0% found this document useful (0 votes)
60 views2 pages

HVAC/R Workshop Layout Overview

The document outlines the layout of an HVAC/R workshop with 7 stations: 1) install piping and PACU/CRE units; 2) install electrical systems; 3) service and maintain units; 4) troubleshoot and test run systems; 5) recover and recycle refrigerant; 6) repair and retrofit systems and accessories; and 7) perform start-up and commissioning. The layout also includes areas for bench work, tools/equipment, computer lab, learning resources, quality control, and assessment.

Uploaded by

EMELITO COLENTUM
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
60 views2 pages

HVAC/R Workshop Layout Overview

The document outlines the layout of an HVAC/R workshop with 7 stations: 1) install piping and PACU/CRE units; 2) install electrical systems; 3) service and maintain units; 4) troubleshoot and test run systems; 5) recover and recycle refrigerant; 6) repair and retrofit systems and accessories; and 7) perform start-up and commissioning. The layout also includes areas for bench work, tools/equipment, computer lab, learning resources, quality control, and assessment.

Uploaded by

EMELITO COLENTUM
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

HVAC/R WORKSHOP LAYOUT

PTC - Pagadian
Dao, Pagadian City

Station 3 Station 4 Station 5 Station 6 Tools/


Equipment/
Supply Room

Station 2

Computer
BENCH WORK
Laboratory

Station 1 Learning
Trainer's Resource/
Learning Distance
Area Learning
Progress
Chart Assessment Quality
Station 7
Area Control Contextual
Learning Area
Fire Fire
Extinguisher Extinguisher

LEGEND: Station 1 : Survey site for installation, Install PACU/CRE piping systems & Install PACU/CRE
Station 2 : Install PACU/CRE electrical systems
Station 3 : Service and maintain PACU/CRE units Prepared by:
Station 4 : Troubleshoot and Test run PACU/CRE system
Station 5 : Recover and recycle refrigerant in PACU/CRE systems
Station 6 : Repair and retrofit PACU/CRE systems and its accessories BEN RAYMUNDO S. HELAR
Station 7 : Perform start-up and commissioning for PACU-CRE systems Trainer

You might also like