Initial Environmental Examination (IEE) Checklist Report Form for Road and Bridge Projects

ROAD AND BRIDGE PROJECTS

III. ABANDONMENT /DECOMMISSIONING/REHABILITATION INFORMATION


(If Applicable)

Project Life or Service: 50 years

Alternatives for future use of the project area after abandonment:


None.

Abandonment Plan (general) to include management plan for the projected cumulative/long term project
impacts such as:

 remediation of contaminated soil and water resources,


 ✔
land restoration
 ✔
proper dismantling/abandonment of facilities/ equipment
 others, please specify :
- Siting of the temporary facilities that will be used during the construction phase of the project will be properly dismantled.
- All generated solid and hazardous waste and construction debris will be properly disposed in accordance with RA9003 and RA6969.
- Disturbed areas will be restored upon completion of construction activities.

Project Name: ____________________________________________________


Page 1 of 1