You are on page 1of 4

WELL CONTROL PRE-KICK SHEET Page 1 of 4

(SUBSEA ONLY)
Name:…………………………………. Date:…………………………. Level:…………………….
(All depths measured from RKB)

Measured Depth:……………………7060……………….ft. True Vertical Depth:……7060 ft.


Measured Depth to Casing Shoe:………………….ft. Casing Shoe TVD:……………………ft.
Water Depth:………………………………………....ft. Air Gap:……………………………… .ft.
CAPACITIES AND VOLUMES
DRILL STRING
DATA O.D. I.D. Wt. CAPACITY x LENGTH = VOLUME
(in) (in) (lb/ft) (bbl/ft) (ft) (bbls)

DRILL PIPE
HWDP

DRILL COLLARS
Total Length Total
CHECK THAT TOTAL LENGTH = MEASURED DEPTH Drillstring

(ft) (bbls)

ANNULUS
CAPACITY x LENGTH = VOLUME
DATA
(bbl/ft) (ft) (bbls)

CHOKE LINE
Bit to Shoe
DP/HWDP IN CASING Volume

DP/HWDP IN OPEN HOLE

COLLARS IN OPEN HOLE


(bbls)
Total Length Total Annulus
Note: Total Length may not equal
Measured Depth if choke line is
longer than the riser.
(ft) (bbls)

TOTAL SYSTEM VOLUME

TOTAL DRILLSTRING TOTAL ANNULUS TOTAL SYSTEM


(SURFACE TO BIT) (BIT TO SURFACE) VOLUME

(bbls) + (bbls) = (bbls)

RISER DATA CAPACITY x LENGTH = VOLUME


(DP/RISER)
(bbl/ft) (ft) (bbls)

DP/RISER ANNULUS VOLUME


TR-TP-PER-021_Rev0 K3 Subsea Kill Sheet API Field Units – K3 Welltrain Logo
Reviewed By: L Kenyon 20 June 2016
Approved By: L Nally Page 1 of 4
WELL CONTROL PRE-KICK SHEET Page 2 of 4

(SUBSEA ONLY)

CHOKE
Read and record SLOW CIRCULATING RATES
KILL
FLEX LINE
LINE
JOINT Pump No. Pump Output Current Mud Weight

(bbls/stk) (ppg)
UPPER
ANNULAR
S.C.R CHOKE LINE RISER CHOKE LINE FRICTION

….. spm
CONNECTOR (psi)
- (psi)
= (psi)

….. spm
LOWER
ANNULAR (psi)
- (psi)
= (psi)

….. spm
SHEAR RAMS (psi)
- (psi)
= (psi)

Drill String Data


Drill String Pump Output
Volume (bbls) (bbls/stk) Surface to Bit Strokes
UPPER PIPE RAMS

÷ =
Slow Circulating
Surface to Bit Strokes Rate (spm) Surface to Bit Time
MIDDLE PIPE RAMS
÷ = (min)

Open Hole Data


LOWER PIPE RAMS
Bit to Shoe Pump Output Bit to Shoe
Volume (bbls) (bbls/stk) Strokes

CONNECTOR ÷ =
Bit to Shoe Slow Circulating
Strokes Rate (spm) Bit to Shoe Time

÷ = (min)

Annulus Data
Bit to Surface Pump Output Bit to Surface
Volume (bbls) (bbls/stk) Strokes

CASING
SHOE
(ft) MD
÷ =
TVD
(ft)
Bit to Surface Slow Circulating Bit to Surface
Strokes Rate (spm) Time

÷ = (min)

Riser Data
DP/Riser Pump Output BOP to Surface
Volume (bbls) (bbls/stk) Strokes

÷ =
BOP to Surface Slow Circulating BOP to Surface
(ft) MD
Strokes Rate (spm) Time

BIT (ft) TVD ÷ = (min)

TR-TP-PER-021_Rev0 K3 Subsea Kill Sheet API Field Units - Welltrain Logo


Reviewed By: L Kenyon 20 June 2016
Approved By: Page 2 of 4
WELL CONTROL KICK SHEET Page 3 of 4

(SUBSEA ONLY)

Name: ………………………………................

Read and record SIDPP, SICP and PIT GAIN

S.I.D.P.P. PIT GAIN S.I.C.P.

............... psi ............... psi


............... bbls

Day: ....................... Date: ....................... Time: .......................

Max. Mud Wt.


Surface Casing T.V.D. Leak Off
Leak Off Test from RKB Test Mud Weight Maximum Mud Weight

÷ ÷ 0.052 + =
(psi) (ft) (ppg) (ppg)
Formation
Breakdown Gradient Maximum Mud Weight
OR
÷ 0.052 =
(psi/ft) (ppg)
M.A.A.S.P.
Maximum Casing T.V.D. Maximum Allowable
Mud Weight Drilling Mud Weight from RKB Annulus Surface Pressure

- X 0.052 X =
(ppg) (ppg) (ft) (psi)

M.A.C.P. Maximum Allowable


Casing Burst Casing Yield Safety Factor Casing Pressure

X 0.8
(psi)

Kill Mud Wt.


S.I.D.P.P. T.V.D. from RKB Drilling Mud Weight Kill Mud Weight

÷ ÷ 0.052 + =
(psi) (ft) (ppg) (ppg)

NEW M.A.A.S.P.
Maximum Casing T.V.D. New Maximum Allowable
Mud Weight Kill Mud Weight from RKB Annulus Surface Pressure

- X 0.052 X =
(ppg) (ppg) (ft) (psi)
TR-TP-PER-021_Rev0 K3 Subsea Kill Sheet API Field Units - Welltrain Logo
Reviewed By: L Kenyon 20 June 2016
Approved By: Page 3 of 4
WELL CONTROL KICK SHEET Page 4 of 4

(SUBSEA ONLY)
Pressure Step Down Chart Strokes Minimum Including
1) Calculate I.C.P. 2) Calculate F.C. P. 3) Calculate Step-down. to Bit D.P psi Safety
4) In the left column record strokes in 100 stroke intervals,
until final circulating pressure is reached ΔP x 100 ICP =
0
5) Record I.C.P. in top right column, and deduct the
pressure step down ΔP until F.C.P. is reached (psi/100 stks)
6) Calculate adjusted choke line friction (using Kill Mud).
7) Calculate complete circulation, in strokes and time

I.C.P.
SCR Riser SIDPP Initial Circulating Pressure

+ =
(psi) (psi) (psi)
F.C.P.
SCR Riser Kill Mud Drilling Mud Final Circulating Pressure

X ÷ =
(psi) (ppg) (ppg) (psi)
ΔP
Surface to
ICP FCP Pressure Step-down
Bit strokes
- ÷ =
(psi) (psi) (stks) (psi/stk)

I.D.C.P.
SICP Choke Line Friction Initial Dynamic Casing Pressure

- =
(psi) (psi) (psi)

Adjusted Choke Line Friction


Choke Line Friction Kill Mud Drilling Mud Adjusted Choke Line Friction

X ÷ =
(psi) (ppg) (ppg) (psi)

Complete Circulation Data


Surface to Bit Strokes Bit to Surface strokes Total Strokes to Kill Well

+ =
Surface to Bit Time Bit to Surface Time Total Time to Kill Well

(min) + (min) = (min)

Riser Data
DP/Riser Volume Pump Output Riser Strokes

(bbl)
÷ (bbl/stk) =
Riser strokes Slow Circulating Rate Time to Displace Riser
÷ = (min)
(spm)

TR-TP-PER-021_Rev0 K3 Subsea Kill Sheet API Field Units - Welltrain Logo


Reviewed By: L Kenyon 20 June 2016
Approved By: Page 4 of 4

You might also like