Professional Documents
Culture Documents
Section A: Company
Company Profile
Company Name UMW INDUSTRIES (1985) SDN BHD
Registered Address Level 6, Menara UMW, Jalan Puncak, Off Jalan P. Ramlee, Wilayah Persekutuan Kuala Lumpur, 50250 Wilayah
Persekutuan Kuala Lumpur, Malaysia
Correspondence Level 1, No. 16, Jalan Utas 15/7, 40915, Shah Alam,, Selangor Darul Ehsan, Shah Alam, 40915 Selangor, Malaysia
Address
Company Background TRADING AND HIRING OF INDUSTRIAL AND MATERIAL HANDLING EQUIPMENT AND RELATED PARTS
Total 0 %
Contact Person
No. Title Name Designation Email Phone No. Fax No.
Dokumen ini telah ditandatangani secara digital oleh WONG KWANG BING pada 24/03/2022 18:51:0010
Section B: Previous Company Activity(s)/Project(s)
Approval of Manufacturing Licence(s) under the Industrial Coordination Act, 1975
No. Reference Licence Serial Effective Product(s)/Activity(s) Premise(s)/Factory Equity Export
No. No. No. Date Location(s) Condition Condition
No items to show...
No items to show...
No items to show...
No items to show...
No items to show...
No items to show...
No items to show...
No items to show...
2
Dokumen ini telah ditandatangani secara digital oleh WONG KWANG BING pada 24/03/2022 18:51:0010
Section C: Application Information
3
Dokumen ini telah ditandatangani secara digital oleh WONG KWANG BING pada 24/03/2022 18:51:0010
Section D: Project Cost
Total Existing and Additional Project Cost
Total Cost of Fixed Assets Working Capital (RM) Pre-Operational Expenditure Total Project
(RM) Cost (RM)
Land (RM) Building (RM) Plant Machinery Other Equipments Other Cost (RM)
(RM) (RM)
Address Sebahagian PT17910 (HSD63047), PT17911(HSD63048) dan PT17937 (HSD63076), Seksyen 20, Bandar Serendah, 48200, Serendah, Selangor, Malaysia
Cost
Additional Project Cost
2021 22.89 hectare 31,171.16 m² RM 0.00 RM 4,842,580.22 RM 0.00 RM 0.00 RM 0.00 RM 117,971,566.00
RM 39,883,566.00 RM 73,245,419.78
Total Project Cost : RM117,971,566.00
2021 0.00
Total Other Cost of Fixed Assets : RM0.00
4
Dokumen ini telah ditandatangani secara digital oleh WONG KWANG BING pada 24/03/2022 18:51:0010
2021 0.00
Operational Expenditure
Year Salary And Wages (RM) Transportation Services (RM) Banking Services (RM) Insurance Services (RM) Legal Services (RM) ICT (RM) Other Operation (RM) Total (RM) Percentage
of Local
Spending(%)
2021 27,665,695.00 1,712,523.00 2,819,454.00 0.00 0.00 0.00 0.00 RM 32,197,672.00 0.00
Total Operational Expenditure : RM32,197,672.00
2021 0.00
Total Other Operational Expenditure : RM0.00
5
Dokumen ini telah ditandatangani secara digital oleh WONG KWANG BING pada 24/03/2022 18:51:0010
Section E: Project Financing
Authorised Capital
Amount (RM) 0.00
*Authorised Capital of Company
Year
Year 2021
Shareholder's Fund
(a) Paid-up Capital
(i) Malaysian Individuals
No. Malaysian Individuals Amount (RM) (%)
No items to show...
6
Dokumen ini telah ditandatangani secara digital oleh WONG KWANG BING pada 24/03/2022 18:51:0010
Total (RM) of (a) 140,000,000.00
and (b)
No items to show...
Equity Structure
N Equity Structure Amount (RM) Percentage (%)
o.
A. Malaysian
B. Foreign
Loan
1. Domestic Loan
No items to show...
Description (to insert details of the foreign loan such as type of loan, name of the loan provider etc)
3. Total Loan
Other Sources
No. Other Sources Amount (RM) (%)
No items to show...
Total Financing
Total Paid-up Total Reserve Total Loan Total Other Total Financing
Capital (RM) (RM) Sources (RM)
(RM) (RM)
8
Dokumen ini telah ditandatangani secara digital oleh WONG KWANG BING pada 24/03/2022 18:51:0010
Section F: Manpower
Existing Manpower
No. Position Qualification Major Course Experience Citizenship Averange Number
Monthly of Staff
Salary (RM)
No items to show...
Total : 0
Additional Manpower
9
Dokumen ini telah ditandatangani secara digital oleh WONG KWANG BING pada 24/03/2022 18:51:0010
Section G: Specific Industry
List of Machinery/Equipment/Others
Description Type Unit New or Function Country of Cost
Used Origin (RM)
Energy Efficient Air M - Manual - New To provide ample cooling Malaysia 197,69
Conditioning System Operation without pressuring the 0.70
machine or exhausting it to its
fullest capacity.
Energy Efficient Light M - Manual - New Save the electricity while Malaysia 40,015.
Operation maintaining good quality and 35
quantity of the light
Energy Efficient Mechanical M - Manual - New Provide proper air fresh flow Malaysia 3,664.0
System Operation 0
Energy Efficient Water Pump M - Manual - New Reduces power consumption of motors for water supply Malaysia 4,425.0
Operation 0
Environmentally Friendly M - Manual - New To reduce impact of construction materials to the environment Malaysia 1,841.6
Ceiling Board Operation 8
10
Dokumen ini telah ditandatangani secara digital oleh WONG KWANG BING pada 24/03/2022 18:51:0010
Environmentally M - Manual - New To reduce impact of Malaysia 67.65
Friendly Sealant Operation construction materials to the
environment
LED Street Light A - Automatic - New To provide street lighting with Malaysia 12,266.
Machinery high energy efficiency 15
compared to conventional
street lighting
Lift with ACVVVF & Sleep A - Automatic - New To provide lift that enable smooth starting, controlling motor and energy saving Malaysia 1,500.0
Mode Features Machinery 0
Low VOC Interior Paint M - Manual - New To promote healthy indoor Malaysia 5,568.2
Operation environmental quality 8
Low-E Glazing M - Manual - New To use low-E glass for building façade to minimize the amount of infrared and ultraviolet light without Malaysia 78,174.
Operation minimizing the amount of light enters 00
Precast Concrete M - Manual - New To minimize waste generated at site Malaysia 14,128.
Component Operation 53
Rainwater harvesting M - Manual - New To reduces demanded amount of potable water Malaysia 162,04
system Operation 0.00
Roof Insulation (RC Flat Roof) M - Manual - New To insulate all RC flat roof area Malaysia 6,309.1
Operation 2
Water Sub meter M - Manual - New To track water consumption Malaysia 22,198.
Operation and detect leakage 00
11
Dokumen ini telah ditandatangani secara digital oleh WONG KWANG BING pada 24/03/2022 18:51:0010
Column Function Total RM: 601,238.22
Note: For logistic services please specify category according to Transportation, Warehousing and others.
Address Sebahagian PT17910 (HSD63047), PT17911(HSD63048) dan PT17937 (HSD63076), Seksyen 20, Bandar Serendah, 48200 Serendah Selangor, Malaysia
No items to show...
No items to show...
12
Dokumen ini telah ditandatangani secara digital oleh WONG KWANG BING pada 24/03/2022 18:51:0010
Section H: Incentive
Vendor Development Program
Please indicate if your company plans to create a Vendor/Subcontractor Development No
Programe (VDP)
No items to show...
Product value for export/market size & segment/industries served/innovation based industries RM 0.00 RM 0.00
Manufacturing method
13
Dokumen ini telah ditandatangani secara digital oleh WONG KWANG BING pada 24/03/2022 18:51:0010
Training Program for Local Employees/Subcontractor
Year Projected Number Employees Percentage Total Employees (%) Type of Training
No items to show...
14
Dokumen ini telah ditandatangani secara digital oleh WONG KWANG BING pada 24/03/2022 18:51:0010
Section I: Additional Information
Year Founded 0
Headquarters Location
Activity
Group of Companies
No items to show...
CO2 Reduction
15
Dokumen ini telah ditandatangani secara digital oleh WONG KWANG BING pada 24/03/2022 18:51:0010
Project Name Address of Project Location Purpose CO2 Reduction (MT/Annum)
TRADING AND HIRING OF INDUSTRIAL AND Sebahagian PT17910 (HSD63047), PT17911(HSD63048) dan Green Building 548.54
MATERIAL HANDLING EQUIPMENT AND RELATED PT17937 (HSD63076), Seksyen 20, Bandar Serendah, , 48200,
PARTS Serendah, , Selangor
Certification Body approved by the Government issuing the green certificate GreenRE
1 Energy Minimum west facing facade & openings, Daylighting, Naturally Ventilated Common Areas, Naturally Ventilated Carpark, Low-E Laminated Glass,
Efficiency Insulated Roof, VRV Air-conditioning System, Energy Management System
2 Water Efficiency Rainwater Harvesting System, Provision Sub-meter for major water uses
3 Environmental Concrete Usage Index, Low VOC Products, Recycled Content Material, Non-CFC Refrigerants, QLASSIC Certification, Environmental Management
Protection Practice during Construction
17
Dokumen ini telah ditandatangani secara digital oleh WONG KWANG BING pada 24/03/2022 18:51:0010
Preliminary incremental Green Cost Breakdown UMW INDUSTRIAL :
- Energy Efficient Light RM39,410.35
- Energy Efficient Mechanical Ventilation System
RM3,664.00
- Energy Efficient Air Conditioning System RM156,945.40
- Water Sub Meter RM13,448.00
- Rainwater harvesting system RM119,540.00
- Environmentally Friendly Tiles Adhesive RM180.90
- Environmentally Friendly Exterior Paint RM4,922.04
- Environmentally Friendly Metal Roofing Sheet
RM10,390.13
- Environmentally Friendly Waterproofing RM2,198.80
- Environmentally Friendly Roof Insulation RM12,910.30
- Low VOC Interior Paint RM4,784.25
- LED Street Light RM10,586.15
- Precast Concrete Component RM10,415.00
UMW OFFICE :
- Low-E Glazing RM78,174.00
- Roof Insulation (Metal Deck Roof) RM19,537.92
- Roof Insulation (RC Flat Roof) RM6,309.12
- Energy Efficient Air Conditioning System RM40,745.30
- Lift with ACVVVF & Sleep Mode Features RM1,500.00
- Energy Efficient Pump RM4,425.00
- Energy Efficient Light RM605.00
- LED Street Light RM1,680.00
- Water Sub Meter RM8,750.00
- Rainwater harvesting system RM42,500.00
- Environmentally Friendly Sealant RM67.65
- Environmentally Friendly Ceiling Board RM1,841.68
- Environmentally Friendly Exterior Paint RM1,209.67
- Low VOC Interior Paint RM784.03
- Precast Concrete Component RM3,713.53
18
Dokumen ini telah ditandatangani secara digital oleh WONG KWANG BING pada 24/03/2022 18:51:0010
Breakdown of Payment made by applicant for each of the Green Cost as to date 1) UMW Industrial : 77% (Refer to the certificate
attached)
2) UMW Office : 42% (Refer to the certificate attached)
Other Information
Income tax form (Form C)(1st years) 211210_UMW Ind 1985 Form C-2018.pdf
Group Organisation Chart (if applicable) with shareholder equity structure 211102_UMWI 2021 ORG CHART - JUNE'21.pdf
Please provide the invoice and amount of the Capital Expenditure (CAPEX) incurred as to date UMW Industrial & UMW Office - Progress Certificate.pdf
Income tax form (Form C) (3nd years) 211210_UMW Ind 1985 Form C-2020.pdf
Income tax form (Form C) (2nd years) 211210_UMW Ind 1985 Form C-2019.pdf
19
Dokumen ini telah ditandatangani secara digital oleh WONG KWANG BING pada 24/03/2022 18:51:0010
Sector Energy
Energy Metric Unit Current Consumption Estimated Saving % Saving
Status RM Unit RM Unit RM % Unit %
20
Dokumen ini telah ditandatangani secara digital oleh WONG KWANG BING pada 24/03/2022 18:51:0010
Section J: Supporting Documents
1. Business Premise License from the Local Authority. This is applicable to a company exempted
from Manufacturing License under the Industrial Coordination Act 1975
2. Manufacturing License issued under the Industrial Coordination Act 1975, or Confirmation Letter
for a Company Exempted from Manufacturing License under the Industrial Coordination Act 1975
from MIDA (PDA)
7. Final Certificate
21
Dokumen ini telah ditandatangani secara digital oleh WONG KWANG BING pada 24/03/2022 18:51:0010
Section K: Company Operation And Technology
Automation
22
Dokumen ini telah ditandatangani secara digital oleh WONG KWANG BING pada 24/03/2022 18:51:0010
Section L: Declaration
I hereby declare that to the best of my knowledge, the particulars furnished in this application are true.
Name : Wong Kwang Bing
Identity Card/Passport No. : 780517145457
Designation : Manager, Credit Control
23
Dokumen ini telah ditandatangani secara digital oleh WONG KWANG BING pada 24/03/2022 18:51:0010