This document provides details on structural health monitoring equipment for a new bridge being built across the River Nile at Jinja, Uganda. It lists 29 items needed for the monitoring system, including crack mapping sensors, strain gauges, inclinometers, GPS systems, weather sensors, and supervisory services. The total cost for all monitoring equipment is 1,073,440.88 Ugandan shillings, with Keisokugiken, the contractor, receiving an initial 50% payment of 536,720.44 shillings.
Original Description:
Structural Health Monitoring Manual
Original Title
20181023_Keisoku Giken Structural Health Monitoring
This document provides details on structural health monitoring equipment for a new bridge being built across the River Nile at Jinja, Uganda. It lists 29 items needed for the monitoring system, including crack mapping sensors, strain gauges, inclinometers, GPS systems, weather sensors, and supervisory services. The total cost for all monitoring equipment is 1,073,440.88 Ugandan shillings, with Keisokugiken, the contractor, receiving an initial 50% payment of 536,720.44 shillings.
This document provides details on structural health monitoring equipment for a new bridge being built across the River Nile at Jinja, Uganda. It lists 29 items needed for the monitoring system, including crack mapping sensors, strain gauges, inclinometers, GPS systems, weather sensors, and supervisory services. The total cost for all monitoring equipment is 1,073,440.88 Ugandan shillings, with Keisokugiken, the contractor, receiving an initial 50% payment of 536,720.44 shillings.