You are on page 1of 2

Constructora Héctor

No. Consepto Unidad cantidad Presio unitario IVA


1 Despalme m2 120 $500 $75.00
2 Nivelar m2 120 $500 $75.00
3 Cimientos m3 18 $500 $75.00
4 Cadenas de desplante ml 360 $1,000 $150.00
5 Muros m2 175 $200 $30.00
6 Castillos pz 12 $300 $45.00
7 Cadenas de cerramiento ml 70 $300 $45.00
8 Columnas pz 6 $500 $75.00
9 Trabes M3 1 $600 $90.00
10 Loza m3 1 $2,000 $300.00
SUBTOTAL TOTAL PORCENTUAL
$60,000 $69,000.00 10.83%
$60,000 $69,000.00 10.83%
$9,000 $10,350.00 1.62%
$360,000 $414,000.00 64.96%
$35,000 $40,250.00 6.32%
$3,600 $4,140.00 0.65%
$21,000 $24,150.00 3.79%
$3,000 $3,450.00 0.54%
$600 $690.00 0.11%
$2,000 $2,300.00 0.36%
$637,330.00 100.00%