Professional Documents
Culture Documents
A PRELIMINARY
1 Direksi keet + Gudang Kerja 1,00 ls Rp - Rp -
2 Uitzet / bouwplank 31,00 m¹ Rp 48.150,00 Rp 1.492.650,00
3 Security 1 Orang 1,00 ls Rp - Rp -
4 End of Job Cleaning 1,00 ls Rp 750.000,00 Rp 750.000,00
5 Site Administrasi Shop Drawing, As Built Drawing 1,00 ls Rp 500.000,00 Rp 500.000,00
6 K-3 1,00 ls Rp 5.000.000,00 Rp 5.000.000,00
7 Mobilisasi dan Demobilisasi 1,00 ls Rp 1.000.000,00 Rp 1.000.000,00
TOTAL A Rp 8.742.650,00
TOTAL B Rp 153.786.655,66