BOQ
Description of work Drawing
ITEM
`
QUANTITY CALCULATION
BOQ
Description of work Drawing
ITEM
+12.56
+13.754
+13.084
POTONGAN Ts4 - Ts4
SECTION
+13.854
+13.154 +13.154
+12.494
Culvert L = 25.00 m
Area = 14.01 m2
Volume = area x L1
= 14.01 x 25.00
= 350.25 m3 350.25 m3
Area = 6.69 m2
Volume = area x L1
= 6.69 x 17.20
= 115.07 m3 115.07 m3
Volume = area x L1
= 2.74 x 13.64
= 37.37 m3 37.37 m3
SEGMENT-4 0.00 m3
Potongan Ts2-Ts2 L = m
Area J = 0.70 m2
Volume = area x L
= 0.70 x 0.00
= 0.00 m3
SEGMENT-5 0.00 m3
Potongan Ts4-Ts4 L = m
Area J = 1.51 m2
Volume = area x L
= 1.51 x 0.00
= 0.00 m3
SEGMENT-6 0.00 m3
Potongan Ts4-Ts4 L = m
Area J = 1.09 m2
Volume = area x L
= 1.09 x 0.00
= 0.00 m3