You are on page 1of 36

EQUIPMENT

LEVEL 4

2018
“Revision Questions”

TIME ALLOTED: 3 HRs

NAME:...................................................................

DATE:.....................................................................

MAX. MARK :
MARK :

RESULT :

2018 Level 4 Equipment Revision Questions Page 1 of 36


2018 Level 4 Equipment Revision Questions Page 2 of 36
1. Why is pressure build up in the mud/gas separator (poor boy degasser)
dangerous whilst circulating out a kick?

No. required Answers 1

A. Pressure build up may allow gas to be blown up the derrick vent line.
B. Pressure build up may allow gas to enter the shale shaker area.
C. Pressure build up will increase the risk of lost circulation.
D. Pressure build up will make choke adjustment difficult.

2. Why do choke manifolds have two chokes?

No. required Answers 1

A. To direct returns to the flare.


B. To direct returns to the Mud Gas Separator (MGS)
C. To direct returns to the mud pits.
D. To provide a backup if there are problems with the active choke.

3. What is the API standard 53 definition of “rated working pressure” of BOP stack?

No. required Answers 1

A. The maximum internal pressure that the BOP equipment is designed to contain
and/or control.
B. The proof test pressure of a body or shell member.
C. The test pressure that BOP equipment is designed to contain and/or control.
D. Twice the rated working pressure of the test tool used.

2018 Level 4 Equipment Revision Questions Page 3 of 36


4. Which pressure should be used to determine the rated working pressure of the
ram type BOP to be installed on the well?

No. required Answers 1

1. Maximum anticipated bottom hole pressure.


2. Maximum anticipated hydrostatic drilling mud pressure.
3. Maximum anticipated pore pressure.
4. Maximum anticipated surface pressure.

5. A long series of electric logs will be run in a well with a small over balance. What is
the safest action to take?

No. required Answers 1

A. Install and pressure test the appropriate (Riser/lubricator) assembly.


B. Reduce the number of electric logs to be run.
C. Replace a set of shear/blind rams with asset of pipe rams.
D. Run the logs, as no additional equipment required.

2018 Level 4 Equipment Revision Questions Page 4 of 36


6. BOP stack is made up as follows (from the well head up): -

Three Ram BOP's, 13-5/8, 10,000 psi rated working pressure.


One Annular BOP, 13-5/8, 5,000 psi rated working pressure.
After the well takes a kick, the well is closed in on 5 inch diameter pipe using the
annular preventer.
The stabilised Shut In Casing Pressure (SCIP) is 1000 psi.

The graph above shows a manufacture’s recommended closing pressure according to


well pressure. Use this graph to select the correct pressure range from the options
below for the annular BOP.

No. required Answers 1

A. 200 - 300 psi


B. 300 - 400 psi
C. 400 - 500 psi
D. 500 psi and above.

2018 Level 4 Equipment Revision Questions Page 5 of 36


7. What is good practice for diverter vent line system?

No. required Answers 1

A. Diverter vent lines bends can have full-bore rubber hoses installed.
B. Diverter vent lines should have options to allow discharge down-wind of the rig.
C. Diverter vent lines should be routinely pressure tested.
D. Diverter vent lines can have bends as they not designed to hold high pressure.

8. Before cutting the drilling line, with the bit at casing shoe, which item of equipment
must be installed to make the operation safe?

No. required Answers 1

A. A Circulating head in the closed position.

B. A drill Pipe Safety Valve (DPSV) in the open position and an inside Blow
preventer (IBOP) in the closed position.
C. A Full opening Drill Pipe Safety Valve (DPSV) in the open position.
D. An Inside Blowout Preventer (IBOP) in the closed position.

9. Which one of the following statements about inside Blowout Preventer is correct?

No. required Answers 1

A. It allows reverse circulation when installed in the drill string.


B. It can be opened or closed by turning a wrench connected to an operating
C. It opened by drilling fluid pumped down the drill string.
D. It requires a double box sub in order to be installed in the drill string.

2018 Level 4 Equipment Revision Questions Page 6 of 36


10. A conventional flapper type float valve is installed in the bit sub. What effect does this
have on the operation when tripping into the well? Choose three answers.

No. required Answers 3

A. Back-flow through the drill string increases.


B. If the drill pipe is not filled, the risk of hydraulic collapse will increase.
C. Reverse circulation can be done at any time.
D. Surge pressure on the formation will decrease.
E. Surge pressure will increase if tripping speeds are not decreased.
F. The closed-in drill pipe pressure can be easily read.
G. There will be larger returns to the trip tank.

11. Why are two chokes incorporated into most choke manifolds?

No. required Answers 1

A. To allow a kick to be circulated out at a higher flow rate.


B. To provide backup if there is a problem with the active choke.
C. To simultaneously direct flow to the mud gas separator and the mud pits.
D. To simultaneously direct flow to the vent line and the mud pits.

2018 Level 4 Equipment Revision Questions Page 7 of 36


12. When a Mud Gas Separator (MGS) is working within its handling capacity which
design feature creates the back pressure on pressure gauge ’A’(shown in the figure)

No. required Answers 1

A. Height and diameter of the secondary vent.


B. The flow rate of hot mud into the MGS.
C. The height of the liquid seal.
D. The length and diameter of vent line.

13. The maximum operating pressure allowed in a mud/gas separator is often calculated
on the assumption that there is mud in the liquid seal.

What would be the effect on this maximum operating pressure as a condensate (or oil)
kick is circulated through the mud/gas separator?

No. required Answers 1

A. Maximum operating pressure would decrease.


B. Maximum operating pressure would increase.
C. No effect.

2018 Level 4 Equipment Revision Questions Page 8 of 36


14. How does a vacuum degasser work?

No. required Answers 1

A. Gas cut mud enters the degasser and forms a thin layer over the internal baffle
plates it is vented to the overboard line

B. Gas cut mud enters the degasser and forms a thick layer over the external baffle
plates excess pressure inside the vessel forces the gas to escape

C. Gas cut mud enters the degasser and forms a thin layer over the internal baffle
plate’s atmospheric pressure in the vessel helps to remove the gas.

D. Gas cut mud enters the degasser and forms a thin layer over the internal baffle
plates the vacuum inside the vessels helps removal of gas.

15. Can a vacuum degasser be used instead of a Mud Gas Separator (MGS) during
well control operations?

No. required Answers 1

A. No, because its position and function makes it unsuitable to handle large
volume of gas.
B. No, because the MGS is used to determine gas density.
C. Yes, because the flow rate used during a well kill is small.
D. Yes, because they perform the same function.

2018 Level 4 Equipment Revision Questions Page 9 of 36


16. How should the manually operated and hydraulically operated kill line valves on the BOP
be pressure tested?

No. required Answers 1

A. From the pump side; with the check valve removed so that the pressure can be
bled off.

B. From the pump side; because the check valve on the outside of the valves prevents
the detection of a faulty valve if they are pressure tested from the wellbore side.
C. From the wellbore side; with the check valves installed.
D. From the wellbore side; with the check valve removed and the kill line vented.

17. When testing the BOP stack with a test plug or cup type tester. Why the valves
should be maintained from below the test to atmosphere?

No. required Answers 1

A. Otherwise reverse circulation will be needed to release test plug.


B. To avoid potential damage to the casing/open hole.
C. To avoid swabbing a kick during the test.
D. To avoid the creation of extreme hock load.

18. Why should the side outlet valves below the test plug be kept in open position while
testing a surface BOP stack? Choose two answers.

No. required Answers 2

A. Because the test will create extreme hook loads.


B. If not kept open, reverse circulation will be needed to release the plug.
C. To check the position of the test plug
D. To monitor the annuals for plug leakage.
E. To prevent potential damage to casing or formation.

2018 Level 4 Equipment Revision Questions Page 10 of 36


19. For which ram operation is it most likely the by-pass valve on a surface hydraulic system
unit will be used?

No. required Answers 1

A. Blind/shear rams.
B. Fixed bore pipe rams.
C. The annular preventer.
D. Variable bore rams.

20. When operating a stack function from the remote BOP panel on a surface BOP the
open light goes out, the close light not illuminate and the manifold pressure drops then
rises backup. Which malfunction does this indicate?

No. required Answers 1

A. The 3 positions /4 way valves on the hydraulic BOP control unit fail to shift.
B. The close function light bulb blown.
C. The hydraulic closing line to the BOP is plugged.
D. There is a leak in the hydraulic line to the BOP?

21. On a surface BOP installation, the Driller closes the pipe ram at control remote panel
the close light illuminate but the manifold pressure does not drop. What could happen
when closing the ram?

No. required Answers 1

A. The 3-position/4 way valve on the hydraulic BOP control unit failed to shift
B. The annular preventer has malfunctioned.
C. The hydraulic closing line to the BOP is plugged.
D. The hydraulic line to the BOP ids leaking.

2018 Level 4 Equipment Revision Questions Page 11 of 36


22. In the figure below it shows a set of BOP remote control panel gauge readings. The
Bop has not been operated and the BOP accumulator change pumps (electric and air)
are not running. What is the problem with these gauge pressures?

No. required Answers 1

A. The accumulator pressure is too low.


B. The annular pressure is too low.
C. The manifold pressure is too high.
D. There is no problem. These gauge pressure are normal.

2018 Level 4 Equipment Revision Questions Page 12 of 36


23. Figure below shows a set of BOP remote control panel gauge readings. The BOP has not
been operated and the electrically driven pump is not running. What do these gauges
indicates.

No. required Answers 1

A. The hydraulic circuit is leaking.


B. There is a problem with the automatic hydro-electric pressure switch.
C. There is a problem with the hydraulic pressure regulating valve.
D. These pressure readings are within the normal operating range

2018 Level 4 Equipment Revision Questions Page 13 of 36


24. Figure below shows a set of BOP remote control panel gauge readings. The BOP has
not been operated and the electrically driven pump is not running. What do the gauge
readings indicates.

What is the reason for this reading?

No. required Answers 1

A. There is a Leakage in the manifold hydraulic circuit.


B. There is a problem with the by-pass valve.
C. There is a problem with the charging pump.
D. These readings are within normal operating ranges.

2018 Level 4 Equipment Revision Questions Page 14 of 36


25. The Driller activates a ram close function from the remote BOP panel on a surface
BOP stack installation. The manifold pressure continues to drop and did not rise back
up again.

What is the reason for this?

No. required Answers 1

A. The 3-position/4 way valve on the hydraulic BOP control unit failed to operate.
B. The hydraulic closing line to the BOP is plugged.
C. The light bulb has blown.
D. There is a leak in the hydraulic line to the BOP.

26. In a well control situation with a single ram BOP, the annular BOP is leaking badly.
Driller activates the pipe ram close function and sees that the manifold pressure gauge
decreases to zero.

What action is required to shut in the well quickly as possible?

No. required Answers 1

A. Activate the by-pass functions.


B. Close the ram manually by using the ram lock screws.
C. Send the Assistant Driller to manually operate the stuck selector valve.
D. Use Hammer to release the stuck manifold pressure reduction.

2018 Level 4 Equipment Revision Questions Page 15 of 36


27. Figure below shows a set of BOP remote control panel gauge readings. The BOP has not
been operated and the BOP accumulator charge pumps (electric and air) are not
running. What are the possible reasons for the low accumulator pressure reading?
Choose two answers.

No. required Answers 2

A. The accumulator charge pump pressure switches have failed.


B. The accumulator pre-charge is too high.
C. The accumulator pre-charge is too low.
D. There is a leak at the BOP.
E. There is a leak in the hydraulic accumulator unit.

2018 Level 4 Equipment Revision Questions Page 16 of 36


28. Given the volume below, how much hydraulic fluid id required to complete the
operations (no safety margin)

Operations Close then Open

Equipment One annular preventer

Two pipe rams

Volumes

Annular Preventer 51 gallons to close, 45 gallons to open

Pipe Ram 25 gallons to close, 22 gallons to open

No. required Answers 1

A. 143 gallons
B. 152 gallons
C. 190 gallons
D. 95 gallons

29. Given the volume below, how much hydraulic fluid id required to complete the
following operations (no safety margin)

Operations Close , Open then close again


Equipment One annular preventer
Three pipe rams
Volumes
Annular Preventer 18 gallons to close, 15 gallons to open
Pipe Ram 6 gallons to close, 5 gallons to open

No. required Answers 1

A. 102 gallons
B. 66 gallons
C. 68 gallons
D. 85 gallons

2018 Level 4 Equipment Revision Questions Page 17 of 36


30. What is the maximum annular pressure gauge on reading on a 3000 psi hydraulic BOP
control unit?

No. required Answers 1

A. 1500 psi.
B. 250 psi.
C. 3000 psi.
D. 900 psi.

31. The driller shuts in on a kick the annular using the remote control panel and activate
drill pipe ram close function to protect the annular BOP. The Driller reports the following
pressures:

Accumulator pressure static: 3000 psi


Annular pressure static: 1500 psi
Manifold pressure: 0 psi
Annular indicator light: red
What is the possible cause of this malfunction?

No. required Answers 1

A. The manifold pressure reducing and regulating valve is malfunctioning.


B. The hydraulic line to the upper ram is blocked.
C. The selector valve is stuck in the open position.
D. There is a leak in the hydraulic line to the upper pipe ram.

2018 Level 4 Equipment Revision Questions Page 18 of 36


32. When should well control equipment on a surface BOP installation be tested? Choose
two answers

No. required Answers 2

A. After circulating out a gas kick.

B. After the disconnection or repair of any pressure containing, choke line or choke
manifold.
C. At intervals not exceeding two months.
D. Before spudding or upon installation.
E. When maximum anticipated surface exceeds BOP rated pressure.

33. What is the recommended diameter for the choke manifold vent line/bleed line by-
passing the chokes according to API Standard 53?

No. required Answers 1

A. At least 5 inches
B. At least equal to the diameter of the choke line.
C. Less than 3 inches.
D. The same diameter as the other lines on the choke manifold.

2018 Level 4 Equipment Revision Questions Page 19 of 36


34. Figure below illustrates a typical piping schematic for a surface BOP installation. All the
valves and chokes are numbered. The well is shut in on the annular BOP.

Which group of valves and chokes must be open to circulate from the cement
pump through the drill string and bleed off through the remote choke to the Mud
Gas Separator?

No. required Answers 1

A. Valve Nos. 1, 3, 4, 6, 7, 8, ,9, 10, 11, 14, 19, 23


B. Valve Nos. 1, 3, 5, 8, 9, 10, 11, 12, 15, 17, 23
C. Valve Nos. 2, 3, 4, 6, 7, 8, 9, 10, 11, 14, 19, 23
D. Valve Nos. 2, 3, 5, 8, 9, 10, 11, 14, 19, 23

2018 Level 4 Equipment Revision Questions Page 20 of 36


35. How often should all operational components of the surface Bop stack equipment to
be function tested according to API Standard 53?

No. required Answers 1

A. At least once a week.


B. Once a shift.
C. Once every 14 days.
D. Only after installation of the BOP stack.

2018 Level 4 Equipment Revision Questions Page 21 of 36


36. The Mud Gas Separator (MGS) shown in the figure below has the following dimensions:

H1 - body height: 30 feet


H2 – dip tube height: 10 feet.
H3 – derrick vent line height: 150 feet.
D1 - separator body diameter: 5 feet
D3 – derrick vent line diameter: 10 inches
D4 – mud/gas inlet diameter: 4
inches Drilling fluid density – 10 ppg.

What would be the maximum operating pressure of this MGS when an oil kick with
a density of 6 ppg is circulated through it?

No. required Answers 1

A. 3.12 psi
B. 46.8 psi
C. 9.3 psi
D. 9.36 psi

2018 Level 4 Equipment Revision Questions Page 22 of 36


37. Which function on a BOP stack is operated from the annular pressure regulator?

No. required Answers 1

A. Annular preventer and hydraulically operated choke and kill line valves.
B. Annular preventer only.
C. Ram preventer, annular preventer and hydraulically operated chokes.
D. Ram and hydraulically operated choke and kill line valves.

38. What design feature do diverter systems have to minimise back-pressure on


the system?

No. required Answers 1

A. Dual active vent lines with minimum bore control valves.


B. Large internal diameter, straight and short vent lines.
C. Small internal diameter with targeted bends and maximum length of vent line.
D. The diverter element closes before the selector valve opens.

2018 Level 4 Equipment Revision Questions Page 23 of 36


39. A BOP Stack and wellhead have the pressure ratings

Wellhead 10000 psi


Pipe rams 10000 psi
Blind shear rams 10000 psi
Side outlet valves 10000 psi
Annular 5000 psi
String valves (full open and non-return) 10000
psi Rotary hose 8000 psi
Choke manifold and pipework upstream of chokes 10000 psi
Choke manifold valves and pipework downstream of chokes 5000 psi

If the maximum anticipated surface pressure is 8200 psi, what changes are required
to ensure pressure integrity?

No. required Answers 1

A. Replace the 5000 psi annular with a 10000 psi rated annular
B. Replace the 8000 psi rotary hose with a 10000 psi rated hose
C. The stack rating is acceptable, no changes are required
D. Upgrade the choke manifold downstream of the chokes to 10000 psi.

40. While tripping out of the hole, the wellbore pressure assessed annular preventer is used
to shut in a flowing well.

You decide to strip back to bottom to perform the kill operation.

When should you adjust the closing pressure to manufactures recommendations


while maintain a seal?

No. required Answers 1

A. Before shutting in the well.


B. When the gas reaches the BOP.
C. When the pumps reach the kill speed.
D. When the Shut In Casing Pressure (SICP) stabilse.

2018 Level 4 Equipment Revision Questions Page 24 of 36


41. What is the main limitation of drill string flapper valves when stripping to bottom?

No. required Answers 1

A. The flapper valve is not a tested barrier.


B. The shut in Drill Pipe Pressure (SIDPP) cannot be read on surface.
C. You must reverse circulate before stripping to bottom.
D. You must run wireline inside the drill string to open the flapper valve.

42. You are closing a pipe ram from the remote panel on a surface BOP.

The close light illuminates, and the manifold pressure gauge initially drops and
then returns to normal.

What is the cause of this change in manifold pressure?

No. required Answers 1

A. A pilot signal is being sent to the accumulator charge pumps.


B. Accumulator 4-way valve has shifted in to the ‘neutral position’
C. Fluid is flowing into the pipe ram closing chamber.
D. Fluid is flowing into the pipe ram opening chamber.

43. What is a locking device on a ram-type preventer designed to do?

No. required Answers 1

A. Allows the ram to close around the drill pipe.


B. Locks the manifold pressure so it cannot be changed.
C. Prevent accidental operation of the ram.
D. Prevents the ram from opening.

2018 Level 4 Equipment Revision Questions Page 25 of 36


44. You are drilling top-hole with a diverter installed. The flow line is above the diverter
and the overboard vent lines are below the diverter. The wind is coming from the east
to west. What instructions would you give to the driller about the diverter procedure
for this data?

No. required Answers 1

A. Close the flow line before opening the overboard line to the east.
B. Close the flow line before opening the overboard line to the west.

C. Open the overboard vent line to the east, close the overboard vent line to west
then close the diverter.

D. Open both overboard vent lines, close the diverter, and then close the valve to the
east.

45. You are supervising the weekly BOP function test on the ram and annular BOPs. The
regulated manifold pressure is 1500 psi and the regulated annular pressure is 1000 psi.

Which of the following would tell you that the ram has closed correctly?

No. required Answers 1

A. The annular light should change from ‘open’ to close and 30 seconds and
the pressure should read 1000 psi.

B. The annular light should change from ‘open’ to close and 45 seconds and
the pressure should read 1500 psi.

C. The ram light should change from ‘open to close’ and 23 seconds, pressure should
read 1000 psi.

D. The ram light should change from ‘open to close’ and 23 seconds, pressure should
read 1500 psi.

2018 Level 4 Equipment Revision Questions Page 26 of 36


46. You are supervising the weekly BOP function test on a surface 18 ¾ inch x 10000-psi BOP
stack. The regulated manifold pressure is 1500 psi and regulated annular pressure is
1000 psi. What would tell you that the annular has closed correctly?

No. required Answers 1

A. The annular light should change from ‘open to close’, and 60 seconds later
the annular pressure should read 1000 psi.

B. The ram light should change from ‘open to close’, and 23 seconds later the
manifold pressure should read 1000 psi.

C. The ram light should change from ‘open to close’, and 23 seconds later
the manifold pressure should read 1500 psi.

D. The annular light should change from ‘open to close’, and 43 seconds later the
annular pressure should read 1000 psi.

47. A surface Stack BOP consists of (from top to bottom)

.1 x 10000 psi rated annular preventer.


.1 x 10000 psi rated 3 ½ “- 5 ½” Variable Bore Pipe ram (VBR).
.1 x 10000 psi rated blind/shear rams.
.1 x 15000 psi rated drilling spool with 1000 psi rated remotely operated side
outlets valves.
.1 x 10000 psi rated 5” pipe rams.

Which operation can you do, keeping control of the Bottom Hole Pressure (BHP)?

No. required Answers 1

A. Circulating out an influx while shut in on the lower pipe rams.


B. Circulating out an influx while shut in on 6” pipe.
C. Stripping 6” pipe to bottom ram to ram.
D. Stripping 5” pipe to bottom ram to ram.

2018 Level 4 Equipment Revision Questions Page 27 of 36


48. Why should space out distances for the different BOP types on the stack be posted
where the Driller can see them?

No. required Answers 1

A. So the Driller knows when a tool joint is in the annular preventer cavity.
B. So the Driller knows when a tool joint is level with the flow line.
C. So the Driller knows when a tool joint is level with the well head connector.
D. So the Driller knows when a tool joint is in the shear ram cavity.

49. During a pressure test of a surface stack annular preventer, the closing pressure must
be increased to achieve a successful test. What could be happening?

No. required Answers 1

A. Regulated annular pressure should always be increased to pressure tests.


B. The annular element material is not correct for the drilling fluid type in the well.
C. The annular regulator is damage and should be repaired at the next casing.
D. The annular element is starting to deteriorate and may need replaced soon.

50. What is the advantage of a self-adjusting ram lock?

No. required Answers 1

A. As the ram rubber wears, the closing pressure can be reduced to minimise further
wear.

B. As the ram rubber wears; the lock position changes to maintain a seal around the
pipe.
C. The ram closes quickly to minimise the size of the influx.
D. The ram piston moves the same distance each time the ram is operated.

2018 Level 4 Equipment Revision Questions Page 28 of 36


51. The force required to shear the pipe can be a lot greater than the force needed to
close and seal around drill pipe.

What are the main designs features of a shear ram that create the required force?

No. required Answers 1

A. The length of piston strike and closing pressure.


B. The ram rod diameter and closing pressure.
C. The shear ram closing ratio and closing pressure.
D. The shear ram opening ratio and opening pressure.

52. Using the diagram of a 10000-psi (10k) surface BOP stack. Why the kill line outlet is
placed below the lower ram?

No. required Answers 1

A. To allow the well to flow to the flare line.


B. To kill the well using the Driller’s method or the Wait and Weight method.
C. To monitor the well or bullhead if the lower ram is closed.
D. To use the volumetric method.

2018 Level 4 Equipment Revision Questions Page 29 of 36


53. You are tripping out of the hole and 5000 feet off bottom, when the well starts to flow.
What type of Drill Pipe Safety Valve (DPSV) should you use to secure the well and to
strip back to bottom?

No. required Answers 1

A. Drop a dart valve into the string and pump to the dart sub to secure the well.
Then install a non-return type Inside BOP (IBOP) for stripping.

B. Install a float valve on the pipe to secure well then add a non-return inside
BOP (IBOP) above for stripping.

C. Install a full-opening type DPSV to secure the well. Then install a non-return
type inside BOP (IBOP) above for stripping.

D. Install a non-return type IBOP to secure the well. Then add a full-opening
type DPSV above for stripping.

54. What checks should you do when testing the remote chokes to API standard 53?

No. required Answers 1

A. Function test both primary and secondary control systems.


B. Function test the primary control systems.

C. Function test the primary control systems, then test the back-up system at next
test.
D. Only function test at the API ‘initial’ test.

2018 Level 4 Equipment Revision Questions Page 30 of 36


55. When circulating out a gas kick at 30 spm, the pressure inside the Mud Gas separator
increases close to the maximum allowable pressure.

What should you do to reduce the risk of liquid seal loss in the MGS U-tube?

No. required Answers 1

A. Increase the SPM to circulate the gas through the MGS faster.
B. Shut in the well and bullhead the gas back to the casing shoe.
C. Shut in the well and then re-establish circulation at a lower SPM.
D. Shut in the well in and bleed the gas to reduce the casing pressure.

56. What is the primary reason to use the vacuum degasser when circulating out a gas kick?

No. required Answers 1

A. It can handle large volumes of free gas.


B. It has a limited volume capacity.
C. It removes dissolved gas from the returned drilling fluid.
D. It vents gas through the kill line to the rig flare line.

57. Who should sign the pressure test documentation?

No. required Answers 1

A. The Driller, the Toolpusher, and the Cement Pump operator.


B. The Mechanic, the Drilling contractor representative and the BOP Engineer.
C. The Mechanic, the installation/rig Manger, and the Electrician.

D. The Pump operator, the Drilling Contractor Representative, and the Well sight
Representative.

2018 Level 4 Equipment Revision Questions Page 31 of 36


58. When drilling shallow formations with no BOP installed, how often should you function
tested the Diverter as per API standards.

No. required Answers 1

A. Daily.
B. Every 21 days.
C. Only when first installed.
D. Weekly.

59. In which situation, would you choose to do an inflow test to verify a well barrier
element?

No. required Answers 1

A. When pressure testing a liner lap.


B. When pressure testing the annular preventer.
C. When pressure testing the choke manifold valve upstream of the remote choke.
D. When pressure testing the top-drive inside blowout preventer (IBOP).

60. You are closing a pipe ram from the remote panel on a surface BOP.

The close light illuminates, and the manifold pressure gauge initially drops and then
returns to normal.

What is the cause of this change in manifold pressure?

No. required Answers 1

A. A pilot signal is being sent to the accumulator charge pumps.


B. Accumulator 4-way valve has shifted in to the ‘neutral position’
C. Fluid is flowing into the pipe ram closing chamber.
D. Fluid is flowing into the pipe ram opening chamber.

2018 Level 4 Equipment Revision Questions Page 32 of 36


61. The well has just been shut in using the upper pipe ram.

The flow meter reads 7.2 gallons.

The accumulator pressure has returned to 3000


psi. The manifold pressure has returned to 1500
psi.
Using the data in the table, has the BOP operated successfully?

Function Volume to close (gallons) Volume to open (gallons)


Annular 43 35
Top Ram 12.5 12.5
Lower Ram 12.5 12.5
Choke HCR 2.1 2.1
Kill HCR 2.1 2.1

No. required Answers 1

A. No, the flow meter value is correct but manifold pressure is too low.
B. No, the flow meter value is incorrect.
C. Yes, all pressure values are correct.
D. Yes, the flow meter value is correct.

2018 Level 4 Equipment Revision Questions Page 33 of 36


62. Why is the manual valve and High closing Ratio (HCR) valve installed in the
position show in the diagram?

No. required Answers 1

A. The manual valve acts as a barrier if HCR needs maintained or repaired.


B. To increase the back pressure downhole for a safety margin.
C. To minimise the build-up of cuttings at the drilling spool side outlets.
D. To protect the HCR valve from eroding while cementing.

2018 Level 4 Equipment Revision Questions Page 34 of 36


63. The well starts to flow while you are repairing the chock line high closing ratio (HCR)
Figure below. Which two barriers must be in place to allow you to continue to
replace the valve?

No. required Answers 1

A. Choke line manual valve and bottom pipe ram.


B. The blind ram and the choke line manual valve.
C. The bottom pipe ram and the drilling fluid.
D. The drilling fluid and choke line manual valve.

2018 Level 4 Equipment Revision Questions Page 35 of 36


64. There is drill pipe in the hole, and you are monitoring the well on the trip tank.
Which two barriers must be in place while repairing the choke line High Closing Ratio
(HCR) valve?

No. required Answers 1

A. The blind ram and the manual stack valve


B. The drilling fluid and the bottom pipe ram.
C. The manual choke line valve and the drilling fluid.
D. The manual stack valve and the annular.

2018 Level 4 Equipment Revision Questions Page 36 of 36