TEST REPORT ON CONCRETE MASONRY

DATE : March 18, 20


LAB. NO. : CONC-17-12

CUSTOMER/CLIENT : METRO STONERICH CORP. / TOKWING CONSTRUCTION CORP.


PROJECT : Construction of Nine (9) Storey with Covered Roof Deck HLURB Office Building
LOCATION : Kalayaan Ave. corner Mayaman Street, Quezon City
KIND OF MATERIAL : CHB 6"
SAMPLE IDENTIFICATION : Not Stated
QUANTITY REPRESENTED : Not Stated
SAMPLED AT : Not Stated
SOURCE : MCVR Builders & Construction Supply
SAMPLED BY : Engr. Faye Ricafrente/Engr. Gualberto Lambino/ DATE SAMPLED : March 09, 20
Engr. Sabino Ocillos DATE SUBMITTED : March 16, 20
SUBMITTED BY : Engr. Faye Ricafrente/Engr. Gualberto Lambino/ DATE TESTED : March 16, 20
Engr. Sabino Ocillos DESIRED TEST : Compressio
PROPOSED USED : See Above project Name SPECIFICATION : 700 psi
Date Length Width Height Gross Area Load Ultimate Str
Sample Mark
Molded mm mm mm mm2 kN MPa

1. CHB 6" - 390 150 190 58500 317.9 5.43


2. CHB 6" - 390 150 190 58500 320.2 5.47
3. CHB 6" - 390 150 190 58500 265.9 4.55
4. CHB 6" - 390 150 190 58500 350.5 5.99
5. CHB 6" - 390 150 190 58500 239.9 4.10
6. CHB 6" - 390 150 190 58500 259.3 4.43
7. CHB 6" - 390 150 190 58500 234.0 4.00
8. CHB 6" - 390 150 190 58500 225.2 3.85
9. CHB 6" - 390 150 190 58500 281.7 4.82
10. CHB 6" - 390 150 190 58500 189.0 3.23

Remarks : This report is the result of test performed on the sample submitted.

Witnessed by:

Engr. Faye Ricafrente Engr. Gualberto Lambino Engr. Sabino Ocillos


EMCI - Project Engr. ESCA - PMT ESCA - PMT

Tested by: Checked by: Certified by:

Dexter M. Copino/ Ronel R. Rodela Engr. Raul Leslie S. Banzon Jeffrey C. R


Laboratory Technician Laboratory Head Managing D
N CONCRETE MASONRY
March 18, 2017
CONC-17-1221B-01

March 09, 2017


March 16, 2017
March 16, 2017
Compression Test

Ultimate Strength
psi

788
794
659
869
595
643
580
558
698
468

tnessed by:

Engr. Sabino Ocillos


ESCA - PMT

Jeffrey C. Reyes
Managing Director
TEST REPORT ON CONCRETE MASONRY
DATE : May 23, 2019
LAB. NO. : CONC-19-2241

CUSTOMER/CLIENT : RAFAEL B. RAMOS


PROJECT : Lindenwoods Warehouse
LOCATION : Valenzuela City
KIND OF MATERIAL : CHB 6"
QUANTITY REPRESENTED : 2 pcs.
SAMPLED AT : Not Stated DATE SAMPLED : October 04, 2018
SOURCE : MCBR DATE SUBMITTED : May 22, 2019
SAMPLED BY : Not Stated DATE TESTED : May 22, 2019
SUBMITTED BY : Rafael B. Ramos DESIRED TEST : Compression Test
PROPOSED USE : For Walls SPECIFIED STRENGTH : 450 psi

Date Length Width Height Net Area Load Ultimate Strength


Sample Mark
Molded (mm) (mm) (mm) (mm²) kN MPa psi

1 - 395 145 204 34,875 172.2 4.9 716


2 - 395 145 200 34,875 179.5 5.2 747

Remarks : This report is the result of test performed on the sample submitted.

Witnessed by:

Rafael B. Ramos Kyle Huang

Tested by: Checked by: Certified by:

Rico P. Brase Engr. Raul Leslie S. Banzon Jeffrey C. Reyes


Laboratory Technician Laboratory Head Managing Director
TEST REPORT ON CONCRETE MASONRY
DATE : May 22, 2019
LAB. NO. : CONC-19-2221

CUSTOMER/CLIENT : RAFAEL RAMOS


PROJECT : Warehouse
LOCATION : Valenzuela City
KIND OF MATERIAL : CHB 6"
QUANTITY REPRESENTED : Not Stated
SAMPLED AT : Not Stated DATE SAMPLED : October 04, 2018
SOURCE : Not Stated DATE SUBMITTED : May 21, 2019
SAMPLED BY : Not Stated DATE TESTED : May 21, 2019
SUBMITTED BY : Christopher Ramos DESIRED TEST : Compression Test
PROPOSED USE : For Information SPECIFIED STRENGTH : As per result

Date Length Width Height Net Area Load Ultimate Strength


Sample Mark
Molded (mm) (mm) (mm) (mm²) kN MPa psi

1 - 400 150 200 34,600 203.7 5.9 854

Remarks : This report is the result of test performed on the sample submitted.

Witnessed by:

Christopher Ramos

Tested by: Checked by: Certified by:

Rico P. Brase Engr. Raul Leslie S. Banzon Jeffrey C. Reyes


Laboratory Technician Laboratory Head Managing Director
TEST REPORT ON CONCRETE MASONRY
DATE : May 17, 2019
LAB. NO. : CONC-19-2141

CUSTOMER/CLIENT : RAFAEL RAMOS


PROJECT : Warehouse Val City
LOCATION : Caloocan City
KIND OF MATERIAL : CHB 6"
QUANTITY REPRESENTED : Not Stated
SAMPLED AT : Not Stated DATE SAMPLED : October 04, 2018
SOURCE : Not Stated DATE SUBMITTED : May 16, 2019
SAMPLED BY : Christopher Ramos DATE TESTED : May 16, 2019
SUBMITTED BY : Christopher Ramos DESIRED TEST : Compression Test
PROPOSED USE : For Information SPECIFIED STRENGTH : As per result

Date Length Width Height Net Area Load Ultimate Strength


Sample Mark
Molded (mm) (mm) (mm) (mm²) kN MPa psi

1 - 390 150 190 36,100 75.8 1.3 189


2 - 391 150 191 36,055 75.8 1.3 188

Remarks : This report is the result of test performed on the sample submitted.

Witnessed by:

Christopher Ramos

Tested by: Checked by: Certified by:

Eduardo G. Zamora Engr. Raul Leslie S. Banzon Jeffrey C. Reyes


Laboratory Technician Laboratory Head Managing Director
TEST REPORT ON CONCRETE MASONRY
DATE : April 06, 2019
LAB. NO. : CONC-19-1501

CUSTOMER/CLIENT : PHENIX GARUDA CONSTRUCTION AND DEVELOPMENT CORPORATION


PROJECT : FEU Lerma
LOCATION : Sampaloc, Manila
KIND OF MATERIAL : CHB 6"
SAMPLE IDENTIFICATION : Not Stated
QUANTITY REPRESENTED : Not Stated
SAMPLED AT : FEU Lerma DATE SAMPLED : October 04, 2018
SOURCE : Grand Rajas Black Corp. DATE SUBMITTED : April 06, 2019
SAMPLED BY : Phenix Garuda DATE TESTED : April 06, 2019
SUBMITTED BY : Phenix Garuda DESIRED TEST : Compression Test
PROPOSED USE : For Testing SPECIFICATION : 700 psi

Date Length Width Height Net Area Load Ultimate Strength


Sample Mark
Molded (mm) (mm) (mm) (mm²) kN MPa psi

1 04/05/19 400 150 200 48,661 89.3 1.80 266


2 04/05/19 400 150 200 48,601 101.3 2.10 302
3 04/05/19 410 150 200 48,625 143.4 2.90 428

Remarks : This report is the result of test performed on the sample submitted.

Witnessed by:

Joyce Anne Alam Danilo Serrato Jr.


PGCDC ATMCI

Tested by: Checked by: Certified by:

Rico P. Brase / Joseph Peralta Engr. Raul Leslie S. Banzon Jeffrey C. Reyes
Laboratory Technicians Laboratory Head Managing Director
TEST REPORT ON CONCRETE MASONRY
DATE : March 14, 2019
LAB. NO. : CONC-19-1143
Page 1 of 2

CUSTOMER/CLIENT : PHENIX GARUDA CONSTRUCTION AND DEVELOPMENT CORPORATION


PROJECT : FEU Lerma
LOCATION : Lerma St., Sampaloc, Manila
KIND OF MATERIAL : CHB 6"
SAMPLE IDENTIFICATION : Not Stated
QUANTITY REPRESENTED : Not Stated
SAMPLED AT : FEU Lerma DATE SAMPLED : October 04, 2018
SOURCE : GABTECH Industrial Trading DATE SUBMITTED : March 11, 2019
SAMPLED BY : Phenix Garuda DATE TESTED : March 12, 2019
SUBMITTED BY : Phenix Garuda DESIRED TEST : Compression Test
PROPOSED USE : For Testing SPECIFICATION : 700 psi

Date Length Width Height Gross Area Load Ultimate Strength


Sample Mark
Molded mm mm mm mm2 kN MPa psi

1 Feb 410 150 200 61,500 181.8 2.96 429


2 Feb 400 150 200 60,000 228.0 3.80 551
3 Feb 410 150 200 60,000 204.3 3.41 494

Remarks : This report is the result of test performed on the sample submitted.

Witnessed by:

Joyce Anne Alam Danilo Serrato Jr.


PGCDC ATMCI

Tested by: Checked by: Certified by:

Ricardo E. Valencia Jr./John Paulo M. Saludo Engr. Raul Leslie S. Banzon Jeffrey C. Reyes
Laboratory Technicians Laboratory Head Managing Director

You might also like