Professional Documents
Culture Documents
Deliverables
Fire Safety Engineering Design Report.
Fire Protection Systems Layout/Drawing
Bill of Quantities for Fire Protection Systems
Estimate of Days
Fire Safety Engineering Design Report: 20-40 days
Fire Protection/Fighting System Layout/Drawings: 20-30 days
Total time for completion of project: 20-40 days [tentative]
[Note: the time for completion of the project depends explicitly on the need for fire
engineering simulations for the evaluation of fire safety designs and the time required for
completion of those simulations.]
Fees/Mode of Payment
Fee – NRs. 1,25,000
Mode of Payment – Cash/Cheque