NO DESKRIPSI PEKERJAAN KODE SATUAN VOLUME HARGA SATUAN TOTAL HARGA JUMLAH
Pekerjaan Lighting
1 Instalasi Penerangan, termasuk kabel NYM 3 x 2,5 mm, conduit & aksesoris TTK 23.00 Rp 473,000.00 Rp 10,879,000.00
2 Instalasi LED Strip TTK 1.00 Rp 473,000.00 Rp 473,000.00
3 Instalasi Saklar TTK 2.00 Rp 473,000.00 Rp 946,000.00
4 Armaturre LED Downlight, 12 W , Philip bh 22.00 Rp 204,000.00 Rp 4,488,000.00
5 Armaturre LED Strip 12v Warm white ex. Neonflex/Briliant/Setara m' 25.00 Rp 175,000.00 Rp 4,375,000.00
6 Armaturre Saklar Ganda, Panasonic bh 2.00 Rp 187,000.00 Rp 374,000.00
Total Pekerjaan Lighting Rp 21,535,000.00