Contoh: Rp8,000,000 Rp4,000,000
Contoh: Rp8,000,000 Rp4,000,000
I MEKARSARI
1 MATERIAL
a. PO Delta Brick Rp 8,000,000 Rp - Rp8,000,000
b. PO Dunia Mortar Rp 4,000,000 Rp - Rp4,000,000
CONTOH
c. PO Pipa PVC dan Westpax Rp 3,500,000 Rp 3,500,000 Rp0
2 UPAH
a. Kasbon Tenaga Kerja 09/12/2018 - 15/12/2018 Rp 12,000,000 Rp 12,000,000 Rp0
b. Upah Tenaga Harian Paving Rp 3,000,000 Rp 3,000,000 Rp0
II PEKANBARU
1 MATERIAL
a. PO Pipa PVC Rp 15,000,000 Rp 7,500,000 Rp7,500,000
b. PO Besi Beton Rp 5,000,000 Rp 2,500,000 Rp2,500,000
2 UPAH
a. Kasbon Tenaga Kerja 09/12/2018 - 15/12/2018 Rp 2,000,000 Rp 2,000,000 Rp0