You are on page 1of 3

IADC WellCAP Well Control Worksheet

Subsea Stack - Wait and Weight Method


Well Name: ____________________________ Completed By: ___________________________ Date: _____ / _____ / _____
PRE-RECORDED INFORMATION
TRUE PUMP OUTPUT: ___________ x ___________ = ___________
m3/Stks @ 100% % Efficiency TPO (m3/ Stks)
DRILL STRING CAPACITY:
Drill #1: ________ ________ ________ x ________ = ________ m3 CURRENT WELL DATA
Pipe Size (mm) Weight (kg/m) m3/m Length (m) DP

Drill #2: ________ ________ ________ x ________ = ________ m3 WATER DEPTH: _________ meters PRESENT MUD:
Pipe Size (mm) Weight (kg/m) m3/m Length (m) DP RKB to WATER: _________ meters kg/m3
HWDP : ________ ________ ________ x ________ = ________ m3
CASING DATA:
Size (mm) Weight (kg/m) m3/m Length (m) HWDP

Drill #1: ________ ________ ________ x ________ = ________ m3 CASING_______ , _______ , _______
size ID weight
SEA
Collars Size (mm) Weight (kg/m) m3/m Length (m) DC FLOOR
Drill #2: ________ ________ ________ x ________ = ________ m3 CASING SHOE DEPTH meters
Collars Size (mm) Weight (kg/m) m3/m Length (m) DC
SHOE TEST DATA:
Surface : ________ ________ ________ x ________ = ________ m3
Line Size (mm) Weight (kg/m) m3/m Length (m) SL _________
Depth #1
__________________ _________ @ Test MW of _________
Total Drill String Capacity (m3) (kPa) (kg/m3)
STROKES, SURFACE TO BIT:
_________
__________________ ÷ ______________ = ______________ Depth #2
Total Drill String Capacity (m3) True Pump Strokes, Surface to Bit _________ @ Test MW of _________
Output (m3/Stks) (kPa) (kg/m3)
ANNULAR CAPACITY
_________
Between CSG and DP: _______ m3/m x _______ m = _______ m3 Depth #3
Between Liner #1 and DP: _______ m3/m x _______ m = _______ m3 _________ @ Test MW of _________
(kPa) (kg/m3)
Between Liner #2 and DP: _______ m3/m x _______ m = _______ m3
Between OH and DP/HWDP: _______ m3/m x _______ m = _______ m3 LINER #1 _______ , _______ , _______
size ID weight
Between OH and DC: _______ m /m x _______ m = _______ m
3 3

LINER #2 _______ , _______ , _______


Choke line capacity: _______ m3/m x _______ m = _______ m3 size ID weight

STROKES, BIT TO SHOE: LINER #1 TOP DEPTH meters

__________________ ÷ ______________ = ______________


LINER #2 TOP DEPTH meters
Open Hole Annular Vol. (m3) True Pump Strokes, Bit to Shoe
Output (m3/Stks)
STROKES, BIT TO SURFACE: LINER #1 SHOE DEPTH meters

__________________ ÷ ______________ = ______________ LINER #2 SHOE DEPTH meters


Total Annular Volume (m3) True Pump Strokes, Bit to Shoe
Output (m3/Stks)
TVD CASING or LINER meters
ANNULAR VOL. BETWEEN DRILL PIPE & RISER:
HOLE DATA:
(__________ - __________ ) ÷ 1273 = ___________________
Riser ID 2
Drill Pipe OD 2 3
Capacity Drill Pipe/Riser (m /m) SIZE (bit size) mm

TOTAL DEPTH (MD) meters


___________________ x __________ m = ___________________
Capacity Drill Pipe/Riser Volume between Drill Pipe & Riser
(m3/m) (m3/m)
TOTAL DEPTH (TVD) meters

STROKES TO DISPLACE RISER:


__________________ ÷ ______________ = ______________
Volume between True Pump Strokes
Drill Pipe & Riser (m3) Output (m3/Stks)

KICK DATA

SIDPP: __________ kPa SICP: __________ kPa PIT GAIN: __________ m3 Time of Incident: ____ : ____
DISCLAIMER: This Well Control Worksheet is intended solely for the use of the IADC and IADC accredited schools and organizations engaging in the teaching of the IADC WellCAP
Well Control classes. The IADC, its employees or others acting on its behalf, makes no warranties or guarantees expressed, implied or statutory, as to any matter whatsoever, with
respect to the use of this Well Control Worksheet.
SI Units Rev 01/13/06
(kPa, m3, kg/m3) Page 1
CALCULATIONS
KILL MUD WEIGHT (KMW) KILL MUD
( ______________ ÷ 10.2 ÷ _______________ ) + _______________ = ___________ kg/m3 WEIGHT
SIDPP (kPa) True Vertical Depth (m) Present Mud Weight (kg/m3)
INITIAL CIRCULATING PRESSURE (ICP) INITIAL CIRCULATING
_____________________________ + ____________________________ = ___________ kPa PRESSURE
SIDPP (kPa) Pump Pressure (kPa) @ SCR of _______SPM
FINAL CIRCULATING PRESSURE (FCP) FINAL CIRCULATING
__________________________ x ______________ ÷ ______________ = ___________ kPa PRESSURE
Pump Pressure (kPa) @ SCR of _______SPM Kill Mud Weight (kg/m3) Present Mud Weight (kg/m3)

SELECTED KILL PUMP DATA


Kill Rate Speed Pump Output Circ. Rate Slow Pump Pressure Circ. Pres thru Choke Circ. Pres thru Choke
CLFP
(STKS/MIN) (m3/STK) (m3/MIN) (Circ. Downable & Line (kPa) & Kill Line (kPa) Choke Line Choke &
Up Riser) (kPa) Kill Line(kPa)
PUMP
No. 1
PUMP
No. 2
PUMP
No. 3

PRESSURE CHART
Stroke or Volume Theoretical Drill Pipe Actual Drill Pipe Pressure Actual Actual
Pressure Casing Pressure Pit Volume Deviation
SURFACE ICP
0

BIT FCP

_____________ ÷ 10 = _____________ ________________ - ________________ ÷ 10 = ____________


Strokes Surface to Bit Strokes per Step Initial Circulation Pressure Final Circulation Pressure kPa per Step
BIT FCP

SURFACE

______________ ÷ 10 = ____________
Strokes Bit to Surface Strokes per Step

DISCLAIMER: This Well Control Worksheet is intended solely for the use of the IADC and IADC accredited schools and organizations engaging in the teaching of the IADC WellCAP
Well Control classes. The IADC, its employees or others acting on its behalf, makes no warranties or guarantees expressed, implied or statutory, as to any matter whatsoever, with
respect to the use of this Well Control Worksheet.
SI Units Rev 01/13/06
(kPa, m3, kg/m3) Page 2
GRAPHIC ANALYSIS

INITIAL CIRCULATION PRESSURE (kPa)

FINAL CIRCULATION PRESSURE (kPa)


0
Stroke
Pressure
Time

FORMULAS
1. Pressure Gradient (kPa/m) = Mud Weight (kg/m3) x 0.00981

2. Hydrostatic Pressure (kPa) = Mud Weight (kg/m3) x 0.00981 x Depth (m, TVD)

3. Capacity (m3/m) = Inside Diameter2 (mm) ÷ 1273

4. Annular Capacity (m3/m) = (Inside Diameter of Casing2 (mm) or Hole Diameter2(mm) - Outside Diameter of Pipe2 (mm)) ÷ 1273

5. Pipe Displacement (m3/m) = (Outside Diameter of pipe2 (mm) - Inside Diameter of pipe2 (mm)) ÷ 1273

Surface LOT Pressure (kPa)


6. Maximum Allowable Mud Density (kg/m3) = + LOT Mud Density (kg/m3)
Shoe Depth (m, TVD) x 0.00981

7. MAASP (kPa) = [Maximum Allowable Mud Density (kg/m3) - Present Mud Density (kg/m3)] x 0.00981 x Shoe TVD (m)

Drilling Mud Density (kg/m3) x 0.00981 x Metal Displacement (m3/m)


8. Pressure Drop per Foot Tripping Dry Pipe (kPa/m) =
Casing Capacity (m3/m) - Metal Displacement (m3/m)
Drilling Mud Density (kg/m3) x 0.00981 x Closed End Displacement (m3/m)
9. Pressure Drop per Foot Tripping Wet Pipe (kPa/m) =
Casing Capacity (m3/m) - Closed End Displacement (m3/m)

10. Formation Pressure (kPa) = Hydrostatic Pressure Mud in Hole (kPa) + SIDPP (kPa)

11. EMW (kg/m3) @ Shoe = (SICP (kPa) ÷ 0.00981 ÷ Shoe Depth (m, TVD) ) + Present Mud Weight (kg/m3)

m3 of Mud in System x 4250 x (KMW - OMW)


12. Kg of Barite Needed to Weight-Up Mud =
(4250 - KMW)
Kg of Barite Needed to Weight-Up Mud
13. Volume Increase from Adding Barite (m3) =
4250
Pressure (kPa)
15. Equivalent Fluid Density (kg/m3) @ __________ depth (m) =
Depth (m, TVD) x 0.00981
2
New Pump Rate (SPM)
16. Estimated New Pump Pressure at New Pump Rate (kPa) = Old Pump Pressure (kPa) x [ Old Pump Rate (SPM) ]
New Mud Density (kg/m3)
17. Estimated New Pump Pressure with New Mud Density (kPa) = Old Pump Pressure (kPa) x
Old Mud Density (kg/m3)
DISCLAIMER: This Well Control Worksheet is intended solely for the use of the IADC and IADC accredited schools and organizations engaging in the teaching of the IADC WellCAP
Well Control classes. The IADC, its employees or others acting on its behalf, makes no warranties or guarantees expressed, implied or statutory, as to any matter whatsoever, with
respect to the use of this Well Control Worksheet.
SI Units Rev 12/12/05
(kPa, m3, kg/m3) Page 3

You might also like