You are on page 1of 1

122 125 NORTH

A
These were the original spacing of
temporary filler beams that were used to 1'-101/4 2'-0 2'-0 3'-0 2'-0 2'-0 2'-71/2 2'-0 2'-0 2'-0 3'-0 2'-0 2'-0 2'-0 2'-03/4 2'-0 2'-0 2'-0 1'-31/2
move the heavy equipment across
platform.

1'-101/4 4'-0 3'-0 4'-0 2'-71/2 4'-0 2'-0 3'-0 4'-0 4'-03/4 4'-0 3'-31/2

Can this work?


We have reused the spacing to make use of the existing holes in the girder.
We are reusing the beams that are highlighted in green and omitted beams highlighted in red.
Please review the spacing considering the 4'-0" MAX grating span and confirm this spacing is acceptable.
14'-3 39'-10 17'-11

PLATFORM FRAMING PLAN As per Approver response we are


REFER: FH-S-002 following these spacing, & skipping
beams which are marked in red line.

21/2
33/8
43/4

13/8

21/2
11/8
21/2

13/8

L4X3-1/2X3/8 FILPED INFILL


BEAM

EXISTING GIRDER
BEAM

TYP CONNECTION AT INFILL BEAM

PROJECT NAME
FAIRLESS HILLS FACILITY - TAPS
LOCATION
445 SOUTH STREET, MORRISTOWN, NJ 07560
Tekla Structures

CONTRACTOR
0 0 For Field Use DRAWN BY CHECKED BY JOB No.
PGV HPP
0 A For Approval DESCRIPTION SEQUENCE
DATE DATE DRG No.
DATE NO. DESCRIPTION BY PLATFORM FRAMING PLAN 1 10/17/2018 11/11/2019 E1001 0