ZKB JV LIMAK

Package-4 & 5 (Pindi Gheb)


Subject: Demand Spare Parts Dated: 02-10-2018

Last
SR# Part Name Part No./Size Quantity Rep Balance Remarks

1. Pinion Checknut 01 Nil Dumper TKN-533

2. Hyd Pipe (Received) 02 Nil GD-118


Dumper # 13 (Nissan
3. Water Body Repair 01 Nil Singapuri 8 Cylinder) saad
o deen
Dumper # 13 (Nissan
4. Gear seal Rear 01 Nil Singapuri 8 Cylinder) saad
o deen
All Saad-Ud-Deen
5. Grease Gun 10 kgs 02 Nil
dumpers
Dumper # 5 (Saad-Ud-
6. Battery N-200 02 Nil
deen)

7. Radiator Repair 01 Nil TCM-830

8. Water Body Repair 01 Nil TCM-830

9. Radiator foundation As per sample 02 Nil TCM-830

10. Radiator cap As per sample 01 Nil TCM-830

11. Radiator fan As per sample 01 Nil TCM-830

12. Sulf cuppi 24V As per sample 02 Nil BD-103,104

13. Turbo pipe As per sample 04 Nil Gen 120,150 KVA Camp

14. Steering jack seal As per sample 04 set Nil LD-203,207 (SDLG Loader)
Last
SR# Part Name Part No./Size Quantity Rep Balance Remarks

T=1.5”’,
15. M. S plate 01 Nil Barrier machine
LxW=7’x4’
BC-9292 Prado with GM
16. Tyre 65-R-17 04 Nil
sb.

Manager Technical,

Muhammad Naveed Akhter,

ZKB Engineers and Constructors Company