Professional Documents
Culture Documents
3- Record WHP & Annulus Long term Stand by 1-Drift run 3-J/D to release from SSD with out shear Pin
4- confirm angle drive & splitter box 12 - Check laodcell 2- Set F-collar stop (Tubing Type) 4- run in invert position to close the sleeve
A) PCE rig up check list 12- check BOP 3-Rih slowly to 350 ft Using SB Pooh 50 -- Rih till set Q) Fishing steps
1- Gaz test (Leak, cellar) 13- Adjust Combigauge 4- Hand jar down few time Pooh 1- calculate the Top of wire 200 lbs tension on WC
7-lower the tool string to left Lub 2- Check Lib plugs 5- check set 100 ft up and down to tag 3- blind box to cut a wire from R/S 2- wire finder
9- Connect Manifold Use (thread chaser) 3- Tag line 6- DW hold pressure from below Max 1750 psi & (Bypass) 4- wire grape with correct size
4-Confirm Lib length Crane Zonal 6-wind direction ` 7- set 10 ft above F-collar stop Z - Rig down :
5- connect stuffing box hoses & Check o-ring Tu. Drift SB. NG.R 8- pull up to set, put 750 lbs to check set for 2 min 1- Ensure 2 barrier 5- Call Corrdinator & W/O
8- watch the top using crane (Power Lines) 23/8 1.90 1.820 1.700 9- hand jar up to shear 1/8 and 5/16 for w R\T 2- P/T cap & B/O the pressure & close a valve
10- Lubricator to be leveled with BOP To take O ref 1.995 1.875 1.822 10- to pull Equilize pressure Latch J\D Retrieve 3- Record WHP & Annulus 6- Close well door
H) Tool string check list 31/2 2.86 2.750 11- Retrieve F-collar stop
2.690 4- Declaration ( Moving or Material left on site)
1- check the OD of any new Items Add to T/S 2.991 2.810 2.756 P - Gauge Survey: Enough Libricator , Crane Zonal N test tool :
1-Deviation (F/D with P/R tool + Knuckle Joint + L-Jar Roller stem) 1- drift run 8- Remove all jars 1- check the correct size & TOF 3- make tention for while
2- (Pull or Set) C/W packing ( use Oil jar + Eq-System) 2- connect batteries record On Off times Y Tool : Use RS and SS to set and pull
9- Pass through WEG use F/D with all service tools 3- set 0 referance 10 min on surface
10- Asphaltene use upstrok jar 4- Max speed 150 ft/min 45 m/min
5- eash stop should be 15 or follow a programme
6- always wait 2 min for each change
7- casing static survey need DHCH & produce 24H & SN 24h
Perforator : Swabbing
check the bottom grab screw Max Pull 1400 to 1900
change BOP
Drift
Duel completion don’t pass the short
Gauges
Shut-in survey if there is leak not work
If swab leak don’t touch UMV in flowing survey (Well will die)
Well Number Date :
Annuler A WHP
Annuler B TRSSV P
SWR Flow Line P
Objective:
Asphaleten x x x
Salt x x
Restriction x
enountered Object x
P/W every
500 m
x
1
Date 11/11/2021
2 Well number 3 position
3 well type
4 Trssv
5 Connected Tool
6 File name
7 RIHed tool
8 depth
9 timing
10 Tagged depth
11 Report number
12 guagse seriel number
13 Gauge cutter size
14 tool string
15 WHP & annulurs
16 scanning rate
17 Arrivel/ departure
18 summery of operation
19 flowing / shutin / injecting
20 reporter name
21 RKB or THF
Daily tasks
On well site
Static shut in 24 hour (check if flowing no job)
uncontrolable Leak
Call HBNS operator revien
sign permit on arreval
sign permit on leaving
If well site supervisor don’t call operator
Call schlumberger Corrdinator
Weekly Tasks
right
SDP
Maintenance
[No Subject]
1 recipients
CC: recipientsYou More
BCC: recipientsYou
Show Details
FROM:
bh_hamou@yahoo.com
TO:
hamouda babahamou
Message starred
Preparation:
A)- equipments:
1- P/T Bop F/T
2- wire test log and certifications
3- self make up tool string
4- self
H2S equipments:
1- H2S monitors for each person
2- Emergency escape BA (15min) for each person
3- SCBA 2 in unit (45min)
4- wind socks 2 in the unit
5-Fire extinguisher 2 in unit + check for update
B)- safety meeting :
1- Persons Names
2- Emergency contacts 160 or 112 ( fire, security, ambulance, H2S hazards)
3- assembly point
4- Wind directions
5- Pressure hazards
6- mechanical lifting hazard. ( not walk under loads, Tag line to be use, nominated bankers man &
7- House keeping
8- Operation explanation
C)- Rigup:
1- leak gaz test H2S ( wind direction & 2 assembly point, SCBA )
2- record WHP annulars leak
3- Assembly lubricators check o-rings ( should correctly tight rope socket)
4- lift BOP (F/T +Wire inside)
5- rig up lubricator
6- connect tool muser & take 0 reference
7-open the well open M/V+ S/V, close S/V + M/V
8- P/T 10 min
9- 250 H/m
- static survey:
. connect the gauges record power on off, in lib time
. set o ref,
. Open swab Wait 10 min in Lib
. Max speed 150 ft/min ~ 45 m/min
. Each station stop should kept for 15 min or flow programme
. Last stop should be 30 min
. Always wait 2 min for each change ( lib, B/O, at surface)
. Rig down
Note 1: casing static survey is required to down hole change ( isolate tubing and open sleeve
- build up survey:
. connect the gauges record power on off, in lib time
. set o ref,
. Open swab and Wait 10 min in Lib
. Watch the weight due flow rate
. If flow push the T/S up confirm with GC to reduce the flowing rate Or add more stem weight
. fully open the wing valve once you get control of situation
. Max speed 150 ft/min ~ 45 m/min
. follow the stops station as per programme
. 30 min before change to shut-in the well
. Clamps & barrier tap
. Make sure that the well is 100 % is shut-in
. Pull : ( remove clamps, pooh 150 ft/min, record all times)
. Rig down
- temperature survey:
. connect the gauges record power on off, in lib time
. set o ref,
. Open swab Wait 10 min in Lib
. Rih to 50 ft wait 30 min or follow programme
. Max speed 30 ft/min
. Record time each 150 ft hh.mm.ss until requested depth
. Wait 20 min before POOH at max 150 ft/min
. Always wait 2 min for each change ( lib, B/O, at surface)
. Rig down
C):- Collar stop & DW plug : collar stop use to prevent tool from drooping down hole ( swabbing, tu
- F collar stop EU & NU tubing (DW)
Check the size and tubing type from well schematic
Check f collar stop condition
Rih slowly to 350 ft using SB or C1 aluminium pin (don't use c1)
Pooh slowly 50ft
Rih slowly until stop in the groove
Hand Jar down few time and pooh
Pooh 100 ft and rih to check set
Run slowly desired depth pickup to trip the spring go to the position jar down to lock and shear
to pull use RB land on F collar stop jar up and pooh
- Tubing stop. New vam family
Run and pull SB
Run slowly desired depth overrun go to the position or overpull to reposition jar down to lock and
Latch with SB to pull jar down and pooh
DW plug ??? Hold pressure from below max 1750 psi & allows pass pressure from above??
Check the size as per well schematic
Function test on surface
Check elements seal is in good condition
Check th slips from de damage
Check equalising sub & equaling port is. Working
Pin DW with w running tool
Should be set 10 ft above F collar stop
When rehashed the required depth pull up to set
Put 750 lbs tension and wait 2 minutes
Jar up to shear 1/8 brass pin
Jar up to shear 5/16 brass pin to the w running tool
D2-shifting tool:
1- the D-2 Is selective tool use to model L SSD
2- Jar up to open To allow use of power jars
3- jar down to release
4- you can release when you locate the first SSD with out shear the pins by going down fast
5- run in invert position to close the sleeve
Tubing perforator :-
The tool string is standard
We need to equalize pressure before tubing punch ?
Model A perforator
2 x 3/16 shear pin brass shear by jarring down( lock the finger to come out)
1 x 5/16 shear pin brass shear pin by jarring down ( release the if stuck )
Operations:
- Tubing clearance
- rih tubing stop w/SB at least 3 ft below the desired depth and above any flow coupling (be clear o
- you can also tight the Tbg stop bellow perforator
- rih the perforator jar down to shear 3/16 breasts shear pin
- the finger now is come out jar up to start punching
- when the perforation is done the finger will retract POOH
-test circulation tubing casing
-for any reason you stuck and you can not perforate jar down to shear 5/16
brass pin retract the pin POOH
Note:- You can use 2ft stem + spang jar 20" + blind box or gauge cutter make move up down sudde
Babahamou Hamouda
Contact : 00213 0660504422
00965 66122356
Skype ID Bhamou1
This message sent by IPAd
Reply to:
Reply to bh_hamou@yahoo.com
Reply to bh_hamou@yahoo.com
Send
Reply to bh_hamou@yahoo.com
ated bankers man & crane operator)
bing and open sleeve to produce 24 H from upper zone through SSD (record the casing pressure)
ore stem weight
from above??
move up down suddenly To shear the 3/16 by inertia if any problem you want to pooh just go down above SS