Professional Documents
Culture Documents
March 30, 2019 (Ecological Integrity Workshop @ USC-North Campus, Cebu City)
Note: Due to the possible risk of our students to take out the soil/mud debris just to get the frame/columns for the
garbage bins from the current location, an alternative project is proposed –
1 plant and 1 pot/student.
Unit Cost Total Cost
1 flowering plant/shrub 50.00 (40 students) PhP 2, 000.00
(dwarf-santan)
1 pot 30.00 (40 students) PhP 1, 200.00
TOTAL PhP 2, 200.00
40 students PhP 80.00/student
*Adviser will still try to communicate with USC-admin if NSTP students can use plant-cuttings, to minimize cost. If
not, adviser will also try to look for cheaper plants may it be in Taboan, Cebu City or in Department of Agriculture if
possible. Please do just prepare the budget for this project. If you do have santan-plants at home and you can repot it
in the recommended-pot size/design-the better! Thanks ahead for your understanding and utmost cooperation!
April 27, 2019 (Barangay Road Clean-up @ Sitio Sindulan, Brgy. Mabolo Cebu City)
Note: This is an estimated cost only; if students can bring their own broom sticks and recycled sako-bags from home,
STUDENT MAY NO LONGER BUY ORIGINAL MATERIALS/ITEMS.
Unit Cost Total Cost
1 broom stick/ student 40.00/student (40.00x40 students) PhP 1, 600.00
2 pcs “sako” bag/group 20.00/sack (2 pcs sack/group) = 40.00 PhP 160.00
(empty 50kg. rice-sack) (40.00 x 4 groups)
TOTAL PhP 1, 760.00
(some students dropped from class, 40students PhP 44.00/student
hence 40 students only)