You are on page 1of 2

undefined

East Delhi Municipal Corporation


 
FACTORY LICENSING DEPARTMENT

Applicant Details

Industrial Area and Type

Industrial Type Engineering works

Personal Details

Name of the Business/Factory Sharma lath work


Name of the Applicant Mr Kailash sharma Name of Applicant's Father / Mr Mamraj
Husband name
Residential Address Ms park 1/1912 shahdara Official Address Ms park 1/1912 shahdara
110032 110032
Telephone No. 9318448979 Mobile No. 9318448979
Fax No. 9318448979 E-Mail ID kailashsharma1972158@gmail.com
Full Address of the factory site Door No :Ms park 1/1912 shahdara    
Floor : Ground Floor
Zone : Sh. south zone
110032
Status of the Company Proprietorship    
Relationship of applicant with Proprieter    
Factory

Trade Details

Trade for which license is Engineering works


required
Total HP 3.00 Total Required Power 2.00
Wattage
Date on which business is going 24-12-2020 Date on which business is NA
to start started, if it is already running
Date from which site was 18-12-2018    
occupied by applicant

Factory Details

Information about earlier licence No mention Is some other factory running No mention
w.r.t site, if any in same building ? if yes
provide details
Total Number of employees 1 Total land used with respect 12  (in Sq.Mts)
to master plan
Is factory or part of factory is No    
situated in govt. land? if yes,
provide details

List of machinery

S.NO Machine Name No. of Machines HP of each Machine Total HP


1 Lath machine 1 3.00 3.00

Manufacturing Details

Main Process No mention By-product/miscellaneous No mention


Details about waste products No mention Indicate wheather the factory No mention
coming out of factory, their is inside the building or
quantity and measures to control adjacent to building, which is
them. used for resdential purpose
Give the details of Health No mention    
benefits that are given to Male &
Female workers of the factory
According to building plan, is the No  
site where the factory is going to
set up is accepted, if yes give
Details.

Provide the information

Free space left in the premises 0.00  (in Sq.Mts) Available land for loading, 0.00  (in Sq.Mts)
unloading of load and vehicle
parking
wheather site comes under No With respect to Delhi Master No
Section 4, of wasteland Plan if this site comes on the
management or under removal way, where is the
of slums ? construction of the road
going to take place ?
If you are constrcting a new No  
building for the factory, is the
plan approved by competent
authority ? if yes give details
Is key plan included in the map No    
of the area
No and date of Sanction letter from Delhi Pollution Control Committee for Name of the trade: Lath
carrying out trade Sanction No : 44444
Date : 02-12-2018
Valid Upto : 22-01-2020
Has equipped with Fire Fighting No
Equipment    

Storage

How much space is available to   (in Sq.Mts) Floor No. Ground Floor
the requestor for storing raw
material and on which Floor ?
How much space is available to   (in Sq.Mts) Floor No. Ground Floor
the requestor for storing goods
and on which floor ?

Details of Submitted Documents


Id Description View Documents Date of document upload
7 Consent from DPCC, if any, as per norms laid down for the applied industry. View 21-06-2019
8 One copy each of site plan and key plan. View 21-06-2019
9 A rough sketch showing the proposed installation of machinery alongwith the list of View 21-06-2019
machinery with power load (HP) rating.
10 One copy of manufacturing process for the applied trade. View 21-06-2019
14 Copy of the constitution of the firm, if any. View 21-06-2019
23 Proof of ownership/tenancy/legal occupancy. View 21-06-2019
28 Copy of Lease Deed. If not executed, Copy of auction letter, possession letter. View 21-06-2019
30 Copy of terms and conditions for allotment of the premises by the Land Owning Agency. View 21-06-2019
31 Affidavit as prescribed, which is as per Download Annexure 3. View 21-06-2019
32 One copy of the site plan with dimensions (blue print). View 21-06-2019
33 One copy of key plan earmarking the sailent features in neighbourhood site in question View 21-06-2019
alongwith Zonal Plan and Part Layout Plan indicating the site.
34 Affidavit regarding no unauthorized construction having been carried out, which is as per View 21-06-2019
Download Annexure 5.
  Additional Document View 21-06-2019
 

You might also like