1. In Figure 1 with wire in the well, identify the primary, secondary and tertiary barriers
by entering numbers from the drawing in the boxes below
Primary
Secondary
Tertiary
Page 1 of 27
International well control forum Level 3 & 4
Well Intervention Pressure Control Wireline Operations
2. In Figure 1 the wire has broken and been blown out of the hole. Identify the primary
and secondary barriers by entering numbers from the drawing in the boxes below.
(Assume the lower section of the parted wire has fallen through the Xmas tree.)
Primary
Secondary
3. The wire breaks at the stuffing box, when running in the hole. Which of thefollowing
would become the primary barrier?
A. BOP
B. Stuffing Box
C. Swab valve
D. Master Valve
4. If slick line breaks and the wire is blown out of the hole, which closable
barrieroperates?
A. The DHSV
B. The BOP
Page 2 of 27
International well control forum Level 3 & 4
Well Intervention Pressure Control Wireline Operations
A. True. B. False
6. Stuffing box packing should only be replaced after it has been found leaking.
A. True B. false
7. Before rigging up slick line equipment, it is seen that the stuffing box gland nut
(packing nut) is screwed all the way in. What is the correct course of action?
8. Which of the following statements is true about a slick line stuffing box?
A. After the packing have made a seal around the wire, the applied hydraulic
pressure can be bled down and the wellhead pressure will continue to
maintain the seal
B. The wellhead pressure acting on the lower bushing/gland makes the seal
around the wire
C. The packing nut or piston pushing down on the upper bushing/gland makes
the seal around the wire
Page 3 of 27
International well control forum Level 3 & 4
Well Intervention Pressure Control Wireline Operations
9. Which of the following statements is true about a braided line grease injection head?
A. The wellhead pressure pushing up on the pack-off makes the seal around
the cable
B. The applied hydraulic pressure pushing up on the pack-off makes the seal
around the cable
C. The grease being pumped into the flow tubes through the upper grease
connection makes the seal around the cable
D. The grease being pumped into the flow tubes through the lower grease
inlet connection makes the seal around the cable.
10. Grease is injected into the grease head .at the top of the lowest flow tube.
A. True
B. False
11. What is the best action if the in-filter of the grease injection head is plugged?
B. Cut the wire immediately and secure well before doing anything.
C. Do nothing at the moment. Worry about this later when the job is over.
Page 4 of 27
International well control forum Level 3 & 4
Well Intervention Pressure Control Wireline Operations
12. What is the function of the ball check valve? (safety check union)
D. To stop the well blowing out through the grease head if the cable breaks on
the surface.
13. In a braided line surface pressure equipment rig up, does the ball check valve (safety
check union) always have to be positioned at the bottom of the grease head?
A. True
B. False
14. What are the benefits of using an in-situ test sub (Quick Test Sub)?
Page 5 of 27
International well control forum Level 3 & 4
Well Intervention Pressure Control Wireline Operations
15. What are the advantages of having a BOP directly on top of the tree?
16. On a dual braided line BOP, is it true that the BOP does not contain well pressure?
A. False
B. True
C. It allows the pressure above the ram to be made the same as below the ram
Page 6 of 27
International well control forum Level 3 & 4
Well Intervention Pressure Control Wireline Operations
18. Which of the following must be done before breaking out the lubricator above a
closed BOP?
Page 7 of 27
International well control forum Level 3 & 4
Well Intervention Pressure Control Wireline Operations
21. What is the usual correct configuration for a braided line BOP rig up?
23. A leak is seen between the top two lubricator sections during a slick line job. Which
secondary barrier must be closed to allow the repair of this leak?
B. BOP.
C. Swab valve.
D.UMV.
E. LMV.
Page 8 of 27
International well control forum Level 3 & 4
Well Intervention Pressure Control Wireline Operations
A. False
B. True.
25. ”BOP ram inner seals for 0.108" and 3/16" braided line are completely different”
A. Yes
B. No.
A. Wire cut.
27. Which of the following best describes a 7 1/16” 10,000 psi flange?
B. It has a 10,000 psi test pressure and 5,000 psi working pressure
Page 9 of 27
International well control forum Level 3 & 4
Well Intervention Pressure Control Wireline Operations
28. The term ‘6BX’ when used to describe a flange refers to its size and rating?
A. True. B. False.
29. Figure 10 represents a slick line rig up. Is it safe to use braided line with this rig up?
Page 10 of 27
International well control forum Level 3 & 4
Well Intervention Pressure Control Wireline Operations
30. Figure 10 is a slick line rig up. What changes must be made to run braided line?
E. The slick line stuffing box must be replaced with a grease injectionseal head
31. Which of the following should be done before exposing any part of the surface
pressure equipment rig up to well pressure?
C. Check that the seals and O-rings on the equipment are in good order
Page 11 of 27
International well control forum Level 3 & 4
Well Intervention Pressure Control Wireline Operations
32. A dual-drum winch is being used that has both slickline and a braided fishing line.
The slick line tool string and 1,000 ft of wire have been lost downhole and will be
fished using the braided line. Which of the following statements are correct?
A. The slick line BOP must be added to the rig up, before starting fishing
operations
B. A set of dual braided line BOPs must be added to the rig up before starting
fishing operations
C. The lubricator must be changed out for one of a higher pressure rating
before starting fishing operations
E. A grease injection head assembly must be added to the rig up, before
starting fishing operations.
33. Which of the following statements are true about rigging up slick line?
A. BOP stems not screwed all the way in may cause a leak from the BOP
B. A damaged quick union ‘O’ ring or seal surface may cause a leak
34. When pressure testing the slick line rig up, which of the following statements is true?
1
Page 12 of 27
International well control forum Level 3 & 4
Well Intervention Pressure Control Wireline Operations
A. The pressure must be applied as fast as possible to get the stuffing box to
seal properly
B. The pressure must be applied slowly to avoid hitting the underside of the
stuffing box with the rope socket
C. The pressure must be applied through the port in the side of the stuffing
box
35. Which of the following are correct regarding the care and maintenance of the wire?
36. While pulling out of hole how you would recognize if the hydrates areforming inside
the stuffing box?
C. The stuffing box external area will show signs of ice forming.
37. After setting a wireline plug in place it is found to be leaking, what couldbe the next
action?
2
No. required Answers
Page 13 of 27
International well control forum Level 3 & 4
Well Intervention Pressure Control Wireline Operations
A. Slight leaks are common, allow the leak to reduce and continue
rigoperations as planned.
C. Set another plug on top of the previous plug and pressure test from above.
38. Which of the following factors govern the selection of lubricators for a
wirelineintervention operation?
39. While rigging up a wireline lubricator on the X-Mas tree, the craneoperator
accidently dropped the lubricator on the ground. In the process,the lubricator
bottom edge got dent in the thread. What is the correctaction to take?
A. All connections on the lubricator are hand tight, it will still form a sealonce
made up. Rig up and continue with the job without any further delay.
B. Change the lubricator seals and replace it with the top one then rig-up
andcontinue with the job without any further delay.
Page 14 of 27
International well control forum Level 3 & 4
Well Intervention Pressure Control Wireline Operations
40. A wireline operation is being conducted using 7/32 dyform braided line. The next run will be
done using 7/32 mono conductor line.
Which one of the following changes needs to be done to the BOP ram seals and guides?
A. Ram seals and guides needs to be changed from dyform to conventional type.
D. Ram seals needs to be changed from dyform to conventional type. Guides remain
the same.
41. Which of the following statement about shear ram equipment are true?
C. All shear are equipped with a port take returns when circulating after the cutting
has been performed.
D. Some shear rams are combined with blind rams in order to seal off the well after
cutting.
E. When using a shear seal, there is a second shear seal available in the rig up.
Page 15 of 27
International well control forum Level 3 & 4
Well Intervention Pressure Control Wireline Operations
42. Which one of the following, when running in hole with a toolstring on slickline, could be the
reason for gradual weight loss as the toolstring gets deeper into the well?
A. Scale.
D. collapsed tubing.
43. After setting a plug in tail pipe and it does not hold pressure ( two answers )
44. While doing a job , wire is cut and lost in hole with the string , you rigged up with
braided line to fish ( two answers )
45. When inspecting the BOP rams one hour before running in hole you notice a cut on
the upper inner seal. Should you:
A) Invert the upper element so the cut diverts pressure down the well.
C) Suspend work, replace the inner seal and test before proceeding.
Page 16 of 27
International well control forum Level 3 & 4
Well Intervention Pressure Control Wireline Operations
46. After finishing a wireline job on a platform and you are on surface and BHA above X-
tree , what is the next step to do
47. You are running a memory gauges on Slickline and are near the bottom of the well. As
a part of your normal routine, you ask your assistant to check the Surface Controlled
Sub Surface Safety Valve (SCSSSV) control line pressure your assistant reports that it is
reading 0 psi. Which of the following is true?
A) You should apply pressure to the control line and ensure it is holding.
B) Because you are deep in the well there is no risk of your tool string
damaging the valve, it is safe to continue.
C) The SCSSSV must be open because you still have good string weight.
D) If the SCSSSV was closed, the flapper would have cut the wire.
It is safe to continue.
E) The SCSSSV is a 'fail safe' device, therefore the flapper will be open with 0 psi
on the control line. It is safe to continue.
F) There is a high probability that the flapper is damaged which could result in a
completion Workover. The SCSSSV must be open when pulling out of hole to
prevent wire breaking at the flapper, causing a fishing job.
48. Between two runs you inspect the BOP seal and you find small blisters on the rubber
seals. What is the cause of this?
A) High temperature.
C) Ageing.
D) Explosive decompression.
Page 17 of 27
International well control forum Level 3 & 4
Well Intervention Pressure Control Wireline Operations
49. During an inspection of a Slickline BOP, you notice that one of the ram seals is swollen
and appears to be oil saturated. Do you:
A) Do not replace either ram seal as there is no mechanical damage to the ram.
B) Make a note in your tally book to change the ram when you have a time.
50. You are rigging up your Slickline pressure control equipment. Your lubricator string
includes an in situ sub. Which statement is correct?
A) The test sub can be used to remove the need to test the complete pressure
control equipment, saving time and increasing safety (reduced volume, therefore
reduced energy).
B) The test sub is only used as a barrier when the packing on a braided line
stuffing box need to be replaced under safe conditions.
C) The test sub can be used to remove the need to test the complete pressure
control equipment, after an initial successful test, saving time and increasing safety
(reduced volume, therefore reduced energy).
D) The test sub can only be used in fishing operation due to reduced internal
diameter and coatings to protect from H2S.
51. While rigging up Slickline to a rig floor operation, the final angle of your Slickline is
120 degrees. During operations, what is the weight indicator reading in relation to
the actual weight ( load call at the hay pulley ) ?
Page 18 of 27
International well control forum Level 3 & 4
Well Intervention Pressure Control Wireline Operations
52. While rigging up wire line equipment a lubricator section fall from a crane at 3 meter
height (10 ft) and pin is damaged while O-ring groove seems to be in good condition ,
what do you do now
B) Do nothing
C) Continue the job if you think this damage will not affect test
D) File damage end so tools will not hang during POOH /RIH
53. When testing a braided line BOP with a test rod in place and lubricator off, which
barriers are required to be closed ?
C) Master valve, swab valve, kill wing valve, flow wing valve.
54. In which of the following situations might a slick line BOP have to be closed ?
( TWO ANSWERS )
A) When the tools are stuck in the hole and the cutter bar is to be dropped .
C) When the wire has broken near the surface and fallen down the hole .
E) When a broken wire has been successfully fished and has to be threaded back
through the stuffing box on to the drum
Page 19 of 27
International well control forum Level 3 & 4
Well Intervention Pressure Control Wireline Operations
55. d Sub Surface Safety Valve ( SCSSSV) control line returns.The well has been handed
over to the well intervention crew.You have recorded control line returns 50% less
than that expected. What does this mean ?
A) The SCSSSV flow tube may be sticking. Check the returns for gas ingress/fluid
composition. Repeat the test and compare results .
D) The SCSSSV may have closed fully. This can be confirmed by carrying out an
integrity test .
56. Electric line wireline is rigged up and deep in the well. A production logging run is
ongoing and the well is being flowed directly into production.The wireline operator
has reported that he has lost weight and cannot move up or down. What immediate
actions should you take ?
C) Close the Flow Wing Valve ( FWV) and stop the well flow .
57. Slickline pressure control equipment is rigged up onto a well.Whilst in hole, the wire
has been broken at surface and has disappeared down through the stuffing box.
Hydrocarbon are now flowing through the top of the stuffing box .
What is the primary course of action required to make the well safe ?
Page 20 of 27
International well control forum Level 3 & 4
Well Intervention Pressure Control Wireline Operations
58. In order to be classed as a double barrier a wireline BOP configured for braided line
must have :
D) 1 set of rams.
59. While using tractor in open hole what is the most appropriate action ( two answers )
C) Abort operation
60. Which of the following statements are true about a shear ram BOP ? ( TWO ANSWERS
A) It will cut any tool string but not the wireline tools
61. In a braided line job , dual braided BOP has the lower ram inverted and no wire
cutter valve in X-tree ,what combination of the below to have a two double
barrier
Page 21 of 27
International well control forum Level 3 & 4
Well Intervention Pressure Control Wireline Operations
62. While doing a job with wireline on a live well you noticed a leak coming from the
stuffing box , how many active barriers you have now
63. You are fishing for a stuck plug and notice that the tension on the wire is 90%
of rated breaking strain. The wire has a Poisson's ratio of 0.31 .You walk your
lines and notice an intermittent leak from the stuffing box .You attempt to
pressure up on the stuffing box but the "in-line" filter is blocked .What should
you do ?
A) Remove the "in-line" filter, pump up on packings then release from the fish and pull
out of the hole .
B) Close the BOP and advise the Offshore Installation Manager ( OIM ) that you need
to bull head the well .
C) Remove the "in-line" filter, pump up on packings and return to fishing operations .
D) Do nothing, the line is under tension. When the tension is released, the outside
diameter of the line will return to normal and seal in the stuffing box .
64. During braided line operation with toolstring at 3000 ft. The seal in the
greasehead has been lost and attempts to energise have been unsuccessful.What
is the primary action that should be taken? Two answers
Page 22 of 27
International well control forum Level 3 & 4
Well Intervention Pressure Control Wireline Operations
65. A dual braided line BOP with the bottom ram inverted has been closed on braided
cable. What, if anything, needs to be done to create a seal?
A) Grease must be pumped between the rams to seal against the wire.
C) The pressure applied to the rams must be greater than well pressure.
66. Slickline is to be rigged up on a live gas well to pull a plug installed in the hanger
Where should the BOPs be positioned in the rig up ?
A. Above the point where the rope socket will be when the tools are latched onto the
hanger plug.
B. At a suitable height to allow them to close around the wire if the toolstring became
stuck across the Xmas tree valves.
C. It doesn’t matter where as long as they are installed in the rig up.
----------------------------------------------------------------------------------------------------
Page 23 of 27
International well control forum Level 3 & 4
Well Intervention Pressure Control Wireline Operations
67. When checking seals and sealing surfaces on Quick Union connection before rig
up, which of the following findings should disqualify the O rings from being
used( Choose three answers )
B. Black colour .
D. Back up rings .
F. Smooth surface .
68. During a wire line operation in a high pressure well a leak develops in a pressure
control equipment above the wire line BOP .during the attempt to close the BOP
it becomes clear that there is a malfunction in the BOP control unit and non of
the available BOP’s are closing .
Which of the following actions should be performed (3 answers )
Page 24 of 27
International well control forum Level 3 & 4
Well Intervention Pressure Control Wireline Operations
69. What changes must be made to the BOPs to run braided wire safety?
A) An additional single BOP dressed for braided line must be rigged up.
B) The BOP must be replaced with a dual braided line BOP.
C) No action required , braided wire can be run with this BOP.
D) An additional single BOP dressed as a shear/blind must be rigged up.
70. A double ram braided line with bottom inverted is rigged up onto a live well. The
BOP can be considered as:
A. A single barrier.
B. A double barrier.
C. A shearing barrier.
D. A quad barrier.
71. A well control situation has developed and the BOP has been closed with wire
going through the valve. How should it be tested ?
Page 25 of 27
International well control forum Level 3 & 4
Well Intervention Pressure Control Wireline Operations
72. What is the likely outcome when the clearance gab is too large between the flow
tube inside diameter and the wireline outside diameter? (Two Answers)
-----------------------------------------------------------------------------------------------------
73. When fishing multi strand of wire from the well, the shear devices may be
impacted by:
74. The BOP was accidently closed on the tool string. The BOP was opened and closed
several times. After rigging down, it is observed that the wire guides on the rams are
badly damaged .Which one of the following actions is required?
B. The BOP should be stripped down and all sealing surfaces inspected and repaired if
needed. All damaged parts should be replaced.
C. The hydraulic cylinder may be damaged due to hydraulic pressure and should be
replaced.
Page 26 of 27
International well control forum Level 3 & 4
Well Intervention Pressure Control Wireline Operations
B. The cable is pulled out of rope socket while the well is under controlled.
76. The shear seal BOP fails to close hydraulically due to pump failure. What operations can
be done by hand?
B. Operate the valve, but only the shear function will work.
C. Operate the valve, but only the seal function will work.
Page 27 of 27