Professional Documents
Culture Documents
TABLE OF CONTENTS
Page
List of tables .................................................................................................v
List of figures.....................................................................................................vi
List of Graphs....................................................................................................vi
List of Photos.....................................................................................................vi
List of Annexes..................................................................................................vi
Acronyms..........................................................................................................vii
1. EXECUTIVE SUMMARY............................................................................1
1.1 Background..............................................................................................1
1.2 Scope of the Report.................................................................................1
1.3 Step-I Activities Performed.......................................................................2
1.3.1 Town Water Board (TWB) Establishment.........................................2
1.3.2 Base line assessment.......................................................................3
1.3.3 ISI activities identified and improved................................................4
1.3.4 Major Stakeholders Consultation......................................................5
1.4 Activities Proposed for Step-2..................................................................5
1.4.1 ISI implementation plan....................................................................6
1.4.2 Capacity building needs....................................................................6
1.4.3 Long term project proposals.............................................................6
1.4.4 Proposal on additional data collection..............................................7
1.5 Step-2 implementation schedule..............................................................7
2. INTRODUCTION......................................................................................10
2.1 Project background................................................................................10
2.2 Scope of the report.................................................................................11
2.3 General Background of the town............................................................12
2.3.1 Location...........................................................................................12
2.3.2 Climatic Condition...........................................................................12
2.3.3 Topography and Geology................................................................12
2.3.4 Hydrogeology..................................................................................13
3. STEP-I ACTIVITIES PERFORMED BY TSG...........................................14
a. Methodology and Approach.......................................................................14
a-1. Town Water Board Establishment and Capacitating..........................14
a-2. Baseline Assessment.........................................................................14
List of tables
Page
Table 1.1 Financial plan for implementation of Step-2 9
Table 3.1 Five years population projection 20
Table 3.2 Type and Number of Religion in 2005 20
Table 3.3 Types and number of houses 21
Table 3.4 Number of kindergarten, enrolment and by sex & by year 22
Table 3.5 Number of schools students and by sex
in the year 2001-2005 22
Table 3.6 Number of Teachers by sex and level of education 23
Table 3.7 Number of health personnel by profession,
sex and experience in 2005 23
Table 3.8 Ten top disease in 2005 at woreda level 24
Table 3.9 Water born disease in 2005 25
Table 3.10 Benzene, Gasoline and Lubricant sold
in the year 2005 26
Table 3.11 Number of Telephone Line in the town by the
year 2005 & 2006 26
Table 3.12 Number and type of some commercial entities in the town 29
Table 3.13 Income and Expense in the years 2001-2005 30
Table 3.14 Comparison of current demand and supply of water 32
Table 3.15 Comparison of required and existing reservoir capacity 34
Table 3.16 Water Supply Distribution coverage of the town 36
Table 3.17 Staff of the utility by years of service &
educational background 42
Table 3.18 Current water tariff in birr for different connections 43
Table 3.19 Income and expense of the utility
in the year 2003 –2005 45
Table 3.20 Private pit latrines percentage covers 46
Table 4.1 ISI plan for the town 53
Table 5.1 Step-2 works and responsible body 57
Table 5.2 TSG Consultant manpower 58
Table 5.3 Financial plan for ISI activities 59
List of figures
Figure A - Index Map – 1 viii
Figure B- Index Map – 2 ix
List of Graphs
List of Photos
List of Annexes
Acronyms
Segno Kombolcha
Geba
Guliso
Getem
a
PROJECT TOWNS
1. EXECUTIVE SUMMARY
1.1 Background
The Federal Democratic Republic of Ethiopia has received fund from the
World Bank for Water Supply and Sanitation improvement program. This fund
is partly grant and partly long term loan and distributed to all regional states
proportionally. The goal of the program is to improve health and living
conditions of the society by implementing integrated Water Supply and
Sanitation projects. This program is underway in all regions of the country.
Likewise, the program is on-going at regional level, Oromia, in urban and rural
areas.
With a vision stated above the Water Supply and Sanitation improvement
program is under way in the region under Water Resources Bureau. Small
towns less than 15,000 population are involved in the first phase of this
program. One of objective of Oromia Regional Water Resources Bureau is to
improve health and living conditions of the society by providing better Water
Supply and Sanitation conditions.
To achieve the above stated goal, the Water Supply and Sanitation
improvement program is under way in the region. One part of this program is
urban component of Water Supply and Sanitation improvement. Group 2
towns namely: Guliso, Segno Geba, Getema and Kombolcha are among
towns considered in this program.
Guliso town is found in West Wellega Zone and has a population of 11,171 in
2005.
After the TWB has been established day to day consultations are conducted
in order to increase understanding on regional proclamations and regulations
which clearly shows role and responsibilities of the Board.
As main activity of Step-I works baseline assessment has been carried out for
the town to have clear picture of existing situation. The assessment
encompasses socio-economic features, existing Water Supply and Sanitation
condition of the town.
The area is known by its coffee production and most of the town dwellers are
engaged on coffee trading.
From income generation point of view, most of the residence of the town
engaged in different types of micro and small commercial activities particularly
on coffee trading. Where as, other inhabitants are involved in mixed farming
Moreover, efforts have been made by the municipality of the town in creating
conducive environment for the development /investment opportunities/ of the
town, which can open job opportunities that increase income distribution and
purchasing power of the dwellers.
From the assessment, it has been observed that the existing Water Supply
has so many problems associated with water source and improper
management.
Currently, the water supply system can not satisfy demand of the inhabitants
due to low discharge of the borehole source. Current daily supply from the
spring is 78m3 whereas average day-demand of the town population is 279m 3.
Therefore percentage supply of the existing system is 28.
In general the Water Supply system of the town has design, construction and
O&M problems.
With respect to sanitation condition, better practices are observed than other
towns. However, a lot of works have to be executed in improving awareness
among the community. Percentage of households having private pit latrines is
above 50.
Service improvement could be of two types namely hard ware and soft ware.
To maximize service efficiency of the town water supply and sewerage, some
improvement activities that could be executed with in short period of time and
limited budget have to be identified. Accordingly, all immediate service
improvement activities are identified and categorized as hardware and
software.
Those ISI activities that could be implemented at the utility level and by the
community with out budget are identified and improved during Step-I
implementation period. The following are such activities among others:
Cleaning internal surface of reservoir
Developing recording system for source production
Community motivation and awareness partner ship between
community and authority, for water conservation.
Conducting a sanitary survey around the spring sources and control
disposal of solid waste and sewage that contaminate water sources
to improve sanitation practice.
Measure the flows from the borehole or analyze the records
Developing of operation recording system for pump and generators
On job training for TWB and Utility
Creating awareness on sanitation, using latrines, personal hygiene
and environmental protection and
Guidance provision on notion of recording Transaction, Financial
statement and Stock control.
ISI activities that necessitate allocation of budget are estimated and planned
as per regulation of the program.
An amount of ETB 594,968.00 (Birr Five hundred ninety four thousands nine
hundred sixty eight only) is required for ISI activities implementation for this
town. However, the budget ceiling set according to the program ($5 per capita
based on present population) is ETB 483,145.75 (Birr Four hundred eighty
three thousands one hundred forty five and 75/100). Therefore the activities
are prioritized by the TWB with technical support of the TSG consultant to
identify activities that could be carried out with in the budget. Accordingly, the
ISI activities to be implemented with in the budget is amounted to ETB
483,068.00 (Birr Four hundred eighty three thousands sixty eight only). Detail
list of ISI activities are shown as prioritized by TWB in Annex - C
The primary objective of the program is to build capacity of the Water supply
and Sanitation services of the towns to give better service. Capacitating the
local emerging consultants to improve their performances on development
projects is secondary objective of the program. To identify capacity building
need areas the TSG Consultant has carried out assessments during Step-I
implementation. Accordingly necessary capacity buildings for TWB members
and utility staffs are identified. Moreover need for capacitating the TSG
Consultant through training and providing basic facilities are part of capacity
building needs.
During baseline assessment some data important for long term project study
were collected. For instance population data of the town and some socio
economic features are assessed. Further more, possible potential water
sources are identified. However, for detail study of long term project, detail
data collection and analysis is necessary. Concerning baseline assessment
additional data collection are unavoidable in some areas where data are not
available/ready during the assessment. Moreover it was difficult to collect
sufficient socio economic data with in the time frame set for Step-1 works.
Therefore the following data have to be collected additionally.
Detail assessment on affordability and willingness to pay
Assessment on average income of household
Detail assessment on social institutions
Detail data collection on geological and hydro geological
features of the area
Detail assessment on water resources potential both ground and
surface water
Detail assessment on geophysical investigation
Detail information on electro mechanical equipment and
Data on geological log of existing bore hole
Work schedule for the activities are prepared in such a way that the works
could be accomplished with in the limited period. Accordingly, almost all
activities are planned to be executed in parallel.
The overall estimated period for completion of Step-2 works is 10 months. ISI
activities implementation is estimated to take 8 months.
The total cost estimated for Step-2 activities of this town as detailed in the
report is ETB 714,488.00 (Seven hundred fourteen thousands four hundred
eighty eight only) both for implementation of ISI activities after prioritization
and Consultancy service excluding omitted ISI activities due to budget
constraint. For detail ISI activities prioritized by town water board please refer
to Annex-C.
As described above budget allocated for ISI activities as per regulation of the
program is not sufficient to cover finance required. However, the community is
willing to contribute the budget deficit in cash and/or in kind during the
commencement of the project.
4 Cumulative ISI Cost 6,213.00 154,379.12 248,743.20 330,777.78 377,844.91 415,695.17 463,575.43 483,068.00
Cumulative Total for
5 Consultancy & ISI 18,093.00 200,264.12 315,883.20 422,422.78 511,119.91 572,850.17 641,985.43 685,733.00 714,488.00 726,368.00
2. INTRODUCTION
The Water Supply and Sanitation (WATSAN) Program urban component aims
to improve the health and living conditions of urban dwellers by helping them
improve their water supply, sanitation, and hygiene.
Urban component part of this program was launched at the end of year 2005
in Oromia regional state under Water Resources Bureau.
Financial source of this program is partly loan and partly grant. The fund
allotted for accomplishment of the goal from the World Bank is divided as 75%
loan and 25% grants.
Stretch Consultants Plc is among the local Consultants conducting the study
and supporting group-2 towns namely, Guliso, Segno Geba, Getema and
Kombolcha. Our firm signed Contract agreement on November 16, 2005 with
Oromia Water Resources bureau to carry out the work.
Step-I Activities of the program for the four target towns are accomplished as
per Contractual agreement.
This report is a completion report for Step-I activities of the above mentioned
project. Extent and scope of the report is described in the following sections.
This project is a step approached project. The steps are divided into three
steps namely:
Step – I activities which includes Institutional set-up, initial
assessment/pre-feasibility, stakeholder consultation and
application
Town Water Board establishment and capacitating the utility
Baseline assessment
Stakeholders consultation, information gathering and
dissemination
Preparation of immediate service improvement plan
Application for step II
Guliso town is located in the central part of West Wellega zone of Oromia
National Regional state. This town is the woreda town of Ayira Guliso. The
woreda is bordered by Dale Sedi, Lalo Kile & Yubdo woreda in the south,
Gawo Dale woreda in the west, Jarso & Boji weredas in the north and Lalo
Asabi & Genji weredas in the east.
The town is situated at 501km from the regional capital Finfinne via Nekemte-
Dembidollo main road of which 331km is asphalt paved and the remaining
170km is all weather gravel road.
As the town is located in the area known by its high humidity and dense
forest, the annual rainfall is high.
2.3.4 Hydrogeology
To carry out the baseline assessment for the town the following
methodologies have been adopted:
Desk studies
Field physical observations on existing water supply and sanitation
systems
Taking measurements and verifying the same
Interviews
Group discussion (Brainstorm)
Holding informal meetings with Elders, Religion leaders,
Commercial/Trade persons
Designing questionnaires and check lists
Data collection and analysis
Information gathering and analysis
Photographing the existing water supply structures
Observation of the existing utility operation status and
Observation of utility working premises (office and stores)
For improving skills of the Town Water Board members and utility operators
different methodologies are adopted by the TSG consultant. The first task
performed was identifying skills of each members of the board and staffs of
the utility. Following capacity need assessment, the TSG consultant improved
skills of the board members and utility staffs through on job training.
Regarding hardware capacity building, field physical observation and
identification method was adopted.
b. Limitations
On the process of Step-I activities execution, the TSG Consultant came
across various difficulties with regards to data collection, information gathering
and Town Water Board establishment. The under mentioned problems are
among others:
Lack of proper recording system
Unavailability of data
Lack of power supply in the town
Problem to work according to time schedule due to frequent
damage of working vehicle as a result of inconvenient road
All group-2 towns have no previously formed Town Water Board for
management of their utility. Therefore the first task of the TSG consultant is to
establish Town Water Board and introduce self management. For
establishment of the Town Water Board at the towns step-by-step procedures
are adopted.
Photo 3.2 Town Water Board members together with TSG members
The aim of conducting baseline assessment for the town is to indicate the
status of the town socio-economic as well as current water supply and
sanitation condition. This helps to understand the capability as well as
willingness of the town to return the loan and capacity of the utility to
implement the program under the management of the Water board
successfully.
In regards of Water Supply and Sanitation condition of the town, the baseline
assessment is the cornerstone for determination of improvement activities
required. Therefore, status of water supply and sanitation of the town has to
be clearly investigated.
was 7. And annual growth rate was considered to be 4.11 %( Zone annual
growth rate).
Most of the houses are constructed with wood and mud, and some are made
of hollow concrete blocks with corrugated iron sheets roof cover. More than
half of the houses have private traditional toilet and kitchens.
The following table depicts types and number of houses in the town.
Guliso town is woreda capital of Ayira Guliso. It is one of the woreda’s found in
West Wellega zone administration. The town has two kebeles. The town is
administered by municipality and its accountability is to woreda administration.
a) Education
According to the data obtained from woreda education office, in the town
there is one kindergarten and a total number of 159 children were enrolled in
the year 2004. In 2005 the number of children enrolled was declined to 100.
Table below depicts Number of kindergarten, and number of children enrolled
by sex and year.
Children enrolled in
3 the year 1996 and
1997 - - NA 20 100
Source:- Town Education office
There were 1 primary (1-8) school and one senior secondary school in the
town up to the year 2005. In addition, one 1 st cycle (1-4) school was
constructed in the year 2004. Similarly, the same school are available in
2006.
Table 3.5 Number of schools students and by sex in the year 2001-2005
There were a total number of 52 teachers in the town and the number of
teachers increased to 66 in the year 2005.
Table below shows number teachers by sex and level of education
Background.
Table 3.6 Number of Teachers by sex and level of education
S.N Description 2001 2002 2003 2004 2005
1 TTI 34 38 40 37 30
Male 26 30 33 30 19
Female 8 8 7 7 11
2 Diploma 17 21 24 26 31
Male 17 18 19 20 26
Female - 3 5 6 5
3 Degree 1 - 1 3 5
Male 1 - 1 3 5
Female - - - - -
Source:- Woreda education office
b) Health
In the town there are 1 governmental health centre, one private clinic
(Adventist clinic) and five private rural drug vendors. As to health personnel
there were 17 health personnel in the health centre and health office in the
year 2005.
Data of ten top diseases in the town were not available. However, the data is
available at woreda level.
The following table shows prevailing ten top diseases for the year 2005 in the
woreda.
Regarding water born disease, the inhabitants of the town suffer from lack of
sufficient and potable water. This resulted in harvesting of water from un
protected hand dug wells and springs for their domestic use. Due to this
reason occurrence of water borne disease in the town is high.
Table below depicts water born diseases and cases in 2005 in the town.
5 Ameobiasis 80 3.3
Transport
Transport plays an important role in enhancing economic transformation of
any society. Modern Business, Industry, trade, production, and distribution
activities in general are largely dependent upon transport facilities. The
movement of people and goods from place to place are vital aspects of
modern economic activities.
In this regard, the town has an access road that can facilitate movement to
the town. Moreover, the road from Nekemte to Dembidollo passes through the
town. The road from Nekemte to the town is all weather gravel road.
Fuel Service
There is one fuelling station, Shell, in the town. The fuel station depot has the
capacity of 30,000 litres of Benzene and 30,000 litres of Gasoline. The fuel
station also provides various lubricants for vehicles.
The annual sale record of this station in the year 2005 is shown in the
following table:
Table 3.10 Benzene, Gasoline and Lubricant sold in the year 2005
S.N Type of fuel/lubricant Unit Quantity
1 Benzene Litre 561,911
2 Gasoline Litre 582,588
3 Motor oil Litre 7631
4 Differential Gear Oil Litre 627
5 Wheel oil Litre 209
6 Break oil Litre 220
7 Grease Kg 158
Source:- Municipality of the town
Telecommunication
Tele communication is one of the communications means playing Vital role for
the over all economic development of town. In carrying out
administrative and business activities, telecommunication provides fast and
effective service domestically and internationally. In region like Oromia where
configuration of land is inconvenient and the transportation system is not yet
developed, this type of communication is very vital for day to day economic
activities.
The town had access to direct digital telephone line since 2005 and the
inhabitants of the town is currently beneficiary of direct telephone
communications.
According to information obtained from pay station of the town; there are 272
digital telephone line connections so far. The following table shows
progressive telephone line demand of the town from year 2005 to 2006
particularly in case of private ownership.
Table 3.11 Number of Telephone Line in the town by the year 2005 & 2006
Quantity
Advance created in the field have brought about total convergence within
western region and accordingly some of the town have got Mobile
telecommunication service. On the other hand town like Guliso still do not get
the access though the town is popular by having cash crop and long History.
Postal Service
Postal service is one means of communication playing an important role in
socio- economic development process of the town. It promotes domestic and
international relation in transferring information and goods.
The town has one postal service agent serving the inhabitants for
communication.
d) Power Supply
e) Financial Institutions
Although the current free market economy and prioritization measures are
facilitating per-conditions for increasing number of financial institution in the
town, private Bank and Insurance organizations are still not yet opened in the
town. Only one branch of commercial Bank of Ethiopia and one branch of
Oromia credit and saving Share Company are available in the town.
f) Water Supply
3.2.3.5 Economy
Most of the residences of the town are engaged in different types of micro,
small and large-scale commercial activities. Whereas, other inhabitants are
engaged in farming activates and the rest are government and Non-
governmental employees.
The surrounding areas are popular in cash crop particularly coffee and oil
seeds production and this help most of the residences of the town to depend
on micro, small and large scale coffee and oil seed trading and different
commercial activities.
Although there is no reliable data concerning the live stock population of the
town, the in habitants of the town rear different types of domestic animals.
Some of them produce different cereal crops and coffee.
The town has social service giving institutions and infrastructures such as
digital telecommunication service, health institution, schools, Bank, fuel
station, Postal service and hydro power electric installation underway which is
expected to give service with in the next two or three months. Besides this,
the town is located on the main road from Finfinne to Dembidollo. The above
mentioned conducive environment indicates that the town’s future prospect of
development is promising for investment.
Table 3.12 Number and type of some commercial entities in the town
S.N Type of commercial entity Number Percent coverage
1 Coffee purchasers from direct
producer 26 9.03
2 Cereal trader 8 2.78
3 “Tej” and other Liquor 13 4.51
4 Traditional cloth 2 0.007
5 Readymade cloth 19 6.6
6 Textile 9 3.13
7 Shops 42 14.58
8 Butchery house 18 6.25
9 Hotels 9 3.13
10 Restaurants 5 1.74
11 Hide and skin 3 1.04
12 Tea rooms 12 4.17
13 Super markets 1 0.003
14 Grinding mill (cereal) 14 4.86
15 Coffee washing plant 13 4.51
16 Tyre repair 1 0.003
17 Barbers 16 5.56
18 Drug shops 5 1.74
19 Veterinary drug 1 0.003
20 Photo shops 3 1.04
21 Fuel station 1 0.003
22 Coffee whole seller 67 23.26
Source : Guliso Town Municipality
More over, efforts have been made by the municipality of the town in creating
conducive environment for the development of the town. Further more, the
increment of income in the town increase from year to year which lay down
fertile ground for further expansion of infrastructures and other.
Table 3.13 Income and Expense in the years 2001-2005
Income Expenditure
However the problem of lack of adequate and safe dirking water should be
tackled in order to ensure the future development of the town.
There is marketing place in the town where, Wednesday and Saturday are
market days every week.
Of 161 respondents, 100% are dissatisfied with the quantity of existing water
supply. From taste point of view 57% & 43% replied average and high
respectively. Similarly, regarding colour of the water 78% and 22% said fair &
good in that order.
On the subject of tariff 35% said the existing tariff of water is low, 52% and
13% said average and high respectively.
In line with this, most of the users of public fountain said that the existing
public fountains were not sufficient and far from their living house.
On top of this, the respondents replied that they are expending more budgets
for consumption of water compared to the service rendered.
Regarding, sanitation all respondents are volunteer to pay for the service
delivered on dry waste disposal and public pit latrine by concerned body.
Like other towns in the region, the town has various problems with its Water
Supply system design, construction and operation maintenance. Assessment
carried out with regard to Existing Water Supply in the town to show current
water supply situation will be dealt with in the following sections.
3.2.4.1 Source
The existing water source for the town is borehole. This bore hole was drilled
by zonal water department in 2005. One borehole previously drilled by
EWWCA in 1982 was abandoned. This borehole was abandoned due to the
fact that the water discharged from the borehole contains debris and other
foreign matters.
The other water source for the town is on spot spring developed at eastern
part of the town.
It was Constructed by Mekaneyesus
The yield of this spring is about 0.1 l/sec
This old transmission line was constructed by EWWCA in 1982. Water meter
for recording daily water production was installed at the borehole source on
the transmission line.
3.2.4.3 Storage
Design period for most of civil structures is made for 15-20 years. The service
reservoir was constructed in 1982. From this it can be concluded that, the
storage facility for this town ended its design service period before nine years.
Therefore, currently it is hypothetical to say the town has storage facility to
stabilize their demand fluctuations. In addition to its low capacity to stabilize
demand of the town, the location where the reservoir was constructed is not at
commanding elevation. Due to these reasons, by now the Utility is using the
service storage of woreda health office own property for temporary storage.
This reservoir is located at higher elevation than that of the former reservoir.
The capacity of this service storage is 50 m3.
50 130
3.2.4.4 Distribution
Pipe materials used is Galvanized iron (GI) having different sizes. The pipe
sizes used in distribution are 65mm, 50mm and 40mm. Total pipe length of
distribution system is 2267m. (For detail pipe lay out see Annex - B)
a. Connection types
Existing connection types:
Yard connections
House connections and
Public fountain connection types are available
Public fountains:
Valve chambers are damaged and not lockable
The public fountains have no fence
Fittings in valve chamber are leaking
Faucets are damaged
Current estimated
Total area of town Percentage
distribution coverage
development plan coverage
area
km2 %
km2
(B) (A/B)x100
(A)
0.82 2.04 40.20
3.2.4.5 Electro-mechanical
a. Power Supply
The town hydro electric power supply is under construction and expected to
have electric power supply with in the coming months. When the town is
supplied with hydro electric power, the diesel Generator is expected to be
replaced by EEPCO transformer.
Generator # 1
Generator # 2
No other data are available regarding this generator, but it is functional with
minor defect or leakage of motor oil.
b. Pump
Submersible Pump was installed on this borehole to deliver water from the
well to the reservoir but data on pump characteristics are not available.
However, the associated switch board has a capacity of 15kw.
c. Generator House
a) Operation
Operation is normally carried out as per the rules and procedures (manual)
specifically prepared for specific water supply system or equipment, which
should be handed over to the utility at the completion of the installation or
construction of the part and component.
Some common problems mentioned below exist on their day to day operation.
b) Maintenance
There are three types of maintenances for water supply system under
operation. These are:
i) Preventive maintenance
ii) Major maintenance and
iii) Replacement
a. Organization structure
The crucial responsibilities of the utility of the town are provision of water
supply and sewerage service for the inhabitants of the same.
To carry out the stated objectives the water supply and sewerage service
enterprise has been organized as semi-autonomous organization under
regional Water Bureau next to Zone Water Resources office. Currently, the
water supply and sewerage service enterprise has the following organizational
structure.
Finance Section
Finance section
This section has the responsibility for preparing and collecting bills, preparing
budgets and plan in participatory way, controlling all expenditure, recording all
financial transaction in accordance with modern accounting system.
The office of town water supply and sewerage service enterprise has
temporarily given by municipality of the town. Total area of the compound is
648 m2. It has also a storage facility of 16 m2 house. The office is located
near the borehole source. It is in a good condition, and equipped with all
necessary facilities such as fencing, doors, windows, lightening and
ventilation. The building belongs to Mekaneyesus as information gathered
from the utility head. As the office is located at the edge of the town, it is not
convenient for most of the customers.
Moreover, according to the municipality of the town, the temporary Office
could be taken from the utility because the case is on the process of
adjudication. As result, there should be other alternative for provision of the
office for the utility.
The utility has thirteen staffs, of which one is head of the staff, two are
technical staffs, and the balance is supporting staff.
Regarding experience, skill and education background of the staffs detail is
shown below.
Table 3.17 Staff of the utility by years of service & educational background
Educational Experience
S/No. Description Quantity
Level (years)
1
Utility head 12 complete 1 31
2 Administration and
12 complete 1 29
general service
3 Operation &
10 + 2 1 10
maintenance head
c. Property management
In general the utility has no proper store as well as good store keeping
mechanisms. Due to this, its property is prone to misallocation and exposure
to different problems.
a. Water Tariff
Polices related to water pricing and water tariff are incorporated in the
Ethiopian water resource management policy. Among the water pricing and
tariff polices the following are relevant to urban water supplies.
Tariff setting shall be place specific, depending on the particulars
of the project, location, the user, and the cost and other
characteristics of the scheme.
Ensure that urban tariff structures are based on the basis of full
cost recovery.
Ensure that the price for water should be neither too high
(discourage water use) nor too low (and encourage abuse and
over use of water)
Establish a “social tariff” that enables poor communities to cover
operation and maintenance costs.
Establish progressive tariff rates, in urban water supplies, tied to
consumption rates.
Develop flat rate for communal service like hand pumps and
public stand posts
Further more, tariff setting principles state that the tariff that has to be charged
should be:-
- Full cost recovery
- Promote water consumption
- Fair
- Social tariff and
- Simple and encouraging tariff structure,
Even though, the policy and tariff setting principle state the above mentioned,
the town water supply and sewerage service enterprise has been working with
a tariff, which cannot recover the cost that has been incurred (operational and
capital cost). This tariff remained constant for the past 2 years which resulted
in low income that can not recover the cost (operational and capital).
b. Billing system
Billing has been carried out based on the format developed by Oromia water
Resources Bureau. The utility uses Analysis Sheet for recording the current
and previous readings of house connection and yard connection to follow up
the monthly consumption. The Bill is filled manually in each month and be
provide to the beneficiaries.
c. Procurement
Most of the spare parts required are provide by zone water office and
sometimes by regional water resource bureau of Oromia. However, the utility
carry out procurement of some items with in capacity of their purchasing limit.
d. Recording system
In this regard, the utility has started to carry out the same. The utility has:-
- Record Book for day to day transaction
- Record book for production of water
- Analysis sheet, to record what has been red from water meter
of yard and house connection and
- Record book for the sale of water conducted via public
fountain.
In addition, the Utility opened Bank account in the branch of commercial Bank
of Ethiopia. However, Bank reconciliation has not been made yet.
On the other hand, the recording system, serves as source for reporting
Financial and physical performance of the Utility. The utility reports to zone
water office monthly, quarterly and annually.
Table 3.19 Income and expense of the utility in the year 2003 –2005
Years
2003 2004 2005
Description
Revenue
Water sales
Public mater points - 1467.00 21254.00
House connection - - -
Yard connection - 20,353.70 35,951.60
Meter rent - 1232.00 4749.00
New connections - 35,305.92 49,795.23
Service charges - - -
Other incomes - 1510.66 4529.80
Total revenue - 59,869.28 116,279.63
Expenditure
Salary and wages - 18,346.16 57,222.30
Perdiem and travel - 9156.05 14,873.50
Fuel and lubricants - 15,623.05 52,689.63
Pipes and fitting - - 612
Manteca and repair - 1704 1001.33
Miscellaneous labour - 12,888 21,322.05
Other Administrative services - 3712.60 3362.40
Office supplies - 479.25 1870.42
Taxes - - 3247.90
Other expenditure - 1909 935.22
Total expenditure - 63,818.11 157,136.75
Revenue less expenditure - 3,948.83 40,857.12
Revenue over expenditure - 3,948.83 40,857.12
Source: Town Water and Sewerage Service Enterprise
As mentioned above the reason behind expense exceed Revenue, was due
to subsidy made by Ayra town Water supply.
The current sanitation practice of the town dwellers is similar to any other rural
towns in the country.
More than half of the inhabitants have their own pit latrines and those who
have no, obviously dispose their excreta in the open fields in the vicinity of the
town.
Coverage of private pit latrines in the town as per information gathered from
the town health centre:
In the town two public pit latrines have been constructed by municipality.
However, none of the two pit latrines are functioning currently because the
pits are caved and the houses collapsed as a result of poor design and
construction. In addition, the Wall of the pits were not constructed by stone
masonry.
In most cases dry waste from human activities and similar garbage are simply
damped any where in the town. Awareness regarding dry waste disposal and
adverse effect of improper disposal is very limited. Regarding sanitation
control by the concerned government body this issue is not emphasized.
In the town there are 2 communal solid waste disposal sites under operation.
However, the disposal sites are not properly constructed and protected.
Proper domestic liquid waste disposal practice is not yet started in the town
like other similar towns.
Sewerage system for collecting and disposing waste water from individual
residence require a huge investment. However, at the level of such small
towns creating awareness among the community about liquid waste
management is basic task.
In the town:
There is no proper domestic waste disposal
Awareness regarding liquid waste disposal is limited and
Disposing liquid wastes on open fields adjacent to their home is
common practice
b. Drainage System
ISI have two components; hard ware, i.e. physical assets and soft ware, i.e.
capacity building/awareness creation. In most of our cases, in early step I only
few hard ware and software improvements were executed.
The initial consultation conducted was at regional water bureau level with
project coordinator and other concerned staffs. Points of discussion include
about:
Background information of the towns with regard to water supply and
sanitation
Access to required documents and data at regional level
Supports required from zonal water offices and
Relevant governmental institution that could be source for data and
document for the study
As one segment of water resources bureau, zone water resources office is the
primary contact office to be informed about the program and to work together
for the success of the program. Accordingly, the first task performed by the
TSG was contacting zonal water office to explain mission of the TSG
consultant and extent of the program.
Points of discussion during consultation of zonal water offices include:
Background of the target towns with regard to water supply condition
Previous studies for alleviating water supply problems of the town, if
any
Previous tasks performed for improvement of water supply service
Supports required from zone water office for accomplishment of the
program
Past ground water exploration history and
Ground water potential of the surrounding areas
Occasionally the TSG Consultant contacts zone water office head and other
technical staffs regarding technical matters like availability of data on
electromechanical equipment under operation in the target town.
During first trip for preparation of inception report the TSG consultant met the
Woreda officials to discuss about the program. Key stakeholders consulted at
this stage include:
Guliso town municipality
Woreda water office representative
Woreda officials
Woreda women’s affair and
Utility staffs
Points discussed with the stakeholders during this period include:
Introduction of the TSG consultant members with their respective
professional input during the assignment
Introduction about the program
Approach and implementation steps of the program
About implementation schedule of the program
The first consultation conducted for discussion about Town Water Board
establishment with decision makers.
Business plan
Contractual arrangements for system operations
Integrated Sanitation planning
Capacity building
Stakeholder consultation, interim approval processes and
Regional water board review and approval processes
After data is analyzed and core problems were identified, ISI plan is prepared
and submitted for the TWB that could be implemented in step-2.
The hardware and software ISI activities were identified with their estimated
cost and prioritized by TWB. The ISI activities are listed in the following tables.
Specification and bill of quantities for each activity are prepared and annexed.
Please refer to Annex - D.
Estimated
S/No ISI activities
Cost (birr)
1 Hardware Component
1.1 Catchments protection from erosion -
1.2 Fencing of around the borehole source 900.00
1.3 Replacing of diesel Generator to EEPCO power 120,000.00
1.4 Purchase of simple electro mechanical tools 600.00
Purchase of spare parts for existing Generator (oil filter, 2,500.
1.5 fuel filter) 00
1.6 Washing internal surface of the tank -
1.7 Provide fence for reservoir 600.00
1.8 Provision &installation of fittings at PF 15,288.00
1.9 Fencing of public fountains (6x6m) 9,360.00
1.10 Construction of appropriate valve chamber 18,438.00
1.11 Replacing of damaged faucets at PF 1,674.00
1.12 Supplying of necessarily fitting for stock 10,000.00
1.13 Supplying of plumping tools 15,000.00
1.14 Supply and fixing of CIS doors 3,500.00
1.15 Construction of two public toilets 25,880.00
1.16 Construction of two dry waste disposal sites 960.00
1.17 Construction of utility office 93,623.50
1.18 Construction of utility store 18,001.00
1.19 Fencing for the utility office 5,700.00
1.20 Purchase of computer 7,000.00
Estimated
S/No ISI activities
Cost (birr)
1.21 Purchase of printer 3,000.00
1.22 Purchase of APC smart UPS 3,000.00
1.23 Purchase of office stationery 440.00
1.24 Purchase of office furniture(chair, table and shelf) 4,120.00
1.25 Purchase of water meter for additional connections 14,300.00
Pipe line work for transmission to separate in and out
1.26 expansion 111,900.00
1.27 Distribution pipe line expansion 72,072.00
1.28 Construction of three public fountains 30,898.50
Hardware improvement cost 588,755.00
2 Software Component
2.1 Developing recorded system for source production -
Community motivation & awareness partner ship b/n
2.2 community & authority, for water conservation -
Capacity building for TSG, TWB and Utility operator are very important for the
successful accomplishment of the WSS improvement project. As observed
during baseline assessment, the utility operator and other technical staffs of
the utility need trained. The newly established Town Water Board members
need additional trainings for proper management. Similarly the TSG
Consultants also need training for better and efficient performance on the
project. Therefore, the capacity building needs include:
Organized training for utility staffs and operators on Finance
administration, Planning and Budgeting, recording, property
management, etc.
Town Water Board members to be trained on management of the utility,
planning of projects, contract administration, financial controlling
methods, etc.
As observed during base line assessment, there is an option for surface water
supply source in the vicinity of the town. This water is surface water
impounded in earth dam reservoir constructed by Lutheran World Federation.
Even though there is a possibility of surface water source for the town Water
Supply, ground water is preferable in its less initial cost as well as running
cost. Treatment of surface water requires considerable amount of money at
regular base and for its operation skilled manpower is necessary. However,
after exploration of ground water source if the potential of the ground water in
the area is not promising, it will be mandatory to consider the surface water.
Therefore, the following activities shall be proposed for long term project
Source confirmation /detail site investigation for ground water
potential
Detail design for water Supply systems
Environmental and social impact assessments
Economic feasibility
Business plan and
Integrated Sanitation planning
Detail assessment on water resources potential
Detail assessment on geophysical investigation
Detail information on electro mechanical equipment#
Data on geological log of existing bore hole
Detail data on earth dam constructed by Lutheran World
Federation.
Note: * - To some extent these data are collected during baseline assessment.
However, due to time constraint and lack of proper information it needs
additional data collection during step-II.
#
- Data not available
Detail activities schedule for the above mentioned main works are prepared
and annexed. Please refer to Annex – A.
With a prospect that the activities will be carried out by Contractor the
following key staffs are needed:
For log term Water Supply and Sanitation project study the following key
personnel are required. The following table shows list of TSG manpower
required for the work.
2.7 Surveyor 1
2.8 Auto cad operator 1
3 Supporting staffs
3.1 Driver 2
3.2 Secretary 1
3.3 Accountant 1
3.4 Guard 2
3.5 Janitor 1
Month-1
Month-2
Month-3
Month-4
Month-5
Month-6
Month-7
Month-8
Total
month (ETB)
Amount per
148,166.12
483,068.00
94,364.08
82,034.58
47,067.13
37,850.26
47,880.26
19,492.57
6,213.00
amount (ETB)
Cumulative
154,379.12
248,743.20
330,777.78
377,844.91
415,695.17
463,575.43
483,068.00
6,213.00
Graph: 5.1 Graphical representation of Financial Plan for ISI activities
With the assumption that consultancy fee required for all group 2 towns is
equal, the amount for the town is shown below.
Month-2
Month-3
Month-4
Month-5
Month-6
Month-7
Month-8
Month-9
Total
Months
Month-10
28,755.00
11,880.00
Amount per
243,300.00
34,005.00
21,255.00
24,505.00
41,630.00
23,880.00
21,255.00
24,255.00
11,880.00
243,300.00
231,420.00
Cumulative
202, 665.00
157,155.00
133,275.00
178,410.00
45,885.00
67,140.00
91,645.00
11,880.00
6.1 Conclusion
Base line assessment made during step-one depicts the population of the
town increases from time to time at alarming rate. Further more, the social
and economic activities of the dwellers increasing as result of the existence of
i) The utility has management problems and has not been implementing
water policy of the country that states utility shall cover all its expenses
from its own income. As a solution for this problem, self management
ii) The water supply system has so many technical limitations like lack of
tools, shortage of water source, inadequacy of supply coverage, etc. It
can be concluded that implementation of ISI activities planned in Step-I
can temporarily solve most of the problems.
With existing manpower and one vehicle, it is difficult to manage long term
project study and supervision of ISI works in parallel for all towns. This is
because of:
Volume of works in Step-2 is broad
Geographical location of the towns are far apart
Access road to the towns are very bad
Professional inputs allocated for Step-2 in the Contract is not
sufficient
Time and resources like vehicle are limited.
6.2 Recommendation
For successful accomplishment of the program and arriving at the intended
goal, the following recommendations are proposed:
ii) Introducing self management which has already been started has to
continue by capacitating the TWB through training and consultation.
The utility has to be guided to run as per national policy and regional
proclamation
iv) To complete Step-2 works within the time frame set the required
manpower and resources have to be in place. Thus, for successful
accomplishment of the works, it is recommended:
ANNEXES