Evaluate Circuit Performance

Enter the operating data (in this case Tons) and look for a change in slope to determine trend variations.

Example Tons
Date Value Value - Average Cumulative (Value - Average)
11/21/2019 1330 -66 -66
11/22/2019 1326 -70 -135
11/23/2019 1356 -40 -175
11/24/2019 1328 -68 -243
11/25/2019 1304 -92 -335
11/26/2019 1325 -71 -406
11/27/2019 1372 -23 -430
11/28/2019 1433 38 -392
11/29/2019 1447 51 -341
11/30/2019 1423 27 -314
12/1/2019 1474 78 -235
12/2/2019 1470 75 -161
12/3/2019 1466 71 -90
12/4/2019 1486 90 0

Average = 1396

Tons
11/20/2019
11/21/2019
11/22/2019
11/23/2019
11/24/2019
11/25/2019
11/26/2019
11/27/2019
11/28/2019
11/29/2019
11/30/2019
12/1/2019
12/2/2019
12/3/2019
12/4/2019
12/5/2019

Column B, C are inputs

CUSUM Chart Example


https://en.wikipedia.org/wiki/CUSUM

* Downward slope indicates a period of time where the values tend to be below the average.
* Upward slope indicates a period of time where the values tend to be above the average.
* Zero slope indicates a period of time where the values tend to be equal to average.

Disclaimer
-
mine trend variations.
he average.
phani