1. The document provides tutorial problems from the University of Gondar's Department of Water Resource and Environmental Engineering. The first problem gives basic data for a pumped-storage hydroelectric scheme, including pump and turbine specifications and penstock details. It asks to determine the maximum discharge rate per pump, maximum discharge to the turbine, and overall system efficiency.
2. The document continues with blank pages labeled as problems 2 and 3, indicating there are additional tutorial problems to be completed.
3. The document comes from the University of Gondar in Ethiopia and outlines tutorial problems in hydropower engineering related to a pumped-storage scheme.
1. The document provides tutorial problems from the University of Gondar's Department of Water Resource and Environmental Engineering. The first problem gives basic data for a pumped-storage hydroelectric scheme, including pump and turbine specifications and penstock details. It asks to determine the maximum discharge rate per pump, maximum discharge to the turbine, and overall system efficiency.
2. The document continues with blank pages labeled as problems 2 and 3, indicating there are additional tutorial problems to be completed.
3. The document comes from the University of Gondar in Ethiopia and outlines tutorial problems in hydropower engineering related to a pumped-storage scheme.
1. The document provides tutorial problems from the University of Gondar's Department of Water Resource and Environmental Engineering. The first problem gives basic data for a pumped-storage hydroelectric scheme, including pump and turbine specifications and penstock details. It asks to determine the maximum discharge rate per pump, maximum discharge to the turbine, and overall system efficiency.
2. The document continues with blank pages labeled as problems 2 and 3, indicating there are additional tutorial problems to be completed.
3. The document comes from the University of Gondar in Ethiopia and outlines tutorial problems in hydropower engineering related to a pumped-storage scheme.
School of Technology Department of Water Resource and Environmental Engineering
Tutorial problems -2
1. In a pumped-storage scheme, water is supplied to a single turbine through a 200 m long, 2m
diameter penstock line. The power plant uses two centrifugal pumps to pump water back to the upper reservoir, using the same penstock pipeline. Basic data are as follows. Pumps (2 nos.), rated capacity_6MW each, efficiency of pump_87%, efficiency of pump motor_85%; turbine (1 no), installed capacity_25MW, efficiency of turbine_91%, efficiency of generator_89%; Penstock pipeline, length_200m, diameter_2m, Manning’s n_0.015, gross head above tail water level_115m. Determine 1. The maximum discharge rate per pump, 2. The maximum discharge to the turbine and 3. The overall efficiency of the system if all the water used by the turbine is pumped back to the upper reservoir.
Hydropower Engineering Page 1
University of Gondar School of Technology Department of Water Resource and Environmental Engineering
2.
Hydropower Engineering Page 2
University of Gondar School of Technology Department of Water Resource and Environmental Engineering
3.
Hydropower Engineering Page 3
University of Gondar School of Technology Department of Water Resource and Environmental Engineering
Hydropower Engineering Page 4
University of Gondar School of Technology Department of Water Resource and Environmental Engineering