Professional Documents
Culture Documents
A
These were the original spacing of
temporary filler beams that were used to 1'-101/4 2'-0 2'-0 3'-0 2'-0 2'-0 2'-71/2 2'-0 2'-0 2'-0 3'-0 2'-0 2'-0 2'-0 2'-03/4 2'-0 2'-0 2'-0 1'-31/2
move the heavy equipment across
platform.
1'-101/4 4'-0 3'-0 4'-0 2'-71/2 4'-0 2'-0 3'-0 4'-0 4'-03/4 4'-0 3'-31/2
21/2
33/8
43/4
13/8
21/2
11/8
21/2
13/8
EXISTING GIRDER
BEAM
PROJECT NAME
FAIRLESS HILLS FACILITY - TAPS
LOCATION
445 SOUTH STREET, MORRISTOWN, NJ 07560
Tekla Structures
CONTRACTOR
0 0 For Field Use DRAWN BY CHECKED BY JOB No.
PGV HPP
0 A For Approval DESCRIPTION SEQUENCE
DATE DATE DRG No.
DATE NO. DESCRIPTION BY PLATFORM FRAMING PLAN 1 10/17/2018 11/11/2019 E1001 0