Saldo Rekening Kantor - Awal Rp 35,000,000

Periode : 09 Desember 2018 - 15 Desember 2018

No Uraian Pengajuan Anggaran Alokasi Realisasi Anggaran Defisit Keterangan

I MEKARSARI

1 MATERIAL
a. PO Delta Brick Rp 8,000,000 Rp - Rp8,000,000
b. PO Dunia Mortar Rp 4,000,000 Rp - Rp4,000,000

CONTOH
c. PO Pipa PVC dan Westpax Rp 3,500,000 Rp 3,500,000 Rp0

2 UPAH
a. Kasbon Tenaga Kerja 09/12/2018 - 15/12/2018 Rp 12,000,000 Rp 12,000,000 Rp0
b. Upah Tenaga Harian Paving Rp 3,000,000 Rp 3,000,000 Rp0

II PEKANBARU

1 MATERIAL
a. PO Pipa PVC Rp 15,000,000 Rp 7,500,000 Rp7,500,000
b. PO Besi Beton Rp 5,000,000 Rp 2,500,000 Rp2,500,000

2 UPAH
a. Kasbon Tenaga Kerja 09/12/2018 - 15/12/2018 Rp 2,000,000 Rp 2,000,000 Rp0

TOTAL Rp 52,500,000 Rp 30,500,000 Rp22,000,000

Saldo Rekening Kantor - Akhir Rp 4,500,000