Sales $ 2,152,500
Direct labour expense $ 271,250
Direct materials expense $ 458,000
Manufacturing overhead
Machine related expenses $ 336,000
setup labor $ 40,000
Receiving and production control $ 180,000
engineering $ 100,000
Packaging and shipping $ 150,000
Total manufacturing overhead $ 806,000
Gross Margin $ 617,250
General, Selling and Admin expenses $ 559,650
operating income $ 57,600
Manufacturing overhead
Valves pumps
Machine related expense /unit $ 15 $ 15
Setup labour /unit $ 0.33 $ 1
Receiving and production control /unit $ 1.50 $ 4.50
Engineering cost /unit $ 2.67 $ 2.40
Packaging and shipping $ 0.67 $ 2.80
Manufacturing overhead $ 20 $ 26
Direct labor $ 10.00 $ 12.50
Direct material cost $ 16.00 $ 20.00
3% Product Data
Product Line Valves pumps Flow controllers
Material per unit 4 5 10
Flow controllers Materials cost per unit $ 16.00 $ 20.00 $ 22.00
$ 9 direct labor per unit 0.4 0.5 0.4
$ 6.25 direct labor $/unit @ 25/DL hour $ 10.00 $ 12.50 $ 10.00
$ 28.13 Machine hours per unit 0.5 0.5 0.3
$ 12.50
$ 27.50 Monthly Production & operating Statistics
Valves pumps Flow controller Total
$ 83 Production 7,500 12,500 4,000 24,000
$ 10.00 Machine hours 3,750 6,250 1,200 11,200
$ 22.00 Production runs 10 50 100 160
Number of shipments 10 70 220 300
$ 115 Hours of engineering work 250 375 625 1,250
$ 177.50
Flow controllers
$ 177.50
$ 105.00
$ -72.50
4,000
$ -290,000
-209,423
-9.7%