AYR RGR
ERG Mamuju 2% 25MW RYE
5| LARIAT
Mamuju 2x25MW Coal-Fired Steam Power Plant
Method Statement for ID Fan System Commissioning
KE HI BEEOT RGCA BR A wa]
Jilin Electric Power Research Institute Company Limited
2017 44 6 Aeh Widimiae
Seeret level: Secret
WARAWRT: QR. L/ JDKY—-01—2015,
SA AP: Efe Mamu ju 2% 25MW HAMEL) “G] RIL AER
Project name: ID Fan System Commissioning in Mamu ju 2 25MW Coal-Fired
Steam Power Plant
STEAL: PRAT HA BE FE eT IR ZS
Responsible department: Jilin Electric Power Research Institute
Company Limited
ns: 2 BB.
: Vezenaca| — PUTU Mamuju2 x25 Mw
Writer 1 at
Tame. +r Date +
ae FAH = SEZ { 207
HB Bee a
= [APPROVED WITH CONTE
= [NOT APPROVED
REIECIED.
Review: [INFORMATION ONY
ik Wes kita [cena rer artan fon coxa
Approval:1.0
2.0
3.0
4.0
5.0
6.0
7.0
TABLE OF CONTENTS 13%
General Information
Resource
Preconditions and requirements
System commissioning
The duty of the test staff
Control measures of HSE
Appendixes1 General Information (fk #38
1.1 Sphere of application i HUE
This MS is applicable to the ID fan(induced draft fan) system commissioning in Mamuju
225MW coal-fired steam power plant. 4°77 9815 HIF EWE SAB AYRME2K2SMW HEAL
WISP AGIA
1.2. Reference documents sf fAC48
"Code of safety operation in power engineering construction Part 1: Steam power", DL
5009.1-2014
CRAB RRA TEMA F1 ABS: KARL) DL 5009.1-2014
"Code for fossil power construction project from the unit commissioning to completed
acceptance", DL/T 5437-2009
OKA RAVE ETE AIS MED CDL/T 5437-2009)
"Technical specification for thermal power erection and construction Part 2:Boiler unit",
(5190,2-2012)
CAL ATE EH TAAL 8 2 ABS}: HRIPHLAL) DL 5190.2-2012)
"Emergency evacuation plan", CHEC
FEM) ral ee 2a]
"MS for management of the commissioning process-PTW and LOTO"
POLLY Be CTAREFHD” FEE
“Installation and operation manual " provided by the fan manufacturer JA L#il8)~ 3% 23 WHY
BAS
1.3. Procedure description 1A fais
‘The commissioning proedure for the ID fan startup is provided to ensure the installed fan,
motor, duct and auxiliary equipments functioning properly. So that the ID fan system can be
operated and controled correctly to meet the unit operation. Jy{# A“ FEPN & HLA EH
S| WUIGALAS, HPA FS] RL RG RAS PARIS LAE, DURA BULA HS
DL, ASU RE IE, RATERS, ERIE, WAHAB E tT
BER.
There are the inlet baffler plates, the outlet shut-off baffler plates, the fan bearingstemperature and vibration instruments and the motor bearings temperature and vibration
instruments in the ID fan system. The bearings are cooled by the closed-cycle water system. 4]
FRAILTY ASA TAR Ps BSL UT ELA ARG AYR AR EA A HL ARE RR Bat
BA, HRY ADT RM DK
1.3.1 Equipment specification 4 HUH
Table 1 ID fan parameters 4] WLS HL 2 1.
Table 1 ID fan parameters #1 5] ABLE
Definition % | Unit :
ID fn 3] ML
tems hfe
XinxiangXima Co. Ltd
Manufacturer ti - i SGA BLATRLAS
Mode Mit : Centrifugal tak
Type 15 - 2450BSBFOSE
Flow rate Hi mh 22772
Total pressure 411 Pa 6700
Model 43% YKKS5003-6WFI
Motor RAE HLADHL | Power 3% 710
Voltage Fk 6300
1.3.2 Range of system trial operation A%
1.3.2.1 The ID fan is mainly used to pump the flue gas from the furnace to atmosphere. The flue
gas flows through the horizontal flue , rear pass of fume and chimney in tum .The ID fan should
trial operate together with the SA fan(secondary air fan). 3] JRUBLAE82 Fa eK AP HEA BEF AD
FACE, FEAR, REIT, RRP EL, 5] LA
3B SELINA
1.3.2.2 System technological process ASti072
(Ain)--SA fan-> Air preheater->SA air box-*Furnace Horizontal flue +
Chimney-ID fan +Contacting flue--ESP~ Air preheater~Rear pass of fume
(KA) HERB 23 BE AB > RRS BP AC
‘BRE — 5 AIL Hoots LABS — BRA a — 2s HLS — FA
2 Resource RACE
2.1 Human Resource A / 71H‘Type of work ‘Quantity (people) | Remark iE
it Seat
Responsible for resouroes
‘Supervisor 1 coordination of commissioning in
RATA te process
sae REBEL
Direct fo implement constoetion
technology requirement, check
eee ‘commissioning integrity, test
Seeaeer 2 report records
ij fa
—T BET TZUER, ett
MSR, SREMEUUETI
of oe 2k
Responsible for resources
é coordination of the unit trial
Sti engines Mie : running. #LAL BRS EE
RDM thi.
operations | Control room chief operator i
staff(per shift) etl
sgt 984 | Control room vce operator : saat Roh me BRIE
CEE) fi
Checking equipments locally
Local operatorits tt 6 during the unit trial running #L‘fl
state.
2.2 Commissioning equipment and material Jit #4 &
Serial Device name Model Quantity, Remark fri
Noses ie Hi ay sc
x Interphone VX-210AU_ 2
athe
3 Preconditions and requirements AMMABWAE
3.1 All installation works are complete, the integrated installation records are checked and
accepted. TERA CRLF, MA TMINRRICR, TMM
3.2. The fan proper, inlet duct and outlet duct are cleaned up. fifi AUBL Aciit i 11 Ui A C28
w.
3.3. The secondary grouting strength of the equipment meets design requirement. i #— Kk #t
HOR IS LUIGI,
3.4. The flues, hot and cold air ducts , suspensions and supports are installed. The inlet bafflerplate and the outlet shut-off baffle of the fan can be put into service. Wik. ¥>PA RUE BS: FAL
SOBRE. HURL AEA BIER.
3.5. The on-site instruments of the fan are installed , qualified and auto controlled. UALS
PBA, RBI Te HEE ade tl.
3.6 The on-site lighting is enough, communication system is ready. HAMA FAL NIREH, H%
A EES
3.7. Garbage and sundries around the fan is cleaned, scaffolds are removed, trench is covered.
There is nothing flammable and explosive nearby. ULM INS RA ORES, MPR
RR, HOM AMEE, EITC oR a
3.8 The electrical protection can be put into service normally. The motor idling is qualified and
rotating direction is correct. W/( LEAR, SAP OMI AA: LEAH. WAT
(eae.
3.9. The measuring instruments , audible and visual alarms of the fan can be put into serviee.#i
FAL MALE TT . GHR ERE TE HEA
3.10 The Emergency stop button of the fan is qualified. The temperature alarm and protection
system can be put into service, the vibration alarm and protection system can be put into service.
S| PRA a SEA TS TEA, ULHRA IRE ARS AR RE RE
3.11 The pre-operation of the fan is completed, the interlock protection can be put into service.
SL RUBL BRIE TER, BURP ATE 5
3.12 The cooling water system can be put into service . HK RATE WA.
3.13. The trip function of the fan is qualified by logic simulating. RWLBGIA Dy fei BEANE.
3.14 Confirm no sundries and no person in the ESP . All manhole doors are closed. All
work-orders are withdrew. HELA LAM, EACLE, APL EH, TPR
WIA.
4 System commissioning KAiHiK
4.1. The check before ID fan startup | AWA anit Ket
4.1.1 Confirm no sundries and no person in the fan and the ducts again. 5 2 (hiA AULA MARE
AAR, AMIE A LIF.
4.1.2 Check all rotating components shields to make sure installed and fixed well. #25000FP AB ENS AP EC eRe HAT
4.1.3 Make sure the clearance between impeller and shell to be inspected. 1} 4645 38 (41H SRL HE
#.
4.1.4 Confirm the monitor instruments and the interlock function correct. Hi WAX 2 Ke SCE
BSS ie TTA
4.1.5 Make sure the clearance of the motor shaft end to be inspected. {i L‘iSi fi] BR CLADE.
4.1.6 Check the electrical permanent wiring. A (EIN HA CHEER.
4.1.7 Make sure the motor rotating direction correct. HLL 141 IE.
4.1.8 Check the quality of the bearing lubricant oil up to standard, the oil level normal. {Ei
FACE TA Os ME TE A
4.1.9 Cheek all bolts (shell, bearing, motor) of the fan tightened properly. Check all keys and
fixed screws tightened. MARUI MOE L, FRE, Bik OREM EER, RE
irr te ANE eR RA.
4.1.10 Check the integrated clearance records of coupling, bearing and impeller hull, meeting
the requirements. A AE Zee MMH UN : SETTAE . AIAR HAG Sh EN LTE EAE ER
4.1.11 Make sure the inlet baffler plate and the outlet shut-off bafile of the fan to be put into
service reliably HiA AUBLIH A PA FER
4.1.12 Confirm all auxiliary equipments of the fan to be adjusted according to the instructions.
RUA FIA BAY LOA FA LRN) SE RH EH
4.1.13 Confirm the rotor to be turned by hand. Wiik$#-F-# LLP.
4.2 Commissioning procedure and check during the trail running jstiz 4b 98 Mish SH lade
4.2.1 Starting steps of ID fan 9] RSL B20 SE
‘The startup sequence of the air fans is: ID fan ---- High Pressure Fan -- PA fan ---SA fan
BA RUBLIEINGUF Aes 5 UL 705 FB UL 2R RL 2K RU,
Open the outlet damper, close the inlet damper, start-up the ID fan motor. JT Wi L144,
RAAT, FAB UL AUAL.
4.2.2 The normal operation and maintenance of the ID fan.4| AUJLIK IE# iz 47 RHE.
4.2.2.1 Check the motor bearings to ensure the oil level normal , the oil quality clear and
transparent , and no leakage .# Ar PLA ARI TEAS, TE TESGAN), Abb AISI
4.2.2.2 Check the access holes, manholes, transmission parts and ducts, to ensure no air
5leakage 2487L. AFL. (ah Mit & PULTE AUR R
4.2.2.3 Check the temperatures of the ID fan motor coil less than 130°C. Monitor the motor
bearing temperature less than 90°C, the fan bearing vibration less than 9 mm/s, the fan bearing
temperature less than 85°C, the motor current in the rated range. #55] UL HAMA (Bl MBE <
130°C, HHBLAWAKIMEE<90°C, PULSAR BIT Iimm/s, RULER AP 85°C, HEEL
RUE BEE.
4.2.2.4 After the fan trial running, check all fixed screws. Ascertain if the screws of hull,
bearings and motor tightened by proper torque. Check the shaft straightness of fan and motor.
Check the fan assembling clearance, to ascertain if the clearance meets the requirement. Check
all fan accessories to ascertain if normal. AUJLiS F424 a BE FT Ai Bd EMR Os TEL Hb
LARLE RES, CRE CER, RLS LT EE, RAE AP RAC
BRE ATE SHER, ROCENT A AAR RUBLE Ia
4.2.3 Shutdown steps of the ID fan | ULE 1:
Close the inlet damper of the ID fan; stop the ID fan; close the outlet damper of the ID fan.3¢/4}
SILA PSR, FRIES] OL, S604) 9] ULE PHAR
4.2.4 The ID fan trip conditions and [&C (instruments & communication) signal test 3] UML
BI A AE TA SR
4.2.4.1 When the ID fan bearing temperature>80°C, the alarm o
induced draft fan bearing
temperature is high" is sent, When the ID fan bearing temperature > 85°C, the ID fan trips. J&
PURARIABE> 80°C, Bt “ 5] RULER” JR; > 85°C ULB.
4.2.4.2 When the ID fan motor bearing temperature>85°C, the alarm of" induced draft fan motor
bearing temperature is high" is sent. When the ID fan motor bearing temperature >90°C, the ID
fan trips. 4] LHL AL WAKA BE > 85°C, B51 UPL HL PLA AR Hn” FB; > 90°C RULE
tae
4.2.4.3 When the ID fan motor coil temperature>125'C, the alarm of " induced draft fan motor
sent. When the ID fan motor coil temperature >130°C, the ID fan
coil temperature is high"
trips. 4] APLIAMLSEAL HE > 125°C, $2 “S| SLEDS HE” HE; > 130°C PLB.
4.2.4.4 When MFT occurs and the second low value of the furnace pressure is reached, the ID
fan trips. MFT 24/6 EP IBEAE J Ae, 31 RLBLBET A4.2.4.5 When the ID fan bearing vibration >9 mm/s, the PA fan trips. 3] MWA ARE
{29 mm/s, 9] RULE.
4.2.4.6 When the ID fan starts 60 seconds and the outlet damper keeps closing, the ID fan trips
5) RUPLI Ta 60s SEH APIECE KA
4.3. Organization of commissioning staff? 41424}
‘The commissioning personnel are responsible for coordinating and instructing the trial
operation, The operation personnel are responsible for operating, data recording and regular
equipment checking. The installation personnel are responsible for on-site equipment inspecting
and maintenance, ik A 5 ft BUA IN PMRHEIE, HT Get Ad fh ote tr Be Be ida
LRA TAT WARE MA RES THE, iBT A TEE L .
5 The duty of the test staff UL A RAH
5.1 Inform the non-test personnel to depart from the site before the test . The staff know the test
responsibility, method and procedure well. The communication system between the on-site and
the control room is ready, so that good teamwork is guaranteed. AEH] NH MI FEI A FAS
Ba, REAR OUR EA TT, 2G, SAE ADU Spat ERE A DR
WMA, ACA, Wikiiete.
5.2 The Operation of power outage and transmission must be executed by the electrical
personnel with operation tickets. Af XW AUBi . REHAPR AF DZ hr HAA AR ET
5.3 If an abnormal condition happened in commissioning process, it should be adjusted and
reported to the supervisor promptly. If something endangering the safety of people or equipment,
correlative tests must be stopped and the fan can be shut down by pressing the on-site emergency
bution. MERWE RAR BL, BITE. JIRA, fen
WHERAFRRGREN, BOM IRE Ce, Wiha esr
5.4 Intensify monitoring the bearing temperature, the bushing vibration and the coil temperature
during the fan trial running. Pay attention to the temperature and vibration, as the specified value
is exceeded, stop and repair the fan if necessary. ALi $4 19) fa] IY JN SE Xt LALA AR ULE. BA BAR
a), Whe DEAL, PHL UIE. HRBNEAR, WSR EHLERS.
5.5 Ascertain the electrical grounding of equipments properly. The clutch shields must be fixed
before the fan startup. Someone must be put in charge of monitoring the fan on-site during thetrial running. Confirm the rotor to be tumed by hand without the clutch connecting. The staff
should stand at a safe distance behind the fan motor when startup. KY #EHA (HE L204 BLT
Poh, RCA Aa. RUINS AIP: RL RT baa aS
TER; ULI SOIT A BA IE CE i] Be Ae HA
5.6 Pay attention to the load of rotary equipments. As the specified current is exceeded, stop the
rotary equipment, examine and repair before continue. is\4a METERS 4E HL Gt fil , EBLAS
PRET, FEAL EL, BBA PEIN, Tet BAS By
Bike
5.7 Set up dedicated channel for the interphone to guarantee communication. (EH Xt, BEE
CH SUE, WARE TIE.
5.8 Keep sundries, garbage and waste etc. out of the site , keep the site clean during the test-ist4&
WALA ELA AD. BE. BER, PRU EE.
5.9 Someone must be put in charge of keeping order, clearing sit and counting noses. MjH4i
DMBEBTE, EATS BAR PEAT TA BUH
system to the on-site power. The electric leakage protection
5.10 Apply the three-phase five wi
device is fixed in the switch box with electric grounding properly. Lighting at night is sufficient.
RAE RRMS MEA, FAA PORE, JPA RIB, PCIE
A ALAS RO 5
5.11 Ensure the commissioning personnel, the operation personnel and the installation personnel
is on duty, so that the equipments safty can be guaranteed. ii 42 AEH AT MA ALE,
CARE BIE ATI A.
5.12 The staff has to abide the “Safety code” and the relevant safety rules strictly in
commissioning, to ensure trial running safe and reliable. S/S IA LEAR DH
7 (2) RWBAKEENLE, WR Lit eA HR.
5.13 Make sure the cooling water system and the lubricant oil system work effectually. #574
RATT 6
6. Control measures of HSE 2242, (R845 P6325 fe ti
6.1 Clean the operator access ways iii UHH.
6.2 Establish safety ladders and scaffolds for operating valves. Pett Wal 148 4 22 & BE ANFRe
63
64
65
66
67
6.8
eR, PHA
Place the permanent fire extinguishers. FLAK ATER A »
Install enclosure and warning signs in the test area.
Put up the "No smoking" signs. 48 1 Jblbiisl.
Put on ear plugs. HIE.
Avoid working in high temperature enviroment for long time. E164 ih {E ME
Keep hands form the rotating components. #811: 4 F/R ANE.
See appendix B JSA.JL/IS8 BISA.7 Appendix [3
Appendix A Pte A
Mamuju 2x25MW Coal-Fired Steam Power Plant
Unit: Specialty: Boiler system: ID fan system
Preconditions and requirements QSL A411
Serial Standards and requirements YES/NO
NOES PERER TBE
|All installation works are complete, the integrated installation records are|
1 Ichecked and accepted. vi RUMI TI 22% LAF, MATTE MEON IR ICR, TE
ae ic i»
S |The fan proper, inlet duct and outlet duct are cleaned up. #}VA RUiL Sei a 11
SEE AAR
3 [The secon lary grouting strength of the equipment meets design requirement.
8 he HES BEI TS
‘The flues, hot and cold air duets , suspensions and supports are installed. The|
‘4. [islet batfler plate and the outlet shutoff baile of the fan ean be put into
|service.tALiit . YMA PALIH Se HARI eee HE. TA LA A dS AF
BITKe
[ihe on-site insiruments of the fan are installed , qualified and auto
lcontrolled. A HLai sh Rett se Het. SHAMIM HI IRL A HH.
B |The on-site lighting is enough, communication system is ready JU3H)/ 44 #6|
JAIN, #04 iii.
|Garbage and sundries around the fan is cleaned, scaffolds are removed,
7 teach is covered. There is nothing ammable and explosive nearby. 4B
FLY SiS Be he eT 7 UA Re HY A aE, EEE 3)
Sa ht»
[The electrical protection ean be put into service normally. The motor idling
8 is qualified and rotating direction is correct. tt’ CTE. ARMA CLE
TEMA, BLE ArH. Ree LI
g |e measuring instruments, audible and visual alarms of the fan can be put|
linto service Ai KHL ATW AR Zeit. FAR BAC IE aE BEHL
IThe Emergency stop button of the fan is qualified. The temperature alarm!
10 [AM Protection system can be put into service, the vibration alarm anal
Iprotection system can be put into service. | DUAL AY iti OF Acti #H ite iE |
Ft, PAL ek SE Dea RS RAP ARE ELAR PE
11 | fhe pre-operation ofthe fan is completed, the interlock protection can be pa
into service.| ABLIMR IE TEM, PR BURIMHE ATE »
12 __ |The cooling water system can be put into service 7 HIACRAEIEM BLA.
13 __[The trip function of the fan is qualified by logic simulating, LEIA HEesos»
(Confirm no sundries and no person in the ESP . All manhole doors are
14 [closed All work-orders are withdrawn. Wi REA AA, BATES
AML CA, CARRE Cla.
15 _ [Document TOP release. TOPICA
Remark:
‘Conclusion ‘The system ready for trial test operation,
it YRS GER.
Acknowledged by
BTM CIDRAZ CE"): Date:
WAR VRLEPRI C284) Date:
FRALEAARAICHEC CF) + Date:
Mee A ARARDM CREF) Date:
SUTEPAARRIELEMKA C8) + Date:za
nd ea sf seine
“HEALw oT00 sonpar or (pga toad) Sayles pani] Tame oa ay BION Buide on]
FPL =emi00y Moyes Sunway,
WAIL s1b10n0 Kayes Susesy, wala
“BEE ZEW aU Kes Fu, pewduosn| —¢
“APRESS, “ung 8 pon sey uo} add
“HAR “wonwonps hopes
Q
TAR Ree NT Fe GY Aap) Ean “aa|YRY 4amod aay We BY | LEG THE
MO} aaefd JeUIaLO yp ye Keys “Bunysiy souyug se suor3an ry Buryins s120!GO iB
ay Suyres
a] aR
aaa
HAMEL HITS “Stuoucdwos Fupei0s ay wuoy spuey deoy | soup
piilsiel 1 Blade separ een TR ab ax PLE sae
YODA Ta WAT HeNNLErAeM ATER E | woudmbs ones | eens eee ane
SBGRR WY SEIN forte tf-sued Funddoup q wsey prone or dnwess | 09 35 ae
Se JO}OW! UPJ AY) PUIYaQ DaUEISIP ayes e Ye pUres pInoys jauuOsiog | — sanrense> pte eo
HUE Rt a a
Reet anenon psc sme | “ame | MaWw| ae]
uauidinby SEAIY | PamOWIDAO BULEOHT | sw009 J0 100]
Wee :
TARA Tuyo wow ays-uo Gsuaw] | —aBeuep ceased aad oe) | tig Som
ee sare uey sry | poreaqrono Bunzeag | Y0-99n] $0 99°71 ee
Gea
uence sete | MaetR eee oH ei So
1uopP9¥ uondiosoq
smeig/oun | soBoueg jenusjog | soainog ysry | “on reas
2 joamna wou
UME MBE AME YUM BGA wowssassy sry 10 /sissqeuy Ayes aor
a3ef g xtpueddyAIGA aa now Sa
“AR BRS SAP BE
“sui Tuo] 20j yuouosALD sumeioduios Ysry ropuN Suyyiom ploay | eH ax gy Bh peae
OE MN Apaeypawun eis paunfn way | — PL suoiau [1 Epa ee =e
gz
FEL SEAT | wR sen
x “
EAN “Be URES ae {3 Buryins sioafao | _ parajdwooun
“soajea Buyesodo 109 splojjeas pue sxappo] Aiayes ysiquissl “way Buypey | yuouruosyaus
FRERRERRCLY-B “shew ssa00e soqesado axp Uea}3 aus
ER dE Y-soysind Wee
“saaysindunxe aay uaueunod ayp 200} aBewep
REILLY TNE MRL | mowdinby exe BERGHE
vor uy 1’ uwonsaioxd
SH “Te HEHE O10 PU ALA * amMsojoUD Sats
en oN+
£09 0 “WRELIMOR “EME
pasoyo sadurep 1910 4c “(Ceyap spuosss 99) Buus ACT,
APE NOLLIGNOD dri
MAAR HY |p (eusoU aumessdursy soyeYs so}0W JC
{RALATBOIGA HW ef [fe auOU aanyeraduta Suyswaq soOW JAIL
ICAL YL euuOU ainye:adwi Fuyeg ICL
SHOR REE
pauado sedwep Buneinar
SE GE
1o"pasopo sodiwep Bu
IC If
nou s9]01 dL
Less (2A14' le NOLLIGNOD TAVIS adr
Nva LAVA GAONGNI : T WALT
SIVA nsaa NOLLONA IIT ‘TWNOIS LONI
: ava
LINO
uaTioa
AUVITIXAY AOLOW MOOTIALNI ¥ AONANOAS
JAOdTU LSAL ALIS
AMIN S7xZ ALAIN OLA
ANVTd YAMOd GANA TVOD
OM 9 xtpueddy| vauva
| “ans
| “a uNNons
we wa) 3a wae |r
sasuvtanoo
Ad GIAOUddY Ad GaSIAWadns ‘Ad SSINLIM | ‘Ad daisal
sa108
CUI OLOEL “SE YEO.STL) SE RETERE- BOA EH
(din 9,0€1 “uuRPE 9, $71) aunyeAdduID} 101s JOO,
CHAIN 2.06 “85HEO.8) ARCATA IA TH
(din 9,06 “were 2,¢8) aumeradurar Supswaq L0r0/N
CAS D.SS “HEB Sel BCR WEA
(4 2,53 “wee 9,98) amnyesodwiay Suywoq ue
as SUG “YF SpunEUS) >Y (eA LA DL
din syuatug “uueye stag y uonergea weg
i)36l BdOOST>C¢ SH Biegy din eqoDSz-> sanssoud aovusnyCHW GE FOE Srans iE Susy >/ eRe din se Aejap sputug ~uATe syumtIS)
eg
fem
(sjuw)uoreaqia
oO ies ak Oo ised 2 ° ae as
Rae Eee HAT ee wae
uo oalup-Uou ue pusanupury — | pus anup-uoe soon, roo ung e4,
(WUE SEY =YQ ey =A (A) Hiv
quaung upseyg
oF “A oA
Rao
$909 1 uonnjona jou
= EE Cn WORT
os TOW ay amEndTa TaE 7 REE Ch worEMp MTL
TLLELT BE (ya) Kipedvoay 766 See Cu ) JONOW JO Wide ey
uospuo 12],
009 HS (ed) aunssaud eros, oll SEES CA) Mod parry
TOL RR CV) WAH PHM 0089 SHEE CA) SBBIIOA PEY
In 24 Se
0% A wer
SE NAMIGE LY woysisqng Jo prosay umy [EL
3¢fl a xtpuaddyu
ora
| uu
| aumpeudig
vag wan 3H zu hida'it
oureu curdwo,
&q pasiaradng, q panoiddy q paisa]. eo
310
aces
uuojeiadg
% | a)"
~
SCE Vv Wea Aa om
ng | uadosedwep Sunpmdoy | yuaum> Suruumy | RA MAMOT
“UO.S8) WE BEH EF ATH (Gin 0,06 “uuEIE -5,¢g) auMeredui BuLIBag 10},
(50.88 “SHED.08) BTCA Gut O,¢8 “uuele 2D, 98) aunreieduy Zuizw0q ue
ae
(2) anal
ae Be
ud aausp-uou ueg
Ea
ua axuip weg
mana
ua 2aup-t10U 10
rea ee
ud 9aL.p OVOP
a
sr ——_|Appendix E #8 E
Mamuju 2x25MW Coal-Fired Steam Power Plant
Specialty: Boiler system: ID fan system
System commissioning form AS WiAz
No. Item Result Remarks
een ID fan 4 RL
Items iF
XinxiangXima Fan Co, Lid
Manufacturer iti) iS OIG PIATRA
Mode 7% Centrifugal BOs
Type 425 = 2450BSBF65B
Flow rate if t 272772 m'fh
1 [Total pressure 41k 6700 Pa
Medium temp Jat f 153°C
Medium density $15 5 0.819 kgm
Product number Hi) ii 160604005,
Date We 11 2016.06
Model %! 5 YKKS003-6WFL
Motor HE | Power 33% 710 kW
Seah [Curent RE TTA
Voltage Hi FE 6300 V
‘The check before ID fan startup {| KUL cat KBE
1 Confirm no sundries and no person in the fan and the duets
again. UCHR BLAME CAM, PYAIEA THE
2 Check all rotating components shields to make sure installed
and fixed well. Re PEUbiA 41 Hea HE MIB5 7H See
te
3 Make sure the clearance between impeller and shell to be
inspected. 1H-#25 7: (A (A BRL HE.
4 Confirm the monitor instruments and the interlock function
worrect, Hi BMAR Be AICHE IR IIMB) Dh fs TE 5
5 Make sure the clearance of the motor shaft end to be
inspected. HLH] Ctra 5
6 Check the electrical permanent wiring. *k A HE( HA CHAE.
7 Make sure the motor rotating direction correct. MiAL# [IE
Ti.
8 Check the quality of the bearing lubricant oil up to standard,
the oil level normal. #2: Saif YU WE Cr MM
9 Check all bolts (shell, bearing, motor) of the fan tightened
properly. Check all keys and fixed screws tightened. 2 HL
ARTO L. Hak, Bik OUR EMEEER, Bett
APA BERNA EMR 2 TAN.
10 Check the integrated clearance records of coupling, bearingand impeller hull, meeting the requirements. frit 2:4 Bj
ESO PTE. AAR. RAP AS PAR CRT REE AE OE,
11 Make sure the inlet baffler plate and the outlet shut-off
baffle of the fan to be put into service reliably. AliA BUILIN AFI
PRADHK.
12 Confirm all auxiliary equipments of the fan to be adjusted
according to the instructions. Hi Wit AA ALIN ok
PRUE RM.
13 Confirm the rotor to be turned by hand. fiitih$8-F AT LAE
2).
Starting steps of ID fan 1 ABLE @ DSR
The startup sequence of the air fans is: ID fan — High
Pressure Fan -—- PA fan ---SA fan Bay RUALASIFE ME: 3] UBL
on AEE RB Ln UH AL
‘Open the outlet damper, close the inlet damper, start-up the ID
fan motor. Fiat CHAK, SATS, 1305] PULLS
‘The normal operation and maintenance of the ID fan.%| JHLiN
TEM I2 AT AED.
1 Check the motor bearings to ensure the oil level normal , the
oil quality clear and transparent , and no leakage fs #EHLALSH
FRTNELIEM, THTTAWGAOT, fia ube.
2. Check the access holes, manholes, transmission parts and
ducts, to ensure no air leakage. AVE FL. ATL. {abit 2
SEER LBL
3 Check the temperatures of the ID fan motor coil less than 130
“C. Monitor the motor bearing temperature less than 90°C. the
fan bearing vibration tess than 9 mm/s, the fan bearing
temperature less than 85°C, the motor current in the rated
range. AE 5] KUL BLER AMA RE <130°C, HULA HAE <90
C, PUBL AI) T Limmis, RUILMAKILNE ST 85°C.
HPL HHL ELE TE HS.
4 After the fan trial running, check all fixed screws. Ascertain if
the screws of hull, bearings and motor tightened by proper
torque. Check the shaft straightness of fan and motor. Check
the fan assembling clearance, to ascertain if the clearance meets
the requirement. Check all fan accessories to ascertain if
moral, RAL i 245 fe HS Aa UB AR Ts YE LH
REMMLEREHR, WEREGOER, RARULAS
FLT ELE, PERU AACA ABER, MATT
RRB (ERAS TE A
‘Shutdown steps of the ID fan 3] ALE
Close the inlet damper of the ID fan; stop the ID fan; close the
outlet damper of the ID fan. 2/3] WLA HAAR, HES] Bl
Bhs AVS ASL IK
‘The ID fan trip conditions and 1&C (instruments &
communication) signal test 4] AUILBKIR A(t JH TAR i8
1 When the ID fan bearing temperature>80°C, the alarm of *
induced draft fan bearing temperature is high" is sent. When
the ID fan bearing temperature > 85°C, the ID fan tips. UBL
SACRLRE> 80°C, 32.“ 5] RUPLAWRIRIN RH” HERE, > 85°C DL
‘HUBLI
2 When the ID fan motor bearing temperature>85°C, the alarm
of " induced draft fan motor bearing temperature is high" is
sent, When the ID fan motor bearing temperature >90°C, the ID
fan trips. HLS LSW ARLE 85°C, “| AOL ALLA
ITE” HF: >90'C PLB.
3 When the ID fan motor coil temperature>125°C, the alarm of
"induced draft fan motor coil temperature is high” is sent.
When the ID fan motor coil temperature >130°C, the ID fan
trips. 3] UL tL AME > 125°C, 22 “ H] UL LALEtL
15" HR: > 130°C DHLBEIA.
4 When MPT occurs and the second low value of the furnace
pressure is reached, the ID fan trips. MFT ff HJ?" Af
AH, WLR.
5 When the ID fan bearing vibration >9 mn, the PA fan trips.
SULA RAR AKAN AEAHL 9 mm/s, 3] ULE
6 When the ID fan starts 60 seconds and the outlet damper
keeps closing, the ID fan trips. 4] HBL 477 60s Ft LAB
iBEA A
Remark:
Acknowledged by
TAR ACZOILEPRI (AES) + Date:
FRELAUIARAUCHEC (AEF) Date:
MISE MMIARZERDM CHEF + Date:
JRTEPURAELEMKA (25%) + Date:
2»ID fan System Quality Control Table 4| KLAR GRP Z
Ttems Unit | Quality requirement Method Test Result
eA Sete bree RA RAR
Correct Observe
iE WR
Bearing TEMP an [Check running record
suru HMR
ae mms |<6.3 FRMIEIER
Interlock & protection ‘Operate automatically, correeily | Test & record
neta SADA, aE se WRI
Insulate damper JOpen and close operate) cack in the local
correctly.
a SePHMLEL AT. syst
See
‘Open and close operate
Regulating damper
correctly.
‘Check in the local
TAT seit
i seme icm. abteseig — CORRS
|Current 7 Meet instruments requires Observe local meters:
tit acriOABMER eRe
Calibrate work finished,
Aic ow measure device [Condition displayed in DCS is| Check record
PAR HEN comect Trias
Chive RTE
| Cooling water system Meet designed requires Check in the local
WMA RB AW SER Sse
Remark
|Conclusion ‘The quality of the system meets the above criteria,
ie RRR A EE.
ie AaLfeHe CEE) DRAZ sien) + Date:
WRC CEE) ILEPRI (sign) Date:
cet C8") CHEC Csign) + Date:
WAEMMIARRE CFD RDM (sign) Date:
SUUENMIARE CES) ELEMKA (sign) + Date:
2‘Saas MEE nha oT
Nill
alll
‘Sa Tn WV LVI GRONONT
(EXD vemnnsomezer----~
eas
-meanome vnapsaney CS hewawnemnes
£2)
rysava ane ens sor)
Sesaca tamarar sar “KEES
AXA a cipuaddyTIRES ST
‘Era
poarar rea OLE
i
ij%
sara + ASS) VINETA CE) SN UWI
sored WAY (253%) WEAR
raed, * (BIS) OHO GEE) Waa
sored # CUBIS) RAdaTE CER) AY AAA
sow * (uBis) ZVAC (ERE) AL
ayes USATp-IOTOUN FINO We Yop paaRET
ae ee
ZOOVVOLVNHOZ,
3a]ea [ONO >NTUPIONOW
‘aay ap poonpa
Bish ole IMIS
100VVOLVNHOZ
syreusy
unsoy
DalwA a0;
fe
ENTINTII6)
bate
ETN
ae
SOS
5 xipuoddy