RENCANA ANGGARAN BIAYA

PROYEK EXTERIOR RENOVASI IT REMOTE OFFICE YOGYAKARTA

NO DESKRIPSI PEKERJAAN KODE SATUAN VOLUME HARGA SATUAN TOTAL HARGA JUMLAH

I PEKERJAAN MECHANICAL ELECTRICAL

Pekerjaan Lighting
1 Instalasi Penerangan, termasuk kabel NYM 3 x 2,5 mm, conduit & aksesoris TTK 23.00 Rp 473,000.00 Rp 10,879,000.00
2 Instalasi LED Strip TTK 1.00 Rp 473,000.00 Rp 473,000.00
3 Instalasi Saklar TTK 2.00 Rp 473,000.00 Rp 946,000.00
4 Armaturre LED Downlight, 12 W , Philip bh 22.00 Rp 204,000.00 Rp 4,488,000.00
5 Armaturre LED Strip 12v Warm white ex. Neonflex/Briliant/Setara m' 25.00 Rp 175,000.00 Rp 4,375,000.00
6 Armaturre Saklar Ganda, Panasonic bh 2.00 Rp 187,000.00 Rp 374,000.00
Total Pekerjaan Lighting Rp 21,535,000.00

II TESTING COMMISIONING Unit 1.00 Rp 5,000,000.00 Rp 5,000,000.00


Total Testing Commisioning Rp 5,000,000.00
TOTAL BIAYA Rp 26,535,000.00