Jakarta, 19 Februari 2024

CV . Graha Ideku Interior

Attn. : Bapak Kurniadi

PERIHAL :

BQ Pekerjaan AC Shopee Gamma lantai 7 option 1


Area staff dan meeting room

Dengan Hormat Bapak / Ibu :

Dengan ini kami ajukan penawaran harga sesuai permintaan dengan detail :

TOTAL AMOUNT
NO. ITEM
( Rp )

A PRELIMINARY Rp 7.500.000
B AIR CONDITIONING WORKS Rp 160.799.000
C PANEL WORKS Rp 2.500.000

TOTAL Rp 170.799.000
PPN 11% Rp 18.787.890
GRAND TOTAL Rp 189.586.890

Note : Harga diatas :


- excluding repair ceiling or wall

- Term of Payment = Down Payment 30% after receive PO


2nd Payment upon 20% after 50% progress on site
3rd Payment upon 25% after 75% progress on site
25% upon completion of the construction

Teroma kasih
PT. Anugrah Tekno Semesta

_______________________
Indrianto
Location : GAMA TOWER
Floor : 7 (OFFICE SHOPEE)
BILL OF ITEMS
Area : STAFF & MEETING ROOM
option 1
Revision :
Date : 16 JANUARY 2024

Unit price Amount


No. Description SPECIFICATION Qty (Rp.) (Rp.) REMARK
BQ BQ PO
BILL OF QUANTITY
A PRELIMINARY
1 Material support & transport 1 lot Rp 7.500.000 Rp 7.500.000

TOTAL Rp 7.500.000
B AIR CONDITIONING WORKS
1 Supply & install AC CASSETTE CAP 2,5PK 2 unit Rp 46.120.000 Rp 92.240.000 Daikin (SCC60ARR)
2 Supply & install AC SPLIT WALL CAP 2PK 1 unit Rp 10.384.000 Rp 10.384.000 Daikin (FTC50XV14 + RC50XV 14)
3 Supply & install refrigerant pipe 84 m Rp 260.000 Rp 21.840.000
4 Supply & install drain pipe 84 m Rp 85.000 Rp 7.140.000
5 supply & install drain pump 1 unit Rp 975.000 Rp 975.000
6 Supply & install cable installation NYM 3x4 mm for AC CASSETTE CAP 2,5PK 100 m Rp 49.000 Rp 4.900.000
7 Supply & install cable installation NYM 3x2,5 mm for AC SPLIT WALL CAP 2PK 50 m Rp 27.000 Rp 1.350.000
8 Supply & install bracket support for outdoor AC 3 unit Rp 2.025.000 Rp 6.075.000
9 Pressure test, Vaccum & commissioning 1 lot Rp 895.000 Rp 895.000

TOTAL Rp 160.799.000
C PANEL WORKS
1 Modifikasi panel existing 1 unit Rp 2.500.000 Rp 2.500.000

TOTAL Rp 2.500.000
GRAND TOTAL Rp 170.799.000
Jakarta, 19 Februari 2024

CV . Graha Ideku Interior

Attn. : Bapak Kurniadi

PERIHAL :

BQ Pekerjaan AC Shopee Gamma lantai 7 option 2


Area staff

Dengan Hormat Bapak / Ibu :

Dengan ini kami ajukan penawaran harga sesuai permintaan dengan detail :

TOTAL AMOUNT
NO. ITEM
( Rp )

A PRELIMINARY Rp 6.000.000
B AIR CONDITIONING WORKS Rp 135.820.000
C PANEL WORKS Rp 2.500.000

TOTAL Rp 144.320.000
PPN 11% Rp 15.875.200
GRAND TOTAL Rp 160.195.200

Note : Harga diatas :


- excluding repair ceiling or wall

- Term of Payment = Down Payment 30% after receive PO


2nd Payment upon 20% after 50% progress on site
3rd Payment upon 25% after 75% progress on site
25% upon completion of the construction

Teroma kasih
PT. Anugrah Tekno Semesta

_______________________
Indrianto
Location : GAMA TOWER
Floor : 7 (OFFICE SHOPEE)
Area : STAFF AREA BILL OF ITEMS
Revision : option 2
Date : 16 JANUARY 2024

Unit price Amount


No. Description SPECIFICATION Qty (Rp.) (Rp.) REMARK
BQ BQ PO
BILL OF QUANTITY
A PRELIMINARY
1 Material support & transport 1 lot Rp 6.000.000 Rp 6.000.000

TOTAL Rp 6.000.000
B AIR CONDITIONING WORKS
1 Supply & install AC CASSETTE CAP 2,5PK 2 unit Rp 46.120.000 Rp 92.240.000 Daikin (SCC60ARR)
2 Supply & install refrigerant pipe 63 m Rp 260.000 Rp 16.380.000
3 Supply & install drain pipe 63 m Rp 85.000 Rp 5.355.000
4 Supply & install cable installation NYM 3x4 mm for AC CASSETTE CAP 2,5PK 100 m Rp 49.000 Rp 4.900.000
5 Supply & install bracket support for outdoor AC 2 unit Rp 2.025.000 Rp 4.050.000
6 Pressure test, Vaccum & commissioning 1 lot Rp 895.000 Rp 895.000

TOTAL Rp 135.820.000
C PANEL WORKS
1 Modifikasi panel existing 1 unit Rp 2.500.000 Rp 2.500.000

TOTAL Rp 2.500.000
GRAND TOTAL Rp 144.320.000
Jakarta, 19 Februari 2024

CV . Graha Ideku Interior

Attn. : Bapak Kurniadi

PERIHAL :

BQ Pekerjaan AC Shopee Gamma lantai 7 option 3


Area meeting room

Dengan Hormat Bapak / Ibu :

Dengan ini kami ajukan penawaran harga sesuai permintaan dengan detail :

TOTAL AMOUNT
NO. ITEM
( Rp )

A PRELIMINARY Rp 2.000.000
B AIR CONDITIONING WORKS Rp 26.874.000
C PANEL WORKS Rp 2.500.000

TOTAL Rp 31.374.000
PPN 11% Rp 3.451.140
GRAND TOTAL Rp 34.825.140

Note : Harga diatas :


- excluding repair ceiling or wall

- Term of Payment = Down Payment 30% after receive PO


2nd Payment upon 20% after 50% progress on site
3rd Payment upon 25% after 75% progress on site
25% upon completion of the construction

Teroma kasih
PT. Anugrah Tekno Semesta

_______________________
Indrianto
Location : GAMA TOWER
Floor : 7 (OFFICE SHOPEE)
BILL OF ITEMS
Area : MEETING ROOM
option 3
Revision :
Date : 16 JANUARY 2024

Unit price Amount


No. Description SPECIFICATION Qty (Rp.) (Rp.) REMARK
BQ BQ PO
BILL OF QUANTITY
A PRELIMINARY
1 Material support & transport 1 lot Rp 2.000.000 Rp 2.000.000

TOTAL Rp 2.000.000
B AIR CONDITIONING WORKS
1 Supply & install AC SPLIT WALL CAP 2PK 1 unit Rp 10.384.000 Rp 10.384.000 Daikin (FTC50XV14 + RC50XV 14)
2 Supply & install refrigerant pipe 21 m Rp 260.000 Rp 5.460.000
3 Supply & install drain pipe 21 m Rp 85.000 Rp 1.785.000
4 supply & install drain pump 1 unit Rp 975.000 Rp 975.000
5 Supply & install cable installation NYM 3x2,5 mm for AC SPLIT WALL CAP 2PK 50 m Rp 27.000 Rp 1.350.000
6 Supply & install bracket support for outdoor AC 1 unit Rp 2.025.000 Rp 2.025.000
7 Pressure test, Vaccum & commissioning 1 lot Rp 895.000 Rp 895.000

TOTAL Rp 26.874.000
C PANEL WORKS
1 Modifikasi panel existing 1 unit Rp 2.500.000 Rp 2.500.000

TOTAL Rp 2.500.000
GRAND TOTAL Rp 31.374.000