Professional Documents
Culture Documents
Unconventional Reservoirs
Mark Chapman
Petroleum Engineering Manager
Two Goals of Hydraulic Fracturing
• Fluid system
– Slickwater vs XL fluids and impact on proppant size
• Conductivity requirements
– How much conductivity do we need?
– Cost vs benefit
3
How Much Conductivity Do I Need?
Cf = kf * wf
wf
kf
4
Characteristics of High Conductivity Proppant
• Strength
– Minimal internal porosity
• Shape
– Spherical, round particles
• Size
– Larger, coarser, uniformly sized
• Durability
– Thermal stability, resistant to
long term degradation
5
Hierarchy of Proppant Value
kf
xf
Fracture Flow Capacity
Reservoir Deliverability
7
How Much Conductivity Do I Need?
Cf = kf * wf
kform wf
kf
xf
kf * wf
FCD =
kform * xf
8
How Much Conductivity Do I Need?
Cf = kf * wf
kform wf
kf
Contact
kf * wf
FCD =
kform * Contact
9
Why Would Something That Looks Like This…
10
Why Would Something That Looks Like This…
~2000 md-ft
~700 md-ft
~350 md-ft
11
Current Conductivity Test
API/ISO conductivity test
• Ohio Sandstone
• 2 lb/ft2 proppant loading
• Stress maintained for 50 hours
• 150 or 250° F
• Extremely low water velocity (2 ml/min)
Holistically accounts for:
• Proppant size
API/ISO conductivity cell
• Proppant strength and crush ‘profile’
• ‘Wet’ system …Does not account for downhole conditions
• Some temperature effects [more details in SPE 106301]
• Some embedment Reference: ISO 13503-5 & API RP19D
12
Conductivity Balance – Cost vs. Benefit
13
Conductivity Balance – Cost vs. Benefit
14
Conductivity Balance – Cost vs. Benefit
15
In Reality our Fractures are Conductivity Limited
30/50 Baseline 30/50 *Realistic
Conductivity @ 8000 psi Conductivity @ 8000 psi
50,000
30 Day Oil (bbl)
40,000
30,000 35,000
29,000
20,000
10,000
0
Conductivity Design (Ceramic) Increased Contact Design (Sand) Increased Contact & Conductivity
(Ceramic)
Period of Time 2013 Incr Length, Stages, Sand Incr Length, Stages, Ceramic
Avg # Stages 19 25 29
Proppant Type Ceramic Sand Ceramic
Well Count 13 3 2
17
Contact and Conductivity - Bakken Shale
70
$16
Thousands
6 Mo Cum Oil
60 $14
NPV ($M)
50 $12
52
6 Mo Cum Oil (bbl)
40 60% $10
NPV ($M)
$8
30 34 32
$6
20 27
$4
10 $2
0 $0
Conductivity Low Cost Contact Area Contact & Conductivity
Period of Time Initial Wells Tested Sand Tested More Stages Today’s Design 6 Month ~ 20,000 bbl
Stages 20 20 30 30 Production Gain oil per well
Proppant Type Ceramic Sand Sand Ceramic Net $ Gain @ $75 oil $1,500,000
Well Cost $5.5M $5.0M $5.4M $6.7M
Payout on Conductivity ~ 5 Months
Model EUR 409 MBO 359 MBO 469 MBO 605 MBO
18
Summary
• Hydraulic fractures require contact and conductivity in unconventional
reservoirs
– Fracture conductivity is driven by proppant
19