BILL OF QUANTITY

OWNER : CV. ARYA PUTRA BUANA


PEKERJAAN : WOOD CHIPPER
TANGGAL : 8-Dec-2020

Tonase Total Tonase


No. Deskripsi Pekerjaan Jumlah Sat Keterangan Harga Satuan Jumlah Harga
( Kg ) ( Kg )
A. MECHANICAL
1 MS. Plat 5'x20' , t= 6 mm 1.00 Lbr 438.00 438.00
2 MS. Plat 5'x20' , t= 12 mm 1.00 Lbr 875.00 875.00
3 MS. Plat 4'x8' , t= 10 mm 1.00 Lbr 233.30 233.30
4 MS. Plat 4'x8' , t= 12 mm 1.00 Lbr 280.00 280.00
5 MS. Plat 4'x8' , t=65mm 1.00 Lbr 1,516.50 1,516.50
6 Siku 100x100x10mm - 6m 6.00 btg 90.72 544.32
7 Shaft Ø160mm x 1300 mm 1.00 Pcs 192.00 192.00
8 Knife Crusher Size: 230x40x16mm 6.00 Pcs - -
9 Pulley Ø 400 mm 1.00 Pcs - -
10 Pulley Ø 600 mm 1.00 Pcs - -
11 Belt C-173 4.00 pcs - -
12 Plummer Block FAG SN 624 2.00 Pcs - -
13 Bolt & Nut Ø1/2" x 1" 86.00 Pcs - -
14 Bolt & Nut Ø 3/4" x 2" 18.00 Pcs - -
15 Bolt & Nut Ø 3/4" x 3" 34.00 Pcs - -
16 Engsel Bubut Ø1/2" 2.00 Pcs - -

TOTAL 4,079.12 Sub total Rp 135,459,140

B JASA & CONSUMABLE

TOTAL - Sub total Rp 77,503,280

C Painting
1 Cat finishing 20.00 Ltr -
2 Cat Meny 20.00 Ltr - Abu-abu
3 Thiner 30.00 Ltr -

TOTAL - Sub total Rp 6,525,000


TOTAL TONASE : 4,079.12
JUMLAH TOTAL A+B+C : Rp 219,487,420
TRANSPOTASI : Rp 4,500,000
JUMLAH TOTAL + TRANSPORTASI : Rp 223,987,420
PEMBULATAN : Rp 223,988,000

Dibuat, Disetujui,

Fauzi Martin Efendi Maryadi


Engineer Direktur Operasional

PJT-FORM-BOQ-Rev.O