by post-tensioning was
installed above and below
the upper block.
— Duration: an intensive
schedule was put in place
to complete the work in time
for the London Olympics.
The project started at the
end of January 2012 and was
finished in May 2012, well
before the deadline set.
A second phase of work
took place in 2013.
More about
Hammersmith Bridge.
PANNECIERE
DAM
ÓťŧŢ
ŪŢ, the Pannecière Dam is
one of a number of basins and reservoirs upstream
of the greater Paris region. It provides flood risk
protection in a densely populated area. The structure
also houses a hydrœlectric plant, and required
general strengthening, particularly to bring it into
compliance with new earthquake regulations.
Freyssinet has carried out several different types
of work in conjunction with other VINCI Group
companies, using its Foreva® repair solutions.
The essentials
âÓàà×ÕÛ×ä×ÖÓß
— The project: repairing
the structure, which no
longer complied with
standards and needed to
be strengthened in order to
meet the new earthquake
regulations.
— Implementation:
Freyssinet stabilised
and strengthened the
arches, installed braces
for earthquake protection,
decontaminated the
asbestos-containing facings
(MTS) and repaired the
structure’s concrete using
Foreva® solutions.
— Duration: the work
took 18 months and was
completed in early 2013.
More about
Panneciere Dam.
18
19
æ
Ö
on buildings,
elements,
of the structure.
æ
Û
in which a large
percentage of the structural weight is horizontally
disconnected from the foundation system.
The movements of the ground and the structure
are therefore uncoupled. The system works like
a mattress and is designed to absorb the seismic
vibrations coming from the ground and propagating
in the structure, by means of four components:
is constructed.
Ó
æ is such that the
underground level can be used as a car park.
Designed to be modular, the Isoslab system
comes in the form of a kit made up of standard
elements enabling fast, reliable design, supply
and assembly. A complete catalogue of standard
size Isoslab systems is available, facilitating
the design of future projects.
á
to find out more
about Isoslab
1928
Prestressing is patented
Eugène Freyssinet filed the patent for prestressing,
using the term «permanent pre-compression of
concrete». The patent is a turning point in the life
of the engineer, who decides to devote himself entirely
to research into prestressing so that it can become
an industrial reality.
19 000 80 5
employees countries companies
methane terminal
shielding and a containment membrane. The work
on both units was carried out in conjunction with
other Nuvia group entities such as Vraco and Essor.
23
— Q2 2012 —