You are on page 1of 27
AYR RGR ERG Mamuju 2% 25MW RYE 5| LARIAT Mamuju 2x25MW Coal-Fired Steam Power Plant Method Statement for ID Fan System Commissioning KE HI BEEOT RGCA BR A wa] Jilin Electric Power Research Institute Company Limited 2017 44 6 A eh Widimiae Seeret level: Secret WARAWRT: QR. L/ JDKY—-01—2015, SA AP: Efe Mamu ju 2% 25MW HAMEL) “G] RIL AER Project name: ID Fan System Commissioning in Mamu ju 2 25MW Coal-Fired Steam Power Plant STEAL: PRAT HA BE FE eT IR ZS Responsible department: Jilin Electric Power Research Institute Company Limited ns: 2 BB. : Vezenaca| — PUTU Mamuju2 x25 Mw Writer 1 at Tame. +r Date + ae FAH = SEZ { 207 HB Bee a = [APPROVED WITH CONTE = [NOT APPROVED REIECIED. Review: [INFORMATION ONY ik Wes kita [cena rer artan fon coxa Approval: 1.0 2.0 3.0 4.0 5.0 6.0 7.0 TABLE OF CONTENTS 13% General Information Resource Preconditions and requirements System commissioning The duty of the test staff Control measures of HSE Appendixes 1 General Information (fk #38 1.1 Sphere of application i HUE This MS is applicable to the ID fan(induced draft fan) system commissioning in Mamuju 225MW coal-fired steam power plant. 4°77 9815 HIF EWE SAB AYRME2K2SMW HEAL WISP AGIA 1.2. Reference documents sf fAC48 "Code of safety operation in power engineering construction Part 1: Steam power", DL 5009.1-2014 CRAB RRA TEMA F1 ABS: KARL) DL 5009.1-2014 "Code for fossil power construction project from the unit commissioning to completed acceptance", DL/T 5437-2009 OKA RAVE ETE AIS MED CDL/T 5437-2009) "Technical specification for thermal power erection and construction Part 2:Boiler unit", (5190,2-2012) CAL ATE EH TAAL 8 2 ABS}: HRIPHLAL) DL 5190.2-2012) "Emergency evacuation plan", CHEC FEM) ral ee 2a] "MS for management of the commissioning process-PTW and LOTO" POLLY Be CTAREFHD” FEE “Installation and operation manual " provided by the fan manufacturer JA L#il8)~ 3% 23 WHY BAS 1.3. Procedure description 1A fais ‘The commissioning proedure for the ID fan startup is provided to ensure the installed fan, motor, duct and auxiliary equipments functioning properly. So that the ID fan system can be operated and controled correctly to meet the unit operation. Jy{# A“ FEPN & HLA EH S| WUIGALAS, HPA FS] RL RG RAS PARIS LAE, DURA BULA HS DL, ASU RE IE, RATERS, ERIE, WAHAB E tT BER. There are the inlet baffler plates, the outlet shut-off baffler plates, the fan bearings temperature and vibration instruments and the motor bearings temperature and vibration instruments in the ID fan system. The bearings are cooled by the closed-cycle water system. 4] FRAILTY ASA TAR Ps BSL UT ELA ARG AYR AR EA A HL ARE RR Bat BA, HRY ADT RM DK 1.3.1 Equipment specification 4 HUH Table 1 ID fan parameters 4] WLS HL 2 1. Table 1 ID fan parameters #1 5] ABLE Definition % | Unit : ID fn 3] ML tems hfe XinxiangXima Co. Ltd Manufacturer ti - i SGA BLATRLAS Mode Mit : Centrifugal tak Type 15 - 2450BSBFOSE Flow rate Hi mh 22772 Total pressure 411 Pa 6700 Model 43% YKKS5003-6WFI Motor RAE HLADHL | Power 3% 710 Voltage Fk 6300 1.3.2 Range of system trial operation A% 1.3.2.1 The ID fan is mainly used to pump the flue gas from the furnace to atmosphere. The flue gas flows through the horizontal flue , rear pass of fume and chimney in tum .The ID fan should trial operate together with the SA fan(secondary air fan). 3] JRUBLAE82 Fa eK AP HEA BEF AD FACE, FEAR, REIT, RRP EL, 5] LA 3B SELINA 1.3.2.2 System technological process ASti072 (Ain)--SA fan-> Air preheater->SA air box-*Furnace Horizontal flue + Chimney-ID fan +Contacting flue--ESP~ Air preheater~Rear pass of fume (KA) HERB 23 BE AB > RRS BP AC ‘BRE — 5 AIL Hoots LABS — BRA a — 2s HLS — FA 2 Resource RACE 2.1 Human Resource A / 71H ‘Type of work ‘Quantity (people) | Remark iE it Seat Responsible for resouroes ‘Supervisor 1 coordination of commissioning in RATA te process sae REBEL Direct fo implement constoetion technology requirement, check eee ‘commissioning integrity, test Seeaeer 2 report records ij fa —T BET TZUER, ett MSR, SREMEUUETI of oe 2k Responsible for resources é coordination of the unit trial Sti engines Mie : running. #LAL BRS EE RDM thi. operations | Control room chief operator i staff(per shift) etl sgt 984 | Control room vce operator : saat Roh me BRIE CEE) fi Checking equipments locally Local operatorits tt 6 during the unit trial running #L‘fl state. 2.2 Commissioning equipment and material Jit #4 & Serial Device name Model Quantity, Remark fri Noses ie Hi ay sc x Interphone VX-210AU_ 2 athe 3 Preconditions and requirements AMMABWAE 3.1 All installation works are complete, the integrated installation records are checked and accepted. TERA CRLF, MA TMINRRICR, TMM 3.2. The fan proper, inlet duct and outlet duct are cleaned up. fifi AUBL Aciit i 11 Ui A C28 w. 3.3. The secondary grouting strength of the equipment meets design requirement. i #— Kk #t HOR IS LUIGI, 3.4. The flues, hot and cold air ducts , suspensions and supports are installed. The inlet baffler plate and the outlet shut-off baffle of the fan can be put into service. Wik. ¥>PA RUE BS: FAL SOBRE. HURL AEA BIER. 3.5. The on-site instruments of the fan are installed , qualified and auto controlled. UALS PBA, RBI Te HEE ade tl. 3.6 The on-site lighting is enough, communication system is ready. HAMA FAL NIREH, H% A EES 3.7. Garbage and sundries around the fan is cleaned, scaffolds are removed, trench is covered. There is nothing flammable and explosive nearby. ULM INS RA ORES, MPR RR, HOM AMEE, EITC oR a 3.8 The electrical protection can be put into service normally. The motor idling is qualified and rotating direction is correct. W/( LEAR, SAP OMI AA: LEAH. WAT (eae. 3.9. The measuring instruments , audible and visual alarms of the fan can be put into serviee.#i FAL MALE TT . GHR ERE TE HEA 3.10 The Emergency stop button of the fan is qualified. The temperature alarm and protection system can be put into service, the vibration alarm and protection system can be put into service. S| PRA a SEA TS TEA, ULHRA IRE ARS AR RE RE 3.11 The pre-operation of the fan is completed, the interlock protection can be put into service. SL RUBL BRIE TER, BURP ATE 5 3.12 The cooling water system can be put into service . HK RATE WA. 3.13. The trip function of the fan is qualified by logic simulating. RWLBGIA Dy fei BEANE. 3.14 Confirm no sundries and no person in the ESP . All manhole doors are closed. All work-orders are withdrew. HELA LAM, EACLE, APL EH, TPR WIA. 4 System commissioning KAiHiK 4.1. The check before ID fan startup | AWA anit Ket 4.1.1 Confirm no sundries and no person in the fan and the ducts again. 5 2 (hiA AULA MARE AAR, AMIE A LIF. 4.1.2 Check all rotating components shields to make sure installed and fixed well. #25000 FP AB ENS AP EC eRe HAT 4.1.3 Make sure the clearance between impeller and shell to be inspected. 1} 4645 38 (41H SRL HE #. 4.1.4 Confirm the monitor instruments and the interlock function correct. Hi WAX 2 Ke SCE BSS ie TTA 4.1.5 Make sure the clearance of the motor shaft end to be inspected. {i L‘iSi fi] BR CLADE. 4.1.6 Check the electrical permanent wiring. A (EIN HA CHEER. 4.1.7 Make sure the motor rotating direction correct. HLL 141 IE. 4.1.8 Check the quality of the bearing lubricant oil up to standard, the oil level normal. {Ei FACE TA Os ME TE A 4.1.9 Cheek all bolts (shell, bearing, motor) of the fan tightened properly. Check all keys and fixed screws tightened. MARUI MOE L, FRE, Bik OREM EER, RE irr te ANE eR RA. 4.1.10 Check the integrated clearance records of coupling, bearing and impeller hull, meeting the requirements. A AE Zee MMH UN : SETTAE . AIAR HAG Sh EN LTE EAE ER 4.1.11 Make sure the inlet baffler plate and the outlet shut-off bafile of the fan to be put into service reliably HiA AUBLIH A PA FER 4.1.12 Confirm all auxiliary equipments of the fan to be adjusted according to the instructions. RUA FIA BAY LOA FA LRN) SE RH EH 4.1.13 Confirm the rotor to be turned by hand. Wiik$#-F-# LLP. 4.2 Commissioning procedure and check during the trail running jstiz 4b 98 Mish SH lade 4.2.1 Starting steps of ID fan 9] RSL B20 SE ‘The startup sequence of the air fans is: ID fan ---- High Pressure Fan -- PA fan ---SA fan BA RUBLIEINGUF Aes 5 UL 705 FB UL 2R RL 2K RU, Open the outlet damper, close the inlet damper, start-up the ID fan motor. JT Wi L144, RAAT, FAB UL AUAL. 4.2.2 The normal operation and maintenance of the ID fan.4| AUJLIK IE# iz 47 RHE. 4.2.2.1 Check the motor bearings to ensure the oil level normal , the oil quality clear and transparent , and no leakage .# Ar PLA ARI TEAS, TE TESGAN), Abb AISI 4.2.2.2 Check the access holes, manholes, transmission parts and ducts, to ensure no air 5 leakage 2487L. AFL. (ah Mit & PULTE AUR R 4.2.2.3 Check the temperatures of the ID fan motor coil less than 130°C. Monitor the motor bearing temperature less than 90°C, the fan bearing vibration less than 9 mm/s, the fan bearing temperature less than 85°C, the motor current in the rated range. #55] UL HAMA (Bl MBE < 130°C, HHBLAWAKIMEE<90°C, PULSAR BIT Iimm/s, RULER AP 85°C, HEEL RUE BEE. 4.2.2.4 After the fan trial running, check all fixed screws. Ascertain if the screws of hull, bearings and motor tightened by proper torque. Check the shaft straightness of fan and motor. Check the fan assembling clearance, to ascertain if the clearance meets the requirement. Check all fan accessories to ascertain if normal. AUJLiS F424 a BE FT Ai Bd EMR Os TEL Hb LARLE RES, CRE CER, RLS LT EE, RAE AP RAC BRE ATE SHER, ROCENT A AAR RUBLE Ia 4.2.3 Shutdown steps of the ID fan | ULE 1: Close the inlet damper of the ID fan; stop the ID fan; close the outlet damper of the ID fan.3¢/4} SILA PSR, FRIES] OL, S604) 9] ULE PHAR 4.2.4 The ID fan trip conditions and [&C (instruments & communication) signal test 3] UML BI A AE TA SR 4.2.4.1 When the ID fan bearing temperature>80°C, the alarm o induced draft fan bearing temperature is high" is sent, When the ID fan bearing temperature > 85°C, the ID fan trips. J& PURARIABE> 80°C, Bt “ 5] RULER” JR; > 85°C ULB. 4.2.4.2 When the ID fan motor bearing temperature>85°C, the alarm of" induced draft fan motor bearing temperature is high" is sent. When the ID fan motor bearing temperature >90°C, the ID fan trips. 4] LHL AL WAKA BE > 85°C, B51 UPL HL PLA AR Hn” FB; > 90°C RULE tae 4.2.4.3 When the ID fan motor coil temperature>125'C, the alarm of " induced draft fan motor sent. When the ID fan motor coil temperature >130°C, the ID fan coil temperature is high" trips. 4] APLIAMLSEAL HE > 125°C, $2 “S| SLEDS HE” HE; > 130°C PLB. 4.2.4.4 When MFT occurs and the second low value of the furnace pressure is reached, the ID fan trips. MFT 24/6 EP IBEAE J Ae, 31 RLBLBET A 4.2.4.5 When the ID fan bearing vibration >9 mm/s, the PA fan trips. 3] MWA ARE {29 mm/s, 9] RULE. 4.2.4.6 When the ID fan starts 60 seconds and the outlet damper keeps closing, the ID fan trips 5) RUPLI Ta 60s SEH APIECE KA 4.3. Organization of commissioning staff? 41424} ‘The commissioning personnel are responsible for coordinating and instructing the trial operation, The operation personnel are responsible for operating, data recording and regular equipment checking. The installation personnel are responsible for on-site equipment inspecting and maintenance, ik A 5 ft BUA IN PMRHEIE, HT Get Ad fh ote tr Be Be ida LRA TAT WARE MA RES THE, iBT A TEE L . 5 The duty of the test staff UL A RAH 5.1 Inform the non-test personnel to depart from the site before the test . The staff know the test responsibility, method and procedure well. The communication system between the on-site and the control room is ready, so that good teamwork is guaranteed. AEH] NH MI FEI A FAS Ba, REAR OUR EA TT, 2G, SAE ADU Spat ERE A DR WMA, ACA, Wikiiete. 5.2 The Operation of power outage and transmission must be executed by the electrical personnel with operation tickets. Af XW AUBi . REHAPR AF DZ hr HAA AR ET 5.3 If an abnormal condition happened in commissioning process, it should be adjusted and reported to the supervisor promptly. If something endangering the safety of people or equipment, correlative tests must be stopped and the fan can be shut down by pressing the on-site emergency bution. MERWE RAR BL, BITE. JIRA, fen WHERAFRRGREN, BOM IRE Ce, Wiha esr 5.4 Intensify monitoring the bearing temperature, the bushing vibration and the coil temperature during the fan trial running. Pay attention to the temperature and vibration, as the specified value is exceeded, stop and repair the fan if necessary. ALi $4 19) fa] IY JN SE Xt LALA AR ULE. BA BAR a), Whe DEAL, PHL UIE. HRBNEAR, WSR EHLERS. 5.5 Ascertain the electrical grounding of equipments properly. The clutch shields must be fixed before the fan startup. Someone must be put in charge of monitoring the fan on-site during the trial running. Confirm the rotor to be tumed by hand without the clutch connecting. The staff should stand at a safe distance behind the fan motor when startup. KY #EHA (HE L204 BLT Poh, RCA Aa. RUINS AIP: RL RT baa aS TER; ULI SOIT A BA IE CE i] Be Ae HA 5.6 Pay attention to the load of rotary equipments. As the specified current is exceeded, stop the rotary equipment, examine and repair before continue. is\4a METERS 4E HL Gt fil , EBLAS PRET, FEAL EL, BBA PEIN, Tet BAS By Bike 5.7 Set up dedicated channel for the interphone to guarantee communication. (EH Xt, BEE CH SUE, WARE TIE. 5.8 Keep sundries, garbage and waste etc. out of the site , keep the site clean during the test-ist4& WALA ELA AD. BE. BER, PRU EE. 5.9 Someone must be put in charge of keeping order, clearing sit and counting noses. MjH4i DMBEBTE, EATS BAR PEAT TA BUH system to the on-site power. The electric leakage protection 5.10 Apply the three-phase five wi device is fixed in the switch box with electric grounding properly. Lighting at night is sufficient. RAE RRMS MEA, FAA PORE, JPA RIB, PCIE A ALAS RO 5 5.11 Ensure the commissioning personnel, the operation personnel and the installation personnel is on duty, so that the equipments safty can be guaranteed. ii 42 AEH AT MA ALE, CARE BIE ATI A. 5.12 The staff has to abide the “Safety code” and the relevant safety rules strictly in commissioning, to ensure trial running safe and reliable. S/S IA LEAR DH 7 (2) RWBAKEENLE, WR Lit eA HR. 5.13 Make sure the cooling water system and the lubricant oil system work effectually. #574 RATT 6 6. Control measures of HSE 2242, (R845 P6325 fe ti 6.1 Clean the operator access ways iii UHH. 6.2 Establish safety ladders and scaffolds for operating valves. Pett Wal 148 4 22 & BE ANF Re 63 64 65 66 67 6.8 eR, PHA Place the permanent fire extinguishers. FLAK ATER A » Install enclosure and warning signs in the test area. Put up the "No smoking" signs. 48 1 Jblbiisl. Put on ear plugs. HIE. Avoid working in high temperature enviroment for long time. E164 ih {E ME Keep hands form the rotating components. #811: 4 F/R ANE. See appendix B JSA.JL/IS8 BISA. 7 Appendix [3 Appendix A Pte A Mamuju 2x25MW Coal-Fired Steam Power Plant Unit: Specialty: Boiler system: ID fan system Preconditions and requirements QSL A411 Serial Standards and requirements YES/NO NOES PERER TBE |All installation works are complete, the integrated installation records are| 1 Ichecked and accepted. vi RUMI TI 22% LAF, MATTE MEON IR ICR, TE ae ic i» S |The fan proper, inlet duct and outlet duct are cleaned up. #}VA RUiL Sei a 11 SEE AAR 3 [The secon lary grouting strength of the equipment meets design requirement. 8 he HES BEI TS ‘The flues, hot and cold air duets , suspensions and supports are installed. The| ‘4. [islet batfler plate and the outlet shutoff baile of the fan ean be put into |service.tALiit . YMA PALIH Se HARI eee HE. TA LA A dS AF BITKe [ihe on-site insiruments of the fan are installed , qualified and auto lcontrolled. A HLai sh Rett se Het. SHAMIM HI IRL A HH. B |The on-site lighting is enough, communication system is ready JU3H)/ 44 #6| JAIN, #04 iii. |Garbage and sundries around the fan is cleaned, scaffolds are removed, 7 teach is covered. There is nothing ammable and explosive nearby. 4B FLY SiS Be he eT 7 UA Re HY A aE, EEE 3) Sa ht» [The electrical protection ean be put into service normally. The motor idling 8 is qualified and rotating direction is correct. tt’ CTE. ARMA CLE TEMA, BLE ArH. Ree LI g |e measuring instruments, audible and visual alarms of the fan can be put| linto service Ai KHL ATW AR Zeit. FAR BAC IE aE BEHL IThe Emergency stop button of the fan is qualified. The temperature alarm! 10 [AM Protection system can be put into service, the vibration alarm anal Iprotection system can be put into service. | DUAL AY iti OF Acti #H ite iE | Ft, PAL ek SE Dea RS RAP ARE ELAR PE 11 | fhe pre-operation ofthe fan is completed, the interlock protection can be pa into service.| ABLIMR IE TEM, PR BURIMHE ATE » 12 __ |The cooling water system can be put into service 7 HIACRAEIEM BLA. 13 __[The trip function of the fan is qualified by logic simulating, LEIA HE esos» (Confirm no sundries and no person in the ESP . All manhole doors are 14 [closed All work-orders are withdrawn. Wi REA AA, BATES AML CA, CARRE Cla. 15 _ [Document TOP release. TOPICA Remark: ‘Conclusion ‘The system ready for trial test operation, it YRS GER. Acknowledged by BTM CIDRAZ CE"): Date: WAR VRLEPRI C284) Date: FRALEAARAICHEC CF) + Date: Mee A ARARDM CREF) Date: SUTEPAARRIELEMKA C8) + Date: za nd ea sf seine “HEALw oT00 sonpar or (pga toad) Sayles pani] Tame oa ay BION Buide on] FPL =emi00y Moyes Sunway, WAIL s1b10n0 Kayes Susesy, wala “BEE ZEW aU Kes Fu, pewduosn| —¢ “APRESS, “ung 8 pon sey uo} add “HAR “wonwonps hopes Q TAR Ree NT Fe GY Aap) Ean “aa|YRY 4amod aay We BY | LEG THE MO} aaefd JeUIaLO yp ye Keys “Bunysiy souyug se suor3an ry Buryins s120!GO iB ay Suyres a] aR aaa HAMEL HITS “Stuoucdwos Fupei0s ay wuoy spuey deoy | soup piilsiel 1 Blade separ een TR ab ax PLE sae YODA Ta WAT HeNNLErAeM ATER E | woudmbs ones | eens eee ane SBGRR WY SEIN forte tf-sued Funddoup q wsey prone or dnwess | 09 35 ae Se JO}OW! UPJ AY) PUIYaQ DaUEISIP ayes e Ye pUres pInoys jauuOsiog | — sanrense> pte eo HUE Rt a a Reet anenon psc sme | “ame | MaWw| ae] uauidinby SEAIY | PamOWIDAO BULEOHT | sw009 J0 100] Wee : TARA Tuyo wow ays-uo Gsuaw] | —aBeuep ceased aad oe) | tig Som ee sare uey sry | poreaqrono Bunzeag | Y0-99n] $0 99°71 ee Gea uence sete | MaetR eee oH ei So 1uopP9¥ uondiosoq smeig/oun | soBoueg jenusjog | soainog ysry | “on reas 2 joamna wou UME MBE AME YUM BGA wowssassy sry 10 /sissqeuy Ayes aor a3ef g xtpueddy AIGA aa now Sa “AR BRS SAP BE “sui Tuo] 20j yuouosALD sumeioduios Ysry ropuN Suyyiom ploay | eH ax gy Bh peae OE MN Apaeypawun eis paunfn way | — PL suoiau [1 Epa ee =e gz FEL SEAT | wR sen x “ EAN “Be URES ae {3 Buryins sioafao | _ parajdwooun “soajea Buyesodo 109 splojjeas pue sxappo] Aiayes ysiquissl “way Buypey | yuouruosyaus FRERRERRCLY-B “shew ssa00e soqesado axp Uea}3 aus ER dE Y-soysind Wee “saaysindunxe aay uaueunod ayp 200} aBewep REILLY TNE MRL | mowdinby exe BERGHE vor uy 1’ uwonsaioxd SH “Te HEHE O10 PU ALA * amMsojoUD Sats en oN + £09 0 “WRELIMOR “EME pasoyo sadurep 1910 4c “(Ceyap spuosss 99) Buus ACT, APE NOLLIGNOD dri MAAR HY |p (eusoU aumessdursy soyeYs so}0W JC {RALATBOIGA HW ef [fe auOU aanyeraduta Suyswaq soOW JAIL ICAL YL euuOU ainye:adwi Fuyeg ICL SHOR REE pauado sedwep Buneinar SE GE 1o"pasopo sodiwep Bu IC If nou s9]01 dL Less (2A14' le NOLLIGNOD TAVIS adr Nva LAVA GAONGNI : T WALT SIVA nsaa NOLLONA IIT ‘TWNOIS LONI : ava LINO uaTioa AUVITIXAY AOLOW MOOTIALNI ¥ AONANOAS JAOdTU LSAL ALIS AMIN S7xZ ALAIN OLA ANVTd YAMOd GANA TVOD OM 9 xtpueddy | vauva | “ans | “a uNNons we wa) 3a wae |r sasuvtanoo Ad GIAOUddY Ad GaSIAWadns ‘Ad SSINLIM | ‘Ad daisal sa108 CUI OLOEL “SE YEO.STL) SE RETERE- BOA EH (din 9,0€1 “uuRPE 9, $71) aunyeAdduID} 101s JOO, CHAIN 2.06 “85HEO.8) ARCATA IA TH (din 9,06 “were 2,¢8) aumeradurar Supswaq L0r0/N CAS D.SS “HEB Sel BCR WEA (4 2,53 “wee 9,98) amnyesodwiay Suywoq ue as SUG “YF SpunEUS) >Y (eA LA DL din syuatug “uueye stag y uonergea weg i)36l BdOOST>C¢ SH Biegy din eqoDSz-> sanssoud aovusny CHW GE FOE Srans iE Susy >/ eRe din se Aejap sputug ~uATe syumtIS) eg fem (sjuw)uoreaqia oO ies ak Oo ised 2 ° ae as Rae Eee HAT ee wae uo oalup-Uou ue pusanupury — | pus anup-uoe soon, roo ung e4, (WUE SEY =YQ ey =A (A) Hiv quaung upseyg oF “A oA Rao $909 1 uonnjona jou = EE Cn WORT os TOW ay amEndTa TaE 7 REE Ch worEMp MTL TLLELT BE (ya) Kipedvoay 766 See Cu ) JONOW JO Wide ey uospuo 12], 009 HS (ed) aunssaud eros, oll SEES CA) Mod parry TOL RR CV) WAH PHM 0089 SHEE CA) SBBIIOA PEY In 24 Se 0% A wer SE NAMIGE LY woysisqng Jo prosay umy [EL 3¢fl a xtpuaddy u ora | uu | aumpeudig vag wan 3H zu hida'it oureu curdwo, &q pasiaradng, q panoiddy q paisa]. eo 310 aces uuojeiadg % | a)" ~ SCE Vv Wea Aa om ng | uadosedwep Sunpmdoy | yuaum> Suruumy | RA MAMOT “UO.S8) WE BEH EF ATH (Gin 0,06 “uuEIE -5,¢g) auMeredui BuLIBag 10}, (50.88 “SHED.08) BTCA Gut O,¢8 “uuele 2D, 98) aunreieduy Zuizw0q ue ae (2) anal ae Be ud aausp-uou ueg Ea ua axuip weg mana ua 2aup-t10U 10 rea ee ud 9aL.p OVOP a sr ——_| Appendix E #8 E Mamuju 2x25MW Coal-Fired Steam Power Plant Specialty: Boiler system: ID fan system System commissioning form AS WiAz No. Item Result Remarks een ID fan 4 RL Items iF XinxiangXima Fan Co, Lid Manufacturer iti) iS OIG PIATRA Mode 7% Centrifugal BOs Type 425 = 2450BSBF65B Flow rate if t 272772 m'fh 1 [Total pressure 41k 6700 Pa Medium temp Jat f 153°C Medium density $15 5 0.819 kgm Product number Hi) ii 160604005, Date We 11 2016.06 Model %! 5 YKKS003-6WFL Motor HE | Power 33% 710 kW Seah [Curent RE TTA Voltage Hi FE 6300 V ‘The check before ID fan startup {| KUL cat KBE 1 Confirm no sundries and no person in the fan and the duets again. UCHR BLAME CAM, PYAIEA THE 2 Check all rotating components shields to make sure installed and fixed well. Re PEUbiA 41 Hea HE MIB5 7H See te 3 Make sure the clearance between impeller and shell to be inspected. 1H-#25 7: (A (A BRL HE. 4 Confirm the monitor instruments and the interlock function worrect, Hi BMAR Be AICHE IR IIMB) Dh fs TE 5 5 Make sure the clearance of the motor shaft end to be inspected. HLH] Ctra 5 6 Check the electrical permanent wiring. *k A HE( HA CHAE. 7 Make sure the motor rotating direction correct. MiAL# [IE Ti. 8 Check the quality of the bearing lubricant oil up to standard, the oil level normal. #2: Saif YU WE Cr MM 9 Check all bolts (shell, bearing, motor) of the fan tightened properly. Check all keys and fixed screws tightened. 2 HL ARTO L. Hak, Bik OUR EMEEER, Bett APA BERNA EMR 2 TAN. 10 Check the integrated clearance records of coupling, bearing and impeller hull, meeting the requirements. frit 2:4 Bj ESO PTE. AAR. RAP AS PAR CRT REE AE OE, 11 Make sure the inlet baffler plate and the outlet shut-off baffle of the fan to be put into service reliably. AliA BUILIN AFI PRADHK. 12 Confirm all auxiliary equipments of the fan to be adjusted according to the instructions. Hi Wit AA ALIN ok PRUE RM. 13 Confirm the rotor to be turned by hand. fiitih$8-F AT LAE 2). Starting steps of ID fan 1 ABLE @ DSR The startup sequence of the air fans is: ID fan — High Pressure Fan -—- PA fan ---SA fan Bay RUALASIFE ME: 3] UBL on AEE RB Ln UH AL ‘Open the outlet damper, close the inlet damper, start-up the ID fan motor. Fiat CHAK, SATS, 1305] PULLS ‘The normal operation and maintenance of the ID fan.%| JHLiN TEM I2 AT AED. 1 Check the motor bearings to ensure the oil level normal , the oil quality clear and transparent , and no leakage fs #EHLALSH FRTNELIEM, THTTAWGAOT, fia ube. 2. Check the access holes, manholes, transmission parts and ducts, to ensure no air leakage. AVE FL. ATL. {abit 2 SEER LBL 3 Check the temperatures of the ID fan motor coil less than 130 “C. Monitor the motor bearing temperature less than 90°C. the fan bearing vibration tess than 9 mm/s, the fan bearing temperature less than 85°C, the motor current in the rated range. AE 5] KUL BLER AMA RE <130°C, HULA HAE <90 C, PUBL AI) T Limmis, RUILMAKILNE ST 85°C. HPL HHL ELE TE HS. 4 After the fan trial running, check all fixed screws. Ascertain if the screws of hull, bearings and motor tightened by proper torque. Check the shaft straightness of fan and motor. Check the fan assembling clearance, to ascertain if the clearance meets the requirement. Check all fan accessories to ascertain if moral, RAL i 245 fe HS Aa UB AR Ts YE LH REMMLEREHR, WEREGOER, RARULAS FLT ELE, PERU AACA ABER, MATT RRB (ERAS TE A ‘Shutdown steps of the ID fan 3] ALE Close the inlet damper of the ID fan; stop the ID fan; close the outlet damper of the ID fan. 2/3] WLA HAAR, HES] Bl Bhs AVS ASL IK ‘The ID fan trip conditions and 1&C (instruments & communication) signal test 4] AUILBKIR A(t JH TAR i 8 1 When the ID fan bearing temperature>80°C, the alarm of * induced draft fan bearing temperature is high" is sent. When the ID fan bearing temperature > 85°C, the ID fan tips. UBL SACRLRE> 80°C, 32.“ 5] RUPLAWRIRIN RH” HERE, > 85°C DL ‘HUBLI 2 When the ID fan motor bearing temperature>85°C, the alarm of " induced draft fan motor bearing temperature is high" is sent, When the ID fan motor bearing temperature >90°C, the ID fan trips. HLS LSW ARLE 85°C, “| AOL ALLA ITE” HF: >90'C PLB. 3 When the ID fan motor coil temperature>125°C, the alarm of "induced draft fan motor coil temperature is high” is sent. When the ID fan motor coil temperature >130°C, the ID fan trips. 3] UL tL AME > 125°C, 22 “ H] UL LALEtL 15" HR: > 130°C DHLBEIA. 4 When MPT occurs and the second low value of the furnace pressure is reached, the ID fan trips. MFT ff HJ?" Af AH, WLR. 5 When the ID fan bearing vibration >9 mn, the PA fan trips. SULA RAR AKAN AEAHL 9 mm/s, 3] ULE 6 When the ID fan starts 60 seconds and the outlet damper keeps closing, the ID fan trips. 4] HBL 477 60s Ft LAB iBEA A Remark: Acknowledged by TAR ACZOILEPRI (AES) + Date: FRELAUIARAUCHEC (AEF) Date: MISE MMIARZERDM CHEF + Date: JRTEPURAELEMKA (25%) + Date: 2» ID fan System Quality Control Table 4| KLAR GRP Z Ttems Unit | Quality requirement Method Test Result eA Sete bree RA RAR Correct Observe iE WR Bearing TEMP an [Check running record suru HMR ae mms |<6.3 FRMIEIER Interlock & protection ‘Operate automatically, correeily | Test & record neta SADA, aE se WRI Insulate damper JOpen and close operate) cack in the local correctly. a SePHMLEL AT. syst See ‘Open and close operate Regulating damper correctly. ‘Check in the local TAT seit i seme icm. abteseig — CORRS |Current 7 Meet instruments requires Observe local meters: tit acriOABMER eRe Calibrate work finished, Aic ow measure device [Condition displayed in DCS is| Check record PAR HEN comect Trias Chive RTE | Cooling water system Meet designed requires Check in the local WMA RB AW SER Sse Remark |Conclusion ‘The quality of the system meets the above criteria, ie RRR A EE. ie AaLfeHe CEE) DRAZ sien) + Date: WRC CEE) ILEPRI (sign) Date: cet C8") CHEC Csign) + Date: WAEMMIARRE CFD RDM (sign) Date: SUUENMIARE CES) ELEMKA (sign) + Date: 2 ‘Saas MEE nha oT Nill alll ‘Sa Tn WV LVI GRONONT (EXD vemnnsomezer----~ eas -meanome vnapsaney CS hewawnemnes £2) rysava ane ens sor) Sesaca tamarar sar “KEES AXA a cipuaddy TIRES ST ‘Era poarar rea OLE i ij % sara + ASS) VINETA CE) SN UWI sored WAY (253%) WEAR raed, * (BIS) OHO GEE) Waa sored # CUBIS) RAdaTE CER) AY AAA sow * (uBis) ZVAC (ERE) AL ayes USATp-IOTOUN FINO We Yop paaRET ae ee ZOOVVOLVNHOZ, 3a]ea [ONO >NTUPIONOW ‘aay ap poonpa Bish ole IMIS 100VVOLVNHOZ syreusy unsoy DalwA a0; fe ENTINTII6) bate ETN ae SOS 5 xipuoddy

You might also like