Professional Documents
Culture Documents
Basement Ladder
Basement Ladder
X X
X X
X X
X X
X X
X X
X
X
X
NEW ATC TOWER X X X X
X
X X X X X X X X X X X
X
X
X X
X
X
XX
X
X
XX
X X X
X
X X X
A X X X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X X X X
X
X
X
X
X
X
X XX XX
X X X X X
X
X
7200
X
X
X
X X X X
X X X X X X
X
X
XX
X
X
X
X
XX
X
7200
ISL-RAF-DAT-G0-01
X
X
30A TPN (5.5kW)
FED FROM MCC-B1-2)
ISL-RAF-DAT-01-01
7200
D
40A TPN (11kW) KEYPLAN
FED FROM MCC-B1-2)
7200
NOTES:
UP 7200
E 1. ALL DIMENSIONS ARE IN MILLIMETER
2. NO CABLE SHALL BE PULLED TRAY/LADDER UNTIL THE
SHOP DRAWING FOR LOW VOLTAGE SINGLE LINE
DIAGRAM OF TOWER IS APPROVED
Shaft
DAT-01-B1-33_9
7200
F 3. SPACING BETWEEN ADJACENT CABLES ON CABLE TRAY
2 SHALL BE MINIMUM TWICE OVERALL DIAMETER OF
ISL-AHU-DAT-G0-01
BIGGER CABLE
UP
ISL-SP-1(ST.BY) SLEE
VE
20A TPN (2.5kW)
18x1 S FOR C
FED FROM MCC-B1-2 00Øm O
m UP MMUNIC J
VC ( A
3 LA TION
AHU
ISL-APF-DAT-B03 DAT-01-B1-03 7200
300
Circulation
B.O.T:3283 DAT-01-B1-30_2 MCC-B1-2
C3 M
C 15 FED FROM MDB-SS-2 7200
300X150 mm C.T
B.O.T:4525
300X150 mm C.T 600 mm C.L 7200
N
60
UP
B.O.T:3175
0
B.O.T:2692
56
300X150 mm C.T
8
ISL-JOCKEY PUMP B.O.T:4525 C.T : CABLE TRAY
771 60A TPN (15kW)
Toilet male 14 FROM MCC-B1-2
CFED
600 mm C.L Shaft
DAT-01-B1-33_8 C3400 C.L : CABLE LADDER
18
DAT-01-B1-25 B.O.T:3175
7
Toilet male
300
UP
DAT-01-B1-26 Shaft
DAT-01-B1-33_10
Core staircase
DAT-01-B1-33_1 600MM CABLE TRAY 538 Staircase-4
DAT-01-B1-09
UP
143
FOR ELV Shaft 135 DAT-01-B1-10
SECTIO
UP
A3
DAT-01-B1-24 B.O.T:4500
300
Circulation 300X150 mm C.T
DAT-01-B1-30_3
C13 Safe room 600MM CABLE TRAY MCC-B1-3 B.O.T:2799 C15 4 4x6.0mm² + 1x2.5mm² Cu/PVC WIRE IN 38mm Ø PVC/GI CONDUIT
DAT-01-B1-23 600 mm C.L FED FROM MDB-SS-2
Circulation B.O.T:3930 914 5 4x10mm² + 1x6.0mm² Cu/PVC WIRE IN 38mm Ø PVC/GI CONDUIT
First aid Core elevator lobby 120
DAT-01-B1-30_1 DAT-01-B1-33_2
DAT-01-B1-29
600 mm C.L Shaft
300X150 mm C.T B.O.T:4090
DAT-01-B1-33_4 6 4x16mm² + 1x6.0mm² Cu/PVC WIRE IN 38mm Ø PVC/GI CONDUIT
600 mm C.L
150
Storage B.O.T:4525
DAT-01-B1-27 Circulation core B.O.T:4400
DAT-01-B1-33_3
7 4x25mm² + 1x16mm² Cu/PVC WIRE IN 50mm Ø PVC/GI CONDUIT
ION
SE
CT B2 300X150 mm C.T
SECTION B.O.T:2918
28 ISL-FAU-DAT-B1-01 4x35mm² + 1x16mm² Cu/PVC WIRE IN 50mm Ø PVC/GI CONDUIT
E
300 mm CABLE TRAY 8
1580 Shaft 100A TPN (22kW)
6 DAT-01-B1-33_5 FOR ELV
85 FED FROM MCC-B1-3 9 4x50mm² + 1x16mm² Cu/PVC WIRE IN 50mm Ø PVC/GI CONDUIT
600 mm C.L
B.O.T:4400
14 4Cx6.0mm² Cu/XLPE/SWA/PVC CABLE ON CABLE TRAY / IN PVC DUCT
Shaft
C 12 DAT-01-B1-33_7 600 mm C.L C6 17 4Cx25mm² Cu/XLPE/SWA/PVC CABLE ON CABLE TRAY / IN PVC DUCT
36 B.O.T:4090
300
600
14 600 mm C.L
3 1 23 4Cx150mm² Cu/XLPE/SWA/PVC CABLE ON CABLE TRAY / IN PVC DUCT
45 B.O.T:3930
372
lation 1958 7200 24 4Cx185mm² Cu/XLPE/SWA/PVC CABLE ON CABLE TRAY / IN PVC DUCT
Circu1-B1-30_4 ISL-RAF-DAT-G0-02 AHU
DAT-0 49
3 SE B1
60A TPN (15kW) A1
CT
IO
DAT-01-B1-11
N' 25 4Cx240mm² Cu/XLPE/SWA/PVC CABLE ON CABLE TRAY / IN PVC DUCT
ION
FED FROM MCC-B1-1 150 mm C.L 600 mm C.L N
SECTION
38
B.O.T:4300
SECT
A2
B.O.T:4400
26 4Cx300mm² Cu/XLPE/SWA/PVC CABLE ON CABLE TRAY / IN PVC DUCT
300
0
300X150 mm C.T FED FROM MCC-B1-3
60
ECB-B1-2 B.O.T:4525 600 mm C.L
600 mm C.L
B.O.T:4100
Reserved space
DAT-01-B1-12 600 THIS APPROVAL STATUS SHALL BE INTERPRETED AS STATED IN THE CONTRACT AND SHALL NOT RELIEVE THE CONTRACTOR
703
300X150 mm C.T FED FROM ECBS B.O.T:3091 FROM HIS CONTRACTUAL OBLIGATIONS.
B.O.T:2971 600 mm C.L
ECB-B1-1 548 SE D1
600 mm C.L B.O.T:3930
FED FROM ECBS 300X150 mm C.T
CT
IO C8 B.O.T:3091 L'
N
ISL-WP-2.1&2.2 Reserved space 200
C12000 B.O.T:2971 600 mm C.L 1440
0
DAT-01-B1-19
B.O.T:2800
200
30A TPN (5kW)
2.0 06.11.19 Third Issue for SD GK
FED FROM MCC-B1-1 LP-B1-2 Electrical room C9
DETAIL 3 1.0 06.10.19 Second Issue for SD GK
200
FED FROM MSB-GF-1 DAT-01-B1-17 600 mm C.L
Reserved space B.O.T:4100 600 mm C.L
4 DAT-01-B1-15 B.O.T:4050 ISL-RAF-DAT-04 0.0 20.05.18 First Issue for SD C GK
LP-B1-1 DETAIL 1
200
60A TPN (15kW) VT
FED FROM MSB-GF-1 200 5
00
1528
DETAIL 4 FED FROM MCC-B1-3
DAT-01-B1-31
REV. DATE DESCRIPTION STATUS APPROVED
135
5
UPP-B1-1 DETAIL SLEEVES FOR ELECTRICAL
SECT
18x100Ømm UPVC (3 LAYERS)
7200
CLIENT
05
300
FED FROM UMSB-GF-1
ONI
04
PP-B1-3 DETAIL 2 SECT
ION
DAT-01-B1-20
150A TPN (15kW) FED FROM MSB-GF-1 Telecom room 01 ON 7200
ECTI SP 24 SP SPSPSP
ISL-AHU-DAT-01-03(WITH HUMIDIFIER) DAT-01-B1-18
I ON S
100A TPN (11kW)
FED FROM MCC-B1-1 PP-B1-1 SLEEVES FOR ELECTRICAL
18x100Ømm UPVC (3 LAYERS)
SEC T
SP 26 25 25 SPSP SP SP SP SPSPSP CLIENT
FED FROM MCC-B1-1 FED FROM MSB-GF-1 SIGNATURE & STAMP:
SP 26 26 25 24 24
N 24 22 22 21 21 21
ATIO CONSULTANT
M M UNIC RS) 25 24 24 23 SPSP
O
OR C C (3 LAYE
7200
pace
L E E VES F U PV 24 24 25 SPSPSP architecture
S Ø mm
Staircase-3
DAT-01-B1-21
18x1
0 0 23 23 23 23 SPSP engineering+
Shaft
DAT-01-B1-33_12 planning
5
UP
7200
J' CONSULTANT
SIGNATURE & STAMP:
K'
CONTRACTOR
UP
7200
H'
HOT Engineering & Construction Co. KSCC
7200
7200
G' DISCIPLINE
ARCHITECTURAL Esraa Alaa
NAME SIGNATURE
06.11.19
DATE
ISL-RAF-DAT-01-03 06.11.19
20A TPN (4kW)
STRUCTURAL Deyaa Oteir
FED FROM MCC-B1-1 ELECTRICAL John Ferrao 06.11.19
7200
F' MECHANICAL Taleb Allouche 06.11.19
DESIGN CONSULTANT
6
7200
E'
DESIGN CONSULTANT
SIGNATURE & STAMP:
FALSE CEILING TYPICAL CABLE LADDER JOINT PROJECT: Package 3, Design and Construction of
600 New Runway 15R/33L,
DETAIL 2
600
Reconstruction of Runway 15L/33R,
SECTION A1 Associated Taxiways,
4Cx300mm² Cu/XLPE/SWA/PVC
FED FROM UMSB-SS-1 4Cx300mm² Cu/XLPE/SWA/PVC
4Cx120mm² Cu/XLPE/SWA/PVC
FED FROM UMSB-SS-1 Infrastructure and Utilities
FOR UMSB-GF-1 FED FROM UMSB-SS-1
FOR UMSB-GF-2 4Cx240mm² Cu/XLPE/SWA/PVC
FOR UMSB-14-1
4Cx95mm² Cu/XLPE/SWA/PVC
CONTRACT: 59-2016/2017
MCC
2800
FOR MCC-B1-1 FED FROM UMSB-SS-1
162.8 68.6 137.2 68.6 162.8
118.6 62.8 118.6
162.5
95 95 85
FOR UMSB-14-2
162.5 FACILITY: (Phase D) DAT/DVC/DCS - New ATC Tower
47.5 47.5 42.5 42.5
600
300
DEV'T STEP: Shop Drawing
SC
DETAIL 3 SECTION A2 SECTION D1 FFL New ATC Tower - Basement Plan
DRAWING TITLE:
4Cx240mm² Cu/XLPE/SWA/PVC
FED FROM UMSB-SS-1 4Cx240mm² Cu/XLPE/SWA/PVC 4Cx185mm² Cu/XLPE/SWA/PVC 4Cx185mm² Cu/XLPE/SWA/PVC Cable Route Layout (SHEET 1 OF 5)
FOR UMSB-L1-1 FED FROM UMSB-SS-1 FOR ISL-FIRE PUMP-1 FOR ISL-FIRE PUMP-2
FOR UMSB-L1-2
4Cx240mm² Cu/XLPE/SWA/PVC
4Cx150mm² Cu/XLPE/SWA/PVC
FOR MCC-B1-2
FED FROM MDB-SS-2
FOR MCC-L12-1
SHEET PK3 AH DAT EL20 SD B1 100001-1 2.0
101.9 57.3 114.6 57.3 114.6 52.4 101.9
174.4 62.8 125.6 62.8 174.4 268.6 62.8 268.6
COPPER LUGS
NUMBER: PRJ ORG FAC DIS DOC LVL SEQ REV
DAT-FFL-B1 DAT-FFL-B1 TYPICAL MCC PANEL ENTRY OF MAIN CABLE
SCALE: 1:100 SIZE: A0
GALVANISED STEEL PLATE
600
41X41X2MM UNISTRUT CHANNEL
600 DESIGNED: AR CALCULATION:
600
SECTION E 4MM EARTH WIRE
DETAIL 4 SECTION A3 CHECKED BY: CS DRAWN: JC
CABLE LADDER/TRAY SUPPORT TYPICAL TYPICAL CABLE TRAY JOINT APPROVED: GK DATE: 06.11.2019