No health effect 1 1 1 1
1 Rarely construction No specific requirement
/injury /No damage.
industry
Incident
Minor health (illness)
happened in our
effect / injury (Keeps 3 3 3 Specific requirement not 3
3 once in a week organization /
person away from work complied.
company 2-3
2-3 days.)
times in a year.
Happened
Fatal\Permanent loss
5 5 several times in a 5 5
5 of organs\functions continuous Needs full compliance
year in our
(eyes, legs, hands.)
sites/company
Risk Evaluation
LOW: MODERATE: HIGH:
IMPACT RISK UPTO 30 IMPACT RISK 31 TO 60 IMPACT RISK 61 & ABOVE
Risk Assessment/Management Form
Permanent/Temp
Noise Use of good quality nose musk
Drilling work done orary hearing loss
1
by Drilling m/c
Only authorised persons are allowed for
working at height
Work to be done after taking the height
permit
Height work Get injury/Fatality 5 1 2 4 40 Yes Moderate Use double rope full body harness and 4 1 2 3 24
it must be anchored above the head
height.
Use of safety shoe,Helmet with chin
strip,Hand gloves & Jacket
2of12
Risk Assessment/Management Form
Exotic innovations pvt ltd.
Section / Dept: civil/interior Location/Area - Razorpay
Activity: Risk Assessment-Dismantling of brick wall.Rev-O1/EIPL/RP
Dismantling of
3
brick wall . Concrete dust 4 1 2 3 24 Yes Low 3 1 2 3 18
arising out of Use of nose mask.
dismantling work
Stacking of
dismantled Shifting of dismantled material to designated place.
materials.
3of12
Risk Assessment/Management Form
Permanent/Temp
Chipping work Noise Use of good quality nose musk
orary hearing loss
1 done by Chipping
m/c Only authorised persons are allowed
for working at height
Work to be done after taking the height
permit
Height work Get injury/Fatality 5 1 2 5 50 Yes Moderate Use double rope full body harness and 4 1 2 4 32
it must be anchored above the head
height.
Use of safety shoe,Helmet with chin
strip,Hand gloves & Jacket
4of12
Risk Assessment/Management Form
Chipping work
2 Chipping activity to be carried on sitting
by manually Flying of
Get injury 3 2 2 2 24 Yes Low inside the jhola which is to be hanged 3 1 2 2 12
materials
with reject silo wall.While changing the
position of work place.People shall go
carefully from jhola sitting on the
beam/girder with anchoring safety
harness.Anchoring facility shall be
made to anchor the harness
6of12
Risk Assessment/Management Form
7of12
Risk Assessment/Management Form
8of12
Risk Assessment/Management Form
9of12
Risk Assessment/Management Form
10of12
Risk Assessment/Management Form
11of12
Risk Assessment/Management Form
Working at Get
2 Fall of man 4 1 2 2 16 Yes Low 3 1 2 2 12
height injury/Fatality Working plateorm if required to be made for
every 2.1m with double railings,toeguard and
scaffolding staging ladder as access whose
rungs are not spaced greater than 500mm
12of12